Mario Russo
- Listed as
- architect
- Firm
- Palazzo Projects
- Based in
- San Francisco
- On San Francisco permits
- Sep 2025 to Aug 2026
8 permits since 2000 (architect on 8 permits): 1 completed, 7 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Aug 2026 | 81 Manchester St | Cma Development Inc | revision to approved permit 202506118433. replacement of e roof framing above living area. partial replacment of e floor framing below kitchen area.Details
revision to approved permit 202506118433. replacement of e roof framing above living area. partial replacment of e floor framing below kitchen area. | $40,000 |
| Jul 1, 2026 | In progress filed Jul 2026, not yet issued | 689 20th Av | adu conversion of level 1 habitable space per state program including new kitchen installation.Details
adu conversion of level 1 habitable space per state program including new kitchen installation. | $5,000 | |
| Jun 8, 2026 | Completed final sign-off Aug 2026 | 2111 Hyde St | Olcan Construction Inc | interior alteration to update fixtures in primary bedroom, and add one half bathroom in existing closet. no wall removal.Details
interior alteration to update fixtures in primary bedroom, and add one half bathroom in existing closet. no wall removal. | $30,000 |
| Jan 30, 2026 | In progress issued Mar 2026 | 1212 Maryland St | Swinerton Builders | tenant improvement at ground fl of the sophie maxwell building. work includes buildout of retail display area, showroom, sales center, bathroom, support spaces.Details
tenant improvement at ground fl of the sophie maxwell building. work includes buildout of retail display area, showroom, sales center, bathroom, support spaces. | $225,000 |
| Jan 15, 2026 | In progress filed Jan 2026, not yet issued | 1241 Delaware St | mayor dir ed13-01: admin bldg- lvl 1- prequel park- potrero power station dev-cold shell remodel for future cafe or restaurant, new elevator, restrooms and mep area. storefront work-partial demo of exterior facade to be replace w/new storefront systems and sectional doors. partial demo of mezzanine.Details
mayor dir ed13-01: admin bldg- lvl 1- prequel park- potrero power station dev-cold shell remodel for future cafe or restaurant, new elevator, restrooms and mep area. storefront work-partial demo of exterior facade to be replace w/new storefront systems and sectional doors. partial demo of mezzanine. | $1,500,000 | |
| Jan 1, 2026 | In progress issued May 2026 | 81 Manchester St | Cma Development Inc | level 1:adu convertion per state prgm include: partition for separate entrance from garage.level 2: replace siding @ street & backyard facade & replace window @ street facade in kind.removal (e) fireplace. (n) en-suite bathrm & closet in master bedrm.reconfiguration of existing bathroom and laundryDetails
level 1:adu convertion per state prgm include: partition for separate entrance from garage.level 2: replace siding @ street & backyard facade & replace window @ street facade in kind.removal (e) fireplace. (n) en-suite bathrm & closet in master bedrm.reconfiguration of existing bathroom and laundry | $180,000 |
| Dec 19, 2025 | In progress issued Jun 2026 | 1283 Delaware St | Plant Construction Co, Lp | priority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partial demolition of concrete header above existing door. structural retrofit including new foundation piles, a new mat slab and a new interior reinforcement wall.Details
priority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partial demolition of concrete header above existing door. structural retrofit including new foundation piles, a new mat slab and a new interior reinforcement wall. | $1,500,000 |
| Sep 9, 2025 | In progress issued Feb 2026 | 351 Hill St | Maguire Construction | single family residence remodel + addition of adu unit at ground level. vertical addition to add 3rd level. (n) roof, improvements: floor reconfiguration, (n) windows, (n) facade, (n) rear decksDetails
single family residence remodel + addition of adu unit at ground level. vertical addition to add 3rd level. (n) roof, improvements: floor reconfiguration, (n) windows, (n) facade, (n) rear decks | $900,000 |