Permit GraphShortlistSan Francisco building permits since 2000

Paul Littler

License
S6189
Structural engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up S6189 at the Board for Professional Engineers
Listed as
authorized agent-others, engineer
Firm
Holmes Structural
Based in
San Francisco
On San Francisco permits
Nov 2019 to Oct 2026

26 permits since 2000 (engineer on 24 permits, authorized agent-others on 2 permits): 8 completed, 17 in progress, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Novo Construction Inc (7), Brandenburg Industrial Service Company (5), Principal Builders Inc. (3), Hillhouse Construction Company Inc (2), Spnr Built Inc. (2), Plant Construction Co, Lp, Terra Nova Industries
Architects
Marc Penninger (3), Marc Pfenninger (3), Mario Russo (2), Mattew Usbeck (2), Ryan Leidner (2), Babac Doane, Eric James Mersmann, Greg Sheppard, Landscape Archtect Andrea Cochran, Michael Stanton, Patrick Daly, Wendy Woo
Engineers
Aditya Paranjape (2), Jose Herrera (2), Amit Wadhwa, Civil Engineer Angelo Obertello, Debbie Grieves, James Bradshaw, Jeffrey Ouellette, Joseph Fay, Levi Abarte, Scott F Arnold, Seth Sherman
Subcontractors
Eric James Mersmann

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 27, 2026In progress
issued Nov 2026
149 New Montgomery StHillhouse Construction Company Incengineering and stair details deferred submittal for stair#: 2. ref pa#: 202512111568 and 202605111058.
Details
Permit
202610279942
Permit issued
Nov 5, 2026

engineering and stair details deferred submittal for stair#: 2. ref pa#: 202512111568 and 202605111058.

Open the permit page

Oct 9, 2026In progress
filed Oct 2026, not yet issued
300 Howard St14th and 15th floor: t.i. for interconnecting stars. new floor opening and construction. ref # 14th floor: 202609238502 and 15th floor: 202609017538
Details
Permit
202610099281

14th and 15th floor: t.i. for interconnecting stars. new floor opening and construction. ref # 14th floor: 202609238502 and 15th floor: 202609017538

Open the permit page

$531,770
Sep 17, 2026In progress
issued Oct 2026
300 Howard StNovo Construction Inc3rd & 4th floors: t.i. including new interior walls, ceilings, millwork and finishes.
Details
Permit
202609178288
Permit issued
Oct 19, 2026

3rd & 4th floors: t.i. including new interior walls, ceilings, millwork and finishes.

Open the permit page

$15,451,442
Sep 1, 2026In progress
issued Oct 2026
300 Howard StNovo Construction Inc5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishes
Details
Permit
202609017533
Permit issued
Oct 8, 2026

5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishes

Open the permit page

$15,451,442
Jul 7, 2026In progress
issued Jul 2026
300 Howard StNovo Construction Inc9/f: structural upgrades to accommodate future tenant buildout.
Details
Permit
202607074613
Permit issued
Jul 27, 2026

9/f: structural upgrades to accommodate future tenant buildout.

Open the permit page

$135,000
Jul 6, 2026In progress
issued Aug 2026
300 Howard StNovo Construction Inc16th fl: structural upgrades to accommodate future tenant buildout
Details
Permit
202607064589
Permit issued
Aug 24, 2026

16th fl: structural upgrades to accommodate future tenant buildout

Open the permit page

$165,000
Jul 1, 2026In progress
filed Jul 2026, not yet issued
1241 Delaware Stmayor dir ed13-01: unit 3-prequel park- potrero power station dev- temp park use & back of house maintenance space(not occupiable to public), under footprint of unit 3 structure. (n)pathways, railings, paving & lighting (deferred). misc, structural work for back on house raised platform on mat slab.
Details
Permit
202512051066

mayor dir ed13-01: unit 3-prequel park- potrero power station dev- temp park use & back of house maintenance space(not occupiable to public), under footprint of unit 3 structure. (n)pathways, railings, paving & lighting (deferred). misc, structural work for back on house raised platform on mat slab.

Open the permit page

$1,500,000
Jun 23, 2026In progress
issued Aug 2026
300 Howard StNovo Construction Inc2 : structural upgrades to accommodate future tenant buildout
Details
Permit
202606233762
Permit issued
Aug 10, 2026

2 : structural upgrades to accommodate future tenant buildout

Open the permit page

$200,000
May 11, 2026In progress
issued Jun 2026
149 New Montgomery StHillhouse Construction Company Incroof floor-revision 202512111568- replace roof membrane throughout roof drainage, cricketing and waterproofing to perform new work. roof framingstructural upgrade at area of work. upgrade and extend elevator at roof
Details
Permit
202605111058
Permit issued
Jun 8, 2026

roof floor-revision 202512111568- replace roof membrane throughout roof drainage, cricketing and waterproofing to perform new work. roof framingstructural upgrade at area of work. upgrade and extend elevator at roof

Open the permit page

Jan 15, 2026In progress
filed Jan 2026, not yet issued
1241 Delaware Stmayor dir ed13-01: admin bldg- lvl 1- prequel park- potrero power station dev-cold shell remodel for future cafe or restaurant, new elevator, restrooms and mep area. storefront work-partial demo of exterior facade to be replace w/new storefront systems and sectional doors. partial demo of mezzanine.
Details
Permit
202512081182

mayor dir ed13-01: admin bldg- lvl 1- prequel park- potrero power station dev-cold shell remodel for future cafe or restaurant, new elevator, restrooms and mep area. storefront work-partial demo of exterior facade to be replace w/new storefront systems and sectional doors. partial demo of mezzanine.

Open the permit page

$1,500,000
Dec 19, 2025In progress
issued Jun 2026
1283 Delaware StPlant Construction Co, Lppriority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partial demolition of concrete header above existing door. structural retrofit including new foundation piles, a new mat slab and a new interior reinforcement wall.
Details
Permit
202511250462
Permit issued
Jun 25, 2026

priority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partial demolition of concrete header above existing door. structural retrofit including new foundation piles, a new mat slab and a new interior reinforcement wall.

Open the permit page

$1,500,000
Oct 14, 2025In progress
issued Feb 2026
500 Terry A Francois BlNovo Construction Incground floor ti work includes refresh of tenant spaces north and main lobby and full ti to suite soth main lobby. partitions, fixtures and finishes and associated mep
Details
Permit
202510147300
Permit issued
Feb 24, 2026

ground floor ti work includes refresh of tenant spaces north and main lobby and full ti to suite soth main lobby. partitions, fixtures and finishes and associated mep

Open the permit page

$5,263,755
Sep 24, 2025In progress
issued Sep 2025
2859 22nd StSpnr Built Inc.revision to permit 202009254954. replace (e) masonry front wall in-kind with new brick-clad framed wall. revised title 24 report. reduce height of (e) south wall to 10 ft
Details
Permit
202509246039
Permit issued
Sep 26, 2025

revision to permit 202009254954. replace (e) masonry front wall in-kind with new brick-clad framed wall. revised title 24 report. reduce height of (e) south wall to 10 ft

Open the permit page

Jul 2, 2025In progress
issued Aug 2025
500 Terry A Francois BlNovo Construction Inc3rd floor: interior alteration of existing tenant space, including light touch alterations, including finishes, fixture and equipment. mep included.
Details
Permit
202507029993
Permit issued
Aug 26, 2025

3rd floor: interior alteration of existing tenant space, including light touch alterations, including finishes, fixture and equipment. mep included.

Open the permit page

$4,790,589
May 28, 2025In progress
issued Aug 2025
550 Terry A Francois BlPrincipal Builders Inc.**ab004: deferred slab strengthening frp for pa# 202412247379.
Details
Permit
202505206865
Permit issued
Aug 21, 2025

**ab004: deferred slab strengthening frp for pa# 202412247379.

Open the permit page

$15,000
Jan 28, 2025Completed
final sign-off Aug 2026
550 Terry A Francois BlPrincipal Builders Inc.structural slab openings and perimeter shaft walls: (2) shaft wall locations at level 1; (2) slab opening and shaft wall location at level 2; (1) slab opening and shaft wall locations at level 3 thru 6
Details
Permit
202412247379
Permit issued
May 6, 2025
Final sign-off
Aug 12, 2026

structural slab openings and perimeter shaft walls: (2) shaft wall locations at level 1; (2) slab opening and shaft wall location at level 2; (1) slab opening and shaft wall locations at level 3 thru 6

Open the permit page

$694,000
Sep 26, 2024Completed
final sign-off Nov 2024
460 Townsend StPrincipal Builders Inc.1f - installation of an rf chamber. includes structural support & anchorage
Details
Permit
202409261681
Permit issued
Oct 7, 2024
Final sign-off
Nov 19, 2024

1f - installation of an rf chamber. includes structural support & anchorage

Open the permit page

$50,000
Jan 2, 2024Completed
final sign-off Dec 2024
420 23rd StBrandenburg Industrial Service Companyrevision to 202305057250 due field condition for additional details for resupport of e walkways south of existing control room
Details
Permit
202401023318
Permit issued
Jan 5, 2024
Final sign-off
Dec 2, 2024

revision to 202305057250 due field condition for additional details for resupport of e walkways south of existing control room

Open the permit page

$7,000
Aug 30, 2023Completed
final sign-off Oct 2024
420 23rd StBrandenburg Industrial Service Companyselect demolition includes removal of selected concrete walls to create (n) openins thru (e) concrete turbine platform.
Details
Permit
202308305599
Permit issued
Sep 14, 2023
Final sign-off
Oct 31, 2024

select demolition includes removal of selected concrete walls to create (n) openins thru (e) concrete turbine platform.

Open the permit page

$200,000
May 5, 2023Completed
final sign-off May 2024
420 23rd StBrandenburg Industrial Service Companyunit 3 bldg - mayoral ed 17-02. removal (e) steel boiler unit, and all associated non-structral equipment. a condenser unit, three intake pumps cooking water heat exchanger per ab-017
Details
Permit
202305057239
Permit issued
Jun 12, 2023
Final sign-off
May 28, 2024

unit 3 bldg - mayoral ed 17-02. removal (e) steel boiler unit, and all associated non-structral equipment. a condenser unit, three intake pumps cooking water heat exchanger per ab-017

Open the permit page

$600,000
May 5, 2023Completed
final sign-off May 2024
420 23rd StBrandenburg Industrial Service Companymayoral ed-17-02 removal of existing concrete encased partial steel control room building to slab on grade. 2. floating concrete slab connecting control room back to turbine platform. per ab-017.
Details
Permit
202305057250
Permit issued
Jun 12, 2023
Final sign-off
May 28, 2024

mayoral ed-17-02 removal of existing concrete encased partial steel control room building to slab on grade. 2. floating concrete slab connecting control room back to turbine platform. per ab-017.

Open the permit page

$30,000
May 4, 2023Completed
final sign-off Jun 2024
420 23rd StBrandenburg Industrial Service Companymayoral ed-17-02: removal of cutout demo of (e) office building only non-structurl demo to remove partitions within building, removal of rooftop locker wash house room located on top of office building roof
Details
Permit
202305047141
Permit issued
May 18, 2023
Final sign-off
Jun 24, 2024

mayoral ed-17-02: removal of cutout demo of (e) office building only non-structurl demo to remove partitions within building, removal of rooftop locker wash house room located on top of office building roof

Open the permit page

$40,000
Dec 29, 2022Completed
final sign-off Apr 2025
335 Powell Stminor permit to alter application requst to convert 2 roof decks on the 2/f east side of the building facing union square to occupied decks for social events. access will be through (e) windows that will be changed to doors. the adjacent meeting rooms will be reconfigured.
Details
Permit
202212299387
Permit issued
Jan 29, 2024
Final sign-off
Apr 14, 2025

minor permit to alter application requst to convert 2 roof decks on the 2/f east side of the building facing union square to occupied decks for social events. access will be through (e) windows that will be changed to doors. the adjacent meeting rooms will be reconfigured.

Open the permit page

$345,000
Apr 21, 2021Never finaled
issued May 2021, no final
717 Battery StTerra Nova Industries1st flr: new glass and steel partition at (e) bar in (e) restaurant dining room, n.w corner of building. new double acting door, new built in seating and new floor finishes within enclosed area. no change to bar, bar equipment, flor levels, occupancies, occupant loads or exist paths.
Details
Permit
202104219033
Permit issued
May 25, 2021

1st flr: new glass and steel partition at (e) bar in (e) restaurant dining room, n.w corner of building. new double acting door, new built in seating and new floor finishes within enclosed area. no change to bar, bar equipment, flor levels, occupancies, occupant loads or exist paths.

Open the permit page

$120,000
Sep 25, 2020In progress
issued Jul 2025
2859 22nd StSpnr Built Inc.vertical addition. change of use and change of occupancy from religious building to multi-family residence. interior renovation to an exist non residential bldg, interior demo. all exist. perimeter walls to remain.
Details
Permit
202009254954
Permit issued
Jul 8, 2025

vertical addition. change of use and change of occupancy from religious building to multi-family residence. interior renovation to an exist non residential bldg, interior demo. all exist. perimeter walls to remain.

Open the permit page

$600,000
Nov 14, 2019In progress
issued Nov 2024
5 03rd Stchange of use and occupancy from office to hotel inclusive w/ guest rooms & amenities, including restaurant/bar @ ground floor, lobby, retail shop, fitness center, event/meeting space(s), offices & a rooftop lounge/restaurant/bar type 3b over 1a construction 135 hotel guest rooms
Details
Permit
201911147319
Permit issued
Nov 21, 2024

change of use and occupancy from office to hotel inclusive w/ guest rooms & amenities, including restaurant/bar @ ground floor, lobby, retail shop, fitness center, event/meeting space(s), offices & a rooftop lounge/restaurant/bar type 3b over 1a construction 135 hotel guest rooms

Open the permit page

$43,000,000