23 permits since 2000 (engineer on 21 permits, authorized agent-others on 2 permits): 8 completed, 14 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | 5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishesDetails
5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishes | $15,451,442 | |
| Jul 7, 2026 | In progress issued Jul 2026 | 300 Howard St | Novo Construction Inc | 9/f: structural upgrades to accommodate future tenant buildout.Details
9/f: structural upgrades to accommodate future tenant buildout. | $135,000 |
| Jul 6, 2026 | In progress issued Aug 2026 | 300 Howard St | Novo Construction Inc | 16th fl: structural upgrades to accommodate future tenant buildoutDetails
16th fl: structural upgrades to accommodate future tenant buildout | $165,000 |
| Jul 1, 2026 | In progress filed Jul 2026, not yet issued | 1241 Delaware St | mayor dir ed13-01: unit 3-prequel park- potrero power station dev- temp park use & back of house maintenance space(not occupiable to public), under footprint of unit 3 structure. (n)pathways, railings, paving & lighting (deferred). misc, structural work for back on house raised platform on mat slab.Details
mayor dir ed13-01: unit 3-prequel park- potrero power station dev- temp park use & back of house maintenance space(not occupiable to public), under footprint of unit 3 structure. (n)pathways, railings, paving & lighting (deferred). misc, structural work for back on house raised platform on mat slab. | $1,500,000 | |
| Jun 23, 2026 | In progress issued Aug 2026 | 300 Howard St | Novo Construction Inc | 2 : structural upgrades to accommodate future tenant buildoutDetails
2 : structural upgrades to accommodate future tenant buildout | $200,000 |
| May 11, 2026 | In progress issued Jun 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | roof floor-revision 202512111568- replace roof membrane throughout roof drainage, cricketing and waterproofing to perform new work. roof framingstructural upgrade at area of work. upgrade and extend elevator at roofDetails
roof floor-revision 202512111568- replace roof membrane throughout roof drainage, cricketing and waterproofing to perform new work. roof framingstructural upgrade at area of work. upgrade and extend elevator at roof | |
| Jan 15, 2026 | In progress filed Jan 2026, not yet issued | 1241 Delaware St | mayor dir ed13-01: admin bldg- lvl 1- prequel park- potrero power station dev-cold shell remodel for future cafe or restaurant, new elevator, restrooms and mep area. storefront work-partial demo of exterior facade to be replace w/new storefront systems and sectional doors. partial demo of mezzanine.Details
mayor dir ed13-01: admin bldg- lvl 1- prequel park- potrero power station dev-cold shell remodel for future cafe or restaurant, new elevator, restrooms and mep area. storefront work-partial demo of exterior facade to be replace w/new storefront systems and sectional doors. partial demo of mezzanine. | $1,500,000 | |
| Dec 19, 2025 | In progress issued Jun 2026 | 1283 Delaware St | Plant Construction Co, Lp | priority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partial demolition of concrete header above existing door. structural retrofit including new foundation piles, a new mat slab and a new interior reinforcement wall.Details
priority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partial demolition of concrete header above existing door. structural retrofit including new foundation piles, a new mat slab and a new interior reinforcement wall. | $1,500,000 |
| Oct 14, 2025 | In progress issued Feb 2026 | 500 Terry A Francois Bl | Novo Construction Inc | ground floor ti work includes refresh of tenant spaces north and main lobby and full ti to suite soth main lobby. partitions, fixtures and finishes and associated mepDetails
ground floor ti work includes refresh of tenant spaces north and main lobby and full ti to suite soth main lobby. partitions, fixtures and finishes and associated mep | $5,263,755 |
| Sep 24, 2025 | In progress issued Sep 2025 | 2859 22nd St | Spnr Built Inc. | revision to permit 202009254954. replace (e) masonry front wall in-kind with new brick-clad framed wall. revised title 24 report. reduce height of (e) south wall to 10 ftDetails
revision to permit 202009254954. replace (e) masonry front wall in-kind with new brick-clad framed wall. revised title 24 report. reduce height of (e) south wall to 10 ft | |
| Jul 2, 2025 | In progress issued Aug 2025 | 500 Terry A Francois Bl | Novo Construction Inc | 3rd floor: interior alteration of existing tenant space, including light touch alterations, including finishes, fixture and equipment. mep included.Details
3rd floor: interior alteration of existing tenant space, including light touch alterations, including finishes, fixture and equipment. mep included. | $4,790,589 |
| May 28, 2025 | In progress issued Aug 2025 | 550 Terry A Francois Bl | Principal Builders Inc. | **ab004: deferred slab strengthening frp for pa# 202412247379.Details
**ab004: deferred slab strengthening frp for pa# 202412247379. | $15,000 |
| Jan 28, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | structural slab openings and perimeter shaft walls: (2) shaft wall locations at level 1; (2) slab opening and shaft wall location at level 2; (1) slab opening and shaft wall locations at level 3 thru 6Details
structural slab openings and perimeter shaft walls: (2) shaft wall locations at level 1; (2) slab opening and shaft wall location at level 2; (1) slab opening and shaft wall locations at level 3 thru 6 | $694,000 |
| Sep 26, 2024 | Completed final sign-off Nov 2024 | 460 Townsend St | Principal Builders Inc. | 1f - installation of an rf chamber. includes structural support & anchorageDetails
1f - installation of an rf chamber. includes structural support & anchorage | $50,000 |
| Jan 2, 2024 | Completed final sign-off Dec 2024 | 420 23rd St | Brandenburg Industrial Service Company | revision to 202305057250 due field condition for additional details for resupport of e walkways south of existing control roomDetails
revision to 202305057250 due field condition for additional details for resupport of e walkways south of existing control room | $7,000 |
| Aug 30, 2023 | Completed final sign-off Oct 2024 | 420 23rd St | Brandenburg Industrial Service Company | select demolition includes removal of selected concrete walls to create (n) openins thru (e) concrete turbine platform.Details
select demolition includes removal of selected concrete walls to create (n) openins thru (e) concrete turbine platform. | $200,000 |
| May 5, 2023 | Completed final sign-off May 2024 | 420 23rd St | Brandenburg Industrial Service Company | mayoral ed-17-02 removal of existing concrete encased partial steel control room building to slab on grade. 2. floating concrete slab connecting control room back to turbine platform. per ab-017.Details
mayoral ed-17-02 removal of existing concrete encased partial steel control room building to slab on grade. 2. floating concrete slab connecting control room back to turbine platform. per ab-017. | $30,000 |
| May 5, 2023 | Completed final sign-off May 2024 | 420 23rd St | Brandenburg Industrial Service Company | unit 3 bldg - mayoral ed 17-02. removal (e) steel boiler unit, and all associated non-structral equipment. a condenser unit, three intake pumps cooking water heat exchanger per ab-017Details
unit 3 bldg - mayoral ed 17-02. removal (e) steel boiler unit, and all associated non-structral equipment. a condenser unit, three intake pumps cooking water heat exchanger per ab-017 | $600,000 |
| May 4, 2023 | Completed final sign-off Jun 2024 | 420 23rd St | Brandenburg Industrial Service Company | mayoral ed-17-02: removal of cutout demo of (e) office building only non-structurl demo to remove partitions within building, removal of rooftop locker wash house room located on top of office building roofDetails
mayoral ed-17-02: removal of cutout demo of (e) office building only non-structurl demo to remove partitions within building, removal of rooftop locker wash house room located on top of office building roof | $40,000 |
| Dec 29, 2022 | Completed final sign-off Apr 2025 | 335 Powell St | minor permit to alter application requst to convert 2 roof decks on the 2/f east side of the building facing union square to occupied decks for social events. access will be through (e) windows that will be changed to doors. the adjacent meeting rooms will be reconfigured.Details
minor permit to alter application requst to convert 2 roof decks on the 2/f east side of the building facing union square to occupied decks for social events. access will be through (e) windows that will be changed to doors. the adjacent meeting rooms will be reconfigured. | $345,000 | |
| Apr 21, 2021 | Never finaled issued May 2021, no final | 717 Battery St | Terra Nova Industries | 1st flr: new glass and steel partition at (e) bar in (e) restaurant dining room, n.w corner of building. new double acting door, new built in seating and new floor finishes within enclosed area. no change to bar, bar equipment, flor levels, occupancies, occupant loads or exist paths.Details
1st flr: new glass and steel partition at (e) bar in (e) restaurant dining room, n.w corner of building. new double acting door, new built in seating and new floor finishes within enclosed area. no change to bar, bar equipment, flor levels, occupancies, occupant loads or exist paths. | $120,000 |
| Sep 25, 2020 | In progress issued Jul 2025 | 2859 22nd St | Spnr Built Inc. | vertical addition. change of use and change of occupancy from religious building to multi-family residence. interior renovation to an exist non residential bldg, interior demo. all exist. perimeter walls to remain.Details
vertical addition. change of use and change of occupancy from religious building to multi-family residence. interior renovation to an exist non residential bldg, interior demo. all exist. perimeter walls to remain. | $600,000 |
| Nov 14, 2019 | In progress issued Nov 2024 | 5 03rd St | change of use and occupancy from office to hotel inclusive w/ guest rooms & amenities, including restaurant/bar @ ground floor, lobby, retail shop, fitness center, event/meeting space(s), offices & a rooftop lounge/restaurant/bar type 3b over 1a construction 135 hotel guest roomsDetails
change of use and occupancy from office to hotel inclusive w/ guest rooms & amenities, including restaurant/bar @ ground floor, lobby, retail shop, fitness center, event/meeting space(s), offices & a rooftop lounge/restaurant/bar type 3b over 1a construction 135 hotel guest rooms | $43,000,000 |