Matthew Usebeck
- Listed as
- architect, engineer
- On San Francisco permits
- Apr 2012 to Jul 2026
16 permits since 2000 (architect on 15 permits, engineer on 1 permit): 4 completed, 10 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2026 | Expired or cancelled withdrawn Aug 2026 | 1350 Howard St | expansion of (e) restroom, addition of (n) accessible shower, relocation of plumbing fixtures, demolition of non-load bearing wall, and associated accessibility upgrades.Details
expansion of (e) restroom, addition of (n) accessible shower, relocation of plumbing fixtures, demolition of non-load bearing wall, and associated accessibility upgrades. | $65,000 | |
| Feb 25, 2026 | In progress filed Feb 2026, not yet issued | 500 Terry A Francois Bl | (1) wall mounted internally illuminated logo sign.Details
(1) wall mounted internally illuminated logo sign. | $2,500 | |
| Feb 25, 2026 | In progress filed Feb 2026, not yet issued | 500 Terry A Francois Bl | (1) wall mounted internally illuminated logo sign.Details
(1) wall mounted internally illuminated logo sign. | $2,500 | |
| Feb 3, 2026 | In progress issued Feb 2026 | 500 Terry A Francois Bl | Novo Construction Inc | 3rd/f revision to 202507029993: revised phone pod locationsDetails
3rd/f revision to 202507029993: revised phone pod locations | |
| Feb 3, 2026 | In progress issued Feb 2026 | 500 Terry A Francois Bl | Novo Construction Inc | level 2 revision to pa#: 202506269604. revised (e) phone pod locations.Details
level 2 revision to pa#: 202506269604. revised (e) phone pod locations. | |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 500 Terry A Francois Bl | 2/fl-ref ti 202506269604- (n) horizontal exit @ (e) tenant spaceDetails
2/fl-ref ti 202506269604- (n) horizontal exit @ (e) tenant space | $126,111 | |
| Oct 14, 2025 | In progress issued Feb 2026 | 500 Terry A Francois Bl | Novo Construction Inc | ground floor ti work includes refresh of tenant spaces north and main lobby and full ti to suite soth main lobby. partitions, fixtures and finishes and associated mepDetails
ground floor ti work includes refresh of tenant spaces north and main lobby and full ti to suite soth main lobby. partitions, fixtures and finishes and associated mep | $5,263,755 |
| Jul 2, 2025 | In progress issued Aug 2025 | 500 Terry A Francois Bl | Novo Construction Inc | 3rd floor: interior alteration of existing tenant space, including light touch alterations, including finishes, fixture and equipment. mep included.Details
3rd floor: interior alteration of existing tenant space, including light touch alterations, including finishes, fixture and equipment. mep included. | $4,790,589 |
| Jul 1, 2025 | In progress issued Oct 2025 | 500 Terry A Francois Bl | Novo Construction Inc | 4th fl: interior alteration at existing tenant space including light touch alterations, including finishes, fixtures, equipment. mep included.Details
4th fl: interior alteration at existing tenant space including light touch alterations, including finishes, fixtures, equipment. mep included. | $4,322,847 |
| Jun 26, 2025 | In progress issued Aug 2025 | 500 Terry A Francois Bl | Novo Construction Inc | 2/fl: interior alteration of existing tenant spaces\. light touch alteration includes finishes, fixtures, equipment.Details
2/fl: interior alteration of existing tenant spaces\. light touch alteration includes finishes, fixtures, equipment. | $4,203,710 |
| Jun 18, 2025 | In progress issued Aug 2025 | 500 Terry A Francois Bl | Novo Construction Inc | 5/fl: interior alteration of existing tenant spaces at the existing fifth floor. including finishes, fixtures and equipment.Details
5/fl: interior alteration of existing tenant spaces at the existing fifth floor. including finishes, fixtures and equipment. | $11,634,224 |
| Jun 10, 2021 | Completed final sign-off Jul 2022 | 560 Mission St | Clune Construction Company L P | interior tenant demo & improvement of (e) office space, new partitons, ceilings, restrooms, ducts. fire alarm and sprinkler under sep permits.Details
interior tenant demo & improvement of (e) office space, new partitons, ceilings, restrooms, ducts. fire alarm and sprinkler under sep permits. | $2,511,150 |
| Oct 2, 2019 | Completed final sign-off Mar 2021 | 115 Sansome St | Ap- Build Inc | rev to pa# 201907196346; work includes additon of showerDetails
rev to pa# 201907196346; work includes additon of shower | $5,000 |
| Jul 19, 2019 | Completed final sign-off Dec 2019 | 115 Sansome St | Ap- Build Inc | ti on 3rd fl. interior work only. work invluces, new constuction of walls, plumbing fixtures, millwork & associated mep & sprinkler work. no coffee bar, self service coffee onlyDetails
ti on 3rd fl. interior work only. work invluces, new constuction of walls, plumbing fixtures, millwork & associated mep & sprinkler work. no coffee bar, self service coffee only | $850,000 |
| May 17, 2019 | Completed final sign-off Oct 2019 | 115 Sansome St | Ap- Build Inc | #300: non-structural demo of existing office space on 3rd fl only. no exterior work. per ab-017.(to remain vacant until adaa features restored.).since the lowered ceiling is being demoed,under separate appl. sprinkler contractor must immediately relocate the sprinklers to the concrete ceiling aboveDetails
#300: non-structural demo of existing office space on 3rd fl only. no exterior work. per ab-017.(to remain vacant until adaa features restored.).since the lowered ceiling is being demoed,under separate appl. sprinkler contractor must immediately relocate the sprinklers to the concrete ceiling above | $20,000 |
| Apr 19, 2012 | Never finaled issued Apr 2012, no final | 845 Market St | revision to pa #2012.02.15.4210 - revise ceiling detail.Details
revision to pa #2012.02.15.4210 - revise ceiling detail. | $5,000 |