Brandon Elliott
- Listed as
- engineer
- On San Francisco permits
- Dec 2018 to Jul 2022
6 permits since 2000 (engineer on 6 permits): 4 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 11, 2022 | Never finaled issued Aug 2022, no final | 124 Geary St | Dickinson Cameron Construction Company I | revision to pa# 202108116268 to incorporate interior plan changes including: interior layout modification, interior lighting, mep revisions.Details
revision to pa# 202108116268 to incorporate interior plan changes including: interior layout modification, interior lighting, mep revisions. | |
| Feb 11, 2020 | Completed final sign-off Nov 2021 | 55 Stockton St | Sign Of Light | install 1 non-illuminated decal/window signage "nesspresso"Details
install 1 non-illuminated decal/window signage "nesspresso" | $2,000 |
| Feb 11, 2020 | Completed final sign-off Nov 2021 | 55 Stockton St | Sign Of Light | install 1 illuminated double-faced projecting blade sign "nesspresso"Details
install 1 illuminated double-faced projecting blade sign "nesspresso" | $2,000 |
| Dec 6, 2019 | Expired or cancelled withdrawn Jul 2022 | 248 Sutter St | ti of (e) space on basement level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing in a mixed-use building. scope includes new studios, offices, restrooms with showers and reception area. maher naDetails
ti of (e) space on basement level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing in a mixed-use building. scope includes new studios, offices, restrooms with showers and reception area. maher na | $380,000 | |
| Jul 19, 2019 | Completed final sign-off Dec 2019 | 115 Sansome St | Ap- Build Inc | ti on 3rd fl. interior work only. work invluces, new constuction of walls, plumbing fixtures, millwork & associated mep & sprinkler work. no coffee bar, self service coffee onlyDetails
ti on 3rd fl. interior work only. work invluces, new constuction of walls, plumbing fixtures, millwork & associated mep & sprinkler work. no coffee bar, self service coffee only | $850,000 |
| Dec 12, 2018 | Completed final sign-off Jul 2019 | 3 Embarcadero Center | Dome Construction Corp | suite # r3112: 3451 sf new build out of existing tenant space including non-structural framing, plumbing, electrical, mechanical and interior decorative materials and surfaces.Details
suite # r3112: 3451 sf new build out of existing tenant space including non-structural framing, plumbing, electrical, mechanical and interior decorative materials and surfaces. | $1,100,000 |