Steven Curry
- Listed as
- architect, attorney, engineer
- Firm
- Murphy Burr Curry
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Jun 2026
49 permits since 2000 (engineer on 46 permits, architect on 2 permits, attorney on 1 permit): 35 completed, 1 in progress, 11 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 11, 2026 | In progress issued Aug 2026 | 516 Diamond St | Dawson - Clinton Gen Contr Corp | revision to bpa202603046908 to add foundation strengthening, add windows to basement storage, relocation of gas meter and stair extension to basement level, add lighting to extg, bedroom, garage and bath door. work not visible from street and work at 516a diamond street.Details
revision to bpa202603046908 to add foundation strengthening, add windows to basement storage, relocation of gas meter and stair extension to basement level, add lighting to extg, bedroom, garage and bath door. work not visible from street and work at 516a diamond street. | $50,000 |
| Oct 15, 2025 | Completed final sign-off Sep 2026 | 505 Howard St | Novo Construction Inc | installation of phone booths throughout the 2nd, 3rd, and 4th floor.Details
installation of phone booths throughout the 2nd, 3rd, and 4th floor. | $660,000 |
| Nov 20, 2024 | Completed final sign-off Jun 2025 | 274 Brannan St | voluntary structural repairs to rooftop billboard signDetails
voluntary structural repairs to rooftop billboard sign | $35,000 | |
| Oct 27, 2023 | Completed final sign-off Oct 2024 | 1928 Fillmore St | Alsterlind Construction Inc. | interior tenant improvement, new raised floor, new partitions, finishes, fixtures, ada ramps, new lighting, relocated furnace, new ducts, restroom alteration for ada compliance. storefront work under separate permit.Details
interior tenant improvement, new raised floor, new partitions, finishes, fixtures, ada ramps, new lighting, relocated furnace, new ducts, restroom alteration for ada compliance. storefront work under separate permit. | $435,115 |
| Aug 22, 2023 | Expired or cancelled withdrawn Dec 2023 | 1201 Bryant St | strengthening of 1st floor existing steel girders to increase live load capacity of the floor to 100 psfDetails
strengthening of 1st floor existing steel girders to increase live load capacity of the floor to 100 psf | $100,000 | |
| Jun 29, 2023 | Completed final sign-off Feb 2024 | 1835 Franklin St | D W Nicholson Corporation | roof structural support for control decent apparatus as authorized by calosha and misc. metal for new guardrail and stair penthouse access ladder.Details
roof structural support for control decent apparatus as authorized by calosha and misc. metal for new guardrail and stair penthouse access ladder. | $180,000 |
| Apr 7, 2023 | Completed final sign-off Mar 2024 | 59 Grant Av | Peacock Construction | rev to pa# 202204081858; structural notes and special inspection form origin scope install a fullly concealed coiling roll down security gate covering retail street only.Details
rev to pa# 202204081858; structural notes and special inspection form origin scope install a fullly concealed coiling roll down security gate covering retail street only. | |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 1333 Gough St | Rainbow Waterproofing & Restor | strengthening of existing concrete joist with the reinforcement of a steel beam assembly. patching of concrete spallsDetails
strengthening of existing concrete joist with the reinforcement of a steel beam assembly. patching of concrete spalls | $106,382 |
| Apr 11, 2022 | Never finaled issued Aug 2022, no final | 90 Grant Av | Trainor Commercial Construction Inc. | interior tenant improvement of 12,418 sqft. no exterior modifications under this permit. incl mechanical. fire alarm/sprinklers under sep permits.Details
interior tenant improvement of 12,418 sqft. no exterior modifications under this permit. incl mechanical. fire alarm/sprinklers under sep permits. | $2,500,000 |
| Mar 31, 2022 | Completed final sign-off May 2023 | 838 Grant Av | C T W Mechanical | basement: remove existing staircase within retail space, infill with 2-hr concrete separation. no change to facade or use. lighting and mech under separate permit. remove special inspections to 2020-1002-5785Details
basement: remove existing staircase within retail space, infill with 2-hr concrete separation. no change to facade or use. lighting and mech under separate permit. remove special inspections to 2020-1002-5785 | $10,000 |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 2206 Great Hy | Guzman Construction Group Inc. | priority processing: 100% affordable housing. rehabilitation of 6 public housing town homes in south building: units 2243, 2252, 2253, 2260, 2263, 2268. windows and doors to be replaced throughout, (n) roofing, exterior finishes, fixtures & appliances. (n) mep fixtures. repair central carport.Details
priority processing: 100% affordable housing. rehabilitation of 6 public housing town homes in south building: units 2243, 2252, 2253, 2260, 2263, 2268. windows and doors to be replaced throughout, (n) roofing, exterior finishes, fixtures & appliances. (n) mep fixtures. repair central carport. | $5,000,000 |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 2206 Great Hy | Guzman Construction Group Inc. | priority processing: 100% affordable housing. rehabilitation of 10 public housing in north bldg: units 2206, 2210, 2215, 2217, 2020, 2222, 2225, 2227, 2228, 2232. replace windows & doors throughout. (n) roof, exterior finishes, fixtures & appliances. (n) mep fixtures. replace north carport in kind.Details
priority processing: 100% affordable housing. rehabilitation of 10 public housing in north bldg: units 2206, 2210, 2215, 2217, 2020, 2222, 2225, 2227, 2228, 2232. replace windows & doors throughout. (n) roof, exterior finishes, fixtures & appliances. (n) mep fixtures. replace north carport in kind. | $6,000,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1361 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016c | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1353 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016bDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016b | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1365 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016c | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1357 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016c | $925,000 |
| Jul 6, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. bldg b:3 of 3 structures. proposed rehabilitation of 6 of 16 public housing apts, replacement of cement plaster cladding, new windows & roofing. related bldg permits: bldg a pa# 202107063834; bldg c pa#202103237113.Details
priority 100% affordable housing. bldg b:3 of 3 structures. proposed rehabilitation of 6 of 16 public housing apts, replacement of cement plaster cladding, new windows & roofing. related bldg permits: bldg a pa# 202107063834; bldg c pa#202103237113. | $3,000,000 |
| Jul 6, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. bldg a:2 of 3 structures. proposed rehabilitation of 10 of 16 public housing apts. replacement of cement plaster cladding, new windows & roofing. rearragement of int. walls at 1 mobility unit. related bldg permits: bldg b pa#202107063835; bldg c pa#202103237113.Details
priority 100% affordable housing. bldg a:2 of 3 structures. proposed rehabilitation of 10 of 16 public housing apts. replacement of cement plaster cladding, new windows & roofing. rearragement of int. walls at 1 mobility unit. related bldg permits: bldg b pa#202107063835; bldg c pa#202103237113. | $3,000,000 |
| Jun 3, 2021 | Completed final sign-off Oct 2021 | 3138 Kamille Ct | Nibbi Bros Assoc Inc. | mayoral ed13-01.interior-repair/replacement include new paint, flooring, plumbing fixtures, smoke & carbon monoxide detectors, light fixtures, door hardware, & hvac equipment. exterior-changing (e) door to a window, exterior light fixtures & signage. no addition/additional condition space proposedDetails
mayoral ed13-01.interior-repair/replacement include new paint, flooring, plumbing fixtures, smoke & carbon monoxide detectors, light fixtures, door hardware, & hvac equipment. exterior-changing (e) door to a window, exterior light fixtures & signage. no addition/additional condition space proposed | $375,000 |
| Mar 23, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. community rm bldg:1 of 3 structures. no dwelling units in this structure. proposed work is rehab. of comm. rm, addition of management & resident office. replacment of cement plaster cladding, n windows & roofing. site work includes all new flatwork & landscaping...Details
priority 100% affordable housing. community rm bldg:1 of 3 structures. no dwelling units in this structure. proposed work is rehab. of comm. rm, addition of management & resident office. replacment of cement plaster cladding, n windows & roofing. site work includes all new flatwork & landscaping... | $2,000,000 |
| Sep 24, 2020 | Completed final sign-off Nov 2021 | 444 De Haro St | Gci, Inc | suite #100: new communicating stair. deferred submittal. ref. pa#2020-0915-4218 and #2020-1022-7121.Details
suite #100: new communicating stair. deferred submittal. ref. pa#2020-0915-4218 and #2020-1022-7121. | $190,000 |
| Feb 11, 2020 | Completed final sign-off Nov 2021 | 55 Stockton St | Sign Of Light | install 1 non-illuminated decal/window signage "nesspresso"Details
install 1 non-illuminated decal/window signage "nesspresso" | $2,000 |
| Feb 11, 2020 | Completed final sign-off Nov 2021 | 55 Stockton St | Sign Of Light | install 1 illuminated double-faced projecting blade sign "nesspresso"Details
install 1 illuminated double-faced projecting blade sign "nesspresso" | $2,000 |
| Dec 31, 2019 | Completed final sign-off Jul 2021 | 180 Townsend St | Vance Brown Inc. | replace e 2 story open stairs non egress of level 2 and 3 and extending it down to the 1st fl. floors 1-3 will be atmosphically connected w centrol non egress staircase. ref 201912068914Details
replace e 2 story open stairs non egress of level 2 and 3 and extending it down to the 1st fl. floors 1-3 will be atmosphically connected w centrol non egress staircase. ref 201912068914 | $31,000 |
| Dec 23, 2019 | Completed final sign-off Sep 2022 | 555 California St | Bcci Construction Company | partial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted.Details
partial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted. | $210,000 |
| Sep 9, 2019 | Never finaled issued Nov 2019, no final | 384 Post St | Freeman Construction Company | commercial t.i. consisting of demo extg area, non structural partitions, casework, fixtures, interior signage and electrical fixtures. tenant sak's fifth ave on post street. n/a for maher.Details
commercial t.i. consisting of demo extg area, non structural partitions, casework, fixtures, interior signage and electrical fixtures. tenant sak's fifth ave on post street. n/a for maher. | $175,000 |
| Mar 20, 2019 | Completed final sign-off Feb 2020 | 2741 16th St | Centric Construction Inc | structural revisions to app#201810183533 and 201901170586Details
structural revisions to app#201810183533 and 201901170586 | |
| Sep 26, 2018 | Completed final sign-off Feb 2019 | 315 Montgomery St | Bcci Construction Company | 13th fl - structural drawings and calculations for server room. ref #2018-0703-3636.Details
13th fl - structural drawings and calculations for server room. ref #2018-0703-3636. | $15,000 |
| Aug 22, 2017 | Never finaled issued Aug 2017, no final | 201 Post St | Dickinson Cameron Construction Company I | revision to 201705025489, minor structural changes for selected elevator, new curb shape, chandelier attachment and misc.Details
revision to 201705025489, minor structural changes for selected elevator, new curb shape, chandelier attachment and misc. | $10,000 |
| Aug 18, 2017 | Completed final sign-off Dec 2017 | 1355 Franklin St | Pacific Thunder | 3rd floor - re-construction of the floor framing in one room of the bldg. the room is called "garden room". it is approx 390 sq ft in size. the room is at the north east corner of the bldg.Details
3rd floor - re-construction of the floor framing in one room of the bldg. the room is called "garden room". it is approx 390 sq ft in size. the room is at the north east corner of the bldg. | $17,500 |
| Jun 23, 2017 | Completed final sign-off May 2019 | 333 Market St | T C B Builders Inc | 3/f- amep plans - work to remodel existing offices, add training facilities and meeting rooms for business training purposes. connect core areas with corridor to access toilets and exit stairs. n/a ordinance #155-13, fire under separate permits.Details
3/f- amep plans - work to remodel existing offices, add training facilities and meeting rooms for business training purposes. connect core areas with corridor to access toilets and exit stairs. n/a ordinance #155-13, fire under separate permits. | $1,500,000 |
| May 2, 2017 | Never finaled issued Aug 2017, no final | 201 Post St | Dickinson Cameron Construction Company I | demo/structural work only. minor demo to basement & 1st floor to remove existing stairs and non bearing partition. structural to relocate some existing columns in basement. new stairs between basement & 1st floor, new catwall to level 1. new elevator from basement to 1st floorDetails
demo/structural work only. minor demo to basement & 1st floor to remove existing stairs and non bearing partition. structural to relocate some existing columns in basement. new stairs between basement & 1st floor, new catwall to level 1. new elevator from basement to 1st floor | $176,000 |
| Jan 13, 2017 | Completed final sign-off Jul 2017 | 2901 Pacific Av | Phollies Inc | structural only: revision to pa 2016-0819-5579 additional interior structural support due to field conditions. add structural support to roof framing for mechanical equipmentDetails
structural only: revision to pa 2016-0819-5579 additional interior structural support due to field conditions. add structural support to roof framing for mechanical equipment | $75,000 |
| Aug 19, 2016 | Completed final sign-off Jul 2017 | 2901 Pacific Av | Phollies Inc | project consists of interior upgrades to (e) guestrooms & common areas & upgrades to the (e) elevator. ada upgrades. no exterior work. fire sprinkler under a separate permit. mep under a separate permit.Details
project consists of interior upgrades to (e) guestrooms & common areas & upgrades to the (e) elevator. ada upgrades. no exterior work. fire sprinkler under a separate permit. mep under a separate permit. | $2,900,000 |
| Aug 12, 2016 | Never finaled issued Aug 2016, no final | 250 King St | Acco Engineered Systems Inc. Dba Acco En | working in common area. furnish & install new air conditioning system to sic units at 452, 552, 652, 752, 852 & 952 including modification to existing ceiling, walls, electric, roofing, framing, painting, coring, and x-rays of structure for support units.Details
working in common area. furnish & install new air conditioning system to sic units at 452, 552, 652, 752, 852 & 952 including modification to existing ceiling, walls, electric, roofing, framing, painting, coring, and x-rays of structure for support units. | $500,000 |
| Aug 12, 2016 | Never finaled issued Aug 2016, no final | 260 King St | Acco Engineered Systems Inc. Dba Acco En | working in common area. furnish & install new air conditioning system to six units at 457, 557, 657, 757, 857 & 957 including modification to existing ceiling, walls, electric, , roofing, framing, painting, coring, and x-rays of structure for support units.Details
working in common area. furnish & install new air conditioning system to six units at 457, 557, 657, 757, 857 & 957 including modification to existing ceiling, walls, electric, , roofing, framing, painting, coring, and x-rays of structure for support units. | $500,000 |
| Mar 2, 2016 | Completed final sign-off Sep 2017 | 555 California St | Gci, Inc | partial demo of existing 29/f slab & construction of new communicating stair connecting 28/f & 29/f with new electrical & finishes. ref pa 2015-0526-7112. n/a ordinance #155-13Details
partial demo of existing 29/f slab & construction of new communicating stair connecting 28/f & 29/f with new electrical & finishes. ref pa 2015-0526-7112. n/a ordinance #155-13 | $240,000 |
| Apr 9, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | interior tenant improvement 4th flr include demo, drywall, ceilings, doors, interior glazing and finishes. mech. and elec. under seperate permit.Details
interior tenant improvement 4th flr include demo, drywall, ceilings, doors, interior glazing and finishes. mech. and elec. under seperate permit. | $2,293,016 |
| Apr 9, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | interior tenant improvement on 6/f include demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. a new communicating stair between 5th and 6th floor. mech. and elec. under seperate permit.Details
interior tenant improvement on 6/f include demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. a new communicating stair between 5th and 6th floor. mech. and elec. under seperate permit. | $2,293,016 |
| Nov 8, 2013 | Never finaled issued Nov 2013, no final | 624 Vallejo St | revision to (e) approved pa#201307192330 revise structural floor (concrete) slab, additional details.Details
revision to (e) approved pa#201307192330 revise structural floor (concrete) slab, additional details. | ||
| Aug 29, 2013 | Completed final sign-off Aug 2014 | 1431 Haight St | Northern Sun Associates | revision to pa#201306119225 replace of steel storefront header & entry steel soffit frame.Details
revision to pa#201306119225 replace of steel storefront header & entry steel soffit frame. | $10,000 |
| Jul 30, 2013 | Completed final sign-off Nov 2018 | 350 08th St | to erect 6 stories, 1 basement, 408 residential units with commercial & parking building.Details
to erect 6 stories, 1 basement, 408 residential units with commercial & parking building. | $115,000,000 | |
| Jul 16, 2013 | Never finaled issued Jul 2013, no final | 1145 Market St | Cci Com'l Constr & Improv**See 985808*** | 4th floor structural upgrade: (n) 3/8" bottom flange cover pl at selected (e) steel beams (8total) to accomodate (n) fixed shelving. shelving & tenant improvement under future separate permit.Details
4th floor structural upgrade: (n) 3/8" bottom flange cover pl at selected (e) steel beams (8total) to accomodate (n) fixed shelving. shelving & tenant improvement under future separate permit. | $20,000 |
| Jul 9, 2013 | Never finaled issued Oct 2013, no final | 2100 Pacific Av | Tom Lewis Restoration And Consulting | install davit life system to existing building for exterior maintenance purposes.Details
install davit life system to existing building for exterior maintenance purposes. | $170,000 |
| Sep 19, 2012 | Completed final sign-off May 2013 | 645 Harrison St | U A Construction | 3rd floor: mechanical, plumbing & electrical system work for 3rd floor ti work under pa# 2012/08/22/8000.Details
3rd floor: mechanical, plumbing & electrical system work for 3rd floor ti work under pa# 2012/08/22/8000. | $500,000 |
| Jul 16, 2012 | Completed final sign-off Jun 2014 | 888 Brannan St | Richlen Construction | revision to pa# 2011-1214-0669-remove (e) trestle below 1st level & replace with concrete slab. raise basement created by trestle removalDetails
revision to pa# 2011-1214-0669-remove (e) trestle below 1st level & replace with concrete slab. raise basement created by trestle removal | $5,000 |
| Dec 30, 2008 | Never finaled issued Jan 2009, no final | 185 Post St | C/S Electors Inc | new sign projecting, double sided, 25'x3' on post st. & grant ave.Details
new sign projecting, double sided, 25'x3' on post st. & grant ave. | $10,000 |
| Feb 27, 2008 | Expired or cancelled expired Sep 2008 | 3408 Broderick St | Gerald J Knox Construction | remove garage slab - new slab with additional footings, replace one 4x4 post wwith new 6 x 6. all interior work (footings).Details
remove garage slab - new slab with additional footings, replace one 4x4 post wwith new 6 x 6. all interior work (footings). | $10,000 |
| Feb 2, 2006 | Completed final sign-off Oct 2006 | 707 Sutter St | umb - seismic retrofit for hazard reduction. construct concrete foundation, steel frame, wall anchors and shear walls. umb retrofit special procedure.Details
umb - seismic retrofit for hazard reduction. construct concrete foundation, steel frame, wall anchors and shear walls. umb retrofit special procedure. | $50,000 |