Permit GraphShortlistSan Francisco building permits since 2000

Block 0748, lot 016A

1361 Eddy St

The city’s assessor roll has no record for this parcel.

Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

5 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 21, 2023Completed
final sign-off May 2023
1361 Eddy StB B J Electric, Increvision to pa# 202301059714. building 2. as built. add low freq sounders in hallways, inside unit, and pull station at exit. add weatherproof h/s. add pull station in laundry.
Details
Permit
202304216228
Permit issued
Apr 24, 2023
Final sign-off
May 12, 2023

revision to pa# 202301059714. building 2. as built. add low freq sounders in hallways, inside unit, and pull station at exit. add weatherproof h/s. add pull station in laundry.

Open the permit page

Jan 5, 2023Never finaled
issued Feb 2023, no final
1361 Eddy StB B J Electric, Incbuilding 2: install fire alarm system to provide audibles in units to comply with 1103.7.6.1. shared plans with 202301039623.
Details
Permit
202301059714
Permit issued
Feb 3, 2023

building 2: install fire alarm system to provide audibles in units to comply with 1103.7.6.1. shared plans with 202301039623.

Open the permit page

Apr 25, 2022Never finaled
issued May 2022, no final
1361 Eddy Stadministrative permit to correct the addresses associated with apn 0748/016a for 1361, 1363 eddy street
Details
Permit
M1227729
Permit issued
May 9, 2022

administrative permit to correct the addresses associated with apn 0748/016a for 1361, 1363 eddy street

Open the permit page

Aug 10, 2021Completed
final sign-off Jun 2023
1361 Eddy StAmone Corpmayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016c
Details
Permit
202108106116
Permit issued
Feb 16, 2022
Final sign-off
Jun 23, 2023

mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016c

Open the permit page

$925,000
Apr 26, 2012Never finaled
issued Apr 2012, no final
1361 Eddy St1. dry rot repairs 2. exterior stairs repars and replacement 3. replacement of dryrotted wood framing, insulation, sheathing, gypsum board and exterior wood siding. 4. replacement of damaged sheet-metal conducter and pipes 5. new coping plate, wall scupper and flashing installation where required.
Details
Permit
201204269234
Permit issued
Apr 27, 2012

1. dry rot repairs 2. exterior stairs repars and replacement 3. replacement of dryrotted wood framing, insulation, sheathing, gypsum board and exterior wood siding. 4. replacement of damaged sheet-metal conducter and pipes 5. new coping plate, wall scupper and flashing installation where required.

Open the permit page

$16,500

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
B B J Electric, Inc (2), Amone Corp
Architects
Pamela Anee Collier
Engineers
John Griffiths, Rajendra Sahai, Raymond Keane, Steven Curry
Designers
Thomas Berrill

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.