17 permits since 2000 (engineer on 17 permits): 16 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 24, 2025 | Completed final sign-off Sep 2026 | 4101 Noriega St | Guzman Construction Group Inc. | revision to permit 202303133537. relocating main switchgear location to adjacent wall, inside the garage. 100% affortable project.Details
revision to permit 202303133537. relocating main switchgear location to adjacent wall, inside the garage. 100% affortable project. | $100,000 |
| Jul 21, 2023 | Completed final sign-off Dec 2023 | 55 Mason St | D & H Construction | revision to 202010106291. changed include revision to 6th fl laundry room layout and unit 628 entry door location. no residential rooms to be removed, altered or demolished.Details
revision to 202010106291. changed include revision to 6th fl laundry room layout and unit 628 entry door location. no residential rooms to be removed, altered or demolished. | |
| Jan 6, 2023 | Completed final sign-off Sep 2023 | 4101 Noriega St | Guzman Construction Group Inc. | reduction in scope: mep only previously approved bpa 202110130352, original scope to replace main switchboard, the main switchboard to remain.Details
reduction in scope: mep only previously approved bpa 202110130352, original scope to replace main switchboard, the main switchboard to remain. | |
| Dec 22, 2022 | Completed final sign-off Dec 2022 | 216 Eddy St | D & H Construction | as built electrical for administrative permit 202008061226Details
as built electrical for administrative permit 202008061226 | |
| Oct 31, 2022 | Completed final sign-off Apr 2023 | 44 02nd St | Hp Build | change of use from retail to office. revision to pa# 202011068418 by previous architect. forge is the new architect. revised scope of work to include reconstruction of millwork at 1st and 2nd fl. remove proposed meeting room at 1st fl and remove proposed closet at basement. mep revisions included.Details
change of use from retail to office. revision to pa# 202011068418 by previous architect. forge is the new architect. revised scope of work to include reconstruction of millwork at 1st and 2nd fl. remove proposed meeting room at 1st fl and remove proposed closet at basement. mep revisions included. | |
| Aug 19, 2022 | Completed final sign-off Dec 2022 | 216 Eddy St | D & H Construction | minor revision to permit 202112084018 to reflect changes to bathrooms at mobility unit #205, smoke detectors, sidewalk.Details
minor revision to permit 202112084018 to reflect changes to bathrooms at mobility unit #205, smoke detectors, sidewalk. | $30,000 |
| Jul 11, 2022 | Expired or cancelled withdrawn Aug 2023 | 44 02nd St | Lighthouse Electric | lighting and power for ti. ref permit 202011068418Details
lighting and power for ti. ref permit 202011068418 | $80,000 |
| Dec 8, 2021 | Completed final sign-off Dec 2022 | 216 Eddy St | D & H Construction | revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams alongDetails
revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams along | |
| Nov 9, 2021 | Completed final sign-off Feb 2022 | 5050 Mission St | Hp Build | 1st fl - revision to pa 2021-0105-2098 and 2021-0802-5536 including the mechanical and electrical changes (suite c)Details
1st fl - revision to pa 2021-0105-2098 and 2021-0802-5536 including the mechanical and electrical changes (suite c) | $60,000 |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 2206 Great Hy | Guzman Construction Group Inc. | priority processing: 100% affordable housing. rehabilitation of 10 public housing in north bldg: units 2206, 2210, 2215, 2217, 2020, 2222, 2225, 2227, 2228, 2232. replace windows & doors throughout. (n) roof, exterior finishes, fixtures & appliances. (n) mep fixtures. replace north carport in kind.Details
priority processing: 100% affordable housing. rehabilitation of 10 public housing in north bldg: units 2206, 2210, 2215, 2217, 2020, 2222, 2225, 2227, 2228, 2232. replace windows & doors throughout. (n) roof, exterior finishes, fixtures & appliances. (n) mep fixtures. replace north carport in kind. | $6,000,000 |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 2206 Great Hy | Guzman Construction Group Inc. | priority processing: 100% affordable housing. rehabilitation of 6 public housing town homes in south building: units 2243, 2252, 2253, 2260, 2263, 2268. windows and doors to be replaced throughout, (n) roofing, exterior finishes, fixtures & appliances. (n) mep fixtures. repair central carport.Details
priority processing: 100% affordable housing. rehabilitation of 6 public housing town homes in south building: units 2243, 2252, 2253, 2260, 2263, 2268. windows and doors to be replaced throughout, (n) roofing, exterior finishes, fixtures & appliances. (n) mep fixtures. repair central carport. | $5,000,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1353 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016bDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016b | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1361 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016c | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1357 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016c | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1365 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016c | $925,000 |
| Mar 23, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. community rm bldg:1 of 3 structures. no dwelling units in this structure. proposed work is rehab. of comm. rm, addition of management & resident office. replacment of cement plaster cladding, n windows & roofing. site work includes all new flatwork & landscaping...Details
priority 100% affordable housing. community rm bldg:1 of 3 structures. no dwelling units in this structure. proposed work is rehab. of comm. rm, addition of management & resident office. replacment of cement plaster cladding, n windows & roofing. site work includes all new flatwork & landscaping... | $2,000,000 |
| Oct 10, 2020 | Completed final sign-off Sep 2023 | 55 Mason St | D & H Construction | voluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well.Details
voluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well. | $12,000,000 |