Pamela Anee Collier
- Listed as
- architect, authorized agent-others
- Firm
- Levy Design Partners
- On San Francisco permits
- Sep 2015 to Apr 2026
54 permits since 2000 (architect on 53 permits, authorized agent-others on 1 permit): 31 completed, 3 in progress, 12 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 22, 2026 | Completed final sign-off Sep 2026 | 421 Leavenworth St | D & H Construction | install (n) fence at rear west property line. no mep, facade work or in public right of wayDetails
install (n) fence at rear west property line. no mep, facade work or in public right of way | $15,000 |
| Jan 16, 2026 | In progress issued Jan 2026 | 1155 Ellis St | D & H Construction | 100% affordable (existing to remain 108 units) sow: non-structural interior only: replace in kind 600 sq ft drywall in units b103 and b203 w/no change to sq footage/occupancy. replace cainets in kind or both unitsDetails
100% affordable (existing to remain 108 units) sow: non-structural interior only: replace in kind 600 sq ft drywall in units b103 and b203 w/no change to sq footage/occupancy. replace cainets in kind or both units | $1,000 |
| Nov 13, 2025 | In progress issued Jan 2026 | 1135 Ellis St | D & H Construction | 100% affordable. non structural rehabilitation of 108 units. exterior work: repair (e) windows, new roof layer.interior: remove finish hall flooring, (n) ada mobility/communication units, disable/remove fireplaces,(n) finishes in select units, repair/update elevator equipment...Details
100% affordable. non structural rehabilitation of 108 units. exterior work: repair (e) windows, new roof layer.interior: remove finish hall flooring, (n) ada mobility/communication units, disable/remove fireplaces,(n) finishes in select units, repair/update elevator equipment... | $203,000 |
| Apr 24, 2025 | Completed final sign-off Sep 2026 | 4101 Noriega St | Guzman Construction Group Inc. | revision to permit 202303133537. relocating main switchgear location to adjacent wall, inside the garage. 100% affortable project.Details
revision to permit 202303133537. relocating main switchgear location to adjacent wall, inside the garage. 100% affortable project. | $100,000 |
| May 25, 2023 | Completed final sign-off Sep 2023 | 363 Noe St | Amone Corp | install fence and motorized vehicle gate at rear parking lot in rear of building inside the property line. no work in prow. no changes to fixrure count.Details
install fence and motorized vehicle gate at rear parking lot in rear of building inside the property line. no work in prow. no changes to fixrure count. | $10,000 |
| May 5, 2023 | In progress issued Feb 2025 | 421 Leavenworth St | D & H Construction | priority processing-100% affordable. 47 units+community room+offices. fire restoration & voluntary seismic. grd flr reconfiguration. in-kind stair repair/replacement. window repair/replace, door replace, (n) mep,hvac,exhaust,fixtures,appliances,mobility+communication units. historic facade remain.Details
priority processing-100% affordable. 47 units+community room+offices. fire restoration & voluntary seismic. grd flr reconfiguration. in-kind stair repair/replacement. window repair/replace, door replace, (n) mep,hvac,exhaust,fixtures,appliances,mobility+communication units. historic facade remain. | $10,000,000 |
| Mar 28, 2023 | Completed final sign-off Aug 2023 | 106 South Park | Saarman Construction,Ltd. | revision to pa# 202211166645, replace hallow metal door at door 108 (storage rm) at lightwell & add guardrail/handrail at door 108 (storage rm).Details
revision to pa# 202211166645, replace hallow metal door at door 108 (storage rm) at lightwell & add guardrail/handrail at door 108 (storage rm). | $45,000 |
| Mar 28, 2023 | Completed final sign-off Aug 2023 | 102 South Park | Saarman Construction,Ltd. | revision to pa# 202211146387, 3-new exterior security grilles located at unit 100 at taber place & jack london alley.Details
revision to pa# 202211146387, 3-new exterior security grilles located at unit 100 at taber place & jack london alley. | $22,000 |
| Mar 28, 2023 | Never finaled issued Apr 2023, no final | 22 South Park | Saarman Construction,Ltd. | repair exterior awning at madrid, new paint and laminated safety glass.Details
repair exterior awning at madrid, new paint and laminated safety glass. | $73,000 |
| Mar 13, 2023 | Expired or cancelled expired Sep 2026 | 4101 Noriega St | Guzman Construction Group Inc. | revision to previously approved permits: 202110130352 & 202301069718. sow:interior-electrical. replace main switchgear. 100% affordable projectDetails
revision to previously approved permits: 202110130352 & 202301069718. sow:interior-electrical. replace main switchgear. 100% affordable project | |
| Jan 6, 2023 | Completed final sign-off Sep 2023 | 4101 Noriega St | Guzman Construction Group Inc. | reduction in scope: mep only previously approved bpa 202110130352, original scope to replace main switchboard, the main switchboard to remain.Details
reduction in scope: mep only previously approved bpa 202110130352, original scope to replace main switchboard, the main switchboard to remain. | |
| Nov 16, 2022 | Completed final sign-off Apr 2023 | 106 South Park | Saarman Construction,Ltd. | revision to permit 201912189921. add full stucco replacement scope at the south elevation corner to corner.Details
revision to permit 201912189921. add full stucco replacement scope at the south elevation corner to corner. | $50,000 |
| Nov 14, 2022 | Completed final sign-off Oct 2023 | 4101 Noriega St | Guzman Construction Group Inc. | 100% affordable deferred submittal for approve bpa 202110130352 add fire escapes to 7 above ground public housing apartments. replace in-kind, juliet balcony + guardrail + (e).Details
100% affordable deferred submittal for approve bpa 202110130352 add fire escapes to 7 above ground public housing apartments. replace in-kind, juliet balcony + guardrail + (e). | $10,000 |
| Nov 14, 2022 | Completed final sign-off Apr 2023 | 102 South Park | Saarman Construction,Ltd. | revision to 201912189903. full stucco replacement at the east elevation corner to corner. front facade only.Details
revision to 201912189903. full stucco replacement at the east elevation corner to corner. front facade only. | $2,100,000 |
| Aug 16, 2022 | Completed final sign-off Sep 2023 | 106 South Park | Saarman Construction,Ltd. | adm permit: 100% affordable to complete work under pa 201912189921 s,s1,s2,s3 work remaining at south facade only: replace roofing and flashing. repair damage finishes and paint on exterior. repair (e) windows.Details
adm permit: 100% affordable to complete work under pa 201912189921 s,s1,s2,s3 work remaining at south facade only: replace roofing and flashing. repair damage finishes and paint on exterior. repair (e) windows. | |
| Aug 16, 2022 | Completed final sign-off Sep 2023 | 102 South Park | Saarman Construction,Ltd. | adm permit: 100% affordable to complete work under pa 201912189903 work remaining at south facade only: replace roofing and flashing. repair damage finishes and paint on exterior. repair (e) windows.Details
adm permit: 100% affordable to complete work under pa 201912189903 work remaining at south facade only: replace roofing and flashing. repair damage finishes and paint on exterior. repair (e) windows. | |
| Jul 27, 2022 | Expired or cancelled cancelled Nov 2023 | 645 Linden St | Nibbi Bros Assoc Inc. | permit revision for removal of unit# 683 linden from pa# 2019-1227-0767 bldg 5 at 645 linden. to remove scope of work in unit# 683.Details
permit revision for removal of unit# 683 linden from pa# 2019-1227-0767 bldg 5 at 645 linden. to remove scope of work in unit# 683. | |
| May 3, 2022 | Completed final sign-off Sep 2023 | 363 Noe St | Amone Corp | deferred submittal for approved bpa #202107094047. parking lot renovation for 21 unit public housing apt. 1 van accessible parking spot in rear of bldg, including platform lift for accessible path of travel to main level of bldg. no work in public right away.Details
deferred submittal for approved bpa #202107094047. parking lot renovation for 21 unit public housing apt. 1 van accessible parking spot in rear of bldg, including platform lift for accessible path of travel to main level of bldg. no work in public right away. | $25,000 |
| Mar 7, 2022 | Never finaled issued Jun 2022, no final | 650 Linden St | Nibbi Bros Assoc Inc. | revision for scope market by mod as "deferred approval" on sheet l103 + l700 during permit review. scope is limited to accessible paths for pa# 201912270759, 201912270764, 201912270766, 201912270767, 201912270768, 201912270769.Details
revision for scope market by mod as "deferred approval" on sheet l103 + l700 during permit review. scope is limited to accessible paths for pa# 201912270759, 201912270764, 201912270766, 201912270767, 201912270768, 201912270769. | |
| Oct 13, 2021 | Completed final sign-off Oct 2023 | 4101 Noriega St | Guzman Construction Group Inc. | full rehab of units and small community room w/ kitchenette and toilet room. new windows, and doors throughout, new exterior finishes, new fixtures, appliances and mechanical equipment. no work in public right of way. partially sprinklered. fire alarm under deferred submittal. 100% affordableDetails
full rehab of units and small community room w/ kitchenette and toilet room. new windows, and doors throughout, new exterior finishes, new fixtures, appliances and mechanical equipment. no work in public right of way. partially sprinklered. fire alarm under deferred submittal. 100% affordable | $6,670,000 |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 2206 Great Hy | Guzman Construction Group Inc. | priority processing: 100% affordable housing. rehabilitation of 6 public housing town homes in south building: units 2243, 2252, 2253, 2260, 2263, 2268. windows and doors to be replaced throughout, (n) roofing, exterior finishes, fixtures & appliances. (n) mep fixtures. repair central carport.Details
priority processing: 100% affordable housing. rehabilitation of 6 public housing town homes in south building: units 2243, 2252, 2253, 2260, 2263, 2268. windows and doors to be replaced throughout, (n) roofing, exterior finishes, fixtures & appliances. (n) mep fixtures. repair central carport. | $5,000,000 |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 2206 Great Hy | Guzman Construction Group Inc. | priority processing: 100% affordable housing. rehabilitation of 10 public housing in north bldg: units 2206, 2210, 2215, 2217, 2020, 2222, 2225, 2227, 2228, 2232. replace windows & doors throughout. (n) roof, exterior finishes, fixtures & appliances. (n) mep fixtures. replace north carport in kind.Details
priority processing: 100% affordable housing. rehabilitation of 10 public housing in north bldg: units 2206, 2210, 2215, 2217, 2020, 2222, 2225, 2227, 2228, 2232. replace windows & doors throughout. (n) roof, exterior finishes, fixtures & appliances. (n) mep fixtures. replace north carport in kind. | $6,000,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1357 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016c | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1361 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016c | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1365 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016c | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1353 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016bDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016b | $925,000 |
| Jul 9, 2021 | Completed final sign-off Sep 2023 | 363 Noe St | Amone Corp | 21 public housing apt w/ 1 resident mgr office. rehab & accesibility @ community space w/ kitchenette,toilet rms & launtry room. replaced windows & exterior doors troughout, (n) roofing, boilers, finishes,fixtures & appliances.(n)mep fixtures+equipmt.minor elevator modernize.addit "b" for office.Details
21 public housing apt w/ 1 resident mgr office. rehab & accesibility @ community space w/ kitchenette,toilet rms & launtry room. replaced windows & exterior doors troughout, (n) roofing, boilers, finishes,fixtures & appliances.(n)mep fixtures+equipmt.minor elevator modernize.addit "b" for office. | $5,000,000 |
| Jul 6, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. bldg b:3 of 3 structures. proposed rehabilitation of 6 of 16 public housing apts, replacement of cement plaster cladding, new windows & roofing. related bldg permits: bldg a pa# 202107063834; bldg c pa#202103237113.Details
priority 100% affordable housing. bldg b:3 of 3 structures. proposed rehabilitation of 6 of 16 public housing apts, replacement of cement plaster cladding, new windows & roofing. related bldg permits: bldg a pa# 202107063834; bldg c pa#202103237113. | $3,000,000 |
| Jul 6, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. bldg a:2 of 3 structures. proposed rehabilitation of 10 of 16 public housing apts. replacement of cement plaster cladding, new windows & roofing. rearragement of int. walls at 1 mobility unit. related bldg permits: bldg b pa#202107063835; bldg c pa#202103237113.Details
priority 100% affordable housing. bldg a:2 of 3 structures. proposed rehabilitation of 10 of 16 public housing apts. replacement of cement plaster cladding, new windows & roofing. rearragement of int. walls at 1 mobility unit. related bldg permits: bldg b pa#202107063835; bldg c pa#202103237113. | $3,000,000 |
| May 17, 2021 | Completed final sign-off Mar 2022 | 22 South Park | Bbi - Con Inc | revision to pa# 201912189908. sow: addition of power door operator in lieu of level landing due to (e) site conditions. (n) casework in unit 101. (n) utiliy sink at mep room. no other changes in this revision. no work in prow.Details
revision to pa# 201912189908. sow: addition of power door operator in lieu of level landing due to (e) site conditions. (n) casework in unit 101. (n) utiliy sink at mep room. no other changes in this revision. no work in prow. | $45,000 |
| Mar 23, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. community rm bldg:1 of 3 structures. no dwelling units in this structure. proposed work is rehab. of comm. rm, addition of management & resident office. replacment of cement plaster cladding, n windows & roofing. site work includes all new flatwork & landscaping...Details
priority 100% affordable housing. community rm bldg:1 of 3 structures. no dwelling units in this structure. proposed work is rehab. of comm. rm, addition of management & resident office. replacment of cement plaster cladding, n windows & roofing. site work includes all new flatwork & landscaping... | $2,000,000 |
| Jan 29, 2021 | Never finaled issued Apr 2021, no final | 301 Buchanan St | Nibbi Bros Assoc Inc. | administrative recognition & correction of occupancy, from b occupancy to e occupancy (daycare). no work under this permit. reference to permit application #201908148760.Details
administrative recognition & correction of occupancy, from b occupancy to e occupancy (daycare). no work under this permit. reference to permit application #201908148760. | |
| Feb 12, 2020 | Completed final sign-off Apr 2022 | 106 South Park | Bbi - Con Inc | exploratory demo to locate structural & utilites in advance of full demo. no more than 500 sq feet. areas of destructive testing repair and patch in kind. no distruption of guest rooms. for future build out 2019-1218-9921.Details
exploratory demo to locate structural & utilites in advance of full demo. no more than 500 sq feet. areas of destructive testing repair and patch in kind. no distruption of guest rooms. for future build out 2019-1218-9921. | $20,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 650 Fell St | Nibbi Bros Assoc Inc. | bldg 6. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 6. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $3,408,000 |
| Dec 27, 2019 | Never finaled issued Jan 2021, no final | 645 Linden St | Nibbi Bros Assoc Inc. | bldg 5. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements.maher n/a.Details
bldg 5. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements.maher n/a. | $2,130,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 695 Buchanan St | Nibbi Bros Assoc Inc. | bldg 2. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 2. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 550 Webster St | Nibbi Bros Assoc Inc. | bldg 4. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 4. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 751 Hayes St | Nibbi Bros Assoc Inc. | bldg 1. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 1. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $4,260,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 650 Linden St | Nibbi Bros Assoc Inc. | bldg 3. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 3. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $4,473,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 500 Webster St | Nibbi Bros Assoc Inc. | bldg 7. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 7. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Dec 18, 2019 | Completed final sign-off Mar 2022 | 22 South Park | Bbi - Con Inc | rehab/renovaiton improvement to sro (n) interiors. new mep. fire alarm & sprinkler deferred. repair & replace roofing drains gutters, repair exterior paint in kind. maher na.Details
rehab/renovaiton improvement to sro (n) interiors. new mep. fire alarm & sprinkler deferred. repair & replace roofing drains gutters, repair exterior paint in kind. maher na. | $2,100,000 |
| Dec 18, 2019 | Completed final sign-off Sep 2023 | 106 South Park | Saarman Construction,Ltd., Bbi - Con Inc | mayors office 13-01.rehab/renovation improvement for sing room occupancy, new interiors, new mep,new stairs, interior walls.exterior replacements. doors, paint windows in kindDetails
mayors office 13-01.rehab/renovation improvement for sing room occupancy, new interiors, new mep,new stairs, interior walls.exterior replacements. doors, paint windows in kind | $3,100,000 |
| Dec 18, 2019 | Completed final sign-off Sep 2023 | 102 South Park | Saarman Construction,Ltd., Bbi - Con Inc | rehab/renovaiton improvement for sro (n) interiors, kitchen, bath. new mep. fire alarm & sprinkler deferred. repair & replace roofing drains gutters, repair exterior paint in kind. maher na.Details
rehab/renovaiton improvement for sro (n) interiors, kitchen, bath. new mep. fire alarm & sprinkler deferred. repair & replace roofing drains gutters, repair exterior paint in kind. maher na. | $2,100,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 301 Buchanan St | Nibbi Bros Assoc Inc. | bldg 14. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 14. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $1,050,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 409 Page St | Nibbi Bros Assoc Inc. | bldg 8. rad rehab work includes: (n) kitchens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 8. rad rehab work includes: (n) kitchens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $4,330,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 405 Rose St | Nibbi Bros Assoc Inc. | bldg 13. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 13. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $2,850,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 323 Buchanan St | Nibbi Bros Assoc Inc. | bldg 9. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 9. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $900,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 312 Haight St | Nibbi Bros Assoc Inc. | bldg 15. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 15. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $3,750,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 224 Webster St | Nibbi Bros Assoc Inc. | bldg 12. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 12. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $900,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 410 Rose St | Nibbi Bros Assoc Inc. | bldg 10. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 10. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $900,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 422 Rose St | Nibbi Bros Assoc Inc. | bldg 11. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 11. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $1,800,000 |
| Dec 16, 2016 | Completed final sign-off Nov 2018 | 1251 Turk St | Cahill Const Service Inc | revision to incorporate m.o.d. approvals to pa#201511162685.Details
revision to incorporate m.o.d. approvals to pa#201511162685. | |
| May 27, 2016 | Completed final sign-off Aug 2017 | 477 Ofarrell St | Cahill Contractors Inc | revision to 201402148536. upgrade bathroom vanities at 101 residential unitsDetails
revision to 201402148536. upgrade bathroom vanities at 101 residential units | $80,000 |
| Sep 2, 2015 | Completed final sign-off Apr 2019 | 1750 Mcallister St | Tony Ng Plumbing Co, D.F.P.F Corp Dba Fine Line Construction, Fire Detection Unlimited | rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred.Details
rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred. | $12,000,000 |