Alphonse Wu
- Listed as
- authorized agent-others, contractor
- Firm
- Amone Corp
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Sep 2026
280 permits since 2000 (contractor on 280 permits, authorized agent-others on 4 permits): 232 completed, 13 in progress, 22 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 280.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 534 Broadway | Amone Corp | revision to pa 202511069121 install pull box at west elevationDetails
revision to pa 202511069121 install pull box at west elevation | |
| Sep 8, 2026 | In progress issued Oct 2026 | 534 Broadway | Amone Corp | revision to bpa: 202511069121 - replace interior doors, door frames to remain. provide self closing hinges, ada compliant hardware and smoke gasket. relocate electrical panels.Details
revision to bpa: 202511069121 - replace interior doors, door frames to remain. provide self closing hinges, ada compliant hardware and smoke gasket. relocate electrical panels. | $25,000 |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 151 Joice St | Amone Corp | replacement of all windows and sliding glass doors at residential floors 1 through 3. (building d)Details
replacement of all windows and sliding glass doors at residential floors 1 through 3. (building d) | $650,000 |
| Aug 26, 2026 | In progress issued Aug 2026 | 1290 Potrero Av | Amone Corp | concrete slab on private walkway 4' x 4' x 1'. at rear, on grade. not a part of an accessible route or exit route.Details
concrete slab on private walkway 4' x 4' x 1'. at rear, on grade. not a part of an accessible route or exit route. | $5,000 |
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 945 Sacramento St | Amone Corp | replacement of all window and sliding glass doors at residential floors: building t- floors 2 through 12, buildings a & b - floors 1 through 4, building c & d: floors 1 through 3Details
replacement of all window and sliding glass doors at residential floors: building t- floors 2 through 12, buildings a & b - floors 1 through 4, building c & d: floors 1 through 3 | $3,800,000 |
| Aug 10, 2026 | In progress filed Aug 2026, not yet issued | 141 Leland Av | Amone Corp | remove (e) fence, pedestrian gate, vehicular gate, parking lighting. and provide new fence, pedestrian gate, vehicular gate, in place of (e), provide new post mounted, parking lighting, paving for pot and parking, underground infraestructure for future ev charger.Details
remove (e) fence, pedestrian gate, vehicular gate, parking lighting. and provide new fence, pedestrian gate, vehicular gate, in place of (e), provide new post mounted, parking lighting, paving for pot and parking, underground infraestructure for future ev charger. | $35,000 |
| Jun 24, 2026 | In progress issued Aug 2026 | 1390 Noriega St | Amone Corp | 1/f: interior tenant improvement to convert (e) office space to pharmacy on first floor. scope of work includes but not limited to interior demolition & new construction of partitions, ceilings, lighting, finishes, mep work. change exterior window to door, change storefront door to sliding doorDetails
1/f: interior tenant improvement to convert (e) office space to pharmacy on first floor. scope of work includes but not limited to interior demolition & new construction of partitions, ceilings, lighting, finishes, mep work. change exterior window to door, change storefront door to sliding door | $800,000 |
| May 20, 2026 | Completed final sign-off May 2026 | 1117 Market St | Amone Corp | g/f and 2/f: revision to permit 202308033645. change to floor plan layout. no change to plumbing fixtures.Details
g/f and 2/f: revision to permit 202308033645. change to floor plan layout. no change to plumbing fixtures. | |
| Mar 4, 2026 | Completed final sign-off Mar 2026 | 1515 Vallejo St | Amone Corp | to obtain final inspection for work approved under pa#: 202310058093. all work is complete.Details
to obtain final inspection for work approved under pa#: 202310058093. all work is complete. | |
| Mar 4, 2026 | Completed final sign-off Mar 2026 | 1590 Broadway | Amone Corp | to obtain final inspection for work approved under pa#: 202205174400. all work is complete.Details
to obtain final inspection for work approved under pa#: 202205174400. all work is complete. | |
| Mar 3, 2026 | In progress issued Oct 2026 | 1750 Noriega St | Amone Corp | the building will be used for a primary care clinic and is not an oshpd3 licensed facility. scope of work includes reception, intake rm, physical therapy rm, dining area, activity rm, pantry, quiet rm, private offices, waste holding, electrical room, gender neutral toilet/shower rooms, laundry room.Details
the building will be used for a primary care clinic and is not an oshpd3 licensed facility. scope of work includes reception, intake rm, physical therapy rm, dining area, activity rm, pantry, quiet rm, private offices, waste holding, electrical room, gender neutral toilet/shower rooms, laundry room. | $2,500,000 |
| Feb 27, 2026 | Completed final sign-off Mar 2026 | 3554 17th St | Amone Corp | to obtain final inspection for work approved under pa#201709117613. all work is complete.Details
to obtain final inspection for work approved under pa#201709117613. all work is complete. | |
| Nov 10, 2025 | Completed final sign-off Apr 2026 | 1117 Market St | Amone Corp | new rooftop unit & 2 split fancoil system to replace removed existing heating systems. new exhaust fan. deferred pa#; 202308033645Details
new rooftop unit & 2 split fancoil system to replace removed existing heating systems. new exhaust fan. deferred pa#; 202308033645 | $75,000 |
| Nov 6, 2025 | In progress issued Dec 2025 | 534 Broadway | Amone Corp | relocate restrooms & laundry rm, replace finishes throughout, replace rehab windows, rehab units. final completiion only after pa#202503101910 final completionDetails
relocate restrooms & laundry rm, replace finishes throughout, replace rehab windows, rehab units. final completiion only after pa#202503101910 final completion | $3,500,000 |
| Oct 24, 2025 | In progress issued Oct 2025 | 1649 Jerrold Av | Amone Corp | repair exterior siding in-kind, damages from car collision, verify electric and gas meter safety, to comply with nov#202545249Details
repair exterior siding in-kind, damages from car collision, verify electric and gas meter safety, to comply with nov#202545249 | $5,000 |
| Sep 30, 2025 | Completed final sign-off Jun 2026 | 141 Leland Av | Amone Corp | dry rot repair @ cafeteria inside group home facility. 1st floor of facility.Details
dry rot repair @ cafeteria inside group home facility. 1st floor of facility. | $8,000 |
| Sep 16, 2025 | Completed final sign-off Nov 2025 | 5630 Mission St | Amone Corp | unit 324 & 224: dry rot repair at bay window 2nd & 3rd/fDetails
unit 324 & 224: dry rot repair at bay window 2nd & 3rd/f | $10,000 |
| Jul 30, 2025 | Completed final sign-off Sep 2025 | 5630 Mission St | Amone Corp | units 108 & 122: shower repair, new shower head, tile, waterproofing, shower pan and water test. all in-kind work. only shower work.Details
units 108 & 122: shower repair, new shower head, tile, waterproofing, shower pan and water test. all in-kind work. only shower work. | $10,000 |
| Jul 18, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | 2/f: voluntary seismic wall ties at 2/f lightwells.Details
2/f: voluntary seismic wall ties at 2/f lightwells. | $45,000 |
| Jul 17, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | second and third floor plan common bathroom ( room 205 & 303) revision to reflect existing conditions correctly as requestd by field inspector. revision to bpa#2024-0419-0348Details
second and third floor plan common bathroom ( room 205 & 303) revision to reflect existing conditions correctly as requestd by field inspector. revision to bpa#2024-0419-0348 | |
| Jul 14, 2025 | Completed final sign-off Mar 2026 | 728 Pacific Av | Amone Corp | 2/f: partial ti of existing medical exam room and supporting spaces. 3/f: partial ti to expand open office space and provide conference room and restrooms. new non-bearing partitions, new finishes.Details
2/f: partial ti of existing medical exam room and supporting spaces. 3/f: partial ti to expand open office space and provide conference room and restrooms. new non-bearing partitions, new finishes. | $1,260,912 |
| Jun 4, 2025 | Completed final sign-off Nov 2025 | 585 Geary St | Amone Corp | revision to pa 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 (n) door openings, 1 (n) partition wall, 1 (n) cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilatorDetails
revision to pa 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 (n) door openings, 1 (n) partition wall, 1 (n) cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilator | $196,400 |
| Mar 31, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | interior unit entry door and door frame replace in kind per ca historical bldg code. the replaced door and frame will maintain the (e) door dimensions. the door and frame will be upgraded to be 20 minute fire rated, and new single motion lever and lock door hardware will be installed.Details
interior unit entry door and door frame replace in kind per ca historical bldg code. the replaced door and frame will maintain the (e) door dimensions. the door and frame will be upgraded to be 20 minute fire rated, and new single motion lever and lock door hardware will be installed. | $75,000 |
| Mar 26, 2025 | Completed final sign-off Mar 2026 | 1590 Broadway | Amone Corp | main building - reference permit #202205174400. scope modified to install concrete beams under new proposed support columns. also include 2 exterior ramps and handrails along with deck between columns. work is only at main building.Details
main building - reference permit #202205174400. scope modified to install concrete beams under new proposed support columns. also include 2 exterior ramps and handrails along with deck between columns. work is only at main building. | $60,000 |
| Mar 18, 2025 | Completed final sign-off Apr 2025 | 195 Woolsey St | Amone Corp | revision to 201910245432. add foundation along gridline 3 and revise detail along gridline 4.Details
revision to 201910245432. add foundation along gridline 3 and revise detail along gridline 4. | $10,000 |
| Mar 3, 2025 | Completed final sign-off Sep 2025 | 1515 Vallejo St | Amone Corp | install pre-fabricated stair for pg&e access. fix one leaf door in closed position.Details
install pre-fabricated stair for pg&e access. fix one leaf door in closed position. | $15,000 |
| Feb 27, 2025 | In progress filed Feb 2025, not yet issued | 799 Pacific Av | Amone Corp | new out door fence and gate(construction revision) per pa #202501077873. relocate of the proposed, fence away from the existing, pull down fire escape ladder. replacement of exterior doors with new exterior door and window; construction revision cost is $10,000.00Details
new out door fence and gate(construction revision) per pa #202501077873. relocate of the proposed, fence away from the existing, pull down fire escape ladder. replacement of exterior doors with new exterior door and window; construction revision cost is $10,000.00 | $10,000 |
| Feb 24, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | revision to pa 202404190348 to add wall ties to remaining half of 2nd fl. structural revision onlyDetails
revision to pa 202404190348 to add wall ties to remaining half of 2nd fl. structural revision only | $25,000 |
| Feb 20, 2025 | In progress issued Apr 2025 | 795 Pacific Av | Amone Corp | new outdoor fence and gate @ playground behind the building of 795 pacific ave. not on property lineDetails
new outdoor fence and gate @ playground behind the building of 795 pacific ave. not on property line | $15,000 |
| Jan 7, 2025 | In progress issued Jan 2025 | 799 Pacific Av | Amone Corp | new outdoor fence and gate.Details
new outdoor fence and gate. | $15,000 |
| Dec 6, 2024 | Completed final sign-off Jun 2025 | 1400 Noriega St | Amone Corp | 2nd fl remodel reception desk, soffit, light & security gateDetails
2nd fl remodel reception desk, soffit, light & security gate | $200,000 |
| Nov 12, 2024 | Completed final sign-off Dec 2024 | 227 Bay St | Amone Corp | 200 sq.ft. of concrete and rebar repair in deck slab of unit 109.Details
200 sq.ft. of concrete and rebar repair in deck slab of unit 109. | $25,000 |
| Jun 25, 2024 | Completed final sign-off Nov 2025 | 585 Geary St | Amone Corp | 100% affordable housing:interior work:renovations to mep, fixtures,& arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includes(n)cabinetry,countertops,appliances & replacing plumb fixtures.Details
100% affordable housing:interior work:renovations to mep, fixtures,& arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includes(n)cabinetry,countertops,appliances & replacing plumb fixtures. | $2,500,000 |
| May 14, 2024 | Completed final sign-off Aug 2025 | 585 Geary St | Amone Corp | repair and normal maintenance for in kind replacement in all units. includes window painting at front facade in and kind window replacement at rear,east,and west elevation.not visiable from street. scope includes new flooring,interior painting, and interior volutary signage.Details
repair and normal maintenance for in kind replacement in all units. includes window painting at front facade in and kind window replacement at rear,east,and west elevation.not visiable from street. scope includes new flooring,interior painting, and interior volutary signage. | $355,000 |
| Apr 19, 2024 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | scope:repair & normal maintenance for in kind replacement of appliances & finishes, providing a utility sink, insulating extg hot water laterals, mech. repairs & hallway ventilation, in kind lighting fixutres & receptacles, new flooring, interior painting, in kind window replacement,Details
scope:repair & normal maintenance for in kind replacement of appliances & finishes, providing a utility sink, insulating extg hot water laterals, mech. repairs & hallway ventilation, in kind lighting fixutres & receptacles, new flooring, interior painting, in kind window replacement, | $2,500,000 |
| Apr 9, 2024 | Completed final sign-off Sep 2024 | 665 Clay St | Amone Corp | to obtain final inspection for work approved under pa# 200501274099Details
to obtain final inspection for work approved under pa# 200501274099 | |
| Mar 29, 2024 | Completed final sign-off Jul 2024 | 2323 Sacramento St | Amone Corp | ab-017 interior demo only. nonstructural walls, doors, and frames. electrical and plumbing fixturesDetails
ab-017 interior demo only. nonstructural walls, doors, and frames. electrical and plumbing fixtures | $30,000 |
| Feb 14, 2024 | Completed final sign-off May 2024 | 1441 Ocean Av | Amone Corp | 7yrevision pa# 2023-1101-9923 new location of sink & cabinets in exam rooms 1,2,3 & 6. new sliding door at exam rooms 1,2,3 & 4. new location of proposed electrical switch and outlets at exam rooms 1,2,3 & 4Details
7yrevision pa# 2023-1101-9923 new location of sink & cabinets in exam rooms 1,2,3 & 6. new sliding door at exam rooms 1,2,3 & 4. new location of proposed electrical switch and outlets at exam rooms 1,2,3 & 4 | |
| Jan 5, 2024 | Completed final sign-off Apr 2024 | 1040 Fillmore St | Amone Corp | unit 501 only: replacement of (1) kitchen cabinets and plumbing fixtures. (2) bathroom fixtures in kind, same locations.Details
unit 501 only: replacement of (1) kitchen cabinets and plumbing fixtures. (2) bathroom fixtures in kind, same locations. | $40,000 |
| Dec 14, 2023 | Completed final sign-off May 2024 | 1536 Wallace Av | Amone Corp | demo interior unpermitted wall, ceiling, stair, mezzanine. exit sign at warehouse. new wall infill, exhaust fan on roof, ext door replacement. comply with planning enforcement case number 2023010331-enf, bid 202315170Details
demo interior unpermitted wall, ceiling, stair, mezzanine. exit sign at warehouse. new wall infill, exhaust fan on roof, ext door replacement. comply with planning enforcement case number 2023010331-enf, bid 202315170 | $8,000 |
| Dec 6, 2023 | Completed final sign-off Aug 2024 | 665 Clay St | Amone Corp | revision to pa# 201910255615, changes ae: installation of tie beam to ground floor along commerical st, new concrete columns need to extend down about 20" more, relocation of auxiliary support steel column to align w/ pilaster below.Details
revision to pa# 201910255615, changes ae: installation of tie beam to ground floor along commerical st, new concrete columns need to extend down about 20" more, relocation of auxiliary support steel column to align w/ pilaster below. | $10,000 |
| Nov 1, 2023 | Completed final sign-off May 2024 | 1441 Ocean Av | Amone Corp | conversion of (e) waiting area and office for 2 new acupuncture rooms. remodeling of 2 (e) acupuncture rooms. remodeling of (e) office-area of works: 638 sf.Details
conversion of (e) waiting area and office for 2 new acupuncture rooms. remodeling of 2 (e) acupuncture rooms. remodeling of (e) office-area of works: 638 sf. | $160,000 |
| Oct 5, 2023 | Expired or cancelled expired Mar 2026 | 1515 Vallejo St | Amone Corp | remove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 7 repairs.Details
remove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 7 repairs. | $13,000 |
| Oct 5, 2023 | Completed final sign-off Mar 2026 | 1590 Broadway | Amone Corp | remove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 29 replacements, 1 repair.Details
remove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 29 replacements, 1 repair. | $300,000 |
| Aug 3, 2023 | Completed final sign-off May 2026 | 1117 Market St | Amone Corp | g/f & 2/f: new office partitions, ceiling, lighting, power/data, casework, signage, toilet accessories, interior stair, interior windowsDetails
g/f & 2/f: new office partitions, ceiling, lighting, power/data, casework, signage, toilet accessories, interior stair, interior windows | $1,371,959 |
| Jul 5, 2023 | Completed final sign-off Nov 2023 | 3386 21st St | Amone Corp | to comply with the abe program #2023-0705-7732 accessible business entrance program per ordinance 51-16 remove entry gate at 3386 21stst. install new gate with door operator for accessiblity install door operator on ground fl. entry door for accessibilityDetails
to comply with the abe program #2023-0705-7732 accessible business entrance program per ordinance 51-16 remove entry gate at 3386 21stst. install new gate with door operator for accessiblity install door operator on ground fl. entry door for accessibility | $45,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 1001 Powell St | Amone Corp | owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422Details
owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422 | $170,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240.Details
add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240. | $129,500 |
| May 25, 2023 | Completed final sign-off Sep 2023 | 363 Noe St | Amone Corp | install fence and motorized vehicle gate at rear parking lot in rear of building inside the property line. no work in prow. no changes to fixrure count.Details
install fence and motorized vehicle gate at rear parking lot in rear of building inside the property line. no work in prow. no changes to fixrure count. | $10,000 |
| May 18, 2023 | Completed final sign-off Apr 2026 | 1117 Market St | Amone Corp | structural work only: re-supporting the rear 2nd floor, other works are under separate permit: accessibility upgrade, t.i., new stair from ground floor to 2/f floor, accessible upgrades- toilet rooms (under sep permits)Details
structural work only: re-supporting the rear 2nd floor, other works are under separate permit: accessibility upgrade, t.i., new stair from ground floor to 2/f floor, accessible upgrades- toilet rooms (under sep permits) | $304,662 |
| Apr 14, 2023 | Completed final sign-off Dec 2023 | 728 Pacific Av | Amone Corp | tenant improvement for e medical office suite 608Details
tenant improvement for e medical office suite 608 | $221,488 |
| Mar 10, 2023 | Completed final sign-off Dec 2023 | 937 Clay St | Amone Corp | rev to pa# 202109309577, 1 of the bedrooms in unit 250 @ ground lvl converted to trash room. the bedroom unit will become a 1 bedrm unit.property manager office will be relocated from the 2nd flr to the former study of unit 250 and a single occup restrm will be added. ramp will be modified @ 250Details
rev to pa# 202109309577, 1 of the bedrooms in unit 250 @ ground lvl converted to trash room. the bedroom unit will become a 1 bedrm unit.property manager office will be relocated from the 2nd flr to the former study of unit 250 and a single occup restrm will be added. ramp will be modified @ 250 | $40,000 |
| Feb 22, 2023 | Never finaled issued Feb 2023, no final | 1019 Clement St | Amone Corp | to obtain final inspection for work approved under pa# 201801269681. all work is complete.Details
to obtain final inspection for work approved under pa# 201801269681. all work is complete. | |
| Feb 9, 2023 | Completed final sign-off Mar 2024 | 1003 Powell St | Amone Corp | t.i., replace (e) restroom w/accessible single occ restroom, replace wall/floor finishes, (e) light fixtures, power, reinstall tenant plumb fixtures & washing machine. abe under bpa#202204142240Details
t.i., replace (e) restroom w/accessible single occ restroom, replace wall/floor finishes, (e) light fixtures, power, reinstall tenant plumb fixtures & washing machine. abe under bpa#202204142240 | $18,000 |
| Dec 21, 2022 | Completed final sign-off Dec 2023 | 937 Clay St | Amone Corp | scope of work include conversion of sro unit 223, 323, and 425 to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust,Details
scope of work include conversion of sro unit 223, 323, and 425 to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust, | $120,000 |
| Dec 9, 2022 | Completed final sign-off Dec 2022 | 615 Grant Av | Amone Corp | revision to permit 202208150517. remove (2) wall on the 3/f server room.Details
revision to permit 202208150517. remove (2) wall on the 3/f server room. | |
| Nov 7, 2022 | Completed final sign-off Mar 2026 | 1515 Vallejo St | Amone Corp | north wing: provide ten steel diaphragm strengthening frames at (e)skylight opening above g/f. all work to occur on interior side of skylight above vacant commercial space & boiler room. provide steel brackets at each of the two (e) bridges that connect the north wing to the main bldg.Details
north wing: provide ten steel diaphragm strengthening frames at (e)skylight opening above g/f. all work to occur on interior side of skylight above vacant commercial space & boiler room. provide steel brackets at each of the two (e) bridges that connect the north wing to the main bldg. | $106,000 |
| Oct 13, 2022 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | partial replacement of footings to correct conditions found during construction under permit #202204142240Details
partial replacement of footings to correct conditions found during construction under permit #202204142240 | $10,000 |
| Sep 30, 2022 | Completed final sign-off Feb 2025 | 2820 16th St | Amone Corp | new t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac.Details
new t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac. | $264,600 |
| Sep 12, 2022 | Completed final sign-off Oct 2022 | 1201 Powell St | Amone Corp | to obtain final inspection for work approved under pa# 202002255287. all work is complete.Details
to obtain final inspection for work approved under pa# 202002255287. all work is complete. | |
| Aug 29, 2022 | Completed final sign-off Dec 2024 | 683 Florida St | Amone Corp | g/f: creating a multi-purpose space with a recording studio, dance rehearsal space, a kitchen and maker's space on ground floor of the base building. signage design will be under separate permit shown here for reference only.Details
g/f: creating a multi-purpose space with a recording studio, dance rehearsal space, a kitchen and maker's space on ground floor of the base building. signage design will be under separate permit shown here for reference only. | $1,750,000 |
| Aug 15, 2022 | Completed final sign-off Dec 2022 | 615 Grant Av | Amone Corp | office space t.i, new finishes, doors, walls, provide accessible sink & counter @ 4th fl. breakroom & 3rd fl. server room. kitchenette for employee self-use only. no outside catering will be provided.Details
office space t.i, new finishes, doors, walls, provide accessible sink & counter @ 4th fl. breakroom & 3rd fl. server room. kitchenette for employee self-use only. no outside catering will be provided. | $178,000 |
| Jul 14, 2022 | Completed final sign-off Feb 2024 | 1005 Powell St | Amone Corp | replace dry rot wood sleeper in dirt with non-structural concrete slab on grade. structure work under permit #202202228422 600 sq ft.Details
replace dry rot wood sleeper in dirt with non-structural concrete slab on grade. structure work under permit #202202228422 600 sq ft. | $5,000 |
| Jun 14, 2022 | Completed final sign-off Jan 2024 | 1590 Broadway | Amone Corp | replace (e) kitchen and counter top in 21 acessible units to meet hud requirements . interior onlyDetails
replace (e) kitchen and counter top in 21 acessible units to meet hud requirements . interior only | $168,000 |
| May 18, 2022 | Completed final sign-off May 2022 | 385 Eddy St | Amone Corp | reduction of scope for 201905029560. removal of fsd on level 2, 3, 4, 5 & 6. total of 2 fsd's removald on each floor/level.Details
reduction of scope for 201905029560. removal of fsd on level 2, 3, 4, 5 & 6. total of 2 fsd's removald on each floor/level. | |
| May 17, 2022 | Expired or cancelled expired Mar 2026 | 1590 Broadway | Amone Corp | 100% affordable housing. main bldg: install new concrete foundation at new steel columns at rear of bldg. provide new concrete walkway and flat work at west courtyard. provide new handrail at (e) ramp. provide steel brackets at each of the two (e) bridges that connect the north wing to the main bldgDetails
100% affordable housing. main bldg: install new concrete foundation at new steel columns at rear of bldg. provide new concrete walkway and flat work at west courtyard. provide new handrail at (e) ramp. provide steel brackets at each of the two (e) bridges that connect the north wing to the main bldg | $200,000 |
| May 3, 2022 | Completed final sign-off Sep 2023 | 363 Noe St | Amone Corp | deferred submittal for approved bpa #202107094047. parking lot renovation for 21 unit public housing apt. 1 van accessible parking spot in rear of bldg, including platform lift for accessible path of travel to main level of bldg. no work in public right away.Details
deferred submittal for approved bpa #202107094047. parking lot renovation for 21 unit public housing apt. 1 van accessible parking spot in rear of bldg, including platform lift for accessible path of travel to main level of bldg. no work in public right away. | $25,000 |
| Apr 14, 2022 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | to comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalkDetails
to comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalk | $150,000 |
| Feb 25, 2022 | Completed final sign-off Mar 2024 | 1001 Powell St | Amone Corp | r/r finishes,fixtures,equipment and mep upgrades at units of the 4 sro levels of 1005 powell. door openings at the unit entires are widened to 36in.(e) wdws at fire escapes are replaced with doors.wdws replace with alum-clad wdw at powell and clay st elevations. and vinyl windowsDetails
r/r finishes,fixtures,equipment and mep upgrades at units of the 4 sro levels of 1005 powell. door openings at the unit entires are widened to 36in.(e) wdws at fire escapes are replaced with doors.wdws replace with alum-clad wdw at powell and clay st elevations. and vinyl windows | $1,500,000 |
| Feb 22, 2022 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | structural work mandatory soft story retrofit using cebc appendix ch a4 and associated accessibility alterations. accessibility improvments include replacement of entry door and side lite at e laundromat. automatic door operators added to the laundromat entrace and at the existing salon door entrancDetails
structural work mandatory soft story retrofit using cebc appendix ch a4 and associated accessibility alterations. accessibility improvments include replacement of entry door and side lite at e laundromat. automatic door operators added to the laundromat entrace and at the existing salon door entranc | $175,000 |
| Feb 3, 2022 | Completed final sign-off Apr 2022 | 2200 Van Ness Av | Amone Corp | revision to permit #202001303133. provide window in extg window opening. provide handrails at extg entrance.Details
revision to permit #202001303133. provide window in extg window opening. provide handrails at extg entrance. | |
| Jan 28, 2022 | Completed final sign-off Jun 2022 | 728 Pacific Av | Amone Corp | suite 115: revision to permit 202108045808. update layout.Details
suite 115: revision to permit 202108045808. update layout. | $10,000 |
| Jan 14, 2022 | Completed final sign-off Apr 2022 | 671 China Basin St | Amone Corp | recalculation of occupancy load to allow retention of (e) as built door/swing. permit 2021-0214-4828 revision. original exterior paly area (58) . proposed occupancy (47) based on deletion of fixed yard structures/storage.Details
recalculation of occupancy load to allow retention of (e) as built door/swing. permit 2021-0214-4828 revision. original exterior paly area (58) . proposed occupancy (47) based on deletion of fixed yard structures/storage. | |
| Dec 29, 2021 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | common space improvements include replacement or repair of finishes, fixtures, equipment and mep upgrades at community kitchens, bathrooms and corridors of the 4 sro residential levels of 1005 powell. 1 of the bathrooms will be made semi-accessible at each level. doors at the bathrooms and ktchensDetails
common space improvements include replacement or repair of finishes, fixtures, equipment and mep upgrades at community kitchens, bathrooms and corridors of the 4 sro residential levels of 1005 powell. 1 of the bathrooms will be made semi-accessible at each level. doors at the bathrooms and ktchens | $475,000 |
| Dec 22, 2021 | Completed final sign-off May 2022 | 385 Eddy St | Amone Corp | revision to permit 201905029560: added rear improvements by adding a deck (30" max.) above (e) grade and fence and replacing (e) door with accessible in-kind door.Details
revision to permit 201905029560: added rear improvements by adding a deck (30" max.) above (e) grade and fence and replacing (e) door with accessible in-kind door. | $55,000 |
| Nov 9, 2021 | Completed final sign-off Oct 2023 | 255 Shotwell St | Amone Corp | revision to pa# 202009103857. revised shared restroom. shared bathroom between tenant spaces deleted, new single stall restroom for tenant a only. expanded storage sq. ft.Details
revision to pa# 202009103857. revised shared restroom. shared bathroom between tenant spaces deleted, new single stall restroom for tenant a only. expanded storage sq. ft. | |
| Nov 5, 2021 | Completed final sign-off Oct 2022 | 1201 Powell St | Amone Corp | res'l units not in scope. provide a new accessible all gender restrm to comm'l retail space on gr fl; new all gender restrm includes (n) door, frameand hardware, (n) paint, flooring, toilet, lavatory, bath accessories, efficient lighting, gfci rated outlets. (n) storage shelving. no addition and noDetails
res'l units not in scope. provide a new accessible all gender restrm to comm'l retail space on gr fl; new all gender restrm includes (n) door, frameand hardware, (n) paint, flooring, toilet, lavatory, bath accessories, efficient lighting, gfci rated outlets. (n) storage shelving. no addition and no | $20,000 |
| Sep 30, 2021 | Completed final sign-off Nov 2023 | 937 Clay St | Amone Corp | add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferredDetails
add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferred | $400,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1361 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016c | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1353 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016bDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016b | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1357 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016c | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1365 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016c | $925,000 |
| Aug 4, 2021 | Completed final sign-off Jun 2022 | 728 Pacific Av | Amone Corp | #115-1/f: t.i. mall of midrise building. new partitions, casework, toilet room, interior mall windows/doors, security gates, hvac, lighting, plumbingDetails
#115-1/f: t.i. mall of midrise building. new partitions, casework, toilet room, interior mall windows/doors, security gates, hvac, lighting, plumbing | $280,000 |
| Jul 26, 2021 | Completed final sign-off Nov 2023 | 937 Clay St | Amone Corp | planned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms w/ trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of bldg. there is no work being done @ ground fl of bldg under this permitDetails
planned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms w/ trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of bldg. there is no work being done @ ground fl of bldg under this permit | $400,000 |
| Jul 9, 2021 | Completed final sign-off Sep 2023 | 363 Noe St | Amone Corp | 21 public housing apt w/ 1 resident mgr office. rehab & accesibility @ community space w/ kitchenette,toilet rms & launtry room. replaced windows & exterior doors troughout, (n) roofing, boilers, finishes,fixtures & appliances.(n)mep fixtures+equipmt.minor elevator modernize.addit "b" for office.Details
21 public housing apt w/ 1 resident mgr office. rehab & accesibility @ community space w/ kitchenette,toilet rms & launtry room. replaced windows & exterior doors troughout, (n) roofing, boilers, finishes,fixtures & appliances.(n)mep fixtures+equipmt.minor elevator modernize.addit "b" for office. | $5,000,000 |
| Apr 15, 2021 | Completed final sign-off Jan 2022 | 2200 Van Ness Av | Amone Corp | revision to pa 202001303133. revise opening to accessible alcove, moving interior walls, changing concrete strength. ground floor office is accessory to ccdc housing.Details
revision to pa 202001303133. revise opening to accessible alcove, moving interior walls, changing concrete strength. ground floor office is accessory to ccdc housing. | |
| Feb 25, 2021 | Never finaled issued Apr 2021, no final | 728 Pacific Av | Amone Corp | no construction to be done. request to designate an area within mixed used space for a "place of assembly" permit.Details
no construction to be done. request to designate an area within mixed used space for a "place of assembly" permit. | |
| Feb 17, 2021 | Completed final sign-off May 2022 | 671 China Basin St | Amone Corp | t.i. build out for a childcare center in a 100% affordable housing project(bpa#201804196818)for 4,428 sq childcare center for 45 children. interior spaces:pre-school,toddler & infant classrooms w/ children's restrooms,central space,food warming/prep room,family & staff resources offices.Details
t.i. build out for a childcare center in a 100% affordable housing project(bpa#201804196818)for 4,428 sq childcare center for 45 children. interior spaces:pre-school,toddler & infant classrooms w/ children's restrooms,central space,food warming/prep room,family & staff resources offices. | $1,125,000 |
| Feb 4, 2021 | Completed final sign-off Dec 2021 | 804 Clement St | Amone Corp | four bathrooms & two kitchen remodel, paint & flooring, new lighting. in-kind replacement. layout to remain the same. (work in residential units only).Details
four bathrooms & two kitchen remodel, paint & flooring, new lighting. in-kind replacement. layout to remain the same. (work in residential units only). | $50,000 |
| Jan 4, 2021 | Completed final sign-off Dec 2021 | 800 Clement St | Amone Corp | repair or replace 15 existing wood windows with similar wood windows. visible from street. wood to wood being single or double hung with ogee lugs and the curved bays will have curved sashesDetails
repair or replace 15 existing wood windows with similar wood windows. visible from street. wood to wood being single or double hung with ogee lugs and the curved bays will have curved sashes | $28,000 |
| Nov 17, 2020 | Never finaled issued Feb 2021, no final | 728 Pacific Av | Amone Corp | suite #201: no construction; tenant space to remain as is. previous a-2 accessory occupancy to be reinstated to activity area under current existing property conditionsDetails
suite #201: no construction; tenant space to remain as is. previous a-2 accessory occupancy to be reinstated to activity area under current existing property conditions | |
| Nov 3, 2020 | Completed final sign-off Oct 2022 | 900 Jackson St | Amone Corp | rehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing.Details
rehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing. | $1,500,000 |
| Oct 19, 2020 | Completed final sign-off Feb 2022 | 800 Clement St | Amone Corp | voluntary lateral strengthening and associated repairs to floor in area of seismic work. also accessibility per 20% rule.Details
voluntary lateral strengthening and associated repairs to floor in area of seismic work. also accessibility per 20% rule. | $25,000 |
| Aug 27, 2020 | Completed final sign-off Nov 2020 | 3158 Mission St | Amone Corp | commencement of work approved under permit application #201707071225Details
commencement of work approved under permit application #201707071225 | $30,000 |
| May 21, 2020 | Completed final sign-off Jun 2020 | 348 Precita Av | Amone Corp | rev to pa#202002204930. revise the new foundation details (sheet s-3 detail 5).Details
rev to pa#202002204930. revise the new foundation details (sheet s-3 detail 5). | |
| May 20, 2020 | Never finaled issued Jul 2020, no final | 3198 24th St | Amone Corp | mech, electrical & plumb work for interior t.i of (e) ground flr tenant space for (e) donut cafe. (n) furnace, restrm exhaust fan, type 1 hood & associated exhaust fan & makeup air unit. replace electrical branch cir panel,(n) water heater & grease interceptor. ref pa#'s 201809130103, 201912179801Details
mech, electrical & plumb work for interior t.i of (e) ground flr tenant space for (e) donut cafe. (n) furnace, restrm exhaust fan, type 1 hood & associated exhaust fan & makeup air unit. replace electrical branch cir panel,(n) water heater & grease interceptor. ref pa#'s 201809130103, 201912179801 | $100,000 |
| May 11, 2020 | Completed final sign-off Oct 2021 | 1535 Jackson St | Amone Corp | revision to permit application number 2019-1114-7307 for mandatory soft story retrofit using cebc appendix a-4. revision includes changes based field conditions and eliminates two shear lines for value engineering.Details
revision to permit application number 2019-1114-7307 for mandatory soft story retrofit using cebc appendix a-4. revision includes changes based field conditions and eliminates two shear lines for value engineering. | |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 344 Precita Av | Amone Corp | removal of (e) roofdeck to replace (e) flatroof, reinstall (e) deck mat'l after roofwork, work less than 50% of new mat'l, roof under separate permit, exploratory demo of exterior wood siding for structural investigatives, replace (13) aluminum clad wood windows in-kind.Details
removal of (e) roofdeck to replace (e) flatroof, reinstall (e) deck mat'l after roofwork, work less than 50% of new mat'l, roof under separate permit, exploratory demo of exterior wood siding for structural investigatives, replace (13) aluminum clad wood windows in-kind. | $10,000 |
| Feb 25, 2020 | Completed final sign-off Oct 2022 | 1201 Powell St | Amone Corp | mandatory soft story retrofit of gr fl basement based on 2019 cebc appendix chapter a4. comply with nov 201803429Details
mandatory soft story retrofit of gr fl basement based on 2019 cebc appendix chapter a4. comply with nov 201803429 | $200,000 |
| Feb 25, 2020 | Expired or cancelled expired Oct 2022 | 1201 Powell St | Amone Corp | mandatory soft story retrofit of gr fl and basement based on 2019 cebc appendix ch a4. includes accesibility improvments to commercial entry. automatic door. comply with nov 201803426Details
mandatory soft story retrofit of gr fl and basement based on 2019 cebc appendix ch a4. includes accesibility improvments to commercial entry. automatic door. comply with nov 201803426 | $40,000 |