David Crestifield
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Triangle Engineering
- Based in
- Sf
- On San Francisco permits
- Feb 2006 to Jul 2025
26 permits since 2000 (engineer on 19 permits, architect on 6 permits, authorized agent-others on 1 permit): 23 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 18, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | 2/f: voluntary seismic wall ties at 2/f lightwells.Details
2/f: voluntary seismic wall ties at 2/f lightwells. | $45,000 |
| Dec 6, 2023 | Completed final sign-off Aug 2024 | 665 Clay St | Amone Corp | revision to pa# 201910255615, changes ae: installation of tie beam to ground floor along commerical st, new concrete columns need to extend down about 20" more, relocation of auxiliary support steel column to align w/ pilaster below.Details
revision to pa# 201910255615, changes ae: installation of tie beam to ground floor along commerical st, new concrete columns need to extend down about 20" more, relocation of auxiliary support steel column to align w/ pilaster below. | $10,000 |
| Aug 16, 2023 | Completed final sign-off Feb 2024 | 1175 Oakdale Av | Mulhall Construction Inc. | work on 6 unit bldg (1183-1187 oakdale): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 6 unit bldg (1183-1187 oakdale): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Feb 2024 | 766 Kirkwood Av | Mulhall Construction Inc. | work on 10 unit bldg (778-782 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 10 unit bldg (778-782 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Mar 2024 | 1065 Oakdale Av | Mulhall Construction Inc. | work on 7 unit bldg (1071-1077 oakdale): mandatory soft-story retrofit to foundation/basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 7 unit bldg (1071-1077 oakdale): mandatory soft-story retrofit to foundation/basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Feb 2024 | 784 Kirkwood Av | Mulhall Construction Inc. | work on 10 unit bldg (788-792 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 10 unit bldg (788-792 kirkwood): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 16, 2023 | Completed final sign-off Mar 2024 | 1130 Palou Av | Mulhall Construction Inc. | work on 10 unit bldg (1148-1152 palou): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement onlyDetails
work on 10 unit bldg (1148-1152 palou): mandatory soft-story retrofit to foundation/ basement level, based on ca bldg code appendix a-4. work limit to crawlspece/basement only | $75,000 |
| Aug 11, 2023 | Completed final sign-off Mar 2024 | 1163 Oakdale Av | Mulhall Construction Inc. | work is only for 10-unit building (1163-1167 oakdale): mandatory soft-story retrofit to foundation/ basement level. ca bldg code appendix a-4. work limit to crawl space/basement level onlyDetails
work is only for 10-unit building (1163-1167 oakdale): mandatory soft-story retrofit to foundation/ basement level. ca bldg code appendix a-4. work limit to crawl space/basement level only | $75,000 |
| Oct 19, 2020 | Completed final sign-off Feb 2022 | 800 Clement St | Amone Corp | voluntary lateral strengthening and associated repairs to floor in area of seismic work. also accessibility per 20% rule.Details
voluntary lateral strengthening and associated repairs to floor in area of seismic work. also accessibility per 20% rule. | $25,000 |
| Nov 19, 2019 | Completed final sign-off Apr 2020 | 253 Mullen Av | repair rear stairs and dedk in kind, less than 50%Details
repair rear stairs and dedk in kind, less than 50% | $10,000 | |
| Apr 17, 2019 | Completed final sign-off Jul 2019 | 462 Green St | F D C Construction Inc | minor alterations & repairs to ground floor (basement). work includes in kind replacement of stairs from basement to 1st fl; exit deck repairs, shifting of passageway door to provide clearance and slab replacement.Details
minor alterations & repairs to ground floor (basement). work includes in kind replacement of stairs from basement to 1st fl; exit deck repairs, shifting of passageway door to provide clearance and slab replacement. | $25,000 |
| Apr 15, 2019 | Completed final sign-off Jan 2020 | 1034 Clay St | voluntary partial soft story retrofit per sfbc chapter 4d unsing the 2016 cbc appx a4. work limited to basement floor onlyDetails
voluntary partial soft story retrofit per sfbc chapter 4d unsing the 2016 cbc appx a4. work limited to basement floor only | $50,000 | |
| Apr 15, 2019 | Completed final sign-off Feb 2020 | 462 Green St | F D C Construction Inc | mandatory soft story retrofit using 2016 cbc appx a4 (not on soft story list) work limited to gnd flr only. projects includes coordination with new adu 201903195622, plus some foundation capping, rot repair and in kind replacement of stairs from basement to 1st flrDetails
mandatory soft story retrofit using 2016 cbc appx a4 (not on soft story list) work limited to gnd flr only. projects includes coordination with new adu 201903195622, plus some foundation capping, rot repair and in kind replacement of stairs from basement to 1st flr | $80,000 |
| Feb 5, 2019 | Completed final sign-off Nov 2021 | 70 Belcher St | S M Construction And Assoc | 70 & 72a: voluntary seismic improvements to cripple walls (bolting & bracing); 47' footing cap on south side. work limited to crawl-space level only.Details
70 & 72a: voluntary seismic improvements to cripple walls (bolting & bracing); 47' footing cap on south side. work limited to crawl-space level only. | $20,000 |
| Feb 5, 2019 | Never finaled issued Apr 2019, no final | 72 Belcher St | S M Construction And Assoc | 72b & 72c: voluntary seismic improvements to cripple walls (bolting & bracing); replacement of 28' of footing at rer. repair & replace 125 sf of deteriorated floor at rear. work limited to crawl-space level only (including joists)Details
72b & 72c: voluntary seismic improvements to cripple walls (bolting & bracing); replacement of 28' of footing at rer. repair & replace 125 sf of deteriorated floor at rear. work limited to crawl-space level only (including joists) | $25,000 |
| Aug 30, 2018 | Never finaled issued Sep 2018, no final | 30 Ramona Av | Mulhall Construction Inc. | mandatory soft story retrofit per sfbc chapter 34b, using 2016 cebc appendix a4, work limited to gr fl iDetails
mandatory soft story retrofit per sfbc chapter 34b, using 2016 cebc appendix a4, work limited to gr fl i | $75,000 |
| Aug 30, 2018 | Completed final sign-off Dec 2018 | 524 28th St | Saint Lazarus General Construction | cripple wall bracing, partial foundation replacement 60 ft work limited to basement/crawl space onlyDetails
cripple wall bracing, partial foundation replacement 60 ft work limited to basement/crawl space only | $40,000 |
| Aug 21, 2017 | Completed final sign-off Dec 2019 | 2030 Taraval St | Angotti & Reilly Inc. | commericial area: no work in commercial area:mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront.new moment frame to be installed outside storefront and rear ground floor.windows to be replaced to provide more sheerall length.Details
commericial area: no work in commercial area:mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront.new moment frame to be installed outside storefront and rear ground floor.windows to be replaced to provide more sheerall length. | $8,100 |
| Aug 21, 2017 | Completed final sign-off Dec 2019 | 2028 Taraval St | Angotti & Reilly Inc. | residential area only: mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront. new moment frame to be installed outside storefront and rear ground floor. windows to be replaced to provide more sheerall length.Details
residential area only: mandatory soft-story retrofit using 2016 cebc appendix 4. work limited to ground floor only. no work in commercial storefront. new moment frame to be installed outside storefront and rear ground floor. windows to be replaced to provide more sheerall length. | $81,900 |
| Aug 21, 2017 | Completed final sign-off Aug 2019 | 1376 Church St | Ryan Construction | mandatory soft-story retrofit per sfebc chapter 4d cebc append 4.2016 cebc appendix a all work is on the g/f. no exterior changes.Details
mandatory soft-story retrofit per sfebc chapter 4d cebc append 4.2016 cebc appendix a all work is on the g/f. no exterior changes. | $100,000 |
| Aug 9, 2017 | Completed final sign-off Oct 2018 | 1427 Larkin St | mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a for maher.Details
mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a for maher. | $75,000 | |
| Dec 21, 2016 | Completed final sign-off Dec 2017 | 560 15th Av | Donald Lewis Gen. Contr.Inc. | alteration of garage to eliminate post & replace post & beam with wall. partial seismic improvements per iebc: voluntaryDetails
alteration of garage to eliminate post & replace post & beam with wall. partial seismic improvements per iebc: voluntary | $40,000 |
| Oct 12, 2016 | Never finaled issued Apr 2017, no final | 73 Downey St | revision to application 201405095312/s1(r1). to remove partial height wall in middle bedroom and provide structural reinforcing to compensate.Details
revision to application 201405095312/s1(r1). to remove partial height wall in middle bedroom and provide structural reinforcing to compensate. | $1,000 | |
| Sep 23, 2016 | Completed final sign-off Dec 2016 | 1447 Mcallister St | Donald Lewis Gen. Contr.Inc. | repair of failed overstressed beams in garage. repair or replace portion (15" long) of deteriorated footing. partial voluntary seismic strengthening at gr flDetails
repair of failed overstressed beams in garage. repair or replace portion (15" long) of deteriorated footing. partial voluntary seismic strengthening at gr fl | $30,000 |
| Sep 1, 2015 | Completed final sign-off Sep 2016 | 19 Scott St | Donald Lewis Gen. Contr.Inc. | foundation replacement and ground floor (garage level); alterations.Details
foundation replacement and ground floor (garage level); alterations. | $160,000 |
| Feb 24, 2006 | Completed final sign-off Nov 2006 | 1453 Mission St | improvements to existing roof deck including access ibility mpmprovemtns dorrs to deck will be changed to perovide 3'0 d00r redwood decking installed level with lobby. visual fences installed on 2 interior sides to 6k' ax height. deck is less thqtn 500sfDetails
improvements to existing roof deck including access ibility mpmprovemtns dorrs to deck will be changed to perovide 3'0 d00r redwood decking installed level with lobby. visual fences installed on 2 interior sides to 6k' ax height. deck is less thqtn 500sf | $6,500 |