Block 0224, lot 032
937 Clay St
- City’s use
- Commercial Hotel
- Built
- 1909
- Stories
- 4
- Units
- 70
- Rooms
- 4 bathrooms
- Building
- 21,350 sq ft
- Lot
- 4,592 sq ft
- Zoning
- RM4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
39 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 23, 2025 | Completed final sign-off Jan 2026 | 937 Clay St | Smart Building Inc. | remove & replace 71 interior unit doors like for like, no structural alteration, included replace frames & hardware. doors to be 20 minute rated self closing doors with smoke seals.Details
remove & replace 71 interior unit doors like for like, no structural alteration, included replace frames & hardware. doors to be 20 minute rated self closing doors with smoke seals. | $120,000 |
| Nov 1, 2024 | In progress issued Nov 2024 | 937 Clay St | San Francisco Fire Protection | as built adding dba reading for 4 units. ref#: 202306140079. to verify existing sound levels in sleep area complying with sffc section 1103.7.6.1. indicating the dba reading in each living and sleep area of least 75 dba.Details
as built adding dba reading for 4 units. ref#: 202306140079. to verify existing sound levels in sleep area complying with sffc section 1103.7.6.1. indicating the dba reading in each living and sleep area of least 75 dba. | |
| Oct 5, 2023 | Completed final sign-off Nov 2023 | 937 Clay St | Crime Watch Security Sys Llc | tenant improvement: upgrade (e) f/a system to cover new ada unit 304, office unit 102, and voluntary installation of additional door holders. ref permits 202109309577, 202303103487, 202212218894.Details
tenant improvement: upgrade (e) f/a system to cover new ada unit 304, office unit 102, and voluntary installation of additional door holders. ref permits 202109309577, 202303103487, 202212218894. | $7,480 |
| Jun 14, 2023 | Completed final sign-off Jan 2025 | 937 Clay St | San Francisco Fire Protection | to verify existing sound levels in sleeping areas to comply with sffc section 1103.7.6.1 indicating the dba reading in each living area and sleeping area of at least 75 dbaDetails
to verify existing sound levels in sleeping areas to comply with sffc section 1103.7.6.1 indicating the dba reading in each living area and sleeping area of at least 75 dba | |
| Mar 10, 2023 | Completed final sign-off Dec 2023 | 937 Clay St | Amone Corp | rev to pa# 202109309577, 1 of the bedrooms in unit 250 @ ground lvl converted to trash room. the bedroom unit will become a 1 bedrm unit.property manager office will be relocated from the 2nd flr to the former study of unit 250 and a single occup restrm will be added. ramp will be modified @ 250Details
rev to pa# 202109309577, 1 of the bedrooms in unit 250 @ ground lvl converted to trash room. the bedroom unit will become a 1 bedrm unit.property manager office will be relocated from the 2nd flr to the former study of unit 250 and a single occup restrm will be added. ramp will be modified @ 250 | $40,000 |
| Dec 21, 2022 | Completed final sign-off Dec 2023 | 937 Clay St | Amone Corp | scope of work include conversion of sro unit 223, 323, and 425 to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust,Details
scope of work include conversion of sro unit 223, 323, and 425 to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust, | $120,000 |
| Sep 30, 2021 | Completed final sign-off Nov 2023 | 937 Clay St | Amone Corp | add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferredDetails
add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferred | $400,000 |
| Sep 28, 2021 | Completed final sign-off Nov 2021 | 937 Clay St | North Star Plumbing & Fire Protection | modification of existing sprinkler system. only in the commercial space.Details
modification of existing sprinkler system. only in the commercial space. | $8,800 |
| Aug 18, 2021 | Completed final sign-off May 2022 | 937 Clay St | I & A Contractor Inc | reroofingDetails
reroofing | $46,000 |
| Jul 26, 2021 | Completed final sign-off Nov 2023 | 937 Clay St | Amone Corp | planned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms w/ trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of bldg. there is no work being done @ ground fl of bldg under this permitDetails
planned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms w/ trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of bldg. there is no work being done @ ground fl of bldg under this permit | $400,000 |
| Nov 6, 2019 | Never finaled issued Nov 2019, no final | 937 Clay St | street spaceDetails
street space | ||
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 937 Clay St | street spaceDetails
street space | ||
| May 16, 2019 | Completed final sign-off Feb 2020 | 937 Clay St | Hoi's Construction | (3) shower room/bathroom remodel. all plumbing/electrical in same location. install new shower pan, fixtures, lighting and fan. replace all in kindDetails
(3) shower room/bathroom remodel. all plumbing/electrical in same location. install new shower pan, fixtures, lighting and fan. replace all in kind | $60,000 |
| Aug 24, 2017 | Completed final sign-off Apr 2018 | 937 Clay St | J P F Construction | 4/f: shower room remodel, common area only, (1) shower room, (2) showers onlyDetails
4/f: shower room remodel, common area only, (1) shower room, (2) showers only | $16,000 |
| Apr 19, 2017 | Expired or cancelled cancelled Jan 2026 | 937 Clay St | Blue Light Electric | common areas - electrical title 24Details
common areas - electrical title 24 | $15,000 |
| Feb 15, 2017 | Completed final sign-off Nov 2017 | 937 Clay St | Fire & Security & Alarm Co/ F.S.A.C. | installation of new fire alarm system with control panel, smoke det. above and pull station near panel. notification appliances will be installed thru out all floor area. install monitor modules to tie in water flow & tampers to new panel. install 2 power supply & annunciator panel. ref paDetails
installation of new fire alarm system with control panel, smoke det. above and pull station near panel. notification appliances will be installed thru out all floor area. install monitor modules to tie in water flow & tampers to new panel. install 2 power supply & annunciator panel. ref pa | $52,000 |
| Mar 16, 2016 | Never finaled issued Mar 2016, no final | 937 Clay St | San Francisco Fire Protection | due to interior remodeling installation of drop ceiling, all extg smoke det. will be reinstall on new drop ceiling, all extg pull stations and horn/strobes will be reinstall at proper height. t.i. app #201409045459. extg fa app#200406045562. n/a for maherDetails
due to interior remodeling installation of drop ceiling, all extg smoke det. will be reinstall on new drop ceiling, all extg pull stations and horn/strobes will be reinstall at proper height. t.i. app #201409045459. extg fa app#200406045562. n/a for maher | $5,000 |
| Aug 4, 2015 | Never finaled issued Aug 2015, no final | 937 Clay St | New Era Construction Llc | modify exisitng fire sprinkler system for remodeling in unit #101 on ground floor. adding fire sprinkler heads at new suspended lay-in tile ceiling for hallways & stairs on 2nd, 3rd & 4th floors. 106 sprinklers.Details
modify exisitng fire sprinkler system for remodeling in unit #101 on ground floor. adding fire sprinkler heads at new suspended lay-in tile ceiling for hallways & stairs on 2nd, 3rd & 4th floors. 106 sprinklers. | $20,000 |
| May 28, 2015 | Never finaled issued Jun 2015, no final | 937 Clay St | J P F Construction | 1st flr/unit #101: remodel apartment unit 101- renovating kitchen, renovating bathroom, new finishes connect sprinkler heads. reconfigure layout to create 3 bedroom unitDetails
1st flr/unit #101: remodel apartment unit 101- renovating kitchen, renovating bathroom, new finishes connect sprinkler heads. reconfigure layout to create 3 bedroom unit | $40,000 |
| Mar 13, 2015 | Never finaled issued Mar 2015, no final | 937 Clay St | J P F Construction | units 206, 317 - remove unit's inside walls covering, then upgrade to the fire rated sheetrocks, patch, painting. changes to the layouts.Details
units 206, 317 - remove unit's inside walls covering, then upgrade to the fire rated sheetrocks, patch, painting. changes to the layouts. | $27,000 |
| Jan 2, 2015 | Never finaled issued Jan 2015, no final | 937 Clay St | J P F Construction | remove (e) wall covering inside the unit #401. upgrade all fire-rated sheetrocks. no change door and windows, structures, finishes , patch or painting.Details
remove (e) wall covering inside the unit #401. upgrade all fire-rated sheetrocks. no change door and windows, structures, finishes , patch or painting. | $7,000 |
| Oct 14, 2014 | Never finaled issued Oct 2014, no final | 937 Clay St | J P F Construction | work in unit 215 & 316: demolish all wall inside of the units. (e) drywalls, no change to the wall layout. replace new drywalls. (fire-ratewd updated). repair in-kind. painting. no changes to doors or windows. plumbing: replace (e) water heater convector.Details
work in unit 215 & 316: demolish all wall inside of the units. (e) drywalls, no change to the wall layout. replace new drywalls. (fire-ratewd updated). repair in-kind. painting. no changes to doors or windows. plumbing: replace (e) water heater convector. | $9,000 |
| Sep 4, 2014 | Never finaled issued Sep 2014, no final | 937 Clay St | J P F Construction | units 201 & 212 - 2nd floor: demolish (all wall inside of units) existing drywalls, no changes to the wall layouts. replace new drywalls. paintingDetails
units 201 & 212 - 2nd floor: demolish (all wall inside of units) existing drywalls, no changes to the wall layouts. replace new drywalls. painting | $9,000 |
| Sep 4, 2014 | Never finaled issued Sep 2014, no final | 937 Clay St | J P F Construction | floors 2 - 4 common areas - bathrooms, kitchens, shower rooms: demolish existing drywalls at shower room. remodel demolish drywall at kitchen and bathrooms (3) shower rooms & (3) kitchens total. plumbing: replace all (e) plumbing fixtures with low flow rate units. finishes: lay tiles andDetails
floors 2 - 4 common areas - bathrooms, kitchens, shower rooms: demolish existing drywalls at shower room. remodel demolish drywall at kitchen and bathrooms (3) shower rooms & (3) kitchens total. plumbing: replace all (e) plumbing fixtures with low flow rate units. finishes: lay tiles and | $40,000 |
| Jul 16, 2014 | Never finaled issued Jul 2014, no final | 937 Clay St | Chung's Construction Co Inc | #210, 221- demo drywall, finish paint, match existing. no changes to wall layouts or openings. only (e) gyp. board may be repair/replaced. no disturb (e) plaster.Details
#210, 221- demo drywall, finish paint, match existing. no changes to wall layouts or openings. only (e) gyp. board may be repair/replaced. no disturb (e) plaster. | $7,500 |
| Feb 11, 2014 | Completed final sign-off Apr 2014 | 943 Clay St | Flores General Building | unit #250: revision to 201312265032 for relocation of bathroom room and adding non bearing wallsDetails
unit #250: revision to 201312265032 for relocation of bathroom room and adding non bearing walls | |
| Jan 27, 2014 | Completed final sign-off Apr 2014 | 943 Clay St | Kelly And Son | unit #250 - install fire sprinklers for tenant improvement. - upper & below ceiling, 18 sprinklers. ref pa #2013.1226.5032Details
unit #250 - install fire sprinklers for tenant improvement. - upper & below ceiling, 18 sprinklers. ref pa #2013.1226.5032 | $5,500 |
| Dec 26, 2013 | Completed final sign-off Apr 2014 | 943 Clay St | complete kitchen & bath remodel, electrical upgrade new sinks, , faucets, tub , new flooring paint entire unit# 250Details
complete kitchen & bath remodel, electrical upgrade new sinks, , faucets, tub , new flooring paint entire unit# 250 | $32,500 | |
| May 28, 2013 | Completed final sign-off Nov 2013 | 937 Clay St | Millard Tong Const Co Inc | to comply with ordinance 029-13 only. installation of grab bars in sro. floor 2, 3 & 4 bathroom.Details
to comply with ordinance 029-13 only. installation of grab bars in sro. floor 2, 3 & 4 bathroom. | $1,800 |
| Jan 15, 2013 | Completed final sign-off Nov 2013 | 945 Clay St | Allied Fire Protection | 1st floor added (15) sprinklers. t.i. add coverage to vacant office space.Details
1st floor added (15) sprinklers. t.i. add coverage to vacant office space. | $7,000 |
| Nov 13, 2012 | Expired or cancelled cancelled Jan 2026 | 943 Clay St | J. Ho Construction Inc | interior improvement of front portion of office space. installing new store, new flooring and add electrical outlet.Details
interior improvement of front portion of office space. installing new store, new flooring and add electrical outlet. | $10,000 |
| Aug 1, 2005 | Completed final sign-off Sep 2005 | 941 Clay St | add 2 headers (4x8),relocate lavatory,move reception counter to 5'from entry doorDetails
add 2 headers (4x8),relocate lavatory,move reception counter to 5'from entry door | $3,000 | |
| Jun 30, 2005 | Completed final sign-off Sep 2005 | 941 Clay St | (e) rrestroom to be upgraded - two new lab draw rooms, storage and reception - plus new electricalDetails
(e) rrestroom to be upgraded - two new lab draw rooms, storage and reception - plus new electrical | $90,000 | |
| Jun 30, 2005 | Completed final sign-off Sep 2005 | 941 Clay St | exist restroom to be upgraded 2 new lab draw rooms, storage & reception area-hvac only (m.e.p. only)Details
exist restroom to be upgraded 2 new lab draw rooms, storage & reception area-hvac only (m.e.p. only) | $30,000 | |
| Dec 3, 2004 | Completed final sign-off Jan 2005 | 937 Clay St | renew#200304293358 for final inspection.Details
renew#200304293358 for final inspection. | ||
| Jun 4, 2004 | Completed final sign-off Nov 2013 | 937 Clay St | San Francisco Fire Protection | install/replace (e) fire alarm system w/intellignet systemDetails
install/replace (e) fire alarm system w/intellignet system | $15,000 |
| May 1, 2003 | Completed final sign-off Dec 2003 | 937 Clay St | Hon's Construction Inc. | umb-rev prev 200107254537.rev of steel frame at n. side of building because diff hgt of bsmt fl levlDetails
umb-rev prev 200107254537.rev of steel frame at n. side of building because diff hgt of bsmt fl levl | |
| Apr 29, 2003 | Expired or cancelled expired Jan 2007 | 937 Clay St | Allied Fire Protection | provide automatic wet pipe fire sprinkler sys. for res./roof attic space to comply ordinance #170-02Details
provide automatic wet pipe fire sprinkler sys. for res./roof attic space to comply ordinance #170-02 | $45,000 |
| Jul 25, 2001 | Completed final sign-off Dec 2003 | 937 Clay St | seismic upgrade as per bolt plus with irregulariities corrected for this unreinforce masonry buildinDetails
seismic upgrade as per bolt plus with irregulariities corrected for this unreinforce masonry buildin | $60,000 |