J P F Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Aug 2026
- Last 24 months
- 11 permits filed
122 permits since 2000: 89 completed, 7 in progress, 22 never finaled, 4 expired or cancelled.
Of the 22 never-finaled permits, 4 are 3 to 5 years old, 10 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 122.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Aug 2026 | 1455 Clay St | apt 7: remodel ktichen (replacing appliances, counters) & bathroom, all work in-kind. no layout changes or structural work.Details
apt 7: remodel ktichen (replacing appliances, counters) & bathroom, all work in-kind. no layout changes or structural work. | $48,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 1269 Silver Av | remove drywall to do full 2/f rewire and insulation. install new 5/8" fire rated drywall, paint, new flooring. kitchen bathroom remodel, no move walls.Details
remove drywall to do full 2/f rewire and insulation. install new 5/8" fire rated drywall, paint, new flooring. kitchen bathroom remodel, no move walls. | $60,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 1775 47th Av | 2/f: remodel kitchen and 2.5 bathrooms. 1/f: remodel bathroom in-kind. no structural work or wall modifications.Details
2/f: remodel kitchen and 2.5 bathrooms. 1/f: remodel bathroom in-kind. no structural work or wall modifications. | $103,000 |
| Jun 3, 2026 | In progress issued Jul 2026 | 1455 Clay St | unit 3: bathroom and kitchen build-back due to water damaged walls. hang new 5/8in type-x drywall (fire rated). full paint unit and refinishe the (e) floor). replacement of receptacles throughout. to comply nov 202655991Details
unit 3: bathroom and kitchen build-back due to water damaged walls. hang new 5/8in type-x drywall (fire rated). full paint unit and refinishe the (e) floor). replacement of receptacles throughout. to comply nov 202655991 | $70,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 918 Sacramento St | unit 2 & 7: (2) kitchen and (2) bathroom remodelDetails
unit 2 & 7: (2) kitchen and (2) bathroom remodel | $40,000 |
| May 27, 2026 | In progress issued Jun 2026 | 1405 Van Ness Av | reconfigure interior layout by relocating non load bearing walls and adding laundry units in 201, 210, 404, 407,410. in kind replacement of kitchen and electrical fixtures. in kind replacement of plumbing fixtures and add plumbing fixtures to bathroom.Details
reconfigure interior layout by relocating non load bearing walls and adding laundry units in 201, 210, 404, 407,410. in kind replacement of kitchen and electrical fixtures. in kind replacement of plumbing fixtures and add plumbing fixtures to bathroom. | $100,000 |
| Feb 19, 2026 | Completed final sign-off Jun 2026 | 1940 Washington St | unit #101: kitchen and bathroom remodel. rehang drywall 5/8" type x gyp. bd. and paint throughout the unit. replace flooring throughout the unit.Details
unit #101: kitchen and bathroom remodel. rehang drywall 5/8" type x gyp. bd. and paint throughout the unit. replace flooring throughout the unit. | $60,000 |
| Feb 13, 2026 | Completed final sign-off Apr 2026 | 3571 16th St | unit# 12. bathroom remodel. keep fixtures at (e) locations. relocate (e) sub-panel to hallway, reconnect (e) circuits to new sub-panel. fix (e) laundry room. patch walls & paint whole unit.Details
unit# 12. bathroom remodel. keep fixtures at (e) locations. relocate (e) sub-panel to hallway, reconnect (e) circuits to new sub-panel. fix (e) laundry room. patch walls & paint whole unit. | $20,000 |
| Aug 27, 2025 | Completed final sign-off Oct 2025 | 855 41st Av | relocate the retaining walls in the basement level. reconfigure layout in the 1st floor. enlarge basement level, new wet bar. delete skylight in the roof. revison to pa #202207299584. comply to nov #202428123Details
relocate the retaining walls in the basement level. reconfigure layout in the 1st floor. enlarge basement level, new wet bar. delete skylight in the roof. revison to pa #202207299584. comply to nov #202428123 | $10,000 |
| Jul 7, 2025 | Completed final sign-off Sep 2025 | 196 06th Av | instal double panel windows. 34-35 windows. some street facing. in kindDetails
instal double panel windows. 34-35 windows. some street facing. in kind | $21,000 |
| Nov 20, 2024 | Completed final sign-off Dec 2024 | 1555 Hyde St | unit#: 5; 2 bedroom + laundry room remodel in kind. walls and ceiling per inspector's request. ref#: 202408057938Details
unit#: 5; 2 bedroom + laundry room remodel in kind. walls and ceiling per inspector's request. ref#: 202408057938 | $16,000 |
| Sep 18, 2024 | Completed final sign-off Oct 2025 | 855 41st Av | relocate the retaining walls in the basement. revision to pa# 202207299584. to comply to nov #202428123. excavate basement and enlarge to be a study room, add new bath at basementDetails
relocate the retaining walls in the basement. revision to pa# 202207299584. to comply to nov #202428123. excavate basement and enlarge to be a study room, add new bath at basement | $8,000 |
| Aug 5, 2024 | Completed final sign-off Nov 2024 | 1555 Hyde St | unit 5: kitchen & bathroom remodel in kindDetails
unit 5: kitchen & bathroom remodel in kind | $30,000 |
| Jul 8, 2024 | Completed final sign-off Jul 2024 | 2059 Fulton St | to comply to nov # 200003366. to repair cracked stucco on the right side of the house.Details
to comply to nov # 200003366. to repair cracked stucco on the right side of the house. | $3,500 |
| Jul 5, 2024 | Completed final sign-off May 2025 | 707 Stockton St | unit 101 & 102 remove (e) kitchen cabinets and quartz counters, sink, faucet then replace in kind unit #207 same scope of work at kitchen and replace windows to dual glaz vinyl windows ( not street facing ) in kindDetails
unit 101 & 102 remove (e) kitchen cabinets and quartz counters, sink, faucet then replace in kind unit #207 same scope of work at kitchen and replace windows to dual glaz vinyl windows ( not street facing ) in kind | $12,000 |
| May 9, 2024 | Completed final sign-off Sep 2024 | 1307 Stevenson St | mandatory soft story retrofit in the basement per 2022 sfebc. appendix a4. add plywood shear wall with concrete grade beams.Details
mandatory soft story retrofit in the basement per 2022 sfebc. appendix a4. add plywood shear wall with concrete grade beams. | $90,000 |
| Mar 25, 2024 | Completed final sign-off May 2025 | 53 Ledyard St | rear cottage: revision to permit 202105180551 - reconfigure bathroom and kitchen. add washer and dryer. details no change and shall follow previous.Details
rear cottage: revision to permit 202105180551 - reconfigure bathroom and kitchen. add washer and dryer. details no change and shall follow previous. | |
| Mar 14, 2024 | Completed final sign-off Sep 2024 | 1645 Golden Gate Av | soft story retrofit (mandatory)- soft story retrofit per sfebc ch. 4d engineering criteria asce 41-13Details
soft story retrofit (mandatory)- soft story retrofit per sfebc ch. 4d engineering criteria asce 41-13 | $10,000 |
| Sep 22, 2023 | Completed final sign-off Jul 2024 | 2059 Fulton St | remove interior walls and add new beams on 1st and 2nd fl. convert 1/2 bath 2nd fl to full bath, add skylight, gr fl: new wetbar, add full bath, family rm, bedroom ,storage. relocate kitchen water heater.Details
remove interior walls and add new beams on 1st and 2nd fl. convert 1/2 bath 2nd fl to full bath, add skylight, gr fl: new wetbar, add full bath, family rm, bedroom ,storage. relocate kitchen water heater. | $20,000 |
| Jul 5, 2023 | Completed final sign-off Jul 2024 | 2059 Fulton St | (1) kitchen and (1) bathroom remodel in kind. no structural work. no wall layout change. no floor layout change.Details
(1) kitchen and (1) bathroom remodel in kind. no structural work. no wall layout change. no floor layout change. | $35,000 |
| May 26, 2023 | Completed final sign-off Oct 2023 | 3223 Laguna St | kitchen and bathroom remodel (rear building). no change of layout.Details
kitchen and bathroom remodel (rear building). no change of layout. | $20,000 |
| Jan 9, 2023 | Completed final sign-off Mar 2023 | 1888 Golden Gate Av | unit #16: kitchen and bathroom remodel in kind.no str workDetails
unit #16: kitchen and bathroom remodel in kind.no str work | $45,000 |
| Dec 7, 2022 | Completed final sign-off Feb 2024 | 4356 California St | accessible business entrance compliance. abe# 202205160835. barrier removal only.Details
accessible business entrance compliance. abe# 202205160835. barrier removal only. | $10,000 |
| Dec 2, 2022 | Completed final sign-off Aug 2023 | 1220 Hayes St | revision to permit 201708316576. to document moment frames changed to shear wall per adu scope of work under approved pa#2018.0116.8754 s1Details
revision to permit 201708316576. to document moment frames changed to shear wall per adu scope of work under approved pa#2018.0116.8754 s1 | |
| Nov 15, 2022 | In progress issued May 2025 | 3223 Folsom St | commencment of work under pa201708215412 for a soft story original permit granted in 2017. we are now ready to begin work and the original permit needs to be looked at again to comply with nov#202045653.Details
commencment of work under pa201708215412 for a soft story original permit granted in 2017. we are now ready to begin work and the original permit needs to be looked at again to comply with nov#202045653. | |
| Oct 21, 2022 | Completed final sign-off Sep 2024 | 1555 Hyde St | interior renovation in unit 2,3,4,6 and 7Details
interior renovation in unit 2,3,4,6 and 7 | $45,000 |
| Jul 29, 2022 | Completed final sign-off Oct 2025 | 855 41st Av | basement fl. inclose tall portion of house, convert to study&wine cell, excavate down to 36" in (e) crawl space 1st fl. relocat utility, n 2bedrm, living rm and bath stair to 2nd fl. 2nd fl. enclosed light well, relocate kithen, refurbish bth remove wall btwn living rm and kitchen, demo (e) stair,Details
basement fl. inclose tall portion of house, convert to study&wine cell, excavate down to 36" in (e) crawl space 1st fl. relocat utility, n 2bedrm, living rm and bath stair to 2nd fl. 2nd fl. enclosed light well, relocate kithen, refurbish bth remove wall btwn living rm and kitchen, demo (e) stair, | $90,000 |
| Jun 24, 2022 | Never finaled issued Aug 2022, no final | 2534 19th Av | revision to pa# 202202258785. 1st fl: total reconfigure layout. new retaining wall at the yard.Details
revision to pa# 202202258785. 1st fl: total reconfigure layout. new retaining wall at the yard. | $5,000 |
| Apr 12, 2022 | Never finaled issued Jul 2022, no final | 1555 Hyde St | interior renovation in unit 2 and 3 on the second floorDetails
interior renovation in unit 2 and 3 on the second floor | $12,000 |
| Mar 25, 2022 | Completed final sign-off Sep 2022 | 1637 Clay St | addition of adu within building envelope at ground. to obtain final inspection for work approved under pa# 201805240029. all work is complete.Details
addition of adu within building envelope at ground. to obtain final inspection for work approved under pa# 201805240029. all work is complete. | $80,000 |
| Feb 25, 2022 | Never finaled issued May 2022, no final | 2534 19th Av | 1st fl: add family room, 1 bedroom, sauna, 1 full bath & laundry. 2nd fl: remodel kitchen, bathroom, add full bath. relocate interior stairs.Details
1st fl: add family room, 1 bedroom, sauna, 1 full bath & laundry. 2nd fl: remodel kitchen, bathroom, add full bath. relocate interior stairs. | $150,000 |
| Feb 3, 2022 | Completed final sign-off Apr 2025 | 340 05th Av | revision to bpa# 2021-1019-0776. 2nd fl: reduce partial lightwell in fill. reconfigure (n) bathoom and closet layout.Details
revision to bpa# 2021-1019-0776. 2nd fl: reduce partial lightwell in fill. reconfigure (n) bathoom and closet layout. | |
| Jan 27, 2022 | Completed final sign-off Oct 2023 | 2507 41st Av | 1st fl: add den, family & 1 full bath. 2nd fl: remodel kitchen, bathroom & bedrooms. add 1 full bath. add new deck.Details
1st fl: add den, family & 1 full bath. 2nd fl: remodel kitchen, bathroom & bedrooms. add 1 full bath. add new deck. | $85,000 |
| Oct 19, 2021 | Completed final sign-off Apr 2025 | 340 05th Av | 2nd fl: in-fill partial lightwell at north side of the bldg 2. remove walls between kitchen and family room to crfeat open layout 3. convert (e) living rm into bedroom 4. convert (e) bedroom into gym. 5. convert (e) family rm in living room. 6. add one bathroom. 7 kitchen and powder rm remodel.Details
2nd fl: in-fill partial lightwell at north side of the bldg 2. remove walls between kitchen and family room to crfeat open layout 3. convert (e) living rm into bedroom 4. convert (e) bedroom into gym. 5. convert (e) family rm in living room. 6. add one bathroom. 7 kitchen and powder rm remodel. | $20,000 |
| Sep 16, 2021 | Completed final sign-off Oct 2023 | 2224 Union St | tenant improvedment: construct new demising wall. 2 new ada compliant single occupancy restrooms. new egress door and stairs. remove existing wall finishes back to taped gypsum board finish throughout. safe off abandoned plumbing, and associated electrical.Details
tenant improvedment: construct new demising wall. 2 new ada compliant single occupancy restrooms. new egress door and stairs. remove existing wall finishes back to taped gypsum board finish throughout. safe off abandoned plumbing, and associated electrical. | $90,000 |
| Dec 17, 2020 | Completed final sign-off Feb 2022 | 1260 Vallejo St | front bldg - revision to permit #2019-1001-3173. 1) eliminate rj1 and rj2, future roof deck. scope eliminated. 2) eliminate 6x6 post @ line 1.3 install concrete pad at line 3Details
front bldg - revision to permit #2019-1001-3173. 1) eliminate rj1 and rj2, future roof deck. scope eliminated. 2) eliminate 6x6 post @ line 1.3 install concrete pad at line 3 | |
| Oct 23, 2020 | Never finaled issued Dec 2020, no final | 1260 Vallejo St | revision to pa 201910083945. reinforce roof joist at rear building.Details
revision to pa 201910083945. reinforce roof joist at rear building. | $10,000 |
| Sep 16, 2020 | Never finaled issued Apr 2022, no final | 2749 35th Av | 1st flr- add 2 bedrms, study rm, 3 fixture full bath, entertainment w/ wetbar & laundry rm. 2nd flr- (n) deck at rear. reconfigure intioer layout w/ 2 bedrms, an office, 2 full baths, w.i.c, kitchen, livg, & din rm. relocate interior stairs. (single-family use) (no group housing)Details
1st flr- add 2 bedrms, study rm, 3 fixture full bath, entertainment w/ wetbar & laundry rm. 2nd flr- (n) deck at rear. reconfigure intioer layout w/ 2 bedrms, an office, 2 full baths, w.i.c, kitchen, livg, & din rm. relocate interior stairs. (single-family use) (no group housing) | $50,000 |
| Jan 31, 2020 | Never finaled issued Jan 2020, no final | 1000 Sutter St | remodel (like for like) 1 bathroom in each unit, @ units 215,315,415,515.Details
remodel (like for like) 1 bathroom in each unit, @ units 215,315,415,515. | $20,000 |
| Jan 31, 2020 | Never finaled issued Jan 2020, no final | 1000 Sutter St | remodel (like for like) 1 bathroom in each units, @ units 615,715,815,915.Details
remodel (like for like) 1 bathroom in each units, @ units 615,715,815,915. | $20,000 |
| Jan 29, 2020 | Completed final sign-off Jul 2022 | 840 Greenwich St | convert (e) garage & basement into 3 adu's per ordinance# 162-16 for a building total of 10 units. 2-one bedroom & 1-two bedroom unit.Details
convert (e) garage & basement into 3 adu's per ordinance# 162-16 for a building total of 10 units. 2-one bedroom & 1-two bedroom unit. | $100,000 |
| Jan 16, 2020 | Completed final sign-off Feb 2021 | 4326 Cabrillo St | interior remodel with structural design on 1st and 2nd floor. 1st floor: add one office, one entertainment and 2 bedroom, and one bath. 2nd floor:add 4 fixture bath and a kitchen.Details
interior remodel with structural design on 1st and 2nd floor. 1st floor: add one office, one entertainment and 2 bedroom, and one bath. 2nd floor:add 4 fixture bath and a kitchen. | $80,000 |
| Dec 31, 2019 | Completed final sign-off Feb 2021 | 4326 Cabrillo St | kitchen and bathroom remodel. no change layoutDetails
kitchen and bathroom remodel. no change layout | $25,000 |
| Dec 5, 2019 | Completed final sign-off Aug 2021 | 431 41st Av | 1st fl - reconfigure int'r staircase to 2nd fl; add (1)3 fixture bathrm, i media, study and 2 bedrms; create hallway to rear; raise partial 1st fl.; 2nd fl - reconfigure int'r stair to 3rd fl ; relocate kitchen; remodel (e) 3-fixture bathrm, add (1)3 fixture bathrm and 1 bedrm; 3rd fl - remodel (e)Details
1st fl - reconfigure int'r staircase to 2nd fl; add (1)3 fixture bathrm, i media, study and 2 bedrms; create hallway to rear; raise partial 1st fl.; 2nd fl - reconfigure int'r stair to 3rd fl ; relocate kitchen; remodel (e) 3-fixture bathrm, add (1)3 fixture bathrm and 1 bedrm; 3rd fl - remodel (e) | $50,000 |
| Nov 8, 2019 | Never finaled issued Nov 2019, no final | 431 41st Av | kitchen remodel (7' x 10')Details
kitchen remodel (7' x 10') | $15,000 |
| Oct 22, 2019 | Never finaled issued Oct 2019, no final | 1000 Sutter St | units 115 & 116. unit 115 -bathroom remodel and painting. unit 116 -replace vanity sink and paint. no layout changes in either unit.Details
units 115 & 116. unit 115 -bathroom remodel and painting. unit 116 -replace vanity sink and paint. no layout changes in either unit. | $25,000 |
| Oct 8, 2019 | Completed final sign-off Feb 2022 | 1264 Vallejo St | rear building: 1) reconfigure interior layout with 4 bedrooms, three fixtures bathrooms, kitchen, laundry, and living room on 4th floor.Details
rear building: 1) reconfigure interior layout with 4 bedrooms, three fixtures bathrooms, kitchen, laundry, and living room on 4th floor. | $50,000 |
| Oct 1, 2019 | Completed final sign-off Feb 2022 | 1260 Vallejo St | front bld - reconfig int layout w/2 bedrm, 2 3-fix bathrm, ofc, kitchen, laundry & liv rm on 2nd flr reconfig int layout w/3 bedrm, 2 3-fix bathrms, ofc, kitchen , laundry & liv rm on 4th.Details
front bld - reconfig int layout w/2 bedrm, 2 3-fix bathrm, ofc, kitchen, laundry & liv rm on 2nd flr reconfig int layout w/3 bedrm, 2 3-fix bathrms, ofc, kitchen , laundry & liv rm on 4th. | $50,000 |
| Jun 26, 2019 | Completed final sign-off Aug 2020 | 130 Waverly Pl | commercial ti: upgrade (e) bathroom for ada compliance. upgrade (e) entry's at 130 & 132 waverly place for ada compliance per ordiance 51-16. (abe program)Details
commercial ti: upgrade (e) bathroom for ada compliance. upgrade (e) entry's at 130 & 132 waverly place for ada compliance per ordiance 51-16. (abe program) | $25,000 |
| Jun 21, 2019 | Never finaled issued Sep 2019, no final | 842 Greenwich St | adiministrative permit to include window alterations already approved . no plans required. see 2019-0621-4139. window alteration to existing units 840, 844, 846 greenwich street and 8 jansen street. windows at the front street to be replaced with wood and in curved bay curved sashes.Details
adiministrative permit to include window alterations already approved . no plans required. see 2019-0621-4139. window alteration to existing units 840, 844, 846 greenwich street and 8 jansen street. windows at the front street to be replaced with wood and in curved bay curved sashes. | $25,000 |
| Jun 21, 2019 | Completed final sign-off Jun 2020 | 840 Greenwich St | interior renovations to (e) unit 8 jansen, 840, 844 and 846 greenwich. unit 8 to be reconfigured to a 1 bed 1 bath layout. units 840, 844 and 846 to be reconfigured to 2 bed 2 baths layout. scope of work less than 75% of interior demo. no exterior work; under a separate permit.Details
interior renovations to (e) unit 8 jansen, 840, 844 and 846 greenwich. unit 8 to be reconfigured to a 1 bed 1 bath layout. units 840, 844 and 846 to be reconfigured to 2 bed 2 baths layout. scope of work less than 75% of interior demo. no exterior work; under a separate permit. | $160,000 |
| May 31, 2019 | Never finaled issued May 2021, no final | 3241 23rd St | site. add (3) new dwelling units @ ground fl of existing (7) unit apartment bldg per ordinance 162-16Details
site. add (3) new dwelling units @ ground fl of existing (7) unit apartment bldg per ordinance 162-16 | $150,000 |
| May 21, 2019 | Completed final sign-off Nov 2019 | 1402 Kearny St | unit # 1: remodel kitchen and bathroom. new painting, install nw flooring throughout. no change of existing floor plans.Details
unit # 1: remodel kitchen and bathroom. new painting, install nw flooring throughout. no change of existing floor plans. | $40,000 |
| Apr 5, 2019 | Completed final sign-off Aug 2019 | 927 Rivera St | revision to app#201902072415: 1st floor to 1)add one family room, 2) expand the 3 fixture bathroom. 3) reconfigure interior staircase to connect 1st & 2nd floor. 2nd floor: 4)kitchen remodel. 5)add one w.i.c. to the extg bedroom.Details
revision to app#201902072415: 1st floor to 1)add one family room, 2) expand the 3 fixture bathroom. 3) reconfigure interior staircase to connect 1st & 2nd floor. 2nd floor: 4)kitchen remodel. 5)add one w.i.c. to the extg bedroom. | |
| Feb 7, 2019 | Completed final sign-off Jul 2019 | 927 Rivera St | one media, one office, one full bath, add spiral staircase to create interior connection between 1st & 2nd fl. 2nd fl kitchen remodel, relocate 1 full bath add one 3-fixture bath, add deck at rear for 2nd fl. access, lightwell in-fill at south side of property windowDetails
one media, one office, one full bath, add spiral staircase to create interior connection between 1st & 2nd fl. 2nd fl kitchen remodel, relocate 1 full bath add one 3-fixture bath, add deck at rear for 2nd fl. access, lightwell in-fill at south side of property window | $80,000 |
| Jan 14, 2019 | Completed final sign-off Aug 2019 | 927 Rivera St | kitchen remodel, no change of layout.Details
kitchen remodel, no change of layout. | $22,000 |
| Jan 10, 2019 | Completed final sign-off Aug 2020 | 124 Waverly Pl | convert 2nd floor commercial space to (1) 3-bedrms, 2-baths & 1-kitchen adu unit per ord# 162-16 to (e) residential hotel bldg with 29-guest rooms. fire sprinklers under seperate permit.Details
convert 2nd floor commercial space to (1) 3-bedrms, 2-baths & 1-kitchen adu unit per ord# 162-16 to (e) residential hotel bldg with 29-guest rooms. fire sprinklers under seperate permit. | $30,000 |
| Oct 26, 2018 | Completed final sign-off Aug 2019 | 465 Tehama St | revised bathroom locations. revision to 201804196766 maher nmaDetails
revised bathroom locations. revision to 201804196766 maher nma | |
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 1402 Kearny St | kitchen & bathroom remodel in unit 4. no chanbe of layouts. no change on walls. maher n/a.Details
kitchen & bathroom remodel in unit 4. no chanbe of layouts. no change on walls. maher n/a. | $35,000 |
| Sep 25, 2018 | Expired or cancelled cancelled Dec 2025 | 96 Huntington Dr | 1st fl. remove (e) office, add (2) bedrooms, bathroom remodel. 2nd fl. relocate (e) bedrooms & kitchen, add (1) master bedroom & (1) master bath. add (n) skylights, infill (e) skylights, minor in-kind repair to (e) finishesDetails
1st fl. remove (e) office, add (2) bedrooms, bathroom remodel. 2nd fl. relocate (e) bedrooms & kitchen, add (1) master bedroom & (1) master bath. add (n) skylights, infill (e) skylights, minor in-kind repair to (e) finishes | $75,000 |
| Sep 24, 2018 | Completed final sign-off Feb 2019 | 3245 23rd St | remodel kitchen and bathroom. removal of closet between kitchen and bathroom.Details
remodel kitchen and bathroom. removal of closet between kitchen and bathroom. | $10,000 |
| Aug 24, 2018 | Expired or cancelled cancelled Dec 2025 | 96 Huntington Dr | kitchen remodel.Details
kitchen remodel. | $12,000 |
| Aug 17, 2018 | Completed final sign-off Sep 2018 | 2878 24th St | revision to ba # 201805169286. updates for ceiling lights and relocate mop sink areaDetails
revision to ba # 201805169286. updates for ceiling lights and relocate mop sink area | |
| Aug 7, 2018 | Completed final sign-off Sep 2018 | 1720 Pacific Av | unit 1 - remodel of bathroom in like kind. no walls movedDetails
unit 1 - remodel of bathroom in like kind. no walls moved | $14,490 |
| Jul 31, 2018 | Completed final sign-off Feb 2019 | 466 32nd Av | light well on 1st fl t be in-filled per plan. lower partial platform to increase ceiling height on 1st fl. add one powder & entertainment on 1st fl. add 2 full bathrooms & 1 bedroom on 2nd flDetails
light well on 1st fl t be in-filled per plan. lower partial platform to increase ceiling height on 1st fl. add one powder & entertainment on 1st fl. add 2 full bathrooms & 1 bedroom on 2nd fl | $50,000 |
| Jul 24, 2018 | Completed final sign-off Sep 2018 | 818 Scott St | remodel of kitchen & bath with like kind.Details
remodel of kitchen & bath with like kind. | $20,000 |
| Jul 3, 2018 | Completed final sign-off Feb 2019 | 466 32nd Av | kitchen remodelDetails
kitchen remodel | $12,000 |
| Jun 14, 2018 | Completed final sign-off Aug 2019 | 465 Tehama St | rev to pa# 201804196766; voluntary retrofit to interior of existing concret walls by addition of shotcrete to interior selected existing concrete walls in order to add vertical & lateral load resistance of existing structure n/a maherDetails
rev to pa# 201804196766; voluntary retrofit to interior of existing concret walls by addition of shotcrete to interior selected existing concrete walls in order to add vertical & lateral load resistance of existing structure n/a maher | $65,000 |
| May 16, 2018 | Completed final sign-off Sep 2018 | 2878 24th St | 1)remodel to extg dining area and propose a new sushi bar on 1st floor per plan. 2)convert extg restroom to ada all gender restroom.Details
1)remodel to extg dining area and propose a new sushi bar on 1st floor per plan. 2)convert extg restroom to ada all gender restroom. | $30,000 |
| Apr 25, 2018 | Completed final sign-off Sep 2018 | 121 Peabody St | inkind repair of existing stucco siding on visible side elevation; inkind repair/replacement of wood siding (using real wood boards) on portions of front elevation that currently have existing wood siding; no other work.Details
inkind repair of existing stucco siding on visible side elevation; inkind repair/replacement of wood siding (using real wood boards) on portions of front elevation that currently have existing wood siding; no other work. | $5,000 |
| Apr 19, 2018 | Completed final sign-off Jun 2019 | 465 Tehama St | existing industrial space: rebuild floors as noted in plans,construct new accesible bathrooms, add platform lift. demo floor between first and second floor. remove (e) skylight, replace w/ (n) skylight. full sprinkler system under seperate permit. no change in use, replace garage doors, restore allDetails
existing industrial space: rebuild floors as noted in plans,construct new accesible bathrooms, add platform lift. demo floor between first and second floor. remove (e) skylight, replace w/ (n) skylight. full sprinkler system under seperate permit. no change in use, replace garage doors, restore all | $360,000 |
| Mar 6, 2018 | Completed final sign-off Oct 2018 | 754 Lakeview Av | grnd flr - relocation of (e) full bath, converting approved contioned space into (2) bedrooms. 2nd flr - addition of new full bath, remodel of (e) full bath, relocation of kitchenDetails
grnd flr - relocation of (e) full bath, converting approved contioned space into (2) bedrooms. 2nd flr - addition of new full bath, remodel of (e) full bath, relocation of kitchen | $95,000 |
| Feb 12, 2018 | Never finaled issued Feb 2018, no final | 2228 Union St | wor in unit 107: kitchen and bathroom remodelDetails
wor in unit 107: kitchen and bathroom remodel | $35,000 |
| Jan 30, 2018 | Completed final sign-off Sep 2018 | 121 Peabody St | two bathrooms remodel. install new floors thru out. no rough framing and change of layout.Details
two bathrooms remodel. install new floors thru out. no rough framing and change of layout. | $23,000 |
| Jan 16, 2018 | Completed final sign-off Sep 2023 | 1220 Hayes St | to add two accessory dwelling units (adu) at ground floor per ord no. 162-16.Details
to add two accessory dwelling units (adu) at ground floor per ord no. 162-16. | $60,000 |
| Dec 28, 2017 | Completed final sign-off Jul 2018 | 2087 46th Av | inkind replacement of front bay window (wood casement-style with true-divided-lite muntins); replace non-original front kitchen window with casement-style wood window with true-divided-lite muntin pattern to match bay window; any non-visible window replacement - any material okayDetails
inkind replacement of front bay window (wood casement-style with true-divided-lite muntins); replace non-original front kitchen window with casement-style wood window with true-divided-lite muntin pattern to match bay window; any non-visible window replacement - any material okay | $5,000 |
| Nov 29, 2017 | Completed final sign-off Mar 2018 | 611 Minna St | unit #5: kitchen and bathroom remodel. no change of the layout. maher n/aDetails
unit #5: kitchen and bathroom remodel. no change of the layout. maher n/a | $31,000 |
| Nov 29, 2017 | Completed final sign-off Mar 2018 | 124 Waverly Pl | unit #102: remodel one unit bathroom, replace tiles on floor and walls, replace shower pan, replace plumbing fixtures. no change in opening or wall layout.Details
unit #102: remodel one unit bathroom, replace tiles on floor and walls, replace shower pan, replace plumbing fixtures. no change in opening or wall layout. | $14,000 |
| Nov 29, 2017 | Completed final sign-off Feb 2018 | 2228 Union St | unit #207: kitchen and bathroom remodel. no change in (e) layout. maher n/aDetails
unit #207: kitchen and bathroom remodel. no change in (e) layout. maher n/a | $35,000 |
| Nov 27, 2017 | Completed final sign-off Jul 2018 | 2087 46th Av | kitchen & 2 bathrooms remodel.Details
kitchen & 2 bathrooms remodel. | $65,000 |
| Sep 29, 2017 | Completed final sign-off May 2019 | 19 Jasper Pl | legalize existing bedroom, media rm, storage rm, construct 1 half bathroom. all work at gr flDetails
legalize existing bedroom, media rm, storage rm, construct 1 half bathroom. all work at gr fl | $58,000 |
| Sep 29, 2017 | Completed final sign-off Apr 2018 | 23 Jasper Pl | relocate e kitchen, remodel 1 e bathroom, construct 1 full bath, rewire elec lighting, upgrade partial ceiling framing. all work on the 3rd fl. ref pa#2017-09-29-9917 for ground floorDetails
relocate e kitchen, remodel 1 e bathroom, construct 1 full bath, rewire elec lighting, upgrade partial ceiling framing. all work on the 3rd fl. ref pa#2017-09-29-9917 for ground floor | $45,000 |
| Sep 15, 2017 | Completed final sign-off Jan 2024 | 3241 23rd St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4 | $70,000 |
| Sep 14, 2017 | Completed final sign-off Jan 2018 | 2107 Pierce St | #5. kitchen remodel - bathroom new floor tiles. remove carpets - refinihsing floor. painting. no wall modification - no structural work.Details
#5. kitchen remodel - bathroom new floor tiles. remove carpets - refinihsing floor. painting. no wall modification - no structural work. | $20,000 |
| Sep 14, 2017 | Completed final sign-off Nov 2017 | 611 Minna St | #8. kitchen and bathroom remodel. install new floors. painting. no wall modification - non structural work. maher naDetails
#8. kitchen and bathroom remodel. install new floors. painting. no wall modification - non structural work. maher na | $30,000 |
| Aug 24, 2017 | Completed final sign-off Apr 2018 | 937 Clay St | 4/f: shower room remodel, common area only, (1) shower room, (2) showers onlyDetails
4/f: shower room remodel, common area only, (1) shower room, (2) showers only | $16,000 |
| Aug 8, 2017 | Expired or cancelled expired Jun 2025 | 490 Francisco St | interior remodel, 1st, 2nd, 3rd fl. remove walls, add post and beams. reconfigure space. units 2, 4, 5 & 6 kitchen and bathroom remodel. n/a maherDetails
interior remodel, 1st, 2nd, 3rd fl. remove walls, add post and beams. reconfigure space. units 2, 4, 5 & 6 kitchen and bathroom remodel. n/a maher | $35,000 |
| Aug 3, 2017 | Completed final sign-off Dec 2017 | 1115 Polk St | unit #24: kitchen and bathroom remodel. patch. paint.Details
unit #24: kitchen and bathroom remodel. patch. paint. | $38,000 |
| Jul 6, 2017 | Expired or cancelled expired Apr 2026 | 1415 Clay St | per unit legalization ordinance 43-14, legalization of unit installed without permit, legalize kitchen, living room, one bath room at ground floor. construct interior staircase connect from ground down to lower floor.Details
per unit legalization ordinance 43-14, legalization of unit installed without permit, legalize kitchen, living room, one bath room at ground floor. construct interior staircase connect from ground down to lower floor. | $62,000 |
| Jul 3, 2017 | Completed final sign-off Aug 2017 | 2228 Union St | apt 205; full bathroom remodel, new cabinets at existing kitche.Details
apt 205; full bathroom remodel, new cabinets at existing kitche. | $25,000 |
| Jul 3, 2017 | Completed final sign-off Aug 2017 | 2228 Union St | apt 102: kitchen & bathroom remodel. painting, patch and cabinetry replacement.Details
apt 102: kitchen & bathroom remodel. painting, patch and cabinetry replacement. | $30,000 |
| Jun 6, 2017 | Completed final sign-off Sep 2017 | 1415 Clay St | unit 1 -kitchen & bathroom remodel; patch, painting. re-finishing floor.Details
unit 1 -kitchen & bathroom remodel; patch, painting. re-finishing floor. | $35,000 |
| Feb 27, 2017 | Completed final sign-off Apr 2017 | 611 Minna St | apt 7 & 11: kitchen & bathroom remodels. install new floors. patch & painting.Details
apt 7 & 11: kitchen & bathroom remodels. install new floors. patch & painting. | $50,000 |
| Feb 27, 2017 | Completed final sign-off Aug 2017 | 1415 Clay St | apt 3: kitchen & bathroom remodel. refinish floor. pat & panting.Details
apt 3: kitchen & bathroom remodel. refinish floor. pat & panting. | $35,000 |
| Feb 27, 2017 | Completed final sign-off Dec 2017 | 1115 Polk St | apt 23: kitchen & bathroomreodel. refinish floor. patch & painting.Details
apt 23: kitchen & bathroomreodel. refinish floor. patch & painting. | $30,000 |
| Feb 9, 2017 | Completed final sign-off Dec 2017 | 1115 Polk St | unit 39: kitchen and bath remodel. refinish floor and paintDetails
unit 39: kitchen and bath remodel. refinish floor and paint | $30,000 |
| Nov 29, 2016 | Completed final sign-off May 2017 | 285 Grand View Av | apt #6 : kitchen & bathroom remodel. no changes to pulmbing rough-in. redo eletrical work in unit.Details
apt #6 : kitchen & bathroom remodel. no changes to pulmbing rough-in. redo eletrical work in unit. | $25,000 |
| Nov 29, 2016 | Never finaled issued Nov 2016, no final | 285 Grand View Av | to comply with complaint 201639924: provide req handrils and guard rails to staircase and landing at garage.Details
to comply with complaint 201639924: provide req handrils and guard rails to staircase and landing at garage. | $1,000 |
| Oct 25, 2016 | Completed final sign-off Dec 2017 | 1115 Polk St | unit 20,22,26,31, & 40 -remodel kitchen & bathrooms, re-finishe floor; pathcing/ painting.Details
unit 20,22,26,31, & 40 -remodel kitchen & bathrooms, re-finishe floor; pathcing/ painting. | $150,000 |
| Sep 23, 2016 | Completed final sign-off Aug 2017 | 19 Jasper Pl | relocate extg kitchen, remodel one extg bath room, construct one new full bathroom, re-wire elect., lighting and upgrade partial extg ceiling framing. all work at 1st floor.Details
relocate extg kitchen, remodel one extg bath room, construct one new full bathroom, re-wire elect., lighting and upgrade partial extg ceiling framing. all work at 1st floor. | $36,000 |