Block 0279, lot 005
1000 Sutter St
- City’s use
- Commercial Hotel
- Built
- 1908
- Stories
- 10
- Rooms
- 126 bathrooms
- Building
- 78,950 sq ft
- Lot
- 9,104 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
56 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2025 | Completed final sign-off Jan 2026 | 1000 Sutter St | San Francisco Fire Protection | decomissioning of the existing firefighter phone jack system due to newly approved fire alarm and errcs being finaled. ref errcs 202407317614, ref 202505156569Details
decomissioning of the existing firefighter phone jack system due to newly approved fire alarm and errcs being finaled. ref errcs 202407317614, ref 202505156569 | |
| May 15, 2025 | Completed final sign-off Aug 2025 | 1000 Sutter St | Crime Watch Security Sys Llc | as built change log 04/24/2025. added (6) monitor modules and errcs annunciator for the errcs. ref fire pa@ 202504033659. ref errcs pa# 202407317614.Details
as built change log 04/24/2025. added (6) monitor modules and errcs annunciator for the errcs. ref fire pa@ 202504033659. ref errcs pa# 202407317614. | |
| Apr 3, 2025 | Completed final sign-off Sep 2025 | 1000 Sutter St | Crime Watch Security Sys Llc | as-built: fire alarm: change log updated the basement and g/f layout and added several notification devices on those floors. ref 202107164499 & 202109138252.Details
as-built: fire alarm: change log updated the basement and g/f layout and added several notification devices on those floors. ref 202107164499 & 202109138252. | |
| Mar 18, 2025 | In progress issued Mar 2025 | 1000 Sutter St | Emkjer Enterprises Inc Dba Sign Co Usa | revision to pa 2024-1015-2945 1st fl only evacuation maps fabrication and installation.Details
revision to pa 2024-1015-2945 1st fl only evacuation maps fabrication and installation. | |
| Feb 25, 2025 | Completed final sign-off Apr 2025 | 1000 Sutter St | Battalion One Fire Protection | as built drawings from prior permit 202210053786 fire pump,sprinklers in basement, lobby, upright closets,public restrooms. add additional 50 heads (31 pendant, 19 sidewalls)Details
as built drawings from prior permit 202210053786 fire pump,sprinklers in basement, lobby, upright closets,public restrooms. add additional 50 heads (31 pendant, 19 sidewalls) | $108,000 |
| Jan 14, 2025 | Completed final sign-off Apr 2025 | 1000 Sutter St | Battalion One Fire Protection | as built drawings for our dining room scope of: adding/relocating fire sprinklers revision to permit#2024-1119-5278Details
as built drawings for our dining room scope of: adding/relocating fire sprinklers revision to permit#2024-1119-5278 | $18,205 |
| Nov 19, 2024 | Completed final sign-off Apr 2025 | 1000 Sutter St | Battalion One Fire Protection | add/relocate 27 sprinklers. associated w/ building pa# 202109138252Details
add/relocate 27 sprinklers. associated w/ building pa# 202109138252 | $18,205 |
| Oct 15, 2024 | Completed final sign-off May 2025 | 1000 Sutter St | Emkjer Enterprises Inc Dba Sign Co Usa | ref 202109138252- evacuation map fabrication and installationDetails
ref 202109138252- evacuation map fabrication and installation | $10,725 |
| Aug 1, 2024 | Completed final sign-off Jul 2025 | 1000 Sutter St | Bobcomm Llc Dba Pacific Das Llc. | install emergency responder radio coverage system (errcs)Details
install emergency responder radio coverage system (errcs) | $50,000 |
| Jun 20, 2023 | Completed final sign-off Aug 2025 | 1000 Sutter St | Bbi - Con Inc | revision to pa 2021-0913-8252 residential unit plumbing pipe replacement including plumbing fixtures. "no residential guest rooms will be removed or demolised or converted"Details
revision to pa 2021-0913-8252 residential unit plumbing pipe replacement including plumbing fixtures. "no residential guest rooms will be removed or demolised or converted" | $2,500,000 |
| Feb 7, 2023 | Completed final sign-off Aug 2025 | 1000 Sutter St | Bbi - Con Inc | revision to approved permit #202109138252. convert extg commercial grade kitchen to residential grade warming kitchen @ lobby level 1, community kitchen only include adjacent prop mgmt ofcDetails
revision to approved permit #202109138252. convert extg commercial grade kitchen to residential grade warming kitchen @ lobby level 1, community kitchen only include adjacent prop mgmt ofc | $30,000 |
| Oct 5, 2022 | Completed final sign-off Apr 2025 | 1000 Sutter St | Battalion One Fire Protection | replace firepump, relocate and add sprinklers in basement and lobby. relocate sidewalls in lobby in all residential floors. relocate and add heads in restrooms.Details
replace firepump, relocate and add sprinklers in basement and lobby. relocate sidewalls in lobby in all residential floors. relocate and add heads in restrooms. | $108,000 |
| Aug 30, 2022 | Never finaled filed Aug 2022, never issued | 1000 Sutter St | Battalion One Fire Protection | replace fire pump. ti work in basement and lobby (add + relocate sprinklers) adjust sprinklers in rooms and bathroom on residential floors. ref permit 202109138252Details
replace fire pump. ti work in basement and lobby (add + relocate sprinklers) adjust sprinklers in rooms and bathroom on residential floors. ref permit 202109138252 | $15,985 |
| Sep 13, 2021 | Completed final sign-off Aug 2025 | 1000 Sutter St | Bbi - Con Inc | 100% (n) affordable housing, renovation of a 10-story (e) sro into housing for homeless & impacted by covid-19. elective/discretionary structural upgrades at basement foundations & exterior building envelope; renovate residential units; add/renovate offices, community room, laundry & restrooms.Details
100% (n) affordable housing, renovation of a 10-story (e) sro into housing for homeless & impacted by covid-19. elective/discretionary structural upgrades at basement foundations & exterior building envelope; renovate residential units; add/renovate offices, community room, laundry & restrooms. | $23,303,869 |
| Jul 16, 2021 | Completed final sign-off Aug 2025 | 1000 Sutter St | San Francisco Fire Protection | voluntary replacement + upgrade installation of fa system. install of new facp, aes, power supplies, remote, annuciator, monitor modules, smoke detectors, heat detector, pull station, relay modules, horn strobes, trobes, and combo smoke detecto with lf horn to meet sffc2019- sec1103.7.6.1Details
voluntary replacement + upgrade installation of fa system. install of new facp, aes, power supplies, remote, annuciator, monitor modules, smoke detectors, heat detector, pull station, relay modules, horn strobes, trobes, and combo smoke detecto with lf horn to meet sffc2019- sec1103.7.6.1 | $156,800 |
| Jul 29, 2020 | Never finaled issued Jul 2020, no final | 1000 Sutter St | Brendan Lalor Construction | to obtain final inspection for work approved under pa# 8614134 and 8309817 for final inspectionDetails
to obtain final inspection for work approved under pa# 8614134 and 8309817 for final inspection | |
| Jul 7, 2020 | Completed final sign-off Aug 2020 | 1000 Sutter St | Brendan Lalor Construction | add smoke doors to existing elevators, barrier removal work.Details
add smoke doors to existing elevators, barrier removal work. | $8,800 |
| Jan 31, 2020 | Never finaled issued Jan 2020, no final | 1000 Sutter St | J P F Construction | remodel (like for like) 1 bathroom in each unit, @ units 215,315,415,515.Details
remodel (like for like) 1 bathroom in each unit, @ units 215,315,415,515. | $20,000 |
| Jan 31, 2020 | Never finaled issued Jan 2020, no final | 1000 Sutter St | J P F Construction | remodel (like for like) 1 bathroom in each units, @ units 615,715,815,915.Details
remodel (like for like) 1 bathroom in each units, @ units 615,715,815,915. | $20,000 |
| Jan 27, 2020 | Never finaled issued Jan 2020, no final | 1000 Sutter St | street spaceDetails
street space | ||
| Jan 22, 2020 | Completed final sign-off Feb 2020 | 1000 Sutter St | Parksway Construction Inc | re-roofing. removal of existing; replace all metal flashing; apply modified bitumen w/ mb base; clean and haul all debris off the site.Details
re-roofing. removal of existing; replace all metal flashing; apply modified bitumen w/ mb base; clean and haul all debris off the site. | $99,000 |
| Dec 30, 2019 | Never finaled issued Dec 2019, no final | 1000 Sutter St | street spaceDetails
street space | ||
| Nov 20, 2019 | Completed final sign-off Oct 2020 | 1000 Sutter St | Golden State Lumber Inc Dba (See Notes) | remove all (e) single-hung wood window sashes. street facing window sashes (321) will be replaced with new wood, single-hung windows in same openings (marvin ultimate wood tilt pack). 43 windows in existing lightwell not visible from street will be replaced in same openings with new vinyl windows.Details
remove all (e) single-hung wood window sashes. street facing window sashes (321) will be replaced with new wood, single-hung windows in same openings (marvin ultimate wood tilt pack). 43 windows in existing lightwell not visible from street will be replaced in same openings with new vinyl windows. | $150,000 |
| Oct 22, 2019 | Never finaled issued Oct 2019, no final | 1000 Sutter St | J P F Construction | units 115 & 116. unit 115 -bathroom remodel and painting. unit 116 -replace vanity sink and paint. no layout changes in either unit.Details
units 115 & 116. unit 115 -bathroom remodel and painting. unit 116 -replace vanity sink and paint. no layout changes in either unit. | $25,000 |
| Oct 10, 2019 | Never finaled issued Oct 2019, no final | 1000 Sutter St | street spaceDetails
street space | ||
| Jul 10, 2018 | Completed final sign-off Apr 2019 | 1000 Sutter St | Central Convalescent Homes, Inc. | stucco patch at rear of bld to comply with nov 201851761 item #2Details
stucco patch at rear of bld to comply with nov 201851761 item #2 | $800 |
| Jul 10, 2018 | Completed final sign-off Jul 2019 | 1000 Sutter St | Central Convalescent Homes, Inc. | renew pa# 20161173022Details
renew pa# 20161173022 | $4,000 |
| Jul 10, 2018 | Never finaled issued Jul 2018, no final | 1000 Sutter St | Central Convalescent Homes, Inc. | renew pa# 201611173017Details
renew pa# 201611173017 | $4,000 |
| Jul 10, 2018 | Completed final sign-off Jun 2019 | 1000 Sutter St | Central Convalescent Homes, Inc. | renew pa# 20160751572Details
renew pa# 20160751572 | $4,000 |
| Nov 17, 2016 | Expired or cancelled expired Oct 2019 | 1000 Sutter St | Central Convalescent Homes, Inc. | install new toilet, sink, walk in shower to replace existing. replace 1 gi outlet and 1 switch. 1 moisture activated exhaust fan. room 306, no extra plumbingDetails
install new toilet, sink, walk in shower to replace existing. replace 1 gi outlet and 1 switch. 1 moisture activated exhaust fan. room 306, no extra plumbing | $10,000 |
| Nov 17, 2016 | Expired or cancelled expired Oct 2019 | 1000 Sutter St | Central Convalescent Homes, Inc. | room 508: replacement of existing sub floor, toilet and sink . installation of walk in shower and 1 moisture activated exhaust fan. repalce 1 gf1 outlet and 1 switch. no extra plumbing fixDetails
room 508: replacement of existing sub floor, toilet and sink . installation of walk in shower and 1 moisture activated exhaust fan. repalce 1 gf1 outlet and 1 switch. no extra plumbing fix | $10,000 |
| Jul 5, 2016 | Expired or cancelled expired Oct 2019 | 1000 Sutter St | Central Convalescent Homes, Inc. | room 706 bath remodel. comply with ces 201672438, no structural work ,in kind.no additional fixtures added. maher not reqDetails
room 706 bath remodel. comply with ces 201672438, no structural work ,in kind.no additional fixtures added. maher not req | $10,000 |
| Jul 5, 2016 | Completed final sign-off Nov 2016 | 1000 Sutter St | Central Convalescent Homes, Inc. | room 719 bath remodel. comply with ces 201672438; no structural work, in kind. no extra plumbing fixtures added. maher not reqDetails
room 719 bath remodel. comply with ces 201672438; no structural work, in kind. no extra plumbing fixtures added. maher not req | $10,000 |
| Oct 21, 2014 | Completed final sign-off Nov 2014 | 1000 Sutter St | Olive Construction Corp | #126: existing bathroom door and frame removal.Details
#126: existing bathroom door and frame removal. | $800 |
| Feb 6, 2009 | Never finaled issued Feb 2009, no final | 1000 Sutter St | street space only.Details
street space only. | ||
| Dec 12, 2008 | Never finaled issued Dec 2008, no final | 1000 Sutter St | street space permitDetails
street space permit | ||
| Nov 21, 2008 | Expired or cancelled expired Oct 2019 | 1000 Sutter St | The Granada,Inc. | new mailboxes in existing room at lobby level. sprinkler under separate permit.Details
new mailboxes in existing room at lobby level. sprinkler under separate permit. | $20,000 |
| Oct 16, 2008 | Completed final sign-off Oct 2008 | 1000 Sutter St | The Granada,Inc. | obtain final inspection for application # 200801253260. replace kitchen fire system. all work complete.Details
obtain final inspection for application # 200801253260. replace kitchen fire system. all work complete. | |
| Oct 16, 2008 | Completed final sign-off Oct 2008 | 1000 Sutter St | The Granada,Inc. | obtain final inspection application #200706053025 kitchen remodel. resolve complaints # 200674333, 200670792, 200670795, 200672829. all work complete.Details
obtain final inspection application #200706053025 kitchen remodel. resolve complaints # 200674333, 200670792, 200670795, 200672829. all work complete. | |
| Sep 30, 2008 | Never finaled issued Sep 2008, no final | 1000 Sutter St | street space only.Details
street space only. | ||
| Jul 21, 2008 | Never finaled issued Jul 2008, no final | 1000 Sutter St | street spaceDetails
street space | ||
| May 19, 2008 | Never finaled issued May 2008, no final | 1000 Sutter St | street space.Details
street space. | ||
| Apr 4, 2008 | Never finaled issued Apr 2008, no final | 1000 Sutter St | street space permit only.Details
street space permit only. | ||
| Apr 1, 2008 | Expired or cancelled expired Oct 2019 | 1000 Sutter St | The Granada,Inc. | work on room#719 only.to comply with n.o.v. 200672438,200672829 & 200674333, room 719 remodel bathroom, new fixtures, new wiring, new finishes.Details
work on room#719 only.to comply with n.o.v. 200672438,200672829 & 200674333, room 719 remodel bathroom, new fixtures, new wiring, new finishes. | $10,000 |
| Apr 1, 2008 | Expired or cancelled expired Oct 2019 | 1000 Sutter St | The Granada,Inc. | room 706 - to comply with n.o.v. 200672438(bid), 200672829(pid), 200674333 (eid). bathroom remodel - new fixtures, wiring & finishes.Details
room 706 - to comply with n.o.v. 200672438(bid), 200672829(pid), 200674333 (eid). bathroom remodel - new fixtures, wiring & finishes. | $10,000 |
| Mar 3, 2008 | Never finaled issued Mar 2008, no final | 1000 Sutter St | street space permit only.Details
street space permit only. | ||
| Jan 25, 2008 | Expired or cancelled expired Oct 2019 | 1000 Sutter St | Vulcan Fire Protection | replace pre-ul 300 fire system with ul 300 compliant system - kitchen fire system.Details
replace pre-ul 300 fire system with ul 300 compliant system - kitchen fire system. | $5,000 |
| Dec 28, 2007 | Never finaled issued Dec 2007, no final | 1000 Sutter St | street space permit only.Details
street space permit only. | ||
| Nov 20, 2007 | Never finaled issued Nov 2007, no final | 1000 Sutter St | street space permit only.lDetails
street space permit only.l | ||
| Nov 16, 2007 | Expired or cancelled expired Oct 2019 | 1000 Sutter St | The Granada,Inc. | 1st floor - selective demolition @ (e) vending area. construct new walls, install plumbing & fictures, install lighting, provide new sanitary finishes. note: accessibility is boluntary upgrade at first floor off lobby.Details
1st floor - selective demolition @ (e) vending area. construct new walls, install plumbing & fictures, install lighting, provide new sanitary finishes. note: accessibility is boluntary upgrade at first floor off lobby. | $12,500 |
| Aug 14, 2007 | Expired or cancelled expired Jul 2009 | 1000 Sutter St | The Granada,Inc. | repair combustion air shaft damaged by fire. remodel to meet code, replace inadequate wood framing, relocate or abandon utilities to accomodate the work.Details
repair combustion air shaft damaged by fire. remodel to meet code, replace inadequate wood framing, relocate or abandon utilities to accomodate the work. | $35,000 |
| Jun 5, 2007 | Expired or cancelled expired Oct 2019 | 1000 Sutter St | The Granada,Inc. | resolve complaints # 200670792, 200670795, 200672829, 200673230, 200674333-resume kitchen remodelDetails
resolve complaints # 200670792, 200670795, 200672829, 200673230, 200674333-resume kitchen remodel | $50,000 |
| Nov 8, 2006 | Completed final sign-off Nov 2006 | 1000 Sutter St | Donald S. Maclean, Inc | renew pa# 200508291431 for final inspection.Details
renew pa# 200508291431 for final inspection. | |
| Jul 5, 2006 | Expired or cancelled expired Mar 2007 | 1000 Sutter St | The Granada,Inc. | partial demo at flue shaft and inst allation at flue support. all work done in kitchen area on 1st floorDetails
partial demo at flue shaft and inst allation at flue support. all work done in kitchen area on 1st floor | $2,500 |
| Aug 29, 2005 | Expired or cancelled expired Mar 2007 | 1000 Sutter St | Donald S. Maclean, Inc | remove & replace +/-120 s.f. of structural sidewalk over basement.Details
remove & replace +/-120 s.f. of structural sidewalk over basement. | $7,200 |
| Jul 29, 2003 | Completed final sign-off Oct 2003 | 1000 Sutter St | Donald S. Maclean, Inc | remove & replace concrete structural slab & portion of topping slab over sub sidewalk bsmtDetails
remove & replace concrete structural slab & portion of topping slab over sub sidewalk bsmt | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- The Granada,Inc. (9), Central Convalescent Homes, Inc. (8), Battalion One Fire Protection (5), Bbi - Con Inc (3), Donald S. Maclean, Inc (3), J P F Construction (3), Brendan Lalor Construction (2), Crime Watch Security Sys Llc (2), Emkjer Enterprises Inc Dba Sign Co Usa (2), San Francisco Fire Protection (2), Bobcomm Llc Dba Pacific Das Llc., Golden State Lumber Inc Dba (See Notes), Olive Construction Corp, Parksway Construction Inc, Vulcan Fire Protection
- Architects
- T.H. Chidley (5), Christophe Laverne (3), Structural Design
- Engineers
- Lewis M Gronniger (2), Stephen R De Jesse (2), Ravendra Sahai, Sarah K Outzen
- Authorized agent-otherss
- Carlos Garcia, Christophe Laverne
- Designers
- Battalion One Fire Protection, Crime Watch Security Systems
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.