Permit GraphShortlistSan Francisco building permits since 2000

Lewis M Gronniger

License
E18433
Look the license up with the state
Listed as
engineer
On San Francisco permits
Sep 2020 to Jul 2024

8 permits since 2000 (engineer on 8 permits): 7 completed, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 26, 2024Completed
final sign-off Jan 2025
550 Terry A Francois BlTruebeck Constructionrevision pa# 2023-0217-2178 changes include: reconfigure transfromer room and remove exterior & street work associated with original design
Details
Permit
202407267411
Status
complete
Filed
Jul 26, 2024
Permit issued
Nov 15, 2024
Final sign-off
Jan 16, 2025
Address
550 Terry A Francois Bl

revision pa# 2023-0217-2178 changes include: reconfigure transfromer room and remove exterior & street work associated with original design

Open the permit page

Jul 5, 2023Completed
final sign-off Jan 2025
550 Terry A Francois BlTruebeck Constructionscope of emergency generator permit is limited to only the emergency generators on the roof, & the associated supporting infrustructure for operation of these generators. this includes installing (x5) diesel generators on the roof, equipment anchorage, and fuel oil supply lines within a new shaft.
Details
Permit
202307051465
Status
complete
Filed
Jul 5, 2023
Permit issued
Feb 2, 2024
Final sign-off
Jan 16, 2025
Declared cost
$2,500,000
Address
550 Terry A Francois Bl

scope of emergency generator permit is limited to only the emergency generators on the roof, & the associated supporting infrustructure for operation of these generators. this includes installing (x5) diesel generators on the roof, equipment anchorage, and fuel oil supply lines within a new shaft.

Open the permit page

$2,500,000
Feb 7, 2023Completed
final sign-off Aug 2025
1000 Sutter StBbi - Con Increvision to approved permit #202109138252. convert extg commercial grade kitchen to residential grade warming kitchen @ lobby level 1, community kitchen only include adjacent prop mgmt ofc
Details
Permit
202302071528
Status
complete
Filed
Feb 7, 2023
Permit issued
Apr 18, 2023
Final sign-off
Aug 15, 2025
Declared cost
$30,000
Address
1000 Sutter St

revision to approved permit #202109138252. convert extg commercial grade kitchen to residential grade warming kitchen @ lobby level 1, community kitchen only include adjacent prop mgmt ofc

Open the permit page

$30,000
Dec 12, 2022Completed
final sign-off Jul 2025
1800 Owens StDome Construction Corpsector 1: tenant improvement on the 6th and 7th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.
Details
Permit
202212128137
Status
complete
Filed
Dec 12, 2022
Permit issued
Jun 27, 2024
Final sign-off
Jul 21, 2025
Declared cost
$5,750,000
Address
1800 Owens St

sector 1: tenant improvement on the 6th and 7th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.

Open the permit page

$5,750,000
Aug 1, 2022Completed
final sign-off Aug 2024
1800 Owens StDome Construction Corp, Xl Construction, Corporationtenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.
Details
Permit
202208019663
Status
complete
Filed
Aug 1, 2022
Permit issued
Aug 29, 2023
Final sign-off
Aug 9, 2024
Declared cost
$6,000,000
Address
1800 Owens St

tenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and electrical requirements.

Open the permit page

$6,000,000
Jun 16, 2022Completed
final sign-off Jun 2023
55 02nd StNovo Construction Inc24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg.
Details
Permit
202206166472
Status
complete
Filed
Jun 16, 2022
Permit issued
Jul 21, 2022
Final sign-off
Jun 8, 2023
Declared cost
$650,000
Address
55 02nd St

24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg.

Open the permit page

$650,000
Sep 13, 2021Completed
final sign-off Aug 2025
1000 Sutter StBbi - Con Inc100% (n) affordable housing, renovation of a 10-story (e) sro into housing for homeless & impacted by covid-19. elective/discretionary structural upgrades at basement foundations & exterior building envelope; renovate residential units; add/renovate offices, community room, laundry & restrooms.
Details
Permit
202109138252
Status
complete
Filed
Sep 13, 2021
Permit issued
Feb 3, 2022
Final sign-off
Aug 19, 2025
Declared cost
$23,303,869
Address
1000 Sutter St

100% (n) affordable housing, renovation of a 10-story (e) sro into housing for homeless & impacted by covid-19. elective/discretionary structural upgrades at basement foundations & exterior building envelope; renovate residential units; add/renovate offices, community room, laundry & restrooms.

Open the permit page

$23,303,869
Sep 12, 2020Expired or cancelled
cancelled Jul 2024
1 Front Streplace (e) generator
Details
Permit
202009124078
Status
cancelled
Filed
Sep 12, 2020
Declared cost
$420,000
Address
1 Front St

replace (e) generator

Open the permit page

$420,000