| Sep 22, 2026 | In progress | 1 Front St | 36th floor: t.i. demo existing partitions, ceilings, doors, and remove existing appliances at currant interior space. provide new non-bearing partitions, ceilings, lighting fixtures, millwork and finishes. | $1,280,000 | |
| Sep 14, 2026 | In progress | 1 Front St | Gci, Inc | interior renovation at 2nd floor, (n) bar, (n) gym and (n) coworking office, (n) ceiling, lighting, millwork and finishes. (n) connecting stair from 1/f to 2/f. | $16,000,000 |
| Aug 20, 2026 | In progress | 1 Front St | repave (e) plaza @ market st entry w/stone. (n) planter & seating; repave 9e) entry @ front st w/stone; repave portion of sidewalk w/stone; (n) waterproofing extending into public right of way. (n) awning; (n) storefront doors & recessed entry; refurbish (e) stair door | $277,065 | |
| Jul 24, 2026 | In progress | 1 Front St | deferred submittal for mechanical, electrical, plumbing, food service. gr fl restaurant. ref 202605261845 | $1,800,000 | |
| May 26, 2026 | In progress | 1 Front St | Gci, Inc | interior renovation of ground floor lobby (n) restaurant at ground floor. (n) ceiling, lighting millwork and finishes.food service, mep & lighting under separate permit. | $2,400,000 |
| Apr 28, 2026 | Completed | 1 Front St | Ayoob & Peery Plumbing Co Inc | record as built per pa 202511149689 fire sprinklers. 34th fl - change out 24 fire sprinkler per ti all changes like for like; 36th fl change out 8 fire sprinkler per ti all changes like for like. job 25-702 | $7,685 |
| Apr 8, 2026 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | 31/f: fire alarm - tenant improvement - as built. per sffd walling comment on building job card pa# 202508203550 & fire permit 202510157411. as built drawing are needed, with the av shutdown relay & security relay deleted. | |
| Apr 1, 2026 | In progress | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm as builts - orig fa permit 202501279152, addendum 202508153130. remove fsd and dual monitor / control modules per approved mechanical drawings and field condition | |
| Mar 18, 2026 | In progress | 1 Front St | Bcci Construction Company | basement lv: revision to pa# 202507231437, arch pa# 2024-0325-8522 - delete added fsd. | |
| Feb 4, 2026 | Completed | 1 Front St | Principal Builders Inc. | floor 31-33- 202507110624 and ref 202601284713 to capture as built details | |
| Feb 2, 2026 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm as builts for city inspectors, revised evacuation voice message original permt# 202510318650. as built permit #2026-0107-3379. | |
| Jan 28, 2026 | Completed | 1 Front St | Principal Builders Inc. | structural revision on l32 at interconnecting stairs for pa #202507110624 and removal of special inspection item #4 | |
| Jan 7, 2026 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm as built, removing 2 relay modules from e notifier nfs2-3030 fire alarm system per field inspector request to submit as built. ref 202510318650, 202510207739 | |
| Jan 7, 2026 | Completed | 1 Front St | Field Construction Inc. | 34 and 36th floor: electrical-power, lighting and signal, title 24. ref pa #202511200096 | $15,000 |
| Dec 15, 2025 | Completed | 1 Front St | Field Construction Inc. | removal of mep scope of work for pa: 202503182502 and 202503242917, 202503242918. stair infill work does not require mep. | |
| Dec 9, 2025 | Completed | 1 Front St | Skyline Construction | level 35, revision to pa#202504164571, (n)credenza | $20,000 |
| Nov 20, 2025 | Completed | 1 Front St | Field Construction Inc. | 31/f suite 3150: deferred mechanical and electrical for t.i permit 202510207739. power, lighting and signal. | $45,000 |
| Nov 20, 2025 | Completed | 1 Front St | Field Construction Inc. | fls 34 & 36: fl. demo removal of non-structural ptns, light fixtures, millwork, fixtures, and fnishes. new light fixtures for minimum req'd lighting ab-017 exception to requirements for disabled access to vacant spaces, suite to remain vacant until future t.i. permit is filed. ref pa# 2025-1114-9689 | $575,000 |
| Nov 14, 2025 | Completed | 1 Front St | Ayoob & Peery Plumbing Co Inc | 34th fl- change out (116) fire sprinkler per t.i 36th fl- change out (64) fire sprinkler per t.i job #25-702 all changes are like for like. | $43,231 |
| Nov 13, 2025 | Completed | 1 Front St | Martinelli Environmental Graph | 30/fl- update 3 evac maps | $800 |
| Nov 5, 2025 | Completed | 1 Front St | Anderson, Rowe & Buckley, Inc. | 31st fl - fire sprinkler ti relocate 47, add 8 total 55 | $28,325 |
| Oct 31, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | ste: 3150:building permit#202510207739. fire alarm only, tenant improvement, adding to existing notifier nfs2-3030 the following- 2 control relays, 8 speakers and 18 speaker strobes | $22,000 |
| Oct 22, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | 32/f: fire alarm t.i.: add 1 monitor module, 5 smoke detectors, 64 speakers, 37 speaker-strobes to (e) notifier nfs2-3030 fire alarm system, ref t.i. 202508203545. | $33,882 |
| Oct 20, 2025 | Completed | 1 Front St | Field Construction Inc. | suite 3150 interior tenant improvement, removal and new non-structural partitions, doors, ceilings, light fixtures, plumbing fixtures, millwork and finishes. mep and fire/life safety under defered permit | $850,000 |
| Oct 15, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | 31st fl - fire alarm ti adding 1 relay, 1 smoke detector, 32 speakers and 21 speaker strobes to existing notifier nfs2-3030 fire alarm system. ref pa 202508203550 | $21,830 |
| Oct 6, 2025 | Completed | 1 Front St | Golden Gate Fire Protection Inc | 32nd fl ref pa # 2025-0820-3545. relocate 157 pendents and 34 uprights | $47,750 |
| Oct 1, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm t.i. field changes per sffd and sfed: adding 1 duct detector and 1 smoke detector to existing notifier nfs2-3030 fire alarm system. fa#: 202509054641 and ref#: 202504164571. | |
| Sep 30, 2025 | Completed | 1 Front St | Golden Gate Fire Protection Inc | 31st floor; relocate 83 pendent and relocate 35 uprights on the 31st floor. t.i. ref: 202504043763 | $29,500 |
| Sep 24, 2025 | Completed | 1 Front St | Principal Builders Inc. | 31 and 32/fl- deferred submittal 202507110624 for stair pan and connection | |
| Sep 22, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm t.i adding (6) relays, (3) speakers, (1) strobe and (13) speakers. strobes to existing notifier nfs2-3030 fire alarm system. ref 202507019916 | $18,120 |
| Sep 22, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm permit. add 1 power supply. 2 monitor modules. 3 relays. 8 smoke detectors. 46 speakers & 29 speaker strobes to 9e) notifier. nfs2-3030 networked voice fire alarm system. building pa# 202507312093. 33rd floor. | $47,500 |
| Sep 17, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | floors 33-34: fire alarm t.i. removing 3 smoke detectors, 3 strobes and 1 speaker. adding 1 speaker-strobe to existing notifier nfs2-3030 fire alarm system. ref t.i permit 202503182502 | $4,720 |
| Sep 17, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | floors 35 and 36: fire alarm ti: removing 9 smoke detectors and 5 strobes, adding 4 speaker strobes to existing notifier nfs2-3030 fire alarm system. ref #202503242918 | $4,720 |
| Sep 17, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | floors 34-35: fire alarm t.i. removing 3 smoke detectors, 3 strobes. adding 2 speaker-strobes to existing notifier nfs2-3030 fire alarm system. ref t.i permit 202503242917 | $4,720 |
| Sep 16, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | 35 flr: fire alarm ti: adding 1 remote power supply, 3 duct detectors, 11 smoke detectors, 3 relay modules, 6 dual point monitor modules, 41 speaker strobes, 3 speakers and 2 strobes to existing notifier nfs2-3030 fire alarm system. | $34,150 |
| Sep 12, 2025 | In progress | 1 Front St | Pribuss Engineering Inc | 33rd/f: demo e) sprinklers under stair being removed connecting 33th & 34th/f. install new sprinkler where slab infill occurs at 34th/f (33rd/f overhead). total heads: 2. ref t.i. 202503182502 | $1,030 |
| Sep 12, 2025 | In progress | 1 Front St | Pribuss Engineering Inc | 35th/f: demo e) sprinklers under stair being removed connecting 34th & 35th/f. install new sprinkler where slab infill occurs at 35th/f (35rd/f overhead). total heads: 2. ref t.i. 202503242918 | $1,030 |
| Sep 12, 2025 | Completed | 1 Front St | Golden Gate Fire Protection Inc | 33rd floor: relocate 142 pendent and 32 uprights. ref pa#202507312092 | $43,500 |
| Sep 12, 2025 | In progress | 1 Front St | Pribuss Engineering Inc | 34th/f: demo e) sprinklers under stair being removed connecting 33th & 34th/f. install new sprinkler where slab infill occurs at 35th/f (34rd/f overhead). total heads: 2. ref t.i. 202503242917 | $1,030 |
| Sep 10, 2025 | Expired or cancelled | 1 Front St | 30th fl refer to pa 202507019916 for ti this permit filed to clarify the a3 occupancy and the assembly permit required (fully sprinklered bldg) | ||
| Sep 10, 2025 | Completed | 1 Front St | Skyline Construction | 30th fl ref pa # 2025-0701-9916: mechanical and electrical work for tenant improvement | $170,000 |
| Sep 9, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | 19/f: fire alarm t.i. adding (1) speaker-strobe to existing notifier nfs2-3030 fire alarm system. ref 202505237198 | $6,500 |
| Sep 8, 2025 | Completed | 1 Front St | Martinelli Environmental Graph | 35th fl - update 4 evacuation maps | $1,000 |
| Aug 20, 2025 | Completed | 1 Front St | Principal Builders Inc. | 31st floor: interior office tenant improvement with associated mep | $1,627,500 |
| Aug 20, 2025 | Completed | 1 Front St | Principal Builders Inc. | 32nd floor: interior office tenant improvement with associated mep | $3,472,000 |
| Aug 18, 2025 | Completed | 1 Front St | Skyline Construction | 35/f: revision to bpa#: 202504164571. to include (e) fire rated walls at 3525 and 3526. were not previously shown on as-built-plans. hatch has been added to depict (e) fair rated walls. | |
| Aug 15, 2025 | Completed | 1 Front St | Field Construction Inc. | 19/fl- ref. 202505237198- mech and electrical to install (n) vavs grilles and transfer boots, power light and signal -title 24 | $169,354 |
| Aug 15, 2025 | Completed | 1 Front St | Field Construction Inc. | 31/fl- ref. 202504043763- mech and electrical to install (n) vavs grilles and transfer boots, power light and signal -title 24 | $69,354 |
| Aug 15, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti-revision to pa 2025-0127-9152 adding 1 smoke detector 1 dual monitor module and 1 relay module to existing notifier nf-s2-3030 fire alarm system. | |
| Aug 8, 2025 | In progress | 1 Front St | R L H Fire Protection Inc | fire sprinkler permit. relocate 59, add 9 and delete 0 sprinklers on the 30/f. t.i #202507019916 | $38,000 |
| Jul 31, 2025 | Completed | 1 Front St | Principal Builders Inc. | floor 33- ti non structural (partitions, fixtures, floors, ceilings, and mep) structural for operable partitions. | $2,886,100 |
| Jul 29, 2025 | Completed | 1 Front St | Bilcor Inc | 27th and 28th. install (15) ceiling mount speaker strobes. ref#: 202505277280. | $10,000 |
| Jul 24, 2025 | Completed | 1 Front St | Ayoob & Peery Plumbing Co Inc | 27th floor: add 6 fire sprinkler per t.i., 28th floor: add 9 fire sprinkler per t.i. job#. ref #202505277280. | $9,317 |
| Jul 23, 2025 | In progress | 1 Front St | Bcci Construction Company | basement: revision to pa#2024-0325-8522. add (1) new fire smoke dampers. | |
| Jul 11, 2025 | Completed | 1 Front St | l31-l33 9n) non-egress stair between l31-l32. (n)finishes on (e) non-egress stair between l32-l33. all areas of future tenant space served by this stair is currenlty vacant. mep deferred. metal stair pan treads & connections under separate permit. | $175,000 | |
| Jul 1, 2025 | Completed | 1 Front St | Anderson, Rowe & Buckley, Inc. | 19/f. existing fire sprinkler system - t.i. 6 added, 16 relcated and 1 removed sprinklers. apn #202505237198 | $7,600 |
| Jul 1, 2025 | Completed | 1 Front St | Skyline Construction | 30/f: t.i. includes the demo of nonstructural paritions and building new nonstructural partitions. all new or revised. mep's and life safety & sprinklers separately. bldg is fully sprinklered. | $672,512 |
| Jun 25, 2025 | In progress | 1 Front St | Pioneer Fire Inc. | 31st floor: add 15 new pendents. gc ti #202504043763 | $3,750 |
| Jun 25, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | 31/f: fire alarm t.i - adding 9 speaker-strobes to existing notifier nfs2-3030 fire alarm system. ref permit 202504043763 | $12,875 |
| Jun 17, 2025 | Completed | 1 Front St | Principal Builders Inc. | level 31-level 33; demo only. ab017. no ceiling demo until deffered sprinkler permit. | $300,000 |
| Jun 11, 2025 | In progress | 1 Front St | R L H Fire Protection Inc | 35th fl - ti fire sprinkler. add 14, relocate 84 and delete 2 fire sprinkler ti 202504164571 | $30,000 |
| May 27, 2025 | Completed | 1 Front St | Bcci Construction Company | 27-28f: ti inlcudes anchoring of (e) phone booths. phone booths to be sprinklered. fire sprinklers to be submitted separately. no revisions to meps. life safety work will be design build & submitted separately. (blding is fully sprinklered) structural included. | $75,000 |
| May 23, 2025 | Completed | 1 Front St | Field Construction Inc. | 19/fl- interior ti to include (n) non structural walls, (n) light fixtures, millwork, and finishes, mep and fire/life safety under separate permit | $300,000 |
| May 21, 2025 | Completed | 1 Front St | Field Construction Inc. | 35/f and 36/f: removal of interconnecting stair beteween flrs 35-36, and infill of slabs on fl 36. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal. | $200,000 |
| May 21, 2025 | Completed | 1 Front St | Field Construction Inc. | removal of interconnecting stair beteween flrs 33-34, and infill of slabs on fl 34. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal. | $200,000 |
| May 21, 2025 | Completed | 1 Front St | Field Construction Inc. | 34/f and 35/f: removal of interconnecting stair beteween flrs 34-35, and infill of slabs on fl 35. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal. | $200,000 |
| May 12, 2025 | In progress | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | 35/fl - fire alarm t.i. adding 2 speakers - strobes to existing notifier nfs2-3030 fire alarm system ref 202503122355 | $5,850 |
| May 1, 2025 | Completed | 1 Front St | Field Construction Inc. | 35/f: electrical and mechanical for restroom upgrade. ref building permit 202503172355. | $60,453 |
| Apr 21, 2025 | In progress | 1 Front St | Golden Gate Fire Protection Inc | 35th floor; fire sprinkler demo; relocate 85 upright. ref#: 202504023551 | $21,250 |
| Apr 18, 2025 | Completed | 1 Front St | Pioneer Fire Inc. | 35/f: convert 1 pendant to upright, relocate 4 pendents, remove 1 pendant. ref pa 202503172355 | $2,750 |
| Apr 16, 2025 | Completed | 1 Front St | Skyline Construction | 35/fl- ti (n) non structrural paritions, finishes, lighting. no strucrual work. demo permitted under ref 202504023551 | $2,500,000 |
| Apr 7, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti adding 15 monitor modules, 7 relay modules and 2 smoke detectors. removing 3 relays, relocating 2 smoke detectors on existing notifier nfs2-3030 fire alarm system. adding 3 call stations to existing cornell 2 way communication system. ref pa 202409241463 & mech pa 202503253011 | $15,600 |
| Apr 7, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | 10/f and 13/f: fire alarm ti adding 4 relays, 2 smoke detectors, 8 dual point monitor modules and 2 speaker strobes to existing notifier nfs2-3030 fire alarm system. ref pa 202409241457 and mech rev. 202503212802. | $10,400 |
| Apr 7, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | 15/f: fire alarm ti adding 1 relay module and 2 dual paint monitor modules to existing notifier nfs2-3030 fire alarm system; adding 1 call station to existing cornell 2 way communication system also removing 1 relay module from fa system. ref pa 202410304028 and mech rev ref 202503212808. | $8,660 |
| Apr 4, 2025 | Completed | 1 Front St | Field Construction Inc. | 31/fl- minor demo of non structural partitions for new demising partition and non rated corridor new cieilings light fixtures and new finishes mep and fire life safety under separate permit | $650,000 |
| Apr 4, 2025 | Completed | 1 Front St | Bcci Construction Company | 15/fl- revision 202410304028- add a ceiling height wall, door, and card reader | $5,000 |
| Apr 2, 2025 | Completed | 1 Front St | Skyline Construction | l35. demo only ab-017. interior non-structural partitions, lighting, millwork finishes. | $30,000 |
| Mar 25, 2025 | Completed | 1 Front St | Bcci Construction Company | 22nd, 23rd, 24th and 25th fl - revision to pa 202409241463, change from "fd's" to "fsd's" on drawing | |
| Mar 21, 2025 | Completed | 1 Front St | Bcci Construction Company | 15th floor: revision to pa #202410304028. change from fd's to fsd's on drawings. | |
| Mar 21, 2025 | Completed | 1 Front St | Bcci Construction Company | 10th and 13th/f: revision to pa# 202409241457 - change from "fds" to "fsds' on drawings. | |
| Mar 19, 2025 | In progress | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | 34th floor. fire alarm ti: delete (1) dual point monitor module from existing notifier nfs2-3030 fire alarm system. | $950 |
| Mar 17, 2025 | Completed | 1 Front St | Field Construction Inc. | 35th fl- restroom upgrades | $220,000 |
| Mar 13, 2025 | Completed | 1 Front St | Ayoob & Peery Plumbing Co Inc | fl 10,13,15,22,23,24,25: as-built ref to 202501249065 f/s & 202409241463 t.i. update drawings for adjacent piping plan per inspector's requiest job #24-706 | |
| Feb 19, 2025 | Completed | 1 Front St | Intelligent Technologies & Services Inc | 23rd/f: supply & install 2) pre-action detectors & 1) 6: water-flow notification bell in ups 2315a & mer 2314 room | $20,884 |
| Feb 13, 2025 | Completed | 1 Front St | Pioneer Fire Inc. | add 3 pendemts ref pa 202403258522 | $700 |
| Jan 27, 2025 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti. adding 5 monitor modules, 2 relay modules, 2 s/d, 2 strobes, 1 speaker strobe panel. 1 horn strobe to existing notifier nfs23030 fire alarm system. ref pa# 202403258522. | $7,885 |
| Jan 24, 2025 | Completed | 1 Front St | Ayoob & Peery Plumbing Co Inc | add 6, relocate 8 fire sprinklers per ti across 10,13,15,22-25 fls. install pipe hangers as needed for new sprinkler pipe. job 24-706. ref 202409241463 | $8,695 |
| Oct 30, 2024 | Completed | 1 Front St | Bcci Construction Company | 15/fl-partial ti converting (e) rooms to a main equipment room. telecommunication rooms pre action room and urs room. add card readers on (e) doors includes (n) non bearing partitions. finish lightings, power, equpiment and assocated mep. there is no change of use. | $100,000 |
| Oct 23, 2024 | Completed | 1 Front St | Field Construction Inc. | interior t.i. revision to pa# 202408148615 for updated documentation of accessible parking stall locations. | |
| Sep 24, 2024 | Completed | 1 Front St | partial tenant improvement to 10th and 13th flr. converting existing rooms to mer, tr, pre-action room and ups rooms. add card readers to existing doors. non-bearing partitions, finishes, lighting, equipment, and assocated mep included. no changes to bldg use. | $700,000 | |
| Sep 24, 2024 | Completed | 1 Front St | Bcci Construction Company | partial t.i. to floors: 22,23,24, & 25. converting existing rooms to mer(main equipment rooms) telecommunication room, pre-action room and ups room. add card readers on existing doors includes new non-bearing partitions, finishes, lighting, power, equipment & associated mep. no change of use | $1,465,000 |
| Aug 15, 2024 | In progress | 1 Front St | Bcci Construction Company | (n) 500 gallon fuel tank & (n) pump to be provided in (n) room of 2 hour fire rated construction @ basement level @ northeast corner of bldg. associated piping to be routed vertically in bldg w/in (e) 2 hour separated. removal of 10,000 gallon diesel fuel tank & pumps @ basement level. | $215,000 |
| Aug 14, 2024 | Completed | 1 Front St | Field Construction Inc. | permit documentation of building existing path of travel for accessibility | |
| Jun 3, 2024 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | 32nd/flr- fire alarm ti- adding (2) control modules and (19) speaker strobes to (e) notfier nf52-3030 fire alarm system | $14,788 |
| May 21, 2024 | Completed | 1 Front St | Peacock Construction | ref pa 202403268631 minor mechanical modifications to accomodate new marketing spec suite, new vav box, air distribution & diffusers, thermostat & air balance. lighting fixtures & associated circuiting/controls power & signal | $15,000 |
| Apr 25, 2024 | Completed | 1 Front St | Peacock Construction | revision to pa# 202403268631 revused ceiling plan @conference room addition for suspended acoustical ceiling assembly and light fixtures. mep & fire life safety under separate permit | |
| Apr 10, 2024 | In progress | 1 Front St | Golden Gate Fire Protection Inc | fire sprinkler demo; relocate 116 upright and 4 concealed pendents. | $75,000 |
| Mar 26, 2024 | Completed | 1 Front St | Peacock Construction | 32nd/f interior t.i. new non-structural walls, new paint, flooring, finishes, lighting, plumbing fixtures & millwork. mep & life safety under separate permit | $300,000 |
| Aug 28, 2023 | Completed | 1 Front St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm t.i: decommissioning existing pre-action system. no new fa devices; existing notfier nfs2-3030, fire alarm system. | $4,568 |
| Mar 17, 2023 | Expired or cancelled | 1 Front St | Peacock Construction | ste 1700. t.i to consist of new work station and glass wall. mep and fire life safety under separate permit if necessary. | $27,480 |
| Mar 15, 2023 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | suite 1000 on 1/f: fire alarm ti - resubmittal of fire alarm permit 202201115755 to comply with reference job card comments. | |
| Feb 24, 2023 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 19th fl, suite 1900 fire alarm ti: adding 12 speaker-strobes to existing notifier nfs2 fire alarm system. | $14,442 |
| Jan 11, 2023 | Never finaled | 1 Front St | Golden Gate Fire Protection Inc | 19/flr: relocate 130 upright - fire sprinklers for demo permit. | $20,900 |
| Dec 27, 2022 | Completed | 1 Front St | Field Construction Inc. | 19th fl, ste 1900 removal of non structural partitions, light, millworks, plumbing fixtures and finishes. electrical & fire, life safety and sprinkler under separate permit | $200,000 |
| Nov 29, 2022 | Never finaled | 1 Front St | Swinerton Builders | 32/f: demo/construct nonstructural partitions/ceilings/lights/finishes, accommodate mech for new layout. 1 new fsd. fire alarm/sprinklers/two-way comm all on sep permits. | $937,020 |
| Nov 2, 2022 | Never finaled | 1 Front St | Swinerton Builders | demo non-structural partitions, ceilings, lights, finishes. construct new non structural partitions, ceilings, lights, finishes. accomodate mech for new layout. | $959,790 |
| Sep 28, 2022 | Completed | 1 Front St | Paganini Electric Corp(See Signatories) | 6/f: replace all light fixture (1 for 1) with new led. replace all lighting controls to meet t-24 requirements, and re-circuit lighting as necessary. | $170,000 |
| Sep 28, 2022 | Never finaled | 1 Front St | Paganini Electric Corp(See Signatories) | 8/f: replace all light fixture (1 for 1) with new led. replace all lighting controls to meet t-24 requirements, and re-circuit lighting as necessary. | $140,000 |
| Aug 18, 2022 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | floors 35 & 36: fire alarm t.i. adding 2 relay modules to (e) notifier nfs2-3030 fire alarm system and (2) call stations to (e) cornell 2 way commnumication sysyem | $18,684 |
| Aug 11, 2022 | Never finaled | 1 Front St | Field Construction Inc. | revision to 202204283241 4,30,32 restrooms. technical infeasibility request and approval of eqiv facilitation request added with revised drining fountain space | |
| Aug 10, 2022 | Expired or cancelled | 1 Front St | Swinerton Builders | suite 325: demo non structural partitions lights, finishes, construct new non structural partitoins, lights, mech, millwork, finishes | $478,440 |
| Aug 3, 2022 | Never finaled | 1 Front St | Swinerton Builders | 3/f: demo nonstructural partitions, lights, finishes, construct new on structural partitions, lights, mech millwork, finishes, sprinkler, fire alarm sep permit | $301,080 |
| Jul 8, 2022 | Completed | 1 Front St | Field Construction Inc. | electrical portion of interior improvement project. new 2019 title 24 compliant lighting and controls. ref # 202204283241. flrs 4, 30, 32 | |
| May 26, 2022 | Completed | 1 Front St | Ayoob & Peery Plumbing Co Inc | 17th fl: add 15, relocate 35 sprinkler heads per t.i.. ref pa# 202110220988. | $15,750 |
| May 18, 2022 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 17/f: fire alarm t.i.: adding 15 speaker-strobves, 15 speakers, 1 relay module and 1 smoke detector to (e) notifier nesl-3030 fire alarm system. | $21,446 |
| May 9, 2022 | Expired or cancelled | 1 Front St | new card readers and door contacts. no structural demolition or new partitions or construction. mep fire life safety under separate permit. | $5,000 | |
| Apr 28, 2022 | Completed | 1 Front St | Field Construction Inc. | restroom 4th, 30th, and 32nd floors: upgrades new finishes fixtures and lighting. mep and fire life safety under seperate permit. | $450,000 |
| Feb 22, 2022 | Expired or cancelled | 1 Front St | upgrade to building's path of travel for accessibility by adding vertical actuation bar at door from lobby to parking garage. | $30,000 | |
| Jan 11, 2022 | Never finaled | 1 Front St | Pacific Auxiliary Fire Alarm | #1060 : fire alarm ti: adding (5) speakers and 3 speakers strobes to existing notifier nfs2-3030 fire alarm system. | $13,368 |
| Jan 11, 2022 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | #1000 10th flr: fire alarm ti: adding (1) power supply, (22) speaker strobes, (13) speakers and (2) duct detectors to existing notifier nfs2-3030 fire alarm system. ref 201810233950. | $27,987 |
| Jan 7, 2022 | Completed | 1 Front St | Golden Gate Fire Protection Inc | 10th fl, ste 1000 & 1060 - relocate 45 pendent sprinklers ref pa 2021-1119-2765 | $22,500 |
| Jan 6, 2022 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | fa resubmittal-provide second drawings showing updated bill of material and floor plan. deleted (1) duct detection from approved fa drawing. ref pa# 202112073883. | |
| Dec 8, 2021 | Completed | 1 Front St | Gci, Inc | 5,19,& 26th floors: electrical-power & lighting. ref app#202104309653 | |
| Dec 7, 2021 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 20/f. fire alarm ti. adding 1 duct detector with relay to existing notifier nfs2-3-3- fire alarm system. | $8,724 |
| Dec 7, 2021 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 21/f. fire alarm ti. adding 4 duct detector with relay to existing notifier nfs2-3-3- fire alarm system. | $9,998 |
| Nov 19, 2021 | Completed | 1 Front St | Swinerton Builders | 10th/f (ste #1060): t.i. demo non structural partitions, lights, millwork, mechanical finishes. construct new non structural partitions, install new lightings, mech, doors, finishes. | $112,500 |
| Nov 17, 2021 | Never finaled | 1 Front St | Novo Construction Inc | mechanical work on the 20th & 21st fls. to include demo of (e) duct work installation of new duct work (4) new heat pumpts, (1) new water pump and upgrade pneumatic control to ddc | $400,000 |
| Oct 22, 2021 | Completed | 1 Front St | Swinerton Builders | 17th fl - construct new none structural partitions install new lights, mechanical system, millwork, doors, finishes | $296,340 |
| Sep 10, 2021 | Completed | 1 Front St | Golden Gate Fire Protection Inc | 14/f: revision to pa 202108065932. relocate 125 pendent sprinkler instead of 145 uprights. ref. ti pa 202103307492 | $1,000 |
| Aug 24, 2021 | Never finaled | 1 Front St | Pacific Auxiliary Fire Alarm | 14/f: fire alarm ti adding 33 speaker strobes, 36 speakers, 3 duct detectors with relay modules, 3 smoke detectors and 3 relay modules to (e) notifier nfs2-3030 fire alarm system. add 1 call station to (e) 2way comm system | $40,300 |
| Aug 6, 2021 | Never finaled | 1 Front St | Golden Gate Fire Protection Inc | fire sprinkler relocate 145 upright sprinklers for demo plan | $7,350 |
| Jun 28, 2021 | Never finaled | 1 Front St | Intelligent Technologies & Services Inc | as built, ref 202010156595 provide upgrade 1 for 1 replacement of (e) clean agent fire suppression, pre action detection and controls system. | |
| Jun 24, 2021 | Never finaled | 1 Front St | Ad Art Inc. | install electric wall single faced sign "first republic bank" | $20,000 |
| Jun 1, 2021 | Completed | 1 Front St | Swinerton Builders | 10/f: demo non-structural partitions, lights, millwork, doors, finishes, mech. construct (n) non-structural partitions, install (n) mech lights, doors, finishes. | $519,060 |
| Apr 30, 2021 | Completed | 1 Front St | Gci, Inc | fl 5,19,26: restroom upgrades. | $750,000 |
| Apr 29, 2021 | Completed | 1 Front St | Gci, Inc | 14th floor restroom upgrade. barrier removal. | $185,000 |
| Apr 22, 2021 | Completed | 1 Front St | Gci, Inc | 3rd, 10th, & 17th fl: electrical new gfgi receptacles for restrooms. new lighting & controls ref pa 202012020064. | |
| Mar 30, 2021 | Completed | 1 Front St | Swinerton Builders | 14/f: demo non structural partitions, doors, lights, finishes. construct new non structural partitions, lights, millwork. modify mech for new layout, finishes. fire and life safety under separate permit. | $877,980 |
| Feb 8, 2021 | Never finaled | 1 Front St | Field Construction Inc. | 22nd-25th fl: new lighting. | $50,000 |
| Dec 28, 2020 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | fire alarm ti: adding (71) speaker-strobes, (29) speakers, (6) duct detectors, (3) relay modules, (5) smoke detectors & (1) power supply to existing notifier nfs2-3030 fa system. adding (3) 2-ay comm. call stations to existing cornell system. | $37,100 |
| Dec 15, 2020 | Completed | 1 Front St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 112 pendents and relocate 3 uprights on the 24th floor. relocate 134 pendents and relocate 1 upright on the 25th floor. t.i. ref # 2020-07-31-0988 | $125,000 |
| Dec 2, 2020 | Completed | 1 Front St | Gci, Inc | restroom remodel on 3rd, 10th, & 17th fl. | $450,000 |
| Oct 15, 2020 | Completed | 1 Front St | Intelligent Technologies & Services Inc | upgrade/ 1 for 1 replacement of clean agent/pre-action detection and controls | $25,754 |
| Oct 5, 2020 | Completed | 1 Front St | Field Construction Inc. | barrier removal only -floors 22, 23, 24, 25 - restroom upgrades for accessibility and finishes | $750,000 |
| Sep 12, 2020 | Expired or cancelled | 1 Front St | replace (e) generator | $420,000 | |
| Sep 11, 2020 | Completed | 1 Front St | Ayoob & Peery Plumbing Co Inc | 22nd floor tenant improvement: add eight, relocate 82 and plug 8 sprinklers to conform with the new wall/ceiling layout of the tenant improvemen. ref 201912230375 | $22,650 |
| Sep 10, 2020 | Completed | 1 Front St | Ayoob & Peery Plumbing Co Inc | 23rd flr tenant improvement: add 14, relocate 123and plug 24 sprinklers to conform with the wall/ceiling layout od the tenant improvement. ref pa# 2019122230377 | $35,025 |
| Sep 1, 2020 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | fire alarm only. full floor ti to existing notifier nfs2-3030. adding 36 sprinkler strobes, 34 speakers, 5 duct smoke. detectors at new funs and fsds, 1 relay module, 1 smoke detector and 400 door holders | $19,500 |
| Sep 1, 2020 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | fire alarm only, 2 way communication sytem ti to e cornell 4300. adding 1 call statoin to passenter elevator lobby for lobb door door lock | $4,000 |
| Aug 24, 2020 | Expired or cancelled | 1 Front St | replace a 1,200 ton induced draft cross flow cooling tower system on the roof. | $215,000 | |
| Aug 24, 2020 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 22/f: ref bpa#201912230375, 2-way emergency comm system, t.i. to (e) cornell communication system. add 1 call station to level 22 located in elevator lobby, (e) 2-way emergency comm system installed under 201803022675 | $4,000 |
| Aug 24, 2020 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 22/f: ref bpa#201912230375, fire alarm only-full floor t.i. to (e) notifier nfs2-3030, adding 38 speaker strobes, 3 duct smoke detectors, 1 relay module & 1 smoke detector, 82 speakers | $19,000 |
| Jul 31, 2020 | Never finaled | 1 Front St | Swinerton Builders | first bank of republic at g/f: establish/legalize cafe. construct new partitions at ceiling height & full height. new door frames & hardware. new electrical/data outlets. (e) mech system to remain. new finishes, typical throughout. modified (e) sprinkler system/(e) fls system under sep permit. | $35,100 |
| Dec 26, 2019 | Expired or cancelled | 1 Front St | Swinerton Builders | construct new non rated partitions, doors, finishes. install lights and mech. | $301,810 |
| Dec 24, 2019 | Completed | 1 Front St | Swinerton Builders | 24th & 25th fl: demo non-structural partitions, lights, doors, finishes. construct new non-structural partitions, lights, doors & mod mechanical, new ada restroom. | $1,278,880 |
| Dec 23, 2019 | Completed | 1 Front St | Swinerton Builders | 23rd floor: demo non structural partitions, doors, lights, finishes. construct new non structural partitions, lights, doors & modify mech for new layout. new ada bathroom. sprinkler, fire alarm and two-way comm all under sep permit. | $620,720 |
| Dec 23, 2019 | Completed | 1 Front St | Swinerton Builders | 22nd floor: demo non structural partitions doors, lights, finishes. construct new non structural partitions, lights, modify mech, doors finishes and new ada bathroom. | $916,260 |
| Nov 25, 2019 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | fire alarm ti on 13th fl: adding 1 power supply, 18 speaker strobes, 7 speakers, 1 relay module, & 11 duct detectors to existing notifier nfs2-3030 fa system. maher na | $14,498 |
| Nov 18, 2019 | Completed | 1 Front St | Golden Gate Fire Protection Inc | 13th flr fire sprinklers. ref pa# 201908068039; fire sprinklers, relocate (60) pendent sprinklers on the 13th fl. (suites 1300 & 1325) | $30,000 |
| Sep 12, 2019 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 18th floor: fire alarm ti addin g 33 speaker strobes, 30 speakers, 4 duct detectors, 2 relay modules, 1 smoke detector to e notifieer nfs2 3030 fa system | $15,640 |
| Sep 12, 2019 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | fire alarm ti add 2 way communication system to 18th fl | $5,932 |
| Sep 5, 2019 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | fire alarm ti adding 3 speaker strobes, 2 strobes to exist nofifier nfs2 fire alarm system | $5,100 |
| Aug 22, 2019 | Completed | 1 Front St | Ayoob & Peery Plumbing Co Inc | f/s on 18th fl: add 13, rleocate 108, and plug 14 sprinklers to conform with the new wall/ceiling layout of the ti. ref pa #201905221377 | $31,125 |
| Aug 6, 2019 | Never finaled | 1 Front St | Swinerton Builders | demo non structural partitions, doors, lights, finishes, construct new non structural partitions, install new lights, doors millwork, mech , finishes | $265,230 |
| Jul 9, 2019 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 16th flr. correcting fire alarm as-builts for tenant improvement per fire marshal request | $20,400 |
| Jul 1, 2019 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 32nd floor: fire alarm t.i. add 3 speaker strobes to (e) notifier nfs2-3030 fa system n/a maher | $7,216 |
| May 22, 2019 | Completed | 1 Front St | Swinerton Builders | 18th fl: demo non structural partitions, doors, lights, finishes. construct new - partitions, doors, frames, millwork, lights. reconfigure mech to fit in new layout & new finishes. maher na | $80,500 |
| May 14, 2019 | Completed | 1 Front St | Peacock Construction | t-24 electrical for work under app#201902253676. n/a for maher | |
| May 13, 2019 | Never finaled | 1 Front St | Air Systems, Inc. | disconect (e) 2-ton split system ac-unit in i.t room, install new 2-ton split system reconnect power and thermostats start-up | $14,500 |
| May 8, 2019 | Completed | 1 Front St | Swinerton Builders | (basement) cut wall opening with rated door assembly for maintenence access between 2 e buildings | $65,000 |
| Apr 30, 2019 | Completed | 1 Front St | Gci, Inc | 34/f: building (1) wall separating floors at non-rated stairwell. maher n/a. | $13,000 |
| Apr 26, 2019 | Never finaled | 1 Front St | Emcor Services/Mesa Energy Systems Inc | replace 3(e) chillers with 2 new high efficency chillers | $218,000 |
| Apr 17, 2019 | Expired or cancelled | 1 Front St | 17th floor tenant improvement for portion of floor: construct new non structural partitions, new lighting, mech, doors, frames finishes | $297,960 | |
| Apr 17, 2019 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | fire alarm ti - add to (e) no filer nfs2-3030: 8 duct det, 16 speaker, 1 strobe, 39 speaker/strobes | $15,200 |
| Apr 17, 2019 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | two way comm ti add one call station to (e) 2wc system | $5,200 |
| Apr 1, 2019 | Completed | 1 Front St | Golden Gate Fire Protection Inc | 16th fl - sprinkler only, relocate 61, add 4 kpendents and plug off 17 outlets for first republic bank ref pa 2018-1101-4708 | $32,500 |
| Feb 25, 2019 | Completed | 1 Front St | Peacock Construction | non structral partitions, doors, glazing, millwork, finishes & lighting, no change in occupancy, use or area, mep sprinklers, life safety under sep permit | $184,700 |
| Jan 18, 2019 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 9th fl - ti add to existing notifier nfs2-3030 fire alarm system. adding 5 speaker strobes and 2 speakers. ref pa 2018-1212-8070 | $6,134 |
| Jan 7, 2019 | Never finaled | 1 Front St | Golden Gate Fire Protection Inc | 7th floor: fire sprinklers, relocate 97 pendent sprinklers on 7th fl | $50,925 |
| Dec 27, 2018 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | ref pa# 201810092538; 2 way emergency communication t.i. to existing 4800 service system by cornell communicator. adding 1 - 4800 call station to passenger elevator lobby | $3,600 |
| Dec 27, 2018 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | ref pa# fire alarm t.i. to (e) notifier nfs2-3030 adding 8 - 24 speaker strobes, 22 speakers, 3 duct detectors, 1 smoke detector and 1 control relay | $17,200 |
| Dec 12, 2018 | Completed | 1 Front St | Swinerton Builders | 9th flr. demo entry, lights, carpte, door w/ frames. construct (n) wall. install lights, doors w/ frames, carpet & finishes | $91,380 |
| Nov 1, 2018 | Completed | 1 Front St | Swinerton Builders | 16th fl: demo non structural partitions, doors, frames, lights, mech finishes, construct (n) non structural partition doors, millwork, lights mech, finishes | $934,740 |
| Oct 23, 2018 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | as built fire alarm drawing for a like for like fire alarm system. ** maher: n/a ** | |
| Oct 9, 2018 | Completed | 1 Front St | Pioneer Fire Inc. | removal of fire sprinklers from elevator machine rooms per sfd ab 201 addendums d & f | $17,000 |
| Oct 9, 2018 | Completed | 1 Front St | Swinerton Builders | 7th flr -demo (e) non structural partitions, carpet, doors, casework, mech, finishes, construct new partitions. lights, mech, flooring, finishes-new unisex restroom maher na | $898,860 |
| Aug 9, 2018 | Completed | 1 Front St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 46 pendent sprinklers on 15th floor. ref ti #201805300450 | $22,050 |
| Jul 20, 2018 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 2 way emergency communicator system. adding 1 call station to the passenger/elevator lobby. ref app#201805300450. 201803022675 | $3,800 |
| Jul 20, 2018 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 15th floor: t.i. to extg notifier nfs2-3030. adding 28 speaker strobes, 26 speakers, 4 duct smoke detector and 3 control relays | $18,840 |
| Jul 12, 2018 | Completed | 1 Front St | Sc Builders, Inc | 26th flr. restroom upgrades to meet compliance. ref pa# 201805179344, | |
| Jul 5, 2018 | Never finaled | 1 Front St | Capitol Electric Const | suite 1900: replace existing 2x4 fluorescent light with led liner light. replace existing 4" recessed light with led recessed light. all lights are replaced in existing location. | $2,850 |
| Jun 28, 2018 | Completed | 1 Front St | Golden Gate Fire Protection Inc | fire sprinklers; relocate (14) pendent sprinklers on the 26th fl. ref#201805179344. n/a for maher. | $7,350 |
| Jun 19, 2018 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | f/a on 26th fl. ti to add to a exist nfs2-3030: adding 23 new spreaker strobes. ref building pa #201805179344, mep #201805240044. n/a maher | $14,010 |
| Jun 4, 2018 | Expired or cancelled | 1 Front St | suite 1900 - modification of existing space to include selectrive demo to (e) ceiling grid and closet door, new closet door, new ceiling tile, new light fixtures, (e) power & signal to remain, new recessed floor box & pull back unused v/d, new finishes | $161,298 | |
| May 30, 2018 | Completed | 1 Front St | Swinerton Builders | 15th fl: demo of (e) structural partitions, doors, cabinets, lights, finishes, mech, construct (n) partitions, install new lights, mechanical, finishes & (n) single use toilet. maher na | $750,000 |
| May 24, 2018 | Never finaled | 1 Front St | Sc Builders, Inc | 26th floor: mep for t.i. ref app#201805179344 | |
| May 18, 2018 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 11/f & 12/f: f/a: 77 speakers strobe, 56 speakers, 2 strobes, 7 duct detectors, 2 control relays, 6 smoke detectors, 1 being added to notifier nfs2-3030. ref t.i. #201803012522 | $28,730 |
| May 18, 2018 | Completed | 1 Front St | Pacific Auxiliary Fire Alarm | 11/f & 12/f: f/a: this project is to install 1 call station per floor (total 2 stations) onto (e) 2-way emergency communication system. existing master ecs system installed under pa201803022675. ref t.i. #201803012522 | $7,870 |
| May 17, 2018 | Completed | 1 Front St | Sc Builders, Inc | 26th fl - ti, demo non-structural partitions and building. (n) non structural partitions; all (n) or revised meps, life safety or sprinklers will be fully engineered/submitted separately. bldg is fully sprinklered | $600,000 |
| May 14, 2018 | Completed | 1 Front St | Golden Gate Fire Protection Inc | 11th fl - relcoate 62, add 3 pendent plug off 20; 12th fl - relocate 48 pendents. plug off 20; n/a maher | $28,250 |