Christopher Jones
- License
- E16470
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E16470 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Ama Consulting Engineers
- Based in
- Manhasset
- On San Francisco permits
- Jun 2019 to Mar 2026
5 permits since 2000 (engineer on 5 permits): 3 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bcci Construction Company (5)
- Architects
- Lauren Jordan (3), Stanley H Lew
- Engineers
- Arthur Metzler (4)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 5
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 18, 2026 | In progress issued Mar 2026 | 1 Front St | Bcci Construction Company | basement lv: revision to pa# 202507231437, arch pa# 2024-0325-8522 - delete added fsd.Details
basement lv: revision to pa# 202507231437, arch pa# 2024-0325-8522 - delete added fsd. | |
| Aug 15, 2024 | In progress issued Nov 2024 | 1 Front St | Bcci Construction Company | (n) 500 gallon fuel tank & (n) pump to be provided in (n) room of 2 hour fire rated construction @ basement level @ northeast corner of bldg. associated piping to be routed vertically in bldg w/in (e) 2 hour separated. removal of 10,000 gallon diesel fuel tank & pumps @ basement level.Details
(n) 500 gallon fuel tank & (n) pump to be provided in (n) room of 2 hour fire rated construction @ basement level @ northeast corner of bldg. associated piping to be routed vertically in bldg w/in (e) 2 hour separated. removal of 10,000 gallon diesel fuel tank & pumps @ basement level. | $215,000 |
| Dec 2, 2019 | Completed final sign-off Jan 2021 | 4 Embarcadero Center | Bcci Construction Company | revision to pa# 2019-0808-8332 includes architectural & mep changesDetails
revision to pa# 2019-0808-8332 includes architectural & mep changes | |
| Aug 8, 2019 | Completed final sign-off Jan 2021 | 4 Embarcadero Center | Bcci Construction Company | 11th fl: office t.i. change of floor egress, a new horizontal exit shall be added new non-load bearing partitions. mep included. new interior finishes & millwork. maher naDetails
11th fl: office t.i. change of floor egress, a new horizontal exit shall be added new non-load bearing partitions. mep included. new interior finishes & millwork. maher na | $3,367,000 |
| Jun 6, 2019 | Completed final sign-off Nov 2020 | 4 Embarcadero Center | Bcci Construction Company | 4th fl: interior office ti for existing tenant to include (n) non-load bearing partitions, structural, mep work, finishes & millwork. maher naDetails
4th fl: interior office ti for existing tenant to include (n) non-load bearing partitions, structural, mep work, finishes & millwork. maher na | $4,500,000 |