109 permits since 2000 (architect on 109 permits): 78 completed, 26 in progress, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 109.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 415 Mission St | stair removal from floor 33, slab opening infill on floor 34 and associated structural improvements. no change to existing or occupancy.Details
stair removal from floor 33, slab opening infill on floor 34 and associated structural improvements. no change to existing or occupancy. | $195,000 | |
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 2 Harrison St | 1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230Details
1st fl l- demo and construction of new employee cafeteria with prep plus dining areas, restrooms, exit passageway, elevator lobby, main lobby and assoicated mep improvements. ref demo pa 202607175230 | $4,552,623 | |
| Aug 11, 2026 | In progress issued Sep 2026 | 525 Market St | Skyline Construction | 3/fl- revision 202606253897 to include work partitions and structrual work. 21/fl- revision 202606253896 to include work on structural, finishes and fixtures. 22/fl- revision 202606253894 to include structural work and finishes and finishes and mep. no exterior work.Details
3/fl- revision 202606253897 to include work partitions and structrual work. 21/fl- revision 202606253896 to include work on structural, finishes and fixtures. 22/fl- revision 202606253894 to include structural work and finishes and finishes and mep. no exterior work. | $10,000 |
| Aug 7, 2026 | In progress issued Aug 2026 | 149 New Montgomery St | Principal Builders Inc. | 4th floor. revision to 202604209749. removal of (e) elevator lobby double door and adding new smoke curtain above (e) elevator cab doors. various partition layouts changes, rcp and lighting updates, and finish updates.Details
4th floor. revision to 202604209749. removal of (e) elevator lobby double door and adding new smoke curtain above (e) elevator cab doors. various partition layouts changes, rcp and lighting updates, and finish updates. | |
| Jul 22, 2026 | Completed final sign-off Aug 2026 | 415 Mission St | Hathaway Dinwiddie Co. | revision to phone booths under ref#: 202505287418. floors 25. is area of work focus pod addition.Details
revision to phone booths under ref#: 202505287418. floors 25. is area of work focus pod addition. | |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 149 New Montgomery St | Principal Builders Inc. | stairs commercial tenant improvement between floors 4.5 &6. scope of work includes partial demolition of existing flooring. new interconnecting spiral staircases & associated structural improvements.Details
stairs commercial tenant improvement between floors 4.5 &6. scope of work includes partial demolition of existing flooring. new interconnecting spiral staircases & associated structural improvements. | $1,130,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 699 08th St | B N Builders Inc | 4/f: revision to pa# 202604099181- revised scope to include converting an existing conference room and open office area into a work room with fenced area for new equipment. occupant load is decreasing as part of the scope. revised electrical and structrual included.Details
4/f: revision to pa# 202604099181- revised scope to include converting an existing conference room and open office area into a work room with fenced area for new equipment. occupant load is decreasing as part of the scope. revised electrical and structrual included. | $50,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 525 Market St | Skyline Construction | 3rd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep.Details
3rd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep. | $3,100,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 525 Market St | 22nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep.Details
22nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep. | $999,000 | |
| Jun 25, 2026 | In progress issued Jul 2026 | 525 Market St | Skyline Construction | 21nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep.Details
21nd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep. | $999,999 |
| Jun 18, 2026 | In progress issued Jul 2026 | 101 California St | Skyline Construction | 33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbingDetails
33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbing | $1,583,313 |
| May 28, 2026 | In progress issued Jun 2026 | 525 Market St | Skyline Construction | commercial tenant improvement on 20th fl to secure 1 office space. includes demo and construction of non structural partitons and furniture. minor update to ceilings and finishesDetails
commercial tenant improvement on 20th fl to secure 1 office space. includes demo and construction of non structural partitons and furniture. minor update to ceilings and finishes | $350,000 |
| May 20, 2026 | In progress issued Aug 2026 | 888 Tennessee St | Hi-Top Construction Inc | (n) gantry installation in (e) space. no (n) enclosures or changes to egress or existing.Details
(n) gantry installation in (e) space. no (n) enclosures or changes to egress or existing. | $32,000 |
| May 18, 2026 | In progress filed May 2026, not yet issued | 2 Harrison St | B N Builders Inc | floors 3,4,5: revision to permit 202512302985. added employee cafeteria with no prep qnd mk storage on 5/f. made various minor design changes throughout. add 3 phone booths on 3/f. mep included.Details
floors 3,4,5: revision to permit 202512302985. added employee cafeteria with no prep qnd mk storage on 5/f. made various minor design changes throughout. add 3 phone booths on 3/f. mep included. | |
| May 14, 2026 | In progress filed May 2026, not yet issued | 2 Harrison St | B N Builders Inc | 2/f: revision to pa# 202512302974, updates to accessibilty and finish in core restrooms. renovate mk & mk storage room. revised glazing around floor openings. updates to finishes, doors and lighting. mep included. structural included.Details
2/f: revision to pa# 202512302974, updates to accessibilty and finish in core restrooms. renovate mk & mk storage room. revised glazing around floor openings. updates to finishes, doors and lighting. mep included. structural included. | |
| May 12, 2026 | In progress issued Jul 2026 | 1 Market St | 6/f: interior t.i area of work is 3068 sq.ft partial floor remodel. existing assembly space to be reconfigured. non-structural partition demo. construction of new partitions, doors, and ceiling. mep upgrades and structural.Details
6/f: interior t.i area of work is 3068 sq.ft partial floor remodel. existing assembly space to be reconfigured. non-structural partition demo. construction of new partitions, doors, and ceiling. mep upgrades and structural. | $3,000,000 | |
| Apr 20, 2026 | In progress issued Jul 2026 | 149 New Montgomery St | Principal Builders Inc. | commercial tenant improvement of (e) floors 5 & 6.Details
commercial tenant improvement of (e) floors 5 & 6. | $5,670,000 |
| Apr 13, 2026 | Completed final sign-off Jul 2026 | 2300 Harrison St | Field Construction Inc. | new gender neutral resterooms - demo, new partitions, ceilings, and finishes.Details
new gender neutral resterooms - demo, new partitions, ceilings, and finishes. | $35,000 |
| Apr 9, 2026 | In progress issued May 2026 | 699 08th St | B N Builders Inc | partial tenant improvement at (e) 4/f suite, (n) equipment at idf & mdf rooms, (n) fence @ mdf room, remove & replace (e) card readers, (n) mechanical units for idf and mdf @ roof. accessibility upgrades @ all gender room, 1st flr entry and roof parking.Details
partial tenant improvement at (e) 4/f suite, (n) equipment at idf & mdf rooms, (n) fence @ mdf room, remove & replace (e) card readers, (n) mechanical units for idf and mdf @ roof. accessibility upgrades @ all gender room, 1st flr entry and roof parking. | $110,029 |
| Mar 6, 2026 | In progress issued Mar 2026 | 535 Mission St | Gci, Inc | revision to pa 202512091303 for additional phone booth locationsDetails
revision to pa 202512091303 for additional phone booth locations | $14,000 |
| Mar 2, 2026 | In progress issued Mar 2026 | 101 California St | Bcci Construction Company | 44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lightingDetails
44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lighting | $501,665 |
| Feb 26, 2026 | Completed final sign-off Aug 2026 | 685 Market St | Sc Builders, Inc | 4/f: full office t.i, new non-structural partitions, ceilings and finishes, employee break room/pantryDetails
4/f: full office t.i, new non-structural partitions, ceilings and finishes, employee break room/pantry | $2,500,000 |
| Jan 12, 2026 | Completed final sign-off Jun 2026 | 350 Bush St | Bcci Construction Company | installing and anchoring furniture phone booths on office floor 7.Details
installing and anchoring furniture phone booths on office floor 7. | $20,000 |
| Dec 30, 2025 | In progress issued Apr 2026 | 2 Harrison St | B N Builders Inc | 2nd fl: tenan improvement for existing 2nd fl. partial demo and construction of interior partitions, ceilings, light fixtures. mep included.micro kitchen deferred for sfdph.Details
2nd fl: tenan improvement for existing 2nd fl. partial demo and construction of interior partitions, ceilings, light fixtures. mep included.micro kitchen deferred for sfdph. | $500,000 |
| Dec 10, 2025 | In progress issued May 2026 | 1 Market St | Bcci Construction Company | 10/fl- install of phone booth includes anchorning and adding (3) pendant light fixturesDetails
10/fl- install of phone booth includes anchorning and adding (3) pendant light fixtures | $30,000 |
| Dec 9, 2025 | In progress issued Dec 2025 | 535 Mission St | Gci, Inc | 9th fl - commercial ti demo & construction of non-structural partitions, ceilings, finishes & furniture/equipment expansion of existing pantry/break area (not mirco-kitchen)Details
9th fl - commercial ti demo & construction of non-structural partitions, ceilings, finishes & furniture/equipment expansion of existing pantry/break area (not mirco-kitchen) | $186,000 |
| Dec 5, 2025 | Completed final sign-off Mar 2026 | 888 Tennessee St | B N Builders Inc | revision to pa# 202510086942 add new fence at ground fl. structural sheets included. changes to doors at south machine shop.Details
revision to pa# 202510086942 add new fence at ground fl. structural sheets included. changes to doors at south machine shop. | |
| Nov 17, 2025 | Completed final sign-off Dec 2025 | 50 Fremont St | Gci, Inc | 19th/flr and 20th/flr: new interior partition at existing 20th floor. communication stair, construction of new swinging gate at 19th floor landing of the same stair.Details
19th/flr and 20th/flr: new interior partition at existing 20th floor. communication stair, construction of new swinging gate at 19th floor landing of the same stair. | $80,000 |
| Nov 4, 2025 | Completed final sign-off Feb 2026 | 1 California St | Skyline Construction | 2nd floor suite 200: interior t.i. for spec ready. demolition and construction of non-structural partitions,ceilings, and finishes.Details
2nd floor suite 200: interior t.i. for spec ready. demolition and construction of non-structural partitions,ceilings, and finishes. | $350,000 |
| Nov 4, 2025 | In progress issued Apr 2026 | 505 Howard St | Novo Construction Inc | 5th fl - millwork and equipment for back of house pantry. interior non-structural partitions, new finishes millwork.Details
5th fl - millwork and equipment for back of house pantry. interior non-structural partitions, new finishes millwork. | $700,000 |
| Oct 16, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 7th flr. revision to 202507281741 for dph approval of pantry. no exterior scope.Details
7th flr. revision to 202507281741 for dph approval of pantry. no exterior scope. | $2,000 |
| Oct 8, 2025 | Completed final sign-off Mar 2026 | 888 Tennessee St | B N Builders Inc | ground fl- remove walk in freezer. replace doors at walk in cooler. new fence at ground fl covered space. no food or beverage. ref pa # 202410042366 & 202504214839Details
ground fl- remove walk in freezer. replace doors at walk in cooler. new fence at ground fl covered space. no food or beverage. ref pa # 202410042366 & 202504214839 | $45,000 |
| Oct 3, 2025 | Completed final sign-off Jul 2026 | 50 California St | Sc Builders, Inc | 28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep.Details
28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep. | $4,135,200 |
| Sep 3, 2025 | Completed final sign-off Jul 2026 | 685 Market St | Sc Builders, Inc | 1/f- administrative revision to pa#'s 202506188937, 202503283304 abd 202506168762: to memorialize legalization of office use per cua motion m-21788.Details
1/f- administrative revision to pa#'s 202506188937, 202503283304 abd 202506168762: to memorialize legalization of office use per cua motion m-21788. | |
| Aug 20, 2025 | Completed final sign-off Aug 2026 | 44 Montgomery St | Swinerton Builders | 34/fl- single floor office at a mutli tenant floor ti to include updated finishes new lighting fixtures, removal of 2 partitions between offices to convert to lounge/meeting spaces. removal of previous ti roll up door and convert into drywall partitionDetails
34/fl- single floor office at a mutli tenant floor ti to include updated finishes new lighting fixtures, removal of 2 partitions between offices to convert to lounge/meeting spaces. removal of previous ti roll up door and convert into drywall partition | $650,000 |
| Aug 5, 2025 | In progress issued Aug 2025 | 505 Howard St | Novo Construction Inc | 5th fl - ada actuator project, retrofit of (e) elevator lobby, reception and restroom doors with new ada actuator push plates and door operators. total of 5 doors, 2 double leaf 3 single doorsDetails
5th fl - ada actuator project, retrofit of (e) elevator lobby, reception and restroom doors with new ada actuator push plates and door operators. total of 5 doors, 2 double leaf 3 single doors | $5,000 |
| Aug 1, 2025 | Expired or cancelled withdrawn May 2026 | 2485 San Bruno Av | interior alteration of (e) commercial retail bank bldg with two-story level. this includes the removal and construction of non-structural partitions, ceilings, finishes, and furniture/equipment on the ground floor.Details
interior alteration of (e) commercial retail bank bldg with two-story level. this includes the removal and construction of non-structural partitions, ceilings, finishes, and furniture/equipment on the ground floor. | $996,000 | |
| Jul 28, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 7th floor: full t.i. in a 10 story hi-rise building. new non structural partitions, ceilings, and finishes. includues a breakroom/pantry. mep deferred.Details
7th floor: full t.i. in a 10 story hi-rise building. new non structural partitions, ceilings, and finishes. includues a breakroom/pantry. mep deferred. | $2,500,000 |
| Jul 3, 2025 | Completed final sign-off Nov 2025 | 525 Market St | Skyline Construction | installation and anchoring of phone booths on floors 19, 20, 21, 27Details
installation and anchoring of phone booths on floors 19, 20, 21, 27 | $148,000 |
| Jun 18, 2025 | Completed final sign-off Jul 2026 | 685 Market St | Sc Builders, Inc | first/fl: coffee bar rev to 202503283304 & 202506168762. no legalization of sf planning office use on 1/f under this permit.Details
first/fl: coffee bar rev to 202503283304 & 202506168762. no legalization of sf planning office use on 1/f under this permit. | $40,000 |
| Jun 18, 2025 | Completed final sign-off Jan 2026 | 888 Tennessee St | B N Builders Inc | 1st fl revision to pa # 2025-0421-4839 reduce occupant load of break room. add partition to east end of breakroom to separate utility area. add card readers to the warehouse doors entering the break room.Details
1st fl revision to pa # 2025-0421-4839 reduce occupant load of break room. add partition to east end of breakroom to separate utility area. add card readers to the warehouse doors entering the break room. | $15,000 |
| Jun 16, 2025 | Completed final sign-off Jul 2026 | 685 Market St | Sc Builders, Inc | 1st/f: t.i. non structural partitions, finishes, & raised platform. work includes (n) 21" platform to courtyard & modifications to (e) railing for new finishes at annie st. enttranceDetails
1st/f: t.i. non structural partitions, finishes, & raised platform. work includes (n) 21" platform to courtyard & modifications to (e) railing for new finishes at annie st. enttrance | $999,000 |
| Jun 13, 2025 | Completed final sign-off Jun 2026 | 685 Market St | Sc Builders, Inc | 2nd/f: dhp approval of food service scope at breakroom, fixture & finishes & equipment. ref to t.i. pa# 202504104123. mep deferredDetails
2nd/f: dhp approval of food service scope at breakroom, fixture & finishes & equipment. ref to t.i. pa# 202504104123. mep deferred | |
| May 30, 2025 | Completed final sign-off Dec 2025 | 500 Sansome St | Centric Construction Inc | 1st floor: deferred structural for pa #202503263112Details
1st floor: deferred structural for pa #202503263112 | |
| May 28, 2025 | Completed final sign-off Aug 2026 | 415 Mission St | Hathaway Dinwiddie Co. | floors 21-25, 27-30: install focus pods.Details
floors 21-25, 27-30: install focus pods. | $25,000 |
| May 28, 2025 | Completed final sign-off Aug 2026 | 415 Mission St | Hathaway Dinwiddie Co. | floors 12-19: install focus pods.Details
floors 12-19: install focus pods. | $25,000 |
| May 9, 2025 | Completed final sign-off Aug 2026 | 415 Mission St | Hathaway Dinwiddie Co. | install focus pods on floors 8,9.10, & 11Details
install focus pods on floors 8,9.10, & 11 | $60,000 |
| May 5, 2025 | Completed final sign-off Mar 2026 | 88 Kearny St | Skyline Construction | 5th fl: partial tenant improvement partial demolition, new non bearting partitions, ceilings, millwork, mechancial, electrical & plumbing scope. structural scope for phone booth anchoring. (e) restroom core will be updated to mett per 2022 cbc accessibility.Details
5th fl: partial tenant improvement partial demolition, new non bearting partitions, ceilings, millwork, mechancial, electrical & plumbing scope. structural scope for phone booth anchoring. (e) restroom core will be updated to mett per 2022 cbc accessibility. | $800,000 |
| Apr 21, 2025 | Completed final sign-off Jan 2026 | 888 Tennessee St | B N Builders Inc | 1st/f t.i.: (e) warehouse bldg with accessory business area. new partitions, fisnihes, fencing (interior) new rebotic equipement. restroom uogrades, mep included. ref to 202410042366Details
1st/f t.i.: (e) warehouse bldg with accessory business area. new partitions, fisnihes, fencing (interior) new rebotic equipement. restroom uogrades, mep included. ref to 202410042366 | $1,000,000 |
| Apr 17, 2025 | Completed final sign-off Jun 2025 | 415 Mission St | Hathaway Dinwiddie Co. | 11th fl: new multi-faith room. new finishes, mechanical & electricalDetails
11th fl: new multi-faith room. new finishes, mechanical & electrical | $243,000 |
| Apr 10, 2025 | Completed final sign-off Jun 2026 | 685 Market St | Sc Builders, Inc | 2/fl- ti to floor including addition of restroom, shower rooms, conference , library , alternate work areas and raised platform in all hands area.Details
2/fl- ti to floor including addition of restroom, shower rooms, conference , library , alternate work areas and raised platform in all hands area. | $2,500,000 |
| Apr 4, 2025 | Completed final sign-off Jul 2025 | 1 Front St | Bcci Construction Company | 15/fl- revision 202410304028- add a ceiling height wall, door, and card readerDetails
15/fl- revision 202410304028- add a ceiling height wall, door, and card reader | $5,000 |
| Mar 28, 2025 | Completed final sign-off Jun 2026 | 685 Market St | Sc Builders, Inc | 1st & 2nd fl - interconnecting stair between levels 1-2; (n) gender neutral rr on ground floor, new ground floor janitor's closet & door to courtyard.Details
1st & 2nd fl - interconnecting stair between levels 1-2; (n) gender neutral rr on ground floor, new ground floor janitor's closet & door to courtyard. | $315,000 |
| Mar 26, 2025 | Completed final sign-off Dec 2025 | 500 Sansome St | Centric Construction Inc | 1/fl and mezzanine- ti including dmeo and construction of non structual partitions ceilings, finishes and ffe. (n) restrooms and breakroom. deferred mepDetails
1/fl and mezzanine- ti including dmeo and construction of non structual partitions ceilings, finishes and ffe. (n) restrooms and breakroom. deferred mep | $4,360,000 |
| Mar 3, 2025 | In progress issued Mar 2025 | 415 Mission St | Hathaway Dinwiddie Co. | 44 and 45/fl-revision to 202306129861 to revise smoke control of operationsDetails
44 and 45/fl-revision to 202306129861 to revise smoke control of operations | |
| Jan 29, 2025 | Completed final sign-off Mar 2025 | 50 Fremont St | Gci, Inc | 20th floor: commercial t.i. non structural wood slat dividing partition. demo of ceiling tile to accomodate wood slat dividing partition. structural partition anchrage a support. demo and relocation of 2 av speakers & 1 hvac fixture.Details
20th floor: commercial t.i. non structural wood slat dividing partition. demo of ceiling tile to accomodate wood slat dividing partition. structural partition anchrage a support. demo and relocation of 2 av speakers & 1 hvac fixture. | $10,000 |
| Jan 22, 2025 | Completed final sign-off Mar 2025 | 188 Spear St | Skyline Construction | revision for pa # 2023-1219-2741 proposed relocation of one phone booth & adding one phone booth on the 6th flDetails
revision for pa # 2023-1219-2741 proposed relocation of one phone booth & adding one phone booth on the 6th fl | |
| Dec 26, 2024 | Completed final sign-off Jun 2025 | 120 Kearny St | Hp Build | 28/fl: revision to pa#2024-0725-7281: to reduce size of breakroom 28101, move idf room, create wellness and storage room.Details
28/fl: revision to pa#2024-0725-7281: to reduce size of breakroom 28101, move idf room, create wellness and storage room. | $10,000 |
| Oct 30, 2024 | Completed final sign-off Jul 2025 | 1 Front St | Bcci Construction Company | 15/fl-partial ti converting (e) rooms to a main equipment room. telecommunication rooms pre action room and urs room. add card readers on (e) doors includes (n) non bearing partitions. finish lightings, power, equpiment and assocated mep. there is no change of use.Details
15/fl-partial ti converting (e) rooms to a main equipment room. telecommunication rooms pre action room and urs room. add card readers on (e) doors includes (n) non bearing partitions. finish lightings, power, equpiment and assocated mep. there is no change of use. | $100,000 |
| Oct 25, 2024 | Completed final sign-off Jun 2025 | 888 Tennessee St | B N Builders Inc | revision to pa 202410042366 ground fl - installation of it gear in a cage. barrier removal in the men's restroom & signage installation of equipment and fencing. structural anchorage drawings includedDetails
revision to pa 202410042366 ground fl - installation of it gear in a cage. barrier removal in the men's restroom & signage installation of equipment and fencing. structural anchorage drawings included | $40,000 |
| Oct 17, 2024 | Completed final sign-off Jan 2025 | 140 New Montgomery St | Sc Builders, Inc | 11th flr. decommissioning. scope includes demo of existing lighting and crac units. minor lighting elevation lobby and wall finisher.Details
11th flr. decommissioning. scope includes demo of existing lighting and crac units. minor lighting elevation lobby and wall finisher. | $150,000 |
| Oct 4, 2024 | Completed final sign-off May 2025 | 888 Tennessee St | B N Builders Inc | 1/f: modification to (e) warehouse. add security fencing around security & it equipment.Details
1/f: modification to (e) warehouse. add security fencing around security & it equipment. | $30,000 |
| Sep 24, 2024 | Completed final sign-off Jul 2025 | 1 Front St | partial tenant improvement to 10th and 13th flr. converting existing rooms to mer, tr, pre-action room and ups rooms. add card readers to existing doors. non-bearing partitions, finishes, lighting, equipment, and assocated mep included. no changes to bldg use.Details
partial tenant improvement to 10th and 13th flr. converting existing rooms to mer, tr, pre-action room and ups rooms. add card readers to existing doors. non-bearing partitions, finishes, lighting, equipment, and assocated mep included. no changes to bldg use. | $700,000 | |
| Sep 24, 2024 | Completed final sign-off Jul 2025 | 1 Front St | Bcci Construction Company | partial t.i. to floors: 22,23,24, & 25. converting existing rooms to mer(main equipment rooms) telecommunication room, pre-action room and ups room. add card readers on existing doors includes new non-bearing partitions, finishes, lighting, power, equipment & associated mep. no change of useDetails
partial t.i. to floors: 22,23,24, & 25. converting existing rooms to mer(main equipment rooms) telecommunication room, pre-action room and ups room. add card readers on existing doors includes new non-bearing partitions, finishes, lighting, power, equipment & associated mep. no change of use | $1,465,000 |
| Sep 18, 2024 | Completed final sign-off Dec 2024 | 625 02nd St | Sc Builders, Inc | 3rd fl revision to pa 2024-0725-7264 redoing the communication opening.Details
3rd fl revision to pa 2024-0725-7264 redoing the communication opening. | |
| Sep 18, 2024 | Completed final sign-off Feb 2025 | 275 Brannan St | Sc Builders, Inc | 2nd fl revision (delta 5) to pa 2024-0621-5032 additional detail added to wall section infill update to show 2 hr rated walls (n) details/ showing wrapping of (e) hss. 2nd fl partition plan. closets & nicch added changing some lighting to clarify adding custom wall sconces etc.Details
2nd fl revision (delta 5) to pa 2024-0621-5032 additional detail added to wall section infill update to show 2 hr rated walls (n) details/ showing wrapping of (e) hss. 2nd fl partition plan. closets & nicch added changing some lighting to clarify adding custom wall sconces etc. | |
| Sep 17, 2024 | Completed final sign-off Feb 2025 | 1160 Battery St | Skyline Construction | revision to pa#: 202404260912 responding to health comments and revised building core of non-rated demise walls associated with pa: 202408269452Details
revision to pa#: 202404260912 responding to health comments and revised building core of non-rated demise walls associated with pa: 202408269452 | |
| Sep 12, 2024 | Completed final sign-off Mar 2025 | 505 Howard St | Novo Construction Inc | 5th floor: interior tenant improvement. to include non-load bearing partitions, ceilings and finishes. mep under seperate permit. structural under separate permit. no cfc until mep and structural deferred submittals are permitted and completed.Details
5th floor: interior tenant improvement. to include non-load bearing partitions, ceilings and finishes. mep under seperate permit. structural under separate permit. no cfc until mep and structural deferred submittals are permitted and completed. | $3,822,000 |
| Aug 19, 2024 | Completed final sign-off Dec 2024 | 505 Howard St | Novo Construction Inc | 5/f: demolition of interior non-bearing partitions ceiling and finishesDetails
5/f: demolition of interior non-bearing partitions ceiling and finishes | $45,000 |
| Aug 16, 2024 | Completed final sign-off Aug 2025 | 555 California St | Truebeck Construction | 6th/f t.i. included new partitions, lighting, power, furniture, equipment. mep deferred for separate permit appDetails
6th/f t.i. included new partitions, lighting, power, furniture, equipment. mep deferred for separate permit app | $3,008,592 |
| Aug 6, 2024 | Completed final sign-off Sep 2024 | 222 02nd St | Novo Construction Inc | revision to permit 202405242901 to add/change fire alarm notes on floors 11,12,14,15,16. remove fire alarm devices from plans.Details
revision to permit 202405242901 to add/change fire alarm notes on floors 11,12,14,15,16. remove fire alarm devices from plans. | |
| Aug 2, 2024 | Expired or cancelled cancelled Aug 2024 | 500 Howard St | Novo Construction Inc | 5th floor: demolition of interior non structural partitions ceilings and existing finishes. ab-017.Details
5th floor: demolition of interior non structural partitions ceilings and existing finishes. ab-017. | $45,000 |
| Jul 30, 2024 | Completed final sign-off Sep 2024 | 50 Fremont St | Gci, Inc | construction of new non rated interior partitions for security purposes at existing 21st fl communicating stair, new swinging security gate at 20th fl landing of same stairDetails
construction of new non rated interior partitions for security purposes at existing 21st fl communicating stair, new swinging security gate at 20th fl landing of same stair | $400,000 |
| Jul 25, 2024 | Completed final sign-off Jun 2025 | 120 Kearny St | Hp Build | t.i. to 28th/f included selective demo & contruction of non structural partitions, ceilings, finishes & power. associated mech, elec, & plumbing includedDetails
t.i. to 28th/f included selective demo & contruction of non structural partitions, ceilings, finishes & power. associated mech, elec, & plumbing included | $75,000 |
| Jul 25, 2024 | Completed final sign-off Dec 2024 | 625 02nd St | Sc Builders, Inc | sharing plans with 2024-0621-5032 to include infilling the opening permitted by p/a 2017-0328-2516 and 2017-0328-2517.Details
sharing plans with 2024-0621-5032 to include infilling the opening permitted by p/a 2017-0328-2516 and 2017-0328-2517. | |
| Jul 15, 2024 | Completed final sign-off Nov 2024 | 560 Mission St | Novo Construction Inc | 9th floor: t.i. to include construction of 4 offices with new finishes, non-bearing partitions, ceiling and lighting. mechanical and electrical included.Details
9th floor: t.i. to include construction of 4 offices with new finishes, non-bearing partitions, ceiling and lighting. mechanical and electrical included. | $80,000 |
| Jun 21, 2024 | Completed final sign-off Feb 2025 | 275 Brannan St | Sc Builders, Inc | 2/f: partial floor ti for full floor tenant level 2, infill of (e) fire rated opening; remove fire door & infill opening, demo mezzanine, constr. (n) str. and non-str. part's, finishes & fixtures, mep design build under separate permit. limited to reinforcement of (e) masonry wall, str support ofDetails
2/f: partial floor ti for full floor tenant level 2, infill of (e) fire rated opening; remove fire door & infill opening, demo mezzanine, constr. (n) str. and non-str. part's, finishes & fixtures, mep design build under separate permit. limited to reinforcement of (e) masonry wall, str support of | $1,386,230 |
| Jun 18, 2024 | Completed final sign-off Feb 2025 | 275 Brannan St | Sc Builders, Inc | 2/f: selective demo of existing partitions, doors, finishes for a full floor tenant. multi tenant commercial building. ab-017. sprinker pa# 202407096044Details
2/f: selective demo of existing partitions, doors, finishes for a full floor tenant. multi tenant commercial building. ab-017. sprinker pa# 202407096044 | $59,844 |
| May 24, 2024 | Completed final sign-off Sep 2024 | 222 02nd St | Novo Construction Inc | install and anchor new furniture pods on floors 11,12,14,15 & 16, the scope of work includes anchoring the concrete floor slab and locating new furniture pods in line with the (e) fie alarm strobes, with proper sprinkler conveyr from (e) building system per sffd bulletin ab2.04 line 59Details
install and anchor new furniture pods on floors 11,12,14,15 & 16, the scope of work includes anchoring the concrete floor slab and locating new furniture pods in line with the (e) fie alarm strobes, with proper sprinkler conveyr from (e) building system per sffd bulletin ab2.04 line 59 | $10,000 |
| Apr 26, 2024 | Completed final sign-off Feb 2025 | 1160 Battery St | Skyline Construction | 4/f office ti w/pantry located on the east side of building to include replacing (e) partitions, ceilings, and associated mep work. break room, catering kitchen, servery & dining room.Details
4/f office ti w/pantry located on the east side of building to include replacing (e) partitions, ceilings, and associated mep work. break room, catering kitchen, servery & dining room. | $6,800,000 |
| Apr 24, 2024 | Completed final sign-off Dec 2024 | 50 Fremont St | Gci, Inc | 2nd floor: t.i. to include demolition and construction of non structural partitions, ceilings, lighting, finishes, furiture, equipment, it/av and associated mep.Details
2nd floor: t.i. to include demolition and construction of non structural partitions, ceilings, lighting, finishes, furiture, equipment, it/av and associated mep. | $2,400,000 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 415 Mission St | Hathaway Dinwiddie Co. | 4/f: conversion of an (e) it provisioning room into bt lab work room. relocation of selective furniture, selective relocation of lighting fixtures, upgrades of (e) partitions to the 1hr fire rating and door replacement, minor structural and hvac work included. no chang of occupant load or egressDetails
4/f: conversion of an (e) it provisioning room into bt lab work room. relocation of selective furniture, selective relocation of lighting fixtures, upgrades of (e) partitions to the 1hr fire rating and door replacement, minor structural and hvac work included. no chang of occupant load or egress | $1,350,000 |
| Feb 21, 2024 | Completed final sign-off Sep 2024 | 415 Mission St | Hathaway Dinwiddie Co. | 16/f: conversion of an (e) game room into a secure area including an entry, work room, and safe/storage room. demolition of interior partitions, ceiling, and lighting. new construction of interior non-bearing partitions, ceilings and finishes. no change of use or occupancy.Details
16/f: conversion of an (e) game room into a secure area including an entry, work room, and safe/storage room. demolition of interior partitions, ceiling, and lighting. new construction of interior non-bearing partitions, ceilings and finishes. no change of use or occupancy. | $425,434 |
| Feb 13, 2024 | Completed final sign-off Aug 2024 | 180 Montgomery St | Bcci Construction Company | 25/f floor - minor revision to pa# 202312212906: changes to office configurations.Details
25/f floor - minor revision to pa# 202312212906: changes to office configurations. | |
| Feb 9, 2024 | Completed final sign-off Nov 2024 | 180 Montgomery St | Bcci Construction Company | 13th fl: revision to 202311130699. minor change to office configurations.Details
13th fl: revision to 202311130699. minor change to office configurations. | |
| Feb 9, 2024 | Completed final sign-off Sep 2024 | 180 Montgomery St | Bcci Construction Company | 22th fl: revision to 202311140779. minor change to office configurations.Details
22th fl: revision to 202311140779. minor change to office configurations. | |
| Dec 21, 2023 | Completed final sign-off Nov 2024 | 180 Montgomery St | Bcci Construction Company | 24/f: ti constructing non structural partitions, ceilings, finishes and associated mep.Details
24/f: ti constructing non structural partitions, ceilings, finishes and associated mep. | $2,100,000 |
| Dec 21, 2023 | Completed final sign-off Aug 2024 | 180 Montgomery St | Bcci Construction Company | 25/f: ti constructing non structural partitions, ceilings, finishes and associated mep.Details
25/f: ti constructing non structural partitions, ceilings, finishes and associated mep. | $3,000,000 |
| Dec 19, 2023 | Completed final sign-off Feb 2025 | 525 Market St | Skyline Construction | installing and anchoring furniture phone booths on office floors 20, 21, 33, 35, 36, 37 and 38th floor. no change of use interior onlyDetails
installing and anchoring furniture phone booths on office floors 20, 21, 33, 35, 36, 37 and 38th floor. no change of use interior only | $142,800 |
| Dec 18, 2023 | Completed final sign-off Oct 2024 | 222 02nd St | Aecore Inc. | revision to 20212239060. response to corrective dated 8/26/2021 by inspector kucel. phone boots to be anchored, within fire sprinkler coverage and have direct visual to the strobe. permit revision on locations. add more phone booths on floor 4, 5, 8, 9 & 10 only.Details
revision to 20212239060. response to corrective dated 8/26/2021 by inspector kucel. phone boots to be anchored, within fire sprinkler coverage and have direct visual to the strobe. permit revision on locations. add more phone booths on floor 4, 5, 8, 9 & 10 only. | |
| Nov 14, 2023 | Completed final sign-off Sep 2024 | 180 Montgomery St | Bcci Construction Company | 22nd/fl: office t.i. to included new non structural paritions, ceilings, finishes, & mep. demo permit: 202310108328Details
22nd/fl: office t.i. to included new non structural paritions, ceilings, finishes, & mep. demo permit: 202310108328 | $2,129,375 |
| Nov 13, 2023 | Completed final sign-off Aug 2024 | 180 Montgomery St | Bcci Construction Company | 13/f: new office ti to include new non-structural partitions, ceilings, finishes, and associated mep work. ref demo permit 202310108327Details
13/f: new office ti to include new non-structural partitions, ceilings, finishes, and associated mep work. ref demo permit 202310108327 | $1,912,802 |
| Nov 2, 2023 | Completed final sign-off May 2025 | 555 Market St | Gci, Inc | demo & construction of non-structural partitions, ceilings, lighting, electrical, finishes & furniture. accessible upgrades provided @ (e) mens restrooms & a new gender neutral restroom. structural support for phone boothsDetails
demo & construction of non-structural partitions, ceilings, lighting, electrical, finishes & furniture. accessible upgrades provided @ (e) mens restrooms & a new gender neutral restroom. structural support for phone booths | $800,000 |
| Nov 2, 2023 | In progress filed Nov 2023, not yet issued | 728 Pacific Av | t.i. to include: replacement & enlargment of (e) elevator & shaft from basement to 2nd flr mezzanine, & extension of (n) elevator to 3rd flr. addition of 3rd flr conditioned space @ (e) 2nd fl. roof. selective demo,(n) enclosed lobbies...Details
t.i. to include: replacement & enlargment of (e) elevator & shaft from basement to 2nd flr mezzanine, & extension of (n) elevator to 3rd flr. addition of 3rd flr conditioned space @ (e) 2nd fl. roof. selective demo,(n) enclosed lobbies... | $2,000,000 | |
| Oct 11, 2023 | Completed final sign-off Aug 2024 | 180 Montgomery St | Bcci Construction Company | 24th fl - demo only permit per ab-017 mep demo included. tenant imrpvement permit deferred.Details
24th fl - demo only permit per ab-017 mep demo included. tenant imrpvement permit deferred. | $100,000 |
| Oct 11, 2023 | Expired or cancelled withdrawn Feb 2024 | 415 Mission St | Gci, Inc | 16th floor: partial floor commercial office tenant improvement on floor 16. conversion of an (e) game room to a secure area including an entry, work room and to safe/secture room. selective demo, new construction of partitions, ceiling finishes. minor structural for requipment bracing.Details
16th floor: partial floor commercial office tenant improvement on floor 16. conversion of an (e) game room to a secure area including an entry, work room and to safe/secture room. selective demo, new construction of partitions, ceiling finishes. minor structural for requipment bracing. | $350,000 |
| Oct 11, 2023 | Completed final sign-off Aug 2024 | 180 Montgomery St | Bcci Construction Company | 25th floor: demo only permit per ab-017, demo without full access compliance for interior demo only. mep demo included. tenant improvement permit deferred.Details
25th floor: demo only permit per ab-017, demo without full access compliance for interior demo only. mep demo included. tenant improvement permit deferred. | $100,000 |
| Oct 10, 2023 | Completed final sign-off Aug 2024 | 180 Montgomery St | Bcci Construction Company | flr 22. demo only permit per ab-017. mep demo included. ti permit deferred.Details
flr 22. demo only permit per ab-017. mep demo included. ti permit deferred. | $100,000 |
| Oct 10, 2023 | Completed final sign-off Aug 2024 | 180 Montgomery St | Bcci Construction Company | flr 13. demo only permit per ab-017. mep demo included. ti permit deferred.Details
flr 13. demo only permit per ab-017. mep demo included. ti permit deferred. | $100,000 |
| Aug 11, 2023 | Completed final sign-off Dec 2023 | 1430 Noriega St | Transworld Construction | revision to 202201266651. selective exterior demo: new exterior glazing and new millwork.Details
revision to 202201266651. selective exterior demo: new exterior glazing and new millwork. | $20,000 |