Levi G. Abarte
- Listed as
- architect, designer, engineer
- Firm
- Levi Abarte
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to Sep 2026
232 permits since 2000 (engineer on 229 permits, designer on 2 permits, architect on 1 permit): 163 completed, 46 in progress, 21 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 232.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | 14th fl: dining and servery. ti includes interior walls, ceilkings, millwork, finishes.Details
14th fl: dining and servery. ti includes interior walls, ceilkings, millwork, finishes. | $9,172,090 | |
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 30 Battery St | addition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space.Details
addition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space. | $625,000 | |
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 300 Howard St | 15th floor: t.i. including new interior walls, ceilings, millwork & finishesDetails
15th floor: t.i. including new interior walls, ceilings, millwork & finishes | $8,361,087 | |
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 560 Mission St | interior ti. on portion of 7th floor, including modifications to (e) tenant space including open office areas, breakroom, powder room, conference rooms, as well as new ceiling and light fixtures and mep system in areas throught the floor.Details
interior ti. on portion of 7th floor, including modifications to (e) tenant space including open office areas, breakroom, powder room, conference rooms, as well as new ceiling and light fixtures and mep system in areas throught the floor. | $1,700,000 | |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 300 Howard St | 2nd fl - ti to existing office. includes improvements to arch, mech, electrical and plumbingDetails
2nd fl - ti to existing office. includes improvements to arch, mech, electrical and plumbing | $6,048,657 | |
| Aug 20, 2026 | In progress issued Sep 2026 | 50 California St | Richlen Construction | suit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures.Details
suit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures. | $859,574 |
| Aug 17, 2026 | In progress issued Sep 2026 | 55 Spear St | Source Planning And Construction Inc | 18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review.Details
18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review. | $37,488 |
| Jul 28, 2026 | In progress issued Jul 2026 | 101 California St | Bcci Construction Company | 27th and 28th floors: mep submittal to support approved arch. permit. #202607175188Details
27th and 28th floors: mep submittal to support approved arch. permit. #202607175188 | $202,000 |
| Jul 15, 2026 | In progress issued Aug 2026 | 555 Mission St | Novo Construction Inc | 29/fl- ti to include (n) conferencing rooms, employee break area and storage spaceDetails
29/fl- ti to include (n) conferencing rooms, employee break area and storage space | $2,790,000 |
| Jul 6, 2026 | In progress issued Aug 2026 | 50 California St | Swinerton Builders | 16/f: tenant improvement of an existing suite on the 16th floor of a fully sprinklered building.Details
16/f: tenant improvement of an existing suite on the 16th floor of a fully sprinklered building. | $2,234,736 |
| Jun 30, 2026 | In progress issued Jul 2026 | 550 California St | ste #220 (level 2): deferred mep for pa# 202606052702.Details
ste #220 (level 2): deferred mep for pa# 202606052702. | $172,368 | |
| Jun 26, 2026 | In progress issued Jul 2026 | 550 California St | suite 430: deferred mep for 202604300443Details
suite 430: deferred mep for 202604300443 | $249,000 | |
| Jun 24, 2026 | In progress issued Jul 2026 | 555 Mission St | Gci, Inc | 21st fl - interior ti to demo and construction new non-structural partitions, ceilings, finishes and associated mepDetails
21st fl - interior ti to demo and construction new non-structural partitions, ceilings, finishes and associated mep | $2,012,760 |
| Jun 18, 2026 | In progress issued Jul 2026 | 101 California St | Skyline Construction | 33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbingDetails
33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbing | $1,583,313 |
| Jun 10, 2026 | In progress issued Jun 2026 | 555 Mission St | Gci, Inc | 24th floor: interior tenant improvement to demo and construct new non-structural partitions, ceilings, finishes and associated mep.Details
24th floor: interior tenant improvement to demo and construct new non-structural partitions, ceilings, finishes and associated mep. | $2,312,760 |
| May 28, 2026 | In progress issued Aug 2026 | 50 California St | Sc Builders, Inc | unit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights.Details
unit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights. | $1,308,872 |
| May 12, 2026 | Completed final sign-off Oct 2026 | 555 Mission St | Gci, Inc | 22nd fl revision to pa 202510217782 removing scope to demo certain partitions and offices throughout the floor. mep revision to accomodate removed scopeDetails
22nd fl revision to pa 202510217782 removing scope to demo certain partitions and offices throughout the floor. mep revision to accomodate removed scope | |
| May 1, 2026 | In progress issued Jun 2026 | 101 California St | Hathaway Dinwiddie Co. | 11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke controlDetails
11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke control | $399,334 |
| Apr 10, 2026 | In progress issued Jun 2026 | 1 Embarcadero Center | Skyline Construction | 31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit.Details
31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit. | $2,750,000 |
| Apr 10, 2026 | In progress issued Jun 2026 | 1 Embarcadero Center | 30/f: interior non-structural partitions modification, and reconfiguration interior ceiling modifications. interior finish replacement. related mechanical, electrical, and plumbing modifications. a non-egress stair connecting lvs 30 & 31.Details
30/f: interior non-structural partitions modification, and reconfiguration interior ceiling modifications. interior finish replacement. related mechanical, electrical, and plumbing modifications. a non-egress stair connecting lvs 30 & 31. | $8,750,000 | |
| Apr 7, 2026 | In progress issued May 2026 | 101 California St | Hathaway Dinwiddie Co. | 13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14thDetails
13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14th | $143,772 |
| Mar 30, 2026 | In progress issued Mar 2026 | 120 Kearny St | Bcci Construction Company | 34/f suite 3400: mechanical and electrical submittal to support approved t.i permit 202602125795. duct distribution is being modified per new space plan. new lighting and power.Details
34/f suite 3400: mechanical and electrical submittal to support approved t.i permit 202602125795. duct distribution is being modified per new space plan. new lighting and power. | $150,000 |
| Mar 26, 2026 | In progress issued Mar 2026 | 550 California St | 4th fl, 450 deferred mep for bpa 202602196216Details
4th fl, 450 deferred mep for bpa 202602196216 | $126,000 | |
| Feb 19, 2026 | Completed final sign-off Sep 2026 | 400 Howard St | Rudolph Commercial Interiors Inc, Rci | 4/f: new exercise room, lockers, showers and restroom, scope includes demo and construction of non structural partitions, ceiling, lighting and finishes changes to exterior windows to accomodate new mechanical louvers. mechanical deferred.Details
4/f: new exercise room, lockers, showers and restroom, scope includes demo and construction of non structural partitions, ceiling, lighting and finishes changes to exterior windows to accomodate new mechanical louvers. mechanical deferred. | $473,200 |
| Feb 5, 2026 | In progress issued Feb 2026 | 550 California St | deferred mep for pa#2025-1222-2376Details
deferred mep for pa#2025-1222-2376 | $636,899 | |
| Dec 22, 2025 | Completed final sign-off Jun 2026 | 650 Davis St | Bcci Construction Company | 2/f - mep submittedal to support approved arch permit. (1) new transfer fan, (2) new heat pumps, (5) new fire dampers, and (1) new smokde damper. ref pa# 202512020740Details
2/f - mep submittedal to support approved arch permit. (1) new transfer fan, (2) new heat pumps, (5) new fire dampers, and (1) new smokde damper. ref pa# 202512020740 | $180,000 |
| Dec 3, 2025 | In progress issued Mar 2026 | 101 California St | Hathaway Dinwiddie Co. | 11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mepDetails
11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep | $6,500,000 |
| Dec 3, 2025 | In progress issued Mar 2026 | 101 California St | Hathaway Dinwiddie Co. | 12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior workDetails
12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior work | $9,700,000 |
| Dec 1, 2025 | In progress issued Mar 2026 | 101 California St | Hathaway Dinwiddie Co. | 14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mepDetails
14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep | $6,600,000 |
| Nov 25, 2025 | In progress issued Jan 2026 | 345 California St | Gci, Inc | 25th fl: interior ti- conference room, pantry & restrooms. demo of non structural partitions, ceilings, finishes. new non structural partitions & glazing new doors & hardware, lighting and ceilings.new mepDetails
25th fl: interior ti- conference room, pantry & restrooms. demo of non structural partitions, ceilings, finishes. new non structural partitions & glazing new doors & hardware, lighting and ceilings.new mep | $1,298,024 |
| Nov 25, 2025 | Completed final sign-off May 2026 | 525 Market St | M C S Construction Services | 14/f suite 1460: t.i includes demo of non-structural partitions and build new non-structural partitions. all mep work will be fully engineered and included in this permit. all life safety work will be design-built and submitted separately. fully sprinklered building.Details
14/f suite 1460: t.i includes demo of non-structural partitions and build new non-structural partitions. all mep work will be fully engineered and included in this permit. all life safety work will be design-built and submitted separately. fully sprinklered building. | $550,000 |
| Nov 17, 2025 | Completed final sign-off Mar 2026 | 575 Market St | M C S Construction Services | 12th fl - office interior improvement. new non-structural partitions, new glazing, new doors, new electrical, new finishes, new ceiling. existing mechanical to remainDetails
12th fl - office interior improvement. new non-structural partitions, new glazing, new doors, new electrical, new finishes, new ceiling. existing mechanical to remain | $200,000 |
| Nov 7, 2025 | In progress issued Jan 2026 | 333 Pine St | Source Planning And Construction Inc | 1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes.Details
1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes. | $670,500 |
| Nov 6, 2025 | In progress issued Nov 2025 | 550 California St | 2nd fl, ste 230 deferred mep for pa 202509195772Details
2nd fl, ste 230 deferred mep for pa 202509195772 | $107,064 | |
| Oct 30, 2025 | In progress issued Nov 2025 | 505 Montgomery St | level 6: defered mep for pa#202508294230Details
level 6: defered mep for pa#202508294230 | $58,176 | |
| Oct 21, 2025 | In progress issued Oct 2025 | 550 California St | 12th fl suite 1200: selective interior demolition of non structural elements that include interior partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets and switches. construction includes partitions, doors, finishes, lighting, millwork, mech, electrical and plumbing.Details
12th fl suite 1200: selective interior demolition of non structural elements that include interior partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets and switches. construction includes partitions, doors, finishes, lighting, millwork, mech, electrical and plumbing. | $498,950 | |
| Oct 21, 2025 | Completed final sign-off Oct 2026 | 555 Mission St | Gci, Inc | 22nd fl: office ti. new partitions, light fixtures, ceilings, millwork, ducting, power and plumbing.Details
22nd fl: office ti. new partitions, light fixtures, ceilings, millwork, ducting, power and plumbing. | $835,312 |
| Oct 3, 2025 | Completed final sign-off Jul 2026 | 50 California St | Sc Builders, Inc | 28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep.Details
28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep. | $4,135,200 |
| Sep 18, 2025 | Completed final sign-off Apr 2026 | 535 Mission St | Gci, Inc | 4th fl, ste 400 meps for permit 202508072540 include revistion to 202508072540 and pages a0.00 coversheet, a0.02 egress plan and a1.00 construction plan (clarifying the wall type for mech permit)Details
4th fl, ste 400 meps for permit 202508072540 include revistion to 202508072540 and pages a0.00 coversheet, a0.02 egress plan and a1.00 construction plan (clarifying the wall type for mech permit) | $719,496 |
| Sep 16, 2025 | In progress issued Sep 2025 | 550 California St | level 3, suite 350 deferred mep for 202508042277Details
level 3, suite 350 deferred mep for 202508042277 | $144,792 | |
| Sep 3, 2025 | Completed final sign-off Aug 2026 | 55 Spear St | Novo Construction Inc | 19th floor:revision to pa #202503172361 to revise phone room 1935, pantry 1976 and conference 1911 and 1910 doors. misc. revisions throughout 19th floor.Details
19th floor:revision to pa #202503172361 to revise phone room 1935, pantry 1976 and conference 1911 and 1910 doors. misc. revisions throughout 19th floor. | |
| Aug 8, 2025 | In progress issued Aug 2025 | 550 California St | 9th fl, ste 930 deferred mep for pa 202506309809Details
9th fl, ste 930 deferred mep for pa 202506309809 | $241,488 | |
| Aug 5, 2025 | Completed final sign-off Jul 2026 | 425 Market St | Build Group Inc. | 26/f: meps for tenant improvement permit 202507090436.Details
26/f: meps for tenant improvement permit 202507090436. | |
| Jul 24, 2025 | In progress issued Aug 2025 | 550 California St | level 10 suite 1040. deferred mep for pa #202506118512.Details
level 10 suite 1040. deferred mep for pa #202506118512. | $283,752 | |
| Jul 24, 2025 | In progress issued Aug 2025 | 550 California St | 10/f - #1010: deferred mep for pa # 202506118511.Details
10/f - #1010: deferred mep for pa # 202506118511. | $338,688 | |
| Jul 15, 2025 | Completed final sign-off Feb 2026 | 555 Mission St | Gci, Inc | 28/f -revision to pa # 2024-1217-7023 including new office, change of room from conference to office, change room from office to conference, new phone booths at three locations, new light fixtures and electrical work.Details
28/f -revision to pa # 2024-1217-7023 including new office, change of room from conference to office, change room from office to conference, new phone booths at three locations, new light fixtures and electrical work. | |
| Jun 5, 2025 | Completed final sign-off Jan 2026 | 535 Mission St | Gci, Inc | 3rd fl conference ceneter: ti include demo of non structural partitions & building (n) non structural partitions. all new or revised mep included in this permit. life safety & fire alarm/sprinklers will be design build and submitted separately if needed. assembly area partition is deffered submittalDetails
3rd fl conference ceneter: ti include demo of non structural partitions & building (n) non structural partitions. all new or revised mep included in this permit. life safety & fire alarm/sprinklers will be design build and submitted separately if needed. assembly area partition is deffered submittal | $987,000 |
| Apr 24, 2025 | In progress issued May 2025 | 550 California St | 3rd fl - selective int'r demo of non-struc'l elements inlcuding but not limited to interior partitions, doors, finishes, clg, lighting, mech & elec outlets & switches refer to mech & elec plans. scope includes rr accessibility upgrades. fls & fire sprinkler drwg's to be submitted separately. scopeDetails
3rd fl - selective int'r demo of non-struc'l elements inlcuding but not limited to interior partitions, doors, finishes, clg, lighting, mech & elec outlets & switches refer to mech & elec plans. scope includes rr accessibility upgrades. fls & fire sprinkler drwg's to be submitted separately. scope | $100,000 | |
| Apr 10, 2025 | Completed final sign-off May 2026 | 601 Clement St | Lombardi Property Development | prop h: rev #202405031359: include mezzanine scope & cbc compliant accessible lift to access mezzanine. new non-structural partitions, all-gender restrooms, light fixtures & finishes. medical offices t/i to building counselling offices. no ambulatory care on site.Details
prop h: rev #202405031359: include mezzanine scope & cbc compliant accessible lift to access mezzanine. new non-structural partitions, all-gender restrooms, light fixtures & finishes. medical offices t/i to building counselling offices. no ambulatory care on site. | $800,000 |
| Apr 7, 2025 | Completed final sign-off Sep 2025 | 555 California St | Skyline Construction | revision to pa # 2024-1021-3343 revised lobby area fl plan. deleted focus room, relocated reception desk and closet. revision to conference room. mech and electrical revisionsDetails
revision to pa # 2024-1021-3343 revised lobby area fl plan. deleted focus room, relocated reception desk and closet. revision to conference room. mech and electrical revisions | $20,000 |
| Apr 2, 2025 | Completed final sign-off Oct 2025 | 400 Howard St | Sc Builders, Inc | 4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishesDetails
4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishes | $3,283,298 |
| Mar 31, 2025 | Completed final sign-off Jan 2026 | 500 Howard St | Novo Construction Inc | 5th fl: interior ti. include paint throughout. removal of existing walls, ceilings and finishes. new interior construction of walls, new wall & floor finishes. mechanical, electrical ,plumbing & structural includedDetails
5th fl: interior ti. include paint throughout. removal of existing walls, ceilings and finishes. new interior construction of walls, new wall & floor finishes. mechanical, electrical ,plumbing & structural included | $5,416,864 |
| Mar 10, 2025 | In progress issued Mar 2025 | 345 California St | Gci, Inc | 31st fl - revision to pa 202312132454 updated floor plans door schedule added conference room, reconfigured team rooms/ofces in lieu of open office work stations, updated restroom sheets (34) vav boxes, (2) heat pumps added electrical workDetails
31st fl - revision to pa 202312132454 updated floor plans door schedule added conference room, reconfigured team rooms/ofces in lieu of open office work stations, updated restroom sheets (34) vav boxes, (2) heat pumps added electrical work | |
| Mar 7, 2025 | In progress issued Mar 2025 | 50 California St | R.M.R. Construction Company | 26th fl, partial floor remodel sub dividing existing office suite 2600 into 2 suites. scope includes demo and construction of non-structural partitions, light fixtures, ceiling assembly, and floor finishes; remodel for accessbility compliance a women's toilet compartment.Details
26th fl, partial floor remodel sub dividing existing office suite 2600 into 2 suites. scope includes demo and construction of non-structural partitions, light fixtures, ceiling assembly, and floor finishes; remodel for accessbility compliance a women's toilet compartment. | $440,198 |
| Feb 26, 2025 | Completed final sign-off Feb 2026 | 500 Howard St | Novo Construction Inc | 3rd fl -ti to include new nonstructural partitions, paint, wall covering on, privacy glass film; repairs to existing conditions. mep includedDetails
3rd fl -ti to include new nonstructural partitions, paint, wall covering on, privacy glass film; repairs to existing conditions. mep included | $4,721,444 |
| Feb 21, 2025 | Completed final sign-off May 2025 | 500 Howard St | Novo Construction Inc | 8th fl- revision to pa #202412237306 to add selective new demo for new exhaust duct, new environmental exhuast louver added hand and prep sink, added power, new hot water pump. new exhaust fan, under floor terminal unit and equipment anchorageDetails
8th fl- revision to pa #202412237306 to add selective new demo for new exhaust duct, new environmental exhuast louver added hand and prep sink, added power, new hot water pump. new exhaust fan, under floor terminal unit and equipment anchorage | $75,000 |
| Feb 19, 2025 | In progress issued Mar 2025 | 550 California St | 2/f: selective demo of non-structural elements including but not limited to int. partitions, doors, finishes, ceilings, lighting, mech/elec outs and switches per mech/elec plans. restroom accessibility upgrades. f/l/s and fire sprinkler drawings under separate permit. scope does not affect fixtureDetails
2/f: selective demo of non-structural elements including but not limited to int. partitions, doors, finishes, ceilings, lighting, mech/elec outs and switches per mech/elec plans. restroom accessibility upgrades. f/l/s and fire sprinkler drawings under separate permit. scope does not affect fixture | $75,000 | |
| Jan 10, 2025 | Completed final sign-off Aug 2025 | 500 Howard St | Novo Construction Inc | 4th floor: selective demo of millwork, finshes and wall penetrations, mew carpet, paint and acoustic panels, new exterior window louver alteration of drinking fountain niche, mep includedDetails
4th floor: selective demo of millwork, finshes and wall penetrations, mew carpet, paint and acoustic panels, new exterior window louver alteration of drinking fountain niche, mep included | $325,000 |
| Dec 23, 2024 | Completed final sign-off May 2025 | 500 Howard St | Novo Construction Inc | 8/fl- ti to convert storage to pantry to include (n) refrigator, freezer, food storage and sinks. mep included.Details
8/fl- ti to convert storage to pantry to include (n) refrigator, freezer, food storage and sinks. mep included. | $250,000 |
| Dec 17, 2024 | Completed final sign-off Feb 2026 | 555 Mission St | Gci, Inc | 28/f: interior tenant improvement including new partitions, light fixtures, ceiling assemblies, millwork, and plumbing fixtures. mechanical, electrical, and plumbing drawings included. fire life safety and sprinkler under separate permit.Details
28/f: interior tenant improvement including new partitions, light fixtures, ceiling assemblies, millwork, and plumbing fixtures. mechanical, electrical, and plumbing drawings included. fire life safety and sprinkler under separate permit. | $965,775 |
| Nov 22, 2024 | In progress issued Nov 2024 | 550 California St | 9th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scopeDetails
9th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scope | $75,000 | |
| Nov 22, 2024 | In progress issued Nov 2024 | 550 California St | 6th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scopeDetails
6th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scope | $75,000 | |
| Oct 11, 2024 | Completed final sign-off Mar 2025 | 101 California St | Source Planning And Construction Inc | 19th fl: new ti for open office, conference rooms, boardroom, pantry, library & meeting space. bldg is fully sprinkleredDetails
19th fl: new ti for open office, conference rooms, boardroom, pantry, library & meeting space. bldg is fully sprinklered | $1,675,000 |
| Oct 1, 2024 | Completed final sign-off Jun 2025 | 45 Fremont St | Skyline Construction | 34/f partial floor - office tenant improvement. architecture and mep. new offices.Details
34/f partial floor - office tenant improvement. architecture and mep. new offices. | $375,000 |
| Sep 18, 2024 | In progress issued Oct 2024 | 550 California St | ste 710 - selective interior demo of non-struc'l elements. (n) interior partitions, door, finishes, lighting, mech & elec outlets & switches. lfs and fire sprinkler submitted as separate permit. scope does not affect fixture quantities, occupant load, calcs or path of travel. no exterior change toDetails
ste 710 - selective interior demo of non-struc'l elements. (n) interior partitions, door, finishes, lighting, mech & elec outlets & switches. lfs and fire sprinkler submitted as separate permit. scope does not affect fixture quantities, occupant load, calcs or path of travel. no exterior change to | $100,000 | |
| Sep 9, 2024 | Completed final sign-off Apr 2025 | 475 Sansome St | Bcci Construction Company | 11th fl -tenant improvement. includes new non-load bearing walls, lighting, fixtures & finishesDetails
11th fl -tenant improvement. includes new non-load bearing walls, lighting, fixtures & finishes | $880,258 |
| Aug 13, 2024 | In progress issued Aug 2024 | 550 California St | 7th fl- interior demo of non structural elements including (not limited) to int partitions,doors, finishes, ceilings, lighting,mech & elec outlets & switches. ref to mech & elec plans. restroom accessibility upgrades. fire l/s & sprinkler dwgs under separate permit.Details
7th fl- interior demo of non structural elements including (not limited) to int partitions,doors, finishes, ceilings, lighting,mech & elec outlets & switches. ref to mech & elec plans. restroom accessibility upgrades. fire l/s & sprinkler dwgs under separate permit. | $70,000 | |
| Jun 28, 2024 | Completed final sign-off Aug 2024 | 505 Howard St | Bcci Construction Company | floors 4 and 5- removal of communicating stairs and slab infill between floorsDetails
floors 4 and 5- removal of communicating stairs and slab infill between floors | $120,000 |
| Jun 24, 2024 | In progress issued Jul 2024 | 50 California St | Richlen Construction | 35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17.Details
35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17. | $192,560 |
| Jun 20, 2024 | In progress filed Jun 2024, not yet issued | 550 California St | 8/f: duct distribution is being modified per (n) space plan. (4) vav boxes are being added. no (n) fsds are ebing added. (ref arch permit# 202405152215)Details
8/f: duct distribution is being modified per (n) space plan. (4) vav boxes are being added. no (n) fsds are ebing added. (ref arch permit# 202405152215) | ||
| Jun 12, 2024 | Completed final sign-off Oct 2025 | 555 Mission St | Bcci Construction Company | 2nd floor:interior t.i. including new partitions, light fixtures, ceilings assemblies, millwork, and elevators. t. i. on-site amenities (lounge, gym, locker room,etc). structural, mech, elec, plmg, food service included. fire life safty, & sprinkler under seperate permit.Details
2nd floor:interior t.i. including new partitions, light fixtures, ceilings assemblies, millwork, and elevators. t. i. on-site amenities (lounge, gym, locker room,etc). structural, mech, elec, plmg, food service included. fire life safty, & sprinkler under seperate permit. | $3,620,000 |
| Jun 3, 2024 | Completed final sign-off Nov 2025 | 100 California St | Novo Construction Inc | 13th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered)Details
13th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered) | $900,000 |
| Jun 3, 2024 | Completed final sign-off Oct 2025 | 100 California St | Novo Construction Inc | 14th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered)Details
14th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered) | $900,000 |
| May 15, 2024 | Completed final sign-off Aug 2024 | 101 California St | Skyline Construction | ground floor: demo of (e) walls, plumbing fixtures, doors, ramp, and partial platform. new construction of tenant fit out for proposed bank branch space inlcluding lobby, cash room, restroom, and pantry with new plumbing fixtures. exterior scope includes new entry doors and atm.Details
ground floor: demo of (e) walls, plumbing fixtures, doors, ramp, and partial platform. new construction of tenant fit out for proposed bank branch space inlcluding lobby, cash room, restroom, and pantry with new plumbing fixtures. exterior scope includes new entry doors and atm. | $365,636 |
| May 14, 2024 | Completed final sign-off Nov 2024 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | 15th fl ti: demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised fire alarm or sprinklers will be design build and submitted separately. (bldg fully sprinklered)Details
15th fl ti: demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised fire alarm or sprinklers will be design build and submitted separately. (bldg fully sprinklered) | $1,200,000 |
| May 2, 2024 | Completed final sign-off Nov 2024 | 475 Sansome St | Principal Builders Inc. | 8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep.Details
8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep. | $3,051,349 |
| Apr 25, 2024 | Completed final sign-off Oct 2024 | 101 California St | Novo Construction Inc | 27th fl, ste 2750 to include construction of non-structural partitions, millwork, mep, finishes, ceiling and lightingDetails
27th fl, ste 2750 to include construction of non-structural partitions, millwork, mep, finishes, ceiling and lighting | $1,967,498 |
| Mar 14, 2024 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | revision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference.Details
revision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference. | |
| Feb 23, 2024 | Completed final sign-off Jan 2025 | 525 Market St | Bcci Construction Company | 7/f: deferred mep for bpa# 202401113849 to include exhaust fans and ducts.Details
7/f: deferred mep for bpa# 202401113849 to include exhaust fans and ducts. | |
| Feb 14, 2024 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | 18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities orDetails
18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities or | $216,353 |
| Jan 29, 2024 | Completed final sign-off Sep 2024 | 44 Montgomery St | Bcci Construction Company | 7th fl mep only: deferred mechanical electrical and plumbing (ref permit 202312192740) for build outDetails
7th fl mep only: deferred mechanical electrical and plumbing (ref permit 202312192740) for build out | $1,427,761 |
| Jan 12, 2024 | Completed final sign-off Oct 2024 | 44 Montgomery St | Bcci Construction Company | 5/f: mep only. deferred mechanical, electrial and plumbing for ti permit 202312192740.Details
5/f: mep only. deferred mechanical, electrial and plumbing for ti permit 202312192740. | $646,482 |
| Nov 9, 2023 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | 7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.Details
7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes. | $504,622 |
| Oct 17, 2023 | In progress issued Jan 2024 | 1663 Mission St | Modern Construction Inc | new ceiling, lighting, and millwork at building lobby.Details
new ceiling, lighting, and millwork at building lobby. | $115,000 |
| Oct 5, 2023 | Completed final sign-off Oct 2024 | 45 Fremont St | Clune Construction Company L P | 26/f-suite 2600: t.i., partial shell condition, no modification to (e) rated core barriers/exterior envelope. modifications to elevator lobby, maintain smoke barrier rating.Details
26/f-suite 2600: t.i., partial shell condition, no modification to (e) rated core barriers/exterior envelope. modifications to elevator lobby, maintain smoke barrier rating. | $5,000,000 |
| Sep 26, 2023 | Completed final sign-off Jun 2024 | 425 Market St | Gci, Inc | 14/f: demolition of interior non-load bearing partitions, ceiling, lighting, millwork, plumbing fixtures and flooring. construction of new non-load bearing partitions, restroom upgrades of fixtures, eqmt and interior finishes. new lighting and limited electrical. limited mechanical andDetails
14/f: demolition of interior non-load bearing partitions, ceiling, lighting, millwork, plumbing fixtures and flooring. construction of new non-load bearing partitions, restroom upgrades of fixtures, eqmt and interior finishes. new lighting and limited electrical. limited mechanical and | $918,839 |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 388 Market St | Bevilacqua & Sons | 8/f-suite 888: t.i., 964 sq. ft. new glass partition system for conference room, electrical/mechanical upgrade, break roomDetails
8/f-suite 888: t.i., 964 sq. ft. new glass partition system for conference room, electrical/mechanical upgrade, break room | $93,000 |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 388 Market St | Bevilacqua & Sons | 9/f: t.i., 1,683 sq. ft., new offices (2), demo (e) open office area breakroom, finishesDetails
9/f: t.i., 1,683 sq. ft., new offices (2), demo (e) open office area breakroom, finishes | $150,000 |
| Jun 29, 2023 | Completed final sign-off Apr 2024 | 580 California St | Skyline Construction | 19/f: mechanical and electrical work for tenant improvement, ref pa# 2023-0608-9570Details
19/f: mechanical and electrical work for tenant improvement, ref pa# 2023-0608-9570 | $25,000 |
| Jun 15, 2023 | Completed final sign-off Jan 2026 | 50 California St | Richlen Construction | 35/f: demo of partitions, ceilings, finishes and millwork. demo of interior stair that connects the 35th and 34th floor. new structural floor infill on 35th floor. restroom remodelDetails
35/f: demo of partitions, ceilings, finishes and millwork. demo of interior stair that connects the 35th and 34th floor. new structural floor infill on 35th floor. restroom remodel | $289,880 |
| Jun 8, 2023 | Completed final sign-off Nov 2024 | 1 Embarcadero Center | Skyline Construction | 26th fl deferred mep for pa 2023-0530-8849Details
26th fl deferred mep for pa 2023-0530-8849 | $1,323,360 |
| Jun 8, 2023 | Completed final sign-off Nov 2024 | 1 Embarcadero Center | Skyline Construction | 27/f: deferred mep for 202305318934Details
27/f: deferred mep for 202305318934 | $1,324,800 |
| May 5, 2023 | Completed final sign-off Sep 2023 | 101 California St | Novo Construction Inc | 7/f: rev to pa 202209152536 to provide revised mep for new floor plan. ref arch 202208231049, 202212198637Details
7/f: rev to pa 202209152536 to provide revised mep for new floor plan. ref arch 202208231049, 202212198637 | |
| May 2, 2023 | Completed final sign-off Oct 2023 | 1 California St | M C S Construction Services | 23/f: t.i. with nonstructural partitions, mechanical, electrical, plumbing work includedDetails
23/f: t.i. with nonstructural partitions, mechanical, electrical, plumbing work included | $304,650 |
| Mar 30, 2023 | Completed final sign-off Jul 2024 | 50 California St | Richlen Construction | 13th fl - ti consisting of new non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical, plumbing and hvacDetails
13th fl - ti consisting of new non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical, plumbing and hvac | $1,938,674 |
| Mar 10, 2023 | Expired or cancelled cancelled Jul 2023 | 555 California St | Bcci Construction Company | 51/f: tenant improvement modifications to exsiting dining area within office, new finishes, ceiling, flooring and mep.Details
51/f: tenant improvement modifications to exsiting dining area within office, new finishes, ceiling, flooring and mep. | $152,952 |
| Mar 10, 2023 | Completed final sign-off Jul 2023 | 425 Market St | Richlen Construction | 11th fl - demolition of interior non-load bearing partitions, ceilings, lighting millwork, plumbing, fixtures and flooring in preparation for future tenant. occupancy group to remain b business. sprinklers/life safety under separate permit. ab-017Details
11th fl - demolition of interior non-load bearing partitions, ceilings, lighting millwork, plumbing, fixtures and flooring in preparation for future tenant. occupancy group to remain b business. sprinklers/life safety under separate permit. ab-017 | $160,000 |
| Feb 8, 2023 | Completed final sign-off Aug 2023 | 388 Market St | Paradigm General Contractors | 13th fl - upgrade mechanical & electrical. no tenant occupied. ref pa 2023-0106-9757 & 2022-0118-6116 (fire upgrade)Details
13th fl - upgrade mechanical & electrical. no tenant occupied. ref pa 2023-0106-9757 & 2022-0118-6116 (fire upgrade) | $200,000 |
| Jan 30, 2023 | Completed final sign-off Jul 2023 | 50 California St | Principal Builders Inc. | 21/f: tenant improvement. new offices, reception, conference room, open work stations, new partitions - non load bearing, storefronts, ceilings, millwork, furniture, power/data and mechanical, electrical, and plumbing work. no structural work.Details
21/f: tenant improvement. new offices, reception, conference room, open work stations, new partitions - non load bearing, storefronts, ceilings, millwork, furniture, power/data and mechanical, electrical, and plumbing work. no structural work. | $2,839,105 |
| Jan 13, 2023 | Completed final sign-off Jan 2024 | 50 California St | Richlen Construction | 21st fl - construction of (n) common corridor, elevator lobby and demising walls. scope includes (n) non-structural walls, electrical outlets, (n) floor and wall finishes, and light fixtures, alteration/addition of mep systems to creat warm shellDetails
21st fl - construction of (n) common corridor, elevator lobby and demising walls. scope includes (n) non-structural walls, electrical outlets, (n) floor and wall finishes, and light fixtures, alteration/addition of mep systems to creat warm shell | $180,000 |