Permit GraphShortlistSan Francisco building permits since 2000

Levi G. Abarte

License
E17622
Look the license up with the state
Listed as
architect, designer, engineer
Firm
Levi Abarte
Based in
San Francisco
On San Francisco permits
Feb 2015 to Sep 2026

232 permits since 2000 (engineer on 229 permits, designer on 2 permits, architect on 1 permit): 163 completed, 46 in progress, 21 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 232.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 23, 2026In progress
filed Sep 2026, not yet issued
300 Howard St14th fl: dining and servery. ti includes interior walls, ceilkings, millwork, finishes.
Details
Permit
202609238502
Status
filed
Filed
Sep 23, 2026
Declared cost
$9,172,090
Address
300 Howard St

14th fl: dining and servery. ti includes interior walls, ceilkings, millwork, finishes.

Open the permit page

$9,172,090
Sep 22, 2026In progress
filed Sep 2026, not yet issued
30 Battery Staddition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space.
Details
Permit
202609228466
Status
filed
Filed
Sep 22, 2026
Declared cost
$625,000
Address
30 Battery St

addition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space.

Open the permit page

$625,000
Sep 1, 2026In progress
filed Sep 2026, not yet issued
300 Howard St15th floor: t.i. including new interior walls, ceilings, millwork & finishes
Details
Permit
202609017538
Status
filed
Filed
Sep 1, 2026
Declared cost
$8,361,087
Address
300 Howard St

15th floor: t.i. including new interior walls, ceilings, millwork & finishes

Open the permit page

$8,361,087
Aug 31, 2026In progress
filed Aug 2026, not yet issued
560 Mission Stinterior ti. on portion of 7th floor, including modifications to (e) tenant space including open office areas, breakroom, powder room, conference rooms, as well as new ceiling and light fixtures and mep system in areas throught the floor.
Details
Permit
202608317468
Status
filed
Filed
Aug 31, 2026
Declared cost
$1,700,000
Address
560 Mission St

interior ti. on portion of 7th floor, including modifications to (e) tenant space including open office areas, breakroom, powder room, conference rooms, as well as new ceiling and light fixtures and mep system in areas throught the floor.

Open the permit page

$1,700,000
Aug 25, 2026In progress
filed Aug 2026, not yet issued
300 Howard St2nd fl - ti to existing office. includes improvements to arch, mech, electrical and plumbing
Details
Permit
202608257157
Status
filed
Filed
Aug 25, 2026
Declared cost
$6,048,657
Address
300 Howard St

2nd fl - ti to existing office. includes improvements to arch, mech, electrical and plumbing

Open the permit page

$6,048,657
Aug 20, 2026In progress
issued Sep 2026
50 California StRichlen Constructionsuit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures.
Details
Permit
202608206891
Status
issued
Filed
Aug 20, 2026
Permit issued
Sep 24, 2026
Declared cost
$859,574
Address
50 California St

suit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures.

Open the permit page

$859,574
Aug 17, 2026In progress
issued Sep 2026
55 Spear StSource Planning And Construction Inc18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review.
Details
Permit
202608176695
Status
issued
Filed
Aug 17, 2026
Permit issued
Sep 24, 2026
Declared cost
$37,488
Address
55 Spear St

18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review.

Open the permit page

$37,488
Jul 28, 2026In progress
issued Jul 2026
101 California StBcci Construction Company27th and 28th floors: mep submittal to support approved arch. permit. #202607175188
Details
Permit
202607285685
Status
issued
Filed
Jul 28, 2026
Permit issued
Jul 31, 2026
Declared cost
$202,000
Address
101 California St

27th and 28th floors: mep submittal to support approved arch. permit. #202607175188

Open the permit page

$202,000
Jul 15, 2026In progress
issued Aug 2026
555 Mission StNovo Construction Inc29/fl- ti to include (n) conferencing rooms, employee break area and storage space
Details
Permit
202607155076
Status
issued
Filed
Jul 15, 2026
Permit issued
Aug 18, 2026
Declared cost
$2,790,000
Address
555 Mission St

29/fl- ti to include (n) conferencing rooms, employee break area and storage space

Open the permit page

$2,790,000
Jul 6, 2026In progress
issued Aug 2026
50 California StSwinerton Builders16/f: tenant improvement of an existing suite on the 16th floor of a fully sprinklered building.
Details
Permit
202607064570
Status
issued
Filed
Jul 6, 2026
Permit issued
Aug 28, 2026
Declared cost
$2,234,736
Address
50 California St

16/f: tenant improvement of an existing suite on the 16th floor of a fully sprinklered building.

Open the permit page

$2,234,736
Jun 30, 2026In progress
issued Jul 2026
550 California Stste #220 (level 2): deferred mep for pa# 202606052702.
Details
Permit
202606304369
Status
issued
Filed
Jun 30, 2026
Permit issued
Jul 20, 2026
Declared cost
$172,368
Address
550 California St

ste #220 (level 2): deferred mep for pa# 202606052702.

Open the permit page

$172,368
Jun 26, 2026In progress
issued Jul 2026
550 California Stsuite 430: deferred mep for 202604300443
Details
Permit
202606264021
Status
issued
Filed
Jun 26, 2026
Permit issued
Jul 20, 2026
Declared cost
$249,000
Address
550 California St

suite 430: deferred mep for 202604300443

Open the permit page

$249,000
Jun 24, 2026In progress
issued Jul 2026
555 Mission StGci, Inc21st fl - interior ti to demo and construction new non-structural partitions, ceilings, finishes and associated mep
Details
Permit
202606243868
Status
issued
Filed
Jun 24, 2026
Permit issued
Jul 7, 2026
Declared cost
$2,012,760
Address
555 Mission St

21st fl - interior ti to demo and construction new non-structural partitions, ceilings, finishes and associated mep

Open the permit page

$2,012,760
Jun 18, 2026In progress
issued Jul 2026
101 California StSkyline Construction33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbing
Details
Permit
202606183505
Status
issued
Filed
Jun 18, 2026
Permit issued
Jul 8, 2026
Declared cost
$1,583,313
Address
101 California St

33rd fl - ti to partial suite to include selective demo, new partitions, ceiling, lighting, finishes, electrical, mechanical and plumbing

Open the permit page

$1,583,313
Jun 10, 2026In progress
issued Jun 2026
555 Mission StGci, Inc24th floor: interior tenant improvement to demo and construct new non-structural partitions, ceilings, finishes and associated mep.
Details
Permit
202606102948
Status
issued
Filed
Jun 10, 2026
Permit issued
Jun 16, 2026
Declared cost
$2,312,760
Address
555 Mission St

24th floor: interior tenant improvement to demo and construct new non-structural partitions, ceilings, finishes and associated mep.

Open the permit page

$2,312,760
May 28, 2026In progress
issued Aug 2026
50 California StSc Builders, Incunit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights.
Details
Permit
202605282028
Status
issued
Filed
May 28, 2026
Permit issued
Aug 7, 2026
Declared cost
$1,308,872
Address
50 California St

unit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights.

Open the permit page

$1,308,872
May 12, 2026Completed
final sign-off Oct 2026
555 Mission StGci, Inc22nd fl revision to pa 202510217782 removing scope to demo certain partitions and offices throughout the floor. mep revision to accomodate removed scope
Details
Permit
202605121094
Status
complete
Filed
May 12, 2026
Permit issued
May 19, 2026
Final sign-off
Oct 5, 2026
Address
555 Mission St

22nd fl revision to pa 202510217782 removing scope to demo certain partitions and offices throughout the floor. mep revision to accomodate removed scope

Open the permit page

May 1, 2026In progress
issued Jun 2026
101 California StHathaway Dinwiddie Co.11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke control
Details
Permit
202605010540
Status
issued
Filed
May 1, 2026
Permit issued
Jun 5, 2026
Declared cost
$399,334
Address
101 California St

11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-hr separation and smoke control

Open the permit page

$399,334
Apr 10, 2026In progress
issued Jun 2026
1 Embarcadero CenterSkyline Construction31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit.
Details
Permit
202604109215
Status
issued
Filed
Apr 10, 2026
Permit issued
Jun 10, 2026
Declared cost
$2,750,000
Address
1 Embarcadero Center

31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit.

Open the permit page

$2,750,000
Apr 10, 2026In progress
issued Jun 2026
1 Embarcadero Center30/f: interior non-structural partitions modification, and reconfiguration interior ceiling modifications. interior finish replacement. related mechanical, electrical, and plumbing modifications. a non-egress stair connecting lvs 30 & 31.
Details
Permit
202604109211
Status
issued
Filed
Apr 10, 2026
Permit issued
Jun 10, 2026
Declared cost
$8,750,000
Address
1 Embarcadero Center

30/f: interior non-structural partitions modification, and reconfiguration interior ceiling modifications. interior finish replacement. related mechanical, electrical, and plumbing modifications. a non-egress stair connecting lvs 30 & 31.

Open the permit page

$8,750,000
Apr 7, 2026In progress
issued May 2026
101 California StHathaway Dinwiddie Co.13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14th
Details
Permit
202604079019
Status
issued
Filed
Apr 7, 2026
Permit issued
May 15, 2026
Declared cost
$143,772
Address
101 California St

13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14th

Open the permit page

$143,772
Mar 30, 2026In progress
issued Mar 2026
120 Kearny StBcci Construction Company34/f suite 3400: mechanical and electrical submittal to support approved t.i permit 202602125795. duct distribution is being modified per new space plan. new lighting and power.
Details
Permit
202603308519
Status
issued
Filed
Mar 30, 2026
Permit issued
Mar 30, 2026
Declared cost
$150,000
Address
120 Kearny St

34/f suite 3400: mechanical and electrical submittal to support approved t.i permit 202602125795. duct distribution is being modified per new space plan. new lighting and power.

Open the permit page

$150,000
Mar 26, 2026In progress
issued Mar 2026
550 California St4th fl, 450 deferred mep for bpa 202602196216
Details
Permit
202603268337
Status
issued
Filed
Mar 26, 2026
Permit issued
Mar 31, 2026
Declared cost
$126,000
Address
550 California St

4th fl, 450 deferred mep for bpa 202602196216

Open the permit page

$126,000
Feb 19, 2026Completed
final sign-off Sep 2026
400 Howard StRudolph Commercial Interiors Inc, Rci4/f: new exercise room, lockers, showers and restroom, scope includes demo and construction of non structural partitions, ceiling, lighting and finishes changes to exterior windows to accomodate new mechanical louvers. mechanical deferred.
Details
Permit
202602196138
Status
complete
Filed
Feb 19, 2026
Permit issued
Feb 25, 2026
Final sign-off
Sep 15, 2026
Declared cost
$473,200
Address
400 Howard St

4/f: new exercise room, lockers, showers and restroom, scope includes demo and construction of non structural partitions, ceiling, lighting and finishes changes to exterior windows to accomodate new mechanical louvers. mechanical deferred.

Open the permit page

$473,200
Feb 5, 2026In progress
issued Feb 2026
550 California Stdeferred mep for pa#2025-1222-2376
Details
Permit
202602055365
Status
issued
Filed
Feb 5, 2026
Permit issued
Feb 20, 2026
Declared cost
$636,899
Address
550 California St

deferred mep for pa#2025-1222-2376

Open the permit page

$636,899
Dec 22, 2025Completed
final sign-off Jun 2026
650 Davis StBcci Construction Company2/f - mep submittedal to support approved arch permit. (1) new transfer fan, (2) new heat pumps, (5) new fire dampers, and (1) new smokde damper. ref pa# 202512020740
Details
Permit
202512222386
Status
complete
Filed
Dec 22, 2025
Permit issued
Dec 23, 2025
Final sign-off
Jun 8, 2026
Declared cost
$180,000
Address
650 Davis St

2/f - mep submittedal to support approved arch permit. (1) new transfer fan, (2) new heat pumps, (5) new fire dampers, and (1) new smokde damper. ref pa# 202512020740

Open the permit page

$180,000
Dec 3, 2025In progress
issued Mar 2026
101 California StHathaway Dinwiddie Co.11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep
Details
Permit
202512030863
Status
issued
Filed
Dec 3, 2025
Permit issued
Mar 9, 2026
Declared cost
$6,500,000
Address
101 California St

11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep

Open the permit page

$6,500,000
Dec 3, 2025In progress
issued Mar 2026
101 California StHathaway Dinwiddie Co.12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior work
Details
Permit
202512030869
Status
issued
Filed
Dec 3, 2025
Permit issued
Mar 9, 2026
Declared cost
$9,700,000
Address
101 California St

12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior work

Open the permit page

$9,700,000
Dec 1, 2025In progress
issued Mar 2026
101 California StHathaway Dinwiddie Co.14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep
Details
Permit
202512010611
Status
issued
Filed
Dec 1, 2025
Permit issued
Mar 9, 2026
Declared cost
$6,600,000
Address
101 California St

14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep

Open the permit page

$6,600,000
Nov 25, 2025In progress
issued Jan 2026
345 California StGci, Inc25th fl: interior ti- conference room, pantry & restrooms. demo of non structural partitions, ceilings, finishes. new non structural partitions & glazing new doors & hardware, lighting and ceilings.new mep
Details
Permit
202511250421
Status
issued
Filed
Nov 25, 2025
Permit issued
Jan 21, 2026
Declared cost
$1,298,024
Address
345 California St

25th fl: interior ti- conference room, pantry & restrooms. demo of non structural partitions, ceilings, finishes. new non structural partitions & glazing new doors & hardware, lighting and ceilings.new mep

Open the permit page

$1,298,024
Nov 25, 2025Completed
final sign-off May 2026
525 Market StM C S Construction Services14/f suite 1460: t.i includes demo of non-structural partitions and build new non-structural partitions. all mep work will be fully engineered and included in this permit. all life safety work will be design-built and submitted separately. fully sprinklered building.
Details
Permit
202511250405
Status
complete
Filed
Nov 25, 2025
Permit issued
Jan 20, 2026
Final sign-off
May 1, 2026
Declared cost
$550,000
Address
525 Market St

14/f suite 1460: t.i includes demo of non-structural partitions and build new non-structural partitions. all mep work will be fully engineered and included in this permit. all life safety work will be design-built and submitted separately. fully sprinklered building.

Open the permit page

$550,000
Nov 17, 2025Completed
final sign-off Mar 2026
575 Market StM C S Construction Services12th fl - office interior improvement. new non-structural partitions, new glazing, new doors, new electrical, new finishes, new ceiling. existing mechanical to remain
Details
Permit
202511179774
Status
complete
Filed
Nov 17, 2025
Permit issued
Dec 3, 2025
Final sign-off
Mar 30, 2026
Declared cost
$200,000
Address
575 Market St

12th fl - office interior improvement. new non-structural partitions, new glazing, new doors, new electrical, new finishes, new ceiling. existing mechanical to remain

Open the permit page

$200,000
Nov 7, 2025In progress
issued Jan 2026
333 Pine StSource Planning And Construction Inc1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes.
Details
Permit
202511079210
Status
issued
Filed
Nov 7, 2025
Permit issued
Jan 12, 2026
Declared cost
$670,500
Address
333 Pine St

1/f suite 100: tenant improvement. change of occupancy from b to m. interior modifications involve selective demolition and construction of new non-load bearing partitions, interior door and glazing system, installation of new light fixtures, new millwork and new finishes.

Open the permit page

$670,500
Nov 6, 2025In progress
issued Nov 2025
550 California St2nd fl, ste 230 deferred mep for pa 202509195772
Details
Permit
202511069114
Status
issued
Filed
Nov 6, 2025
Permit issued
Nov 19, 2025
Declared cost
$107,064
Address
550 California St

2nd fl, ste 230 deferred mep for pa 202509195772

Open the permit page

$107,064
Oct 30, 2025In progress
issued Nov 2025
505 Montgomery Stlevel 6: defered mep for pa#202508294230
Details
Permit
202510308607
Status
issued
Filed
Oct 30, 2025
Permit issued
Nov 4, 2025
Declared cost
$58,176
Address
505 Montgomery St

level 6: defered mep for pa#202508294230

Open the permit page

$58,176
Oct 21, 2025In progress
issued Oct 2025
550 California St12th fl suite 1200: selective interior demolition of non structural elements that include interior partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets and switches. construction includes partitions, doors, finishes, lighting, millwork, mech, electrical and plumbing.
Details
Permit
202510217749
Status
issued
Filed
Oct 21, 2025
Permit issued
Oct 29, 2025
Declared cost
$498,950
Address
550 California St

12th fl suite 1200: selective interior demolition of non structural elements that include interior partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets and switches. construction includes partitions, doors, finishes, lighting, millwork, mech, electrical and plumbing.

Open the permit page

$498,950
Oct 21, 2025Completed
final sign-off Oct 2026
555 Mission StGci, Inc22nd fl: office ti. new partitions, light fixtures, ceilings, millwork, ducting, power and plumbing.
Details
Permit
202510217782
Status
complete
Filed
Oct 21, 2025
Permit issued
Apr 13, 2026
Final sign-off
Oct 5, 2026
Declared cost
$835,312
Address
555 Mission St

22nd fl: office ti. new partitions, light fixtures, ceilings, millwork, ducting, power and plumbing.

Open the permit page

$835,312
Oct 3, 2025Completed
final sign-off Jul 2026
50 California StSc Builders, Inc28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep.
Details
Permit
202510036672
Status
complete
Filed
Oct 3, 2025
Permit issued
Dec 8, 2025
Final sign-off
Jul 21, 2026
Declared cost
$4,135,200
Address
50 California St

28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep.

Open the permit page

$4,135,200
Sep 18, 2025Completed
final sign-off Apr 2026
535 Mission StGci, Inc4th fl, ste 400 meps for permit 202508072540 include revistion to 202508072540 and pages a0.00 coversheet, a0.02 egress plan and a1.00 construction plan (clarifying the wall type for mech permit)
Details
Permit
202509185568
Status
complete
Filed
Sep 18, 2025
Permit issued
Oct 10, 2025
Final sign-off
Apr 24, 2026
Declared cost
$719,496
Address
535 Mission St

4th fl, ste 400 meps for permit 202508072540 include revistion to 202508072540 and pages a0.00 coversheet, a0.02 egress plan and a1.00 construction plan (clarifying the wall type for mech permit)

Open the permit page

$719,496
Sep 16, 2025In progress
issued Sep 2025
550 California Stlevel 3, suite 350 deferred mep for 202508042277
Details
Permit
202509165430
Status
issued
Filed
Sep 16, 2025
Permit issued
Sep 25, 2025
Declared cost
$144,792
Address
550 California St

level 3, suite 350 deferred mep for 202508042277

Open the permit page

$144,792
Sep 3, 2025Completed
final sign-off Aug 2026
55 Spear StNovo Construction Inc19th floor:revision to pa #202503172361 to revise phone room 1935, pantry 1976 and conference 1911 and 1910 doors. misc. revisions throughout 19th floor.
Details
Permit
202509034459
Status
complete
Filed
Sep 3, 2025
Permit issued
Sep 4, 2025
Final sign-off
Aug 11, 2026
Address
55 Spear St

19th floor:revision to pa #202503172361 to revise phone room 1935, pantry 1976 and conference 1911 and 1910 doors. misc. revisions throughout 19th floor.

Open the permit page

Aug 8, 2025In progress
issued Aug 2025
550 California St9th fl, ste 930 deferred mep for pa 202506309809
Details
Permit
202508082640
Status
reinstated
Filed
Aug 8, 2025
Permit issued
Aug 14, 2025
Declared cost
$241,488
Address
550 California St

9th fl, ste 930 deferred mep for pa 202506309809

Open the permit page

$241,488
Aug 5, 2025Completed
final sign-off Jul 2026
425 Market StBuild Group Inc.26/f: meps for tenant improvement permit 202507090436.
Details
Permit
202508052319
Status
complete
Filed
Aug 5, 2025
Permit issued
Sep 22, 2025
Final sign-off
Jul 2, 2026
Address
425 Market St

26/f: meps for tenant improvement permit 202507090436.

Open the permit page

Jul 24, 2025In progress
issued Aug 2025
550 California Stlevel 10 suite 1040. deferred mep for pa #202506118512.
Details
Permit
202507241542
Status
issued
Filed
Jul 24, 2025
Permit issued
Aug 4, 2025
Declared cost
$283,752
Address
550 California St

level 10 suite 1040. deferred mep for pa #202506118512.

Open the permit page

$283,752
Jul 24, 2025In progress
issued Aug 2025
550 California St10/f - #1010: deferred mep for pa # 202506118511.
Details
Permit
202507241532
Status
issued
Filed
Jul 24, 2025
Permit issued
Aug 4, 2025
Declared cost
$338,688
Address
550 California St

10/f - #1010: deferred mep for pa # 202506118511.

Open the permit page

$338,688
Jul 15, 2025Completed
final sign-off Feb 2026
555 Mission StGci, Inc28/f -revision to pa # 2024-1217-7023 including new office, change of room from conference to office, change room from office to conference, new phone booths at three locations, new light fixtures and electrical work.
Details
Permit
202507150812
Status
complete
Filed
Jul 15, 2025
Permit issued
Sep 23, 2025
Final sign-off
Feb 25, 2026
Address
555 Mission St

28/f -revision to pa # 2024-1217-7023 including new office, change of room from conference to office, change room from office to conference, new phone booths at three locations, new light fixtures and electrical work.

Open the permit page

Jun 5, 2025Completed
final sign-off Jan 2026
535 Mission StGci, Inc3rd fl conference ceneter: ti include demo of non structural partitions & building (n) non structural partitions. all new or revised mep included in this permit. life safety & fire alarm/sprinklers will be design build and submitted separately if needed. assembly area partition is deffered submittal
Details
Permit
202506057981
Status
complete
Filed
Jun 5, 2025
Permit issued
Jul 10, 2025
Final sign-off
Jan 15, 2026
Declared cost
$987,000
Address
535 Mission St

3rd fl conference ceneter: ti include demo of non structural partitions & building (n) non structural partitions. all new or revised mep included in this permit. life safety & fire alarm/sprinklers will be design build and submitted separately if needed. assembly area partition is deffered submittal

Open the permit page

$987,000
Apr 24, 2025In progress
issued May 2025
550 California St3rd fl - selective int'r demo of non-struc'l elements inlcuding but not limited to interior partitions, doors, finishes, clg, lighting, mech & elec outlets & switches refer to mech & elec plans. scope includes rr accessibility upgrades. fls & fire sprinkler drwg's to be submitted separately. scope
Details
Permit
202504245133
Status
issued
Filed
Apr 24, 2025
Permit issued
May 7, 2025
Declared cost
$100,000
Address
550 California St

3rd fl - selective int'r demo of non-struc'l elements inlcuding but not limited to interior partitions, doors, finishes, clg, lighting, mech & elec outlets & switches refer to mech & elec plans. scope includes rr accessibility upgrades. fls & fire sprinkler drwg's to be submitted separately. scope

Open the permit page

$100,000
Apr 10, 2025Completed
final sign-off May 2026
601 Clement StLombardi Property Developmentprop h: rev #202405031359: include mezzanine scope & cbc compliant accessible lift to access mezzanine. new non-structural partitions, all-gender restrooms, light fixtures & finishes. medical offices t/i to building counselling offices. no ambulatory care on site.
Details
Permit
202504104175
Status
complete
Filed
Apr 10, 2025
Permit issued
Aug 13, 2025
Final sign-off
May 15, 2026
Declared cost
$800,000
Address
601 Clement St

prop h: rev #202405031359: include mezzanine scope & cbc compliant accessible lift to access mezzanine. new non-structural partitions, all-gender restrooms, light fixtures & finishes. medical offices t/i to building counselling offices. no ambulatory care on site.

Open the permit page

$800,000
Apr 7, 2025Completed
final sign-off Sep 2025
555 California StSkyline Constructionrevision to pa # 2024-1021-3343 revised lobby area fl plan. deleted focus room, relocated reception desk and closet. revision to conference room. mech and electrical revisions
Details
Permit
202504073822
Status
complete
Filed
Apr 7, 2025
Permit issued
Apr 22, 2025
Final sign-off
Sep 3, 2025
Declared cost
$20,000
Address
555 California St

revision to pa # 2024-1021-3343 revised lobby area fl plan. deleted focus room, relocated reception desk and closet. revision to conference room. mech and electrical revisions

Open the permit page

$20,000
Apr 2, 2025Completed
final sign-off Oct 2025
400 Howard StSc Builders, Inc4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishes
Details
Permit
202504023527
Status
complete
Filed
Apr 2, 2025
Permit issued
Apr 9, 2025
Final sign-off
Oct 9, 2025
Declared cost
$3,283,298
Address
400 Howard St

4th fl t.i.work includes interoir non structural demo of partitons, light fixtures, ceiling assembly, millwork, plumbing and finishes. build back non structural demising partitons, light fixtures,ceiling assembly, power outlets, finishes

Open the permit page

$3,283,298
Mar 31, 2025Completed
final sign-off Jan 2026
500 Howard StNovo Construction Inc5th fl: interior ti. include paint throughout. removal of existing walls, ceilings and finishes. new interior construction of walls, new wall & floor finishes. mechanical, electrical ,plumbing & structural included
Details
Permit
202503313350
Status
complete
Filed
Mar 31, 2025
Permit issued
Jun 20, 2025
Final sign-off
Jan 23, 2026
Declared cost
$5,416,864
Address
500 Howard St

5th fl: interior ti. include paint throughout. removal of existing walls, ceilings and finishes. new interior construction of walls, new wall & floor finishes. mechanical, electrical ,plumbing & structural included

Open the permit page

$5,416,864
Mar 10, 2025In progress
issued Mar 2025
345 California StGci, Inc31st fl - revision to pa 202312132454 updated floor plans door schedule added conference room, reconfigured team rooms/ofces in lieu of open office work stations, updated restroom sheets (34) vav boxes, (2) heat pumps added electrical work
Details
Permit
202503101898
Status
issued
Filed
Mar 10, 2025
Permit issued
Mar 21, 2025
Address
345 California St

31st fl - revision to pa 202312132454 updated floor plans door schedule added conference room, reconfigured team rooms/ofces in lieu of open office work stations, updated restroom sheets (34) vav boxes, (2) heat pumps added electrical work

Open the permit page

Mar 7, 2025In progress
issued Mar 2025
50 California StR.M.R. Construction Company26th fl, partial floor remodel sub dividing existing office suite 2600 into 2 suites. scope includes demo and construction of non-structural partitions, light fixtures, ceiling assembly, and floor finishes; remodel for accessbility compliance a women's toilet compartment.
Details
Permit
202503071783
Status
issued
Filed
Mar 7, 2025
Permit issued
Mar 20, 2025
Declared cost
$440,198
Address
50 California St

26th fl, partial floor remodel sub dividing existing office suite 2600 into 2 suites. scope includes demo and construction of non-structural partitions, light fixtures, ceiling assembly, and floor finishes; remodel for accessbility compliance a women's toilet compartment.

Open the permit page

$440,198
Feb 26, 2025Completed
final sign-off Feb 2026
500 Howard StNovo Construction Inc3rd fl -ti to include new nonstructural partitions, paint, wall covering on, privacy glass film; repairs to existing conditions. mep included
Details
Permit
202502261131
Status
complete
Filed
Feb 26, 2025
Permit issued
May 15, 2025
Final sign-off
Feb 26, 2026
Declared cost
$4,721,444
Address
500 Howard St

3rd fl -ti to include new nonstructural partitions, paint, wall covering on, privacy glass film; repairs to existing conditions. mep included

Open the permit page

$4,721,444
Feb 21, 2025Completed
final sign-off May 2025
500 Howard StNovo Construction Inc8th fl- revision to pa #202412237306 to add selective new demo for new exhaust duct, new environmental exhuast louver added hand and prep sink, added power, new hot water pump. new exhaust fan, under floor terminal unit and equipment anchorage
Details
Permit
202502210769
Status
complete
Filed
Feb 21, 2025
Permit issued
Mar 21, 2025
Final sign-off
May 6, 2025
Declared cost
$75,000
Address
500 Howard St

8th fl- revision to pa #202412237306 to add selective new demo for new exhaust duct, new environmental exhuast louver added hand and prep sink, added power, new hot water pump. new exhaust fan, under floor terminal unit and equipment anchorage

Open the permit page

$75,000
Feb 19, 2025In progress
issued Mar 2025
550 California St2/f: selective demo of non-structural elements including but not limited to int. partitions, doors, finishes, ceilings, lighting, mech/elec outs and switches per mech/elec plans. restroom accessibility upgrades. f/l/s and fire sprinkler drawings under separate permit. scope does not affect fixture
Details
Permit
202502190631
Status
issued
Filed
Feb 19, 2025
Permit issued
Mar 24, 2025
Declared cost
$75,000
Address
550 California St

2/f: selective demo of non-structural elements including but not limited to int. partitions, doors, finishes, ceilings, lighting, mech/elec outs and switches per mech/elec plans. restroom accessibility upgrades. f/l/s and fire sprinkler drawings under separate permit. scope does not affect fixture

Open the permit page

$75,000
Jan 10, 2025Completed
final sign-off Aug 2025
500 Howard StNovo Construction Inc4th floor: selective demo of millwork, finshes and wall penetrations, mew carpet, paint and acoustic panels, new exterior window louver alteration of drinking fountain niche, mep included
Details
Permit
202501108111
Status
complete
Filed
Jan 10, 2025
Permit issued
Feb 10, 2025
Final sign-off
Aug 6, 2025
Declared cost
$325,000
Address
500 Howard St

4th floor: selective demo of millwork, finshes and wall penetrations, mew carpet, paint and acoustic panels, new exterior window louver alteration of drinking fountain niche, mep included

Open the permit page

$325,000
Dec 23, 2024Completed
final sign-off May 2025
500 Howard StNovo Construction Inc8/fl- ti to convert storage to pantry to include (n) refrigator, freezer, food storage and sinks. mep included.
Details
Permit
202412237306
Status
complete
Filed
Dec 23, 2024
Permit issued
Jan 16, 2025
Final sign-off
May 6, 2025
Declared cost
$250,000
Address
500 Howard St

8/fl- ti to convert storage to pantry to include (n) refrigator, freezer, food storage and sinks. mep included.

Open the permit page

$250,000
Dec 17, 2024Completed
final sign-off Feb 2026
555 Mission StGci, Inc28/f: interior tenant improvement including new partitions, light fixtures, ceiling assemblies, millwork, and plumbing fixtures. mechanical, electrical, and plumbing drawings included. fire life safety and sprinkler under separate permit.
Details
Permit
202412177023
Status
complete
Filed
Dec 17, 2024
Permit issued
Apr 8, 2025
Final sign-off
Feb 25, 2026
Declared cost
$965,775
Address
555 Mission St

28/f: interior tenant improvement including new partitions, light fixtures, ceiling assemblies, millwork, and plumbing fixtures. mechanical, electrical, and plumbing drawings included. fire life safety and sprinkler under separate permit.

Open the permit page

$965,775
Nov 22, 2024In progress
issued Nov 2024
550 California St9th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scope
Details
Permit
202411225540
Status
issued
Filed
Nov 22, 2024
Permit issued
Nov 27, 2024
Declared cost
$75,000
Address
550 California St

9th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scope

Open the permit page

$75,000
Nov 22, 2024In progress
issued Nov 2024
550 California St6th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scope
Details
Permit
202411225537
Status
issued
Filed
Nov 22, 2024
Permit issued
Nov 27, 2024
Declared cost
$75,000
Address
550 California St

6th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scope

Open the permit page

$75,000
Oct 11, 2024Completed
final sign-off Mar 2025
101 California StSource Planning And Construction Inc19th fl: new ti for open office, conference rooms, boardroom, pantry, library & meeting space. bldg is fully sprinklered
Details
Permit
202410112776
Status
complete
Filed
Oct 11, 2024
Permit issued
Oct 21, 2024
Final sign-off
Mar 20, 2025
Declared cost
$1,675,000
Address
101 California St

19th fl: new ti for open office, conference rooms, boardroom, pantry, library & meeting space. bldg is fully sprinklered

Open the permit page

$1,675,000
Oct 1, 2024Completed
final sign-off Jun 2025
45 Fremont StSkyline Construction34/f partial floor - office tenant improvement. architecture and mep. new offices.
Details
Permit
202410012081
Status
complete
Filed
Oct 1, 2024
Permit issued
Dec 2, 2024
Final sign-off
Jun 27, 2025
Declared cost
$375,000
Address
45 Fremont St

34/f partial floor - office tenant improvement. architecture and mep. new offices.

Open the permit page

$375,000
Sep 18, 2024In progress
issued Oct 2024
550 California Stste 710 - selective interior demo of non-struc'l elements. (n) interior partitions, door, finishes, lighting, mech & elec outlets & switches. lfs and fire sprinkler submitted as separate permit. scope does not affect fixture quantities, occupant load, calcs or path of travel. no exterior change to
Details
Permit
202409181012
Status
issued
Filed
Sep 18, 2024
Permit issued
Oct 24, 2024
Declared cost
$100,000
Address
550 California St

ste 710 - selective interior demo of non-struc'l elements. (n) interior partitions, door, finishes, lighting, mech & elec outlets & switches. lfs and fire sprinkler submitted as separate permit. scope does not affect fixture quantities, occupant load, calcs or path of travel. no exterior change to

Open the permit page

$100,000
Sep 9, 2024Completed
final sign-off Apr 2025
475 Sansome StBcci Construction Company11th fl -tenant improvement. includes new non-load bearing walls, lighting, fixtures & finishes
Details
Permit
202409090362
Status
complete
Filed
Sep 9, 2024
Permit issued
Oct 4, 2024
Final sign-off
Apr 1, 2025
Declared cost
$880,258
Address
475 Sansome St

11th fl -tenant improvement. includes new non-load bearing walls, lighting, fixtures & finishes

Open the permit page

$880,258
Aug 13, 2024In progress
issued Aug 2024
550 California St7th fl- interior demo of non structural elements including (not limited) to int partitions,doors, finishes, ceilings, lighting,mech & elec outlets & switches. ref to mech & elec plans. restroom accessibility upgrades. fire l/s & sprinkler dwgs under separate permit.
Details
Permit
202408138524
Status
issued
Filed
Aug 13, 2024
Permit issued
Aug 20, 2024
Declared cost
$70,000
Address
550 California St

7th fl- interior demo of non structural elements including (not limited) to int partitions,doors, finishes, ceilings, lighting,mech & elec outlets & switches. ref to mech & elec plans. restroom accessibility upgrades. fire l/s & sprinkler dwgs under separate permit.

Open the permit page

$70,000
Jun 28, 2024Completed
final sign-off Aug 2024
505 Howard StBcci Construction Companyfloors 4 and 5- removal of communicating stairs and slab infill between floors
Details
Permit
202406285521
Status
complete
Filed
Jun 28, 2024
Permit issued
Jul 1, 2024
Final sign-off
Aug 23, 2024
Declared cost
$120,000
Address
505 Howard St

floors 4 and 5- removal of communicating stairs and slab infill between floors

Open the permit page

$120,000
Jun 24, 2024In progress
issued Jul 2024
50 California StRichlen Construction35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17.
Details
Permit
202406245061
Status
issued
Filed
Jun 24, 2024
Permit issued
Jul 12, 2024
Declared cost
$192,560
Address
50 California St

35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17.

Open the permit page

$192,560
Jun 20, 2024In progress
filed Jun 2024, not yet issued
550 California St8/f: duct distribution is being modified per (n) space plan. (4) vav boxes are being added. no (n) fsds are ebing added. (ref arch permit# 202405152215)
Details
Permit
202406204833
Status
filed
Filed
Jun 20, 2024
Address
550 California St

8/f: duct distribution is being modified per (n) space plan. (4) vav boxes are being added. no (n) fsds are ebing added. (ref arch permit# 202405152215)

Open the permit page

Jun 12, 2024Completed
final sign-off Oct 2025
555 Mission StBcci Construction Company2nd floor:interior t.i. including new partitions, light fixtures, ceilings assemblies, millwork, and elevators. t. i. on-site amenities (lounge, gym, locker room,etc). structural, mech, elec, plmg, food service included. fire life safty, & sprinkler under seperate permit.
Details
Permit
202405172372
Status
complete
Filed
Jun 12, 2024
Permit issued
Nov 14, 2024
Final sign-off
Oct 10, 2025
Declared cost
$3,620,000
Address
555 Mission St

2nd floor:interior t.i. including new partitions, light fixtures, ceilings assemblies, millwork, and elevators. t. i. on-site amenities (lounge, gym, locker room,etc). structural, mech, elec, plmg, food service included. fire life safty, & sprinkler under seperate permit.

Open the permit page

$3,620,000
Jun 3, 2024Completed
final sign-off Nov 2025
100 California StNovo Construction Inc13th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered)
Details
Permit
202406033520
Status
complete
Filed
Jun 3, 2024
Permit issued
Jul 15, 2024
Final sign-off
Nov 6, 2025
Declared cost
$900,000
Address
100 California St

13th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered)

Open the permit page

$900,000
Jun 3, 2024Completed
final sign-off Oct 2025
100 California StNovo Construction Inc14th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered)
Details
Permit
202406033516
Status
complete
Filed
Jun 3, 2024
Permit issued
Jul 15, 2024
Final sign-off
Oct 27, 2025
Declared cost
$900,000
Address
100 California St

14th fl: ti includes the demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (bldg is fully sprinklered)

Open the permit page

$900,000
May 15, 2024Completed
final sign-off Aug 2024
101 California StSkyline Constructionground floor: demo of (e) walls, plumbing fixtures, doors, ramp, and partial platform. new construction of tenant fit out for proposed bank branch space inlcluding lobby, cash room, restroom, and pantry with new plumbing fixtures. exterior scope includes new entry doors and atm.
Details
Permit
202405152153
Status
complete
Filed
May 15, 2024
Permit issued
Jun 12, 2024
Final sign-off
Aug 13, 2024
Declared cost
$365,636
Address
101 California St

ground floor: demo of (e) walls, plumbing fixtures, doors, ramp, and partial platform. new construction of tenant fit out for proposed bank branch space inlcluding lobby, cash room, restroom, and pantry with new plumbing fixtures. exterior scope includes new entry doors and atm.

Open the permit page

$365,636
May 14, 2024Completed
final sign-off Nov 2024
3 Embarcadero CenterHathaway Dinwiddie Co.15th fl ti: demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised fire alarm or sprinklers will be design build and submitted separately. (bldg fully sprinklered)
Details
Permit
202405142073
Status
complete
Filed
May 14, 2024
Permit issued
Jun 3, 2024
Final sign-off
Nov 26, 2024
Declared cost
$1,200,000
Address
3 Embarcadero Center

15th fl ti: demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised fire alarm or sprinklers will be design build and submitted separately. (bldg fully sprinklered)

Open the permit page

$1,200,000
May 2, 2024Completed
final sign-off Nov 2024
475 Sansome StPrincipal Builders Inc.8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep.
Details
Permit
202405021310
Status
complete
Filed
May 2, 2024
Permit issued
May 22, 2024
Final sign-off
Nov 21, 2024
Declared cost
$3,051,349
Address
475 Sansome St

8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep.

Open the permit page

$3,051,349
Apr 25, 2024Completed
final sign-off Oct 2024
101 California StNovo Construction Inc27th fl, ste 2750 to include construction of non-structural partitions, millwork, mep, finishes, ceiling and lighting
Details
Permit
202404250708
Status
complete
Filed
Apr 25, 2024
Permit issued
May 6, 2024
Final sign-off
Oct 30, 2024
Declared cost
$1,967,498
Address
101 California St

27th fl, ste 2750 to include construction of non-structural partitions, millwork, mep, finishes, ceiling and lighting

Open the permit page

$1,967,498
Mar 14, 2024Completed
final sign-off May 2024
201 Mission StRichlen Constructionrevision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference.
Details
Permit
202403147792
Status
complete
Filed
Mar 14, 2024
Permit issued
Mar 20, 2024
Final sign-off
May 2, 2024
Address
201 Mission St

revision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference.

Open the permit page

Feb 23, 2024Completed
final sign-off Jan 2025
525 Market StBcci Construction Company7/f: deferred mep for bpa# 202401113849 to include exhaust fans and ducts.
Details
Permit
202402236430
Status
complete
Filed
Feb 23, 2024
Permit issued
Mar 1, 2024
Final sign-off
Jan 13, 2025
Address
525 Market St

7/f: deferred mep for bpa# 202401113849 to include exhaust fans and ducts.

Open the permit page

Feb 14, 2024Completed
final sign-off May 2024
201 Mission StRichlen Construction18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities or
Details
Permit
202402145870
Status
complete
Filed
Feb 14, 2024
Permit issued
Mar 6, 2024
Final sign-off
May 29, 2024
Declared cost
$216,353
Address
201 Mission St

18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities or

Open the permit page

$216,353
Jan 29, 2024Completed
final sign-off Sep 2024
44 Montgomery StBcci Construction Company7th fl mep only: deferred mechanical electrical and plumbing (ref permit 202312192740) for build out
Details
Permit
202401294847
Status
complete
Filed
Jan 29, 2024
Permit issued
Mar 5, 2024
Final sign-off
Sep 24, 2024
Declared cost
$1,427,761
Address
44 Montgomery St

7th fl mep only: deferred mechanical electrical and plumbing (ref permit 202312192740) for build out

Open the permit page

$1,427,761
Jan 12, 2024Completed
final sign-off Oct 2024
44 Montgomery StBcci Construction Company5/f: mep only. deferred mechanical, electrial and plumbing for ti permit 202312192740.
Details
Permit
202401123938
Status
complete
Filed
Jan 12, 2024
Permit issued
Mar 5, 2024
Final sign-off
Oct 23, 2024
Declared cost
$646,482
Address
44 Montgomery St

5/f: mep only. deferred mechanical, electrial and plumbing for ti permit 202312192740.

Open the permit page

$646,482
Nov 9, 2023Completed
final sign-off May 2024
201 Mission StRichlen Construction7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.
Details
Permit
202311090493
Status
complete
Filed
Nov 9, 2023
Permit issued
Jan 23, 2024
Final sign-off
May 2, 2024
Declared cost
$504,622
Address
201 Mission St

7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.

Open the permit page

$504,622
Oct 17, 2023In progress
issued Jan 2024
1663 Mission StModern Construction Incnew ceiling, lighting, and millwork at building lobby.
Details
Permit
202310178782
Status
issued
Filed
Oct 17, 2023
Permit issued
Jan 23, 2024
Declared cost
$115,000
Address
1663 Mission St

new ceiling, lighting, and millwork at building lobby.

Open the permit page

$115,000
Oct 5, 2023Completed
final sign-off Oct 2024
45 Fremont StClune Construction Company L P26/f-suite 2600: t.i., partial shell condition, no modification to (e) rated core barriers/exterior envelope. modifications to elevator lobby, maintain smoke barrier rating.
Details
Permit
202310058110
Status
complete
Filed
Oct 5, 2023
Permit issued
Oct 30, 2023
Final sign-off
Oct 3, 2024
Declared cost
$5,000,000
Address
45 Fremont St

26/f-suite 2600: t.i., partial shell condition, no modification to (e) rated core barriers/exterior envelope. modifications to elevator lobby, maintain smoke barrier rating.

Open the permit page

$5,000,000
Sep 26, 2023Completed
final sign-off Jun 2024
425 Market StGci, Inc14/f: demolition of interior non-load bearing partitions, ceiling, lighting, millwork, plumbing fixtures and flooring. construction of new non-load bearing partitions, restroom upgrades of fixtures, eqmt and interior finishes. new lighting and limited electrical. limited mechanical and
Details
Permit
202309267413
Status
complete
Filed
Sep 26, 2023
Permit issued
Oct 5, 2023
Final sign-off
Jun 4, 2024
Declared cost
$918,839
Address
425 Market St

14/f: demolition of interior non-load bearing partitions, ceiling, lighting, millwork, plumbing fixtures and flooring. construction of new non-load bearing partitions, restroom upgrades of fixtures, eqmt and interior finishes. new lighting and limited electrical. limited mechanical and

Open the permit page

$918,839
Aug 17, 2023Completed
final sign-off Dec 2023
388 Market StBevilacqua & Sons8/f-suite 888: t.i., 964 sq. ft. new glass partition system for conference room, electrical/mechanical upgrade, break room
Details
Permit
202308174602
Status
complete
Filed
Aug 17, 2023
Permit issued
Sep 6, 2023
Final sign-off
Dec 28, 2023
Declared cost
$93,000
Address
388 Market St

8/f-suite 888: t.i., 964 sq. ft. new glass partition system for conference room, electrical/mechanical upgrade, break room

Open the permit page

$93,000
Aug 17, 2023Completed
final sign-off Dec 2023
388 Market StBevilacqua & Sons9/f: t.i., 1,683 sq. ft., new offices (2), demo (e) open office area breakroom, finishes
Details
Permit
202308174607
Status
complete
Filed
Aug 17, 2023
Permit issued
Sep 6, 2023
Final sign-off
Dec 28, 2023
Declared cost
$150,000
Address
388 Market St

9/f: t.i., 1,683 sq. ft., new offices (2), demo (e) open office area breakroom, finishes

Open the permit page

$150,000
Jun 29, 2023Completed
final sign-off Apr 2024
580 California StSkyline Construction19/f: mechanical and electrical work for tenant improvement, ref pa# 2023-0608-9570
Details
Permit
202306291127
Status
complete
Filed
Jun 29, 2023
Permit issued
Jul 10, 2023
Final sign-off
Apr 16, 2024
Declared cost
$25,000
Address
580 California St

19/f: mechanical and electrical work for tenant improvement, ref pa# 2023-0608-9570

Open the permit page

$25,000
Jun 15, 2023Completed
final sign-off Jan 2026
50 California StRichlen Construction35/f: demo of partitions, ceilings, finishes and millwork. demo of interior stair that connects the 35th and 34th floor. new structural floor infill on 35th floor. restroom remodel
Details
Permit
202306150127
Status
complete
Filed
Jun 15, 2023
Permit issued
Aug 24, 2023
Final sign-off
Jan 5, 2026
Declared cost
$289,880
Address
50 California St

35/f: demo of partitions, ceilings, finishes and millwork. demo of interior stair that connects the 35th and 34th floor. new structural floor infill on 35th floor. restroom remodel

Open the permit page

$289,880
Jun 8, 2023Completed
final sign-off Nov 2024
1 Embarcadero CenterSkyline Construction26th fl deferred mep for pa 2023-0530-8849
Details
Permit
202306089617
Status
complete
Filed
Jun 8, 2023
Permit issued
Aug 25, 2023
Final sign-off
Nov 8, 2024
Declared cost
$1,323,360
Address
1 Embarcadero Center

26th fl deferred mep for pa 2023-0530-8849

Open the permit page

$1,323,360
Jun 8, 2023Completed
final sign-off Nov 2024
1 Embarcadero CenterSkyline Construction27/f: deferred mep for 202305318934
Details
Permit
202306089636
Status
complete
Filed
Jun 8, 2023
Permit issued
Aug 25, 2023
Final sign-off
Nov 8, 2024
Declared cost
$1,324,800
Address
1 Embarcadero Center

27/f: deferred mep for 202305318934

Open the permit page

$1,324,800
May 5, 2023Completed
final sign-off Sep 2023
101 California StNovo Construction Inc7/f: rev to pa 202209152536 to provide revised mep for new floor plan. ref arch 202208231049, 202212198637
Details
Permit
202305057217
Status
complete
Filed
May 5, 2023
Permit issued
May 12, 2023
Final sign-off
Sep 25, 2023
Address
101 California St

7/f: rev to pa 202209152536 to provide revised mep for new floor plan. ref arch 202208231049, 202212198637

Open the permit page

May 2, 2023Completed
final sign-off Oct 2023
1 California StM C S Construction Services23/f: t.i. with nonstructural partitions, mechanical, electrical, plumbing work included
Details
Permit
202305026903
Status
complete
Filed
May 2, 2023
Permit issued
May 4, 2023
Final sign-off
Oct 2, 2023
Declared cost
$304,650
Address
1 California St

23/f: t.i. with nonstructural partitions, mechanical, electrical, plumbing work included

Open the permit page

$304,650
Mar 30, 2023Completed
final sign-off Jul 2024
50 California StRichlen Construction13th fl - ti consisting of new non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical, plumbing and hvac
Details
Permit
202303304700
Status
complete
Filed
Mar 30, 2023
Permit issued
May 19, 2023
Final sign-off
Jul 2, 2024
Declared cost
$1,938,674
Address
50 California St

13th fl - ti consisting of new non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical, plumbing and hvac

Open the permit page

$1,938,674
Mar 10, 2023Expired or cancelled
cancelled Jul 2023
555 California StBcci Construction Company51/f: tenant improvement modifications to exsiting dining area within office, new finishes, ceiling, flooring and mep.
Details
Permit
202303103458
Status
cancelled
Filed
Mar 10, 2023
Permit issued
Apr 3, 2023
Declared cost
$152,952
Address
555 California St

51/f: tenant improvement modifications to exsiting dining area within office, new finishes, ceiling, flooring and mep.

Open the permit page

$152,952
Mar 10, 2023Completed
final sign-off Jul 2023
425 Market StRichlen Construction11th fl - demolition of interior non-load bearing partitions, ceilings, lighting millwork, plumbing, fixtures and flooring in preparation for future tenant. occupancy group to remain b business. sprinklers/life safety under separate permit. ab-017
Details
Permit
202303103457
Status
complete
Filed
Mar 10, 2023
Permit issued
Mar 28, 2023
Final sign-off
Jul 10, 2023
Declared cost
$160,000
Address
425 Market St

11th fl - demolition of interior non-load bearing partitions, ceilings, lighting millwork, plumbing, fixtures and flooring in preparation for future tenant. occupancy group to remain b business. sprinklers/life safety under separate permit. ab-017

Open the permit page

$160,000
Feb 8, 2023Completed
final sign-off Aug 2023
388 Market StParadigm General Contractors13th fl - upgrade mechanical & electrical. no tenant occupied. ref pa 2023-0106-9757 & 2022-0118-6116 (fire upgrade)
Details
Permit
202302081584
Status
complete
Filed
Feb 8, 2023
Permit issued
Feb 16, 2023
Final sign-off
Aug 4, 2023
Declared cost
$200,000
Address
388 Market St

13th fl - upgrade mechanical & electrical. no tenant occupied. ref pa 2023-0106-9757 & 2022-0118-6116 (fire upgrade)

Open the permit page

$200,000
Jan 30, 2023Completed
final sign-off Jul 2023
50 California StPrincipal Builders Inc.21/f: tenant improvement. new offices, reception, conference room, open work stations, new partitions - non load bearing, storefronts, ceilings, millwork, furniture, power/data and mechanical, electrical, and plumbing work. no structural work.
Details
Permit
202301301025
Status
complete
Filed
Jan 30, 2023
Permit issued
Feb 16, 2023
Final sign-off
Jul 25, 2023
Declared cost
$2,839,105
Address
50 California St

21/f: tenant improvement. new offices, reception, conference room, open work stations, new partitions - non load bearing, storefronts, ceilings, millwork, furniture, power/data and mechanical, electrical, and plumbing work. no structural work.

Open the permit page

$2,839,105
Jan 13, 2023Completed
final sign-off Jan 2024
50 California StRichlen Construction21st fl - construction of (n) common corridor, elevator lobby and demising walls. scope includes (n) non-structural walls, electrical outlets, (n) floor and wall finishes, and light fixtures, alteration/addition of mep systems to creat warm shell
Details
Permit
202301130143
Status
complete
Filed
Jan 13, 2023
Permit issued
Jan 18, 2023
Final sign-off
Jan 29, 2024
Declared cost
$180,000
Address
50 California St

21st fl - construction of (n) common corridor, elevator lobby and demising walls. scope includes (n) non-structural walls, electrical outlets, (n) floor and wall finishes, and light fixtures, alteration/addition of mep systems to creat warm shell

Open the permit page

$180,000