Paul Cordova
- Listed as
- architect, engineer
- Firm
- Simpson Gumpertz & Heger
- Based in
- San Francisco
- On San Francisco permits
- Apr 2019 to Aug 2026
8 permits since 2000 (engineer on 7 permits, architect on 1 permit): 5 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2026 | In progress filed Aug 2026, not yet issued | 343 Sansome St | replace water tank like for like, waterproofing and safe aaccess hatch in the slab above the tank. this replaces the (e) 15000 gal tank that has alredy been removed. (e) footprint reinforced concrete walls, beams and slab.Details
replace water tank like for like, waterproofing and safe aaccess hatch in the slab above the tank. this replaces the (e) 15000 gal tank that has alredy been removed. (e) footprint reinforced concrete walls, beams and slab. | $190,000 | |
| Jul 16, 2026 | In progress issued Sep 2026 | 555 California St | Rainbow Waterproofing & Restor | steel frame concrete wall repair ion the mechanical penthouse. the exterior steel frame supports a granite facade and is connected to the penhouse concrete walls. the steel frame has corrosion damage at the wall interface and there is concrete and reinforicnig deterioration on the wall. the goal isDetails
steel frame concrete wall repair ion the mechanical penthouse. the exterior steel frame supports a granite facade and is connected to the penhouse concrete walls. the steel frame has corrosion damage at the wall interface and there is concrete and reinforicnig deterioration on the wall. the goal is | $1,973,967 |
| Dec 12, 2025 | Completed final sign-off Aug 2026 | 312 Mason St | Plant Construction Co, Lp | cornice maintenance, including steel trussed, wood framing, and brick walls. no visible change to the exterior of the building.Details
cornice maintenance, including steel trussed, wood framing, and brick walls. no visible change to the exterior of the building. | $75,000 |
| Nov 5, 2025 | Completed final sign-off Sep 2026 | 450 Powell St | Alpha Restoration & Wateproof | concrete restoration of 21st floor parapet capDetails
concrete restoration of 21st floor parapet cap | $70,000 |
| Oct 3, 2025 | Completed final sign-off Jul 2026 | 50 California St | Sc Builders, Inc | 28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep.Details
28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep. | $4,135,200 |
| Feb 7, 2025 | In progress issued Feb 2025 | 50 California St | Richlen Construction | 2 new freestanding phonebooths located in tenant suite 2525. all other elements are existing to remain with no changes.Details
2 new freestanding phonebooths located in tenant suite 2525. all other elements are existing to remain with no changes. | $14,000 |
| Jun 5, 2024 | Completed final sign-off Nov 2024 | 1201 Illinois St | Singular Builders | emergency stablization repair to historical western facade on unoccupied potrere power station "station a building" stablization repair is temporary & required to abate immennent life safety concerns, ab-017Details
emergency stablization repair to historical western facade on unoccupied potrere power station "station a building" stablization repair is temporary & required to abate immennent life safety concerns, ab-017 | $12,000 |
| Apr 11, 2019 | Completed final sign-off Jun 2022 | 45 Fremont St | Richlen Construction | selective demo within the (e) bsmt & ground fl lobby. demo non-egress communication stair (level 2 - bsmt) plus slab infill @ level 1 & 2 (where removed). expansion of ground fl lobby include new exterior landscape in southern plaza. new store front entry, bicycle entry & basement bicycle amenity.Details
selective demo within the (e) bsmt & ground fl lobby. demo non-egress communication stair (level 2 - bsmt) plus slab infill @ level 1 & 2 (where removed). expansion of ground fl lobby include new exterior landscape in southern plaza. new store front entry, bicycle entry & basement bicycle amenity. | $16,500,000 |