Rainbow Waterproofing & Restor
- Based in
- San Francisco
- On San Francisco permits
- Nov 2003 to Jul 2026
- Last 24 months
- 18 permits filed
79 permits since 2000: 43 completed, 18 in progress, 14 never finaled, 4 expired or cancelled.
Of the 14 never-finaled permits, 1 is 3 to 5 years old, 9 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Jul 2026 | 200 Pine St | concrete repair in basement: repair at concrete walls, beams and soffit, include beam replacement at seven sections of beam. perform epoxy crack injection and concrete spall repairs. all repairs in kind to match original construction.Details
concrete repair in basement: repair at concrete walls, beams and soffit, include beam replacement at seven sections of beam. perform epoxy crack injection and concrete spall repairs. all repairs in kind to match original construction. | $214,300 |
| Jul 16, 2026 | In progress issued Sep 2026 | 555 California St | steel frame concrete wall repair ion the mechanical penthouse. the exterior steel frame supports a granite facade and is connected to the penhouse concrete walls. the steel frame has corrosion damage at the wall interface and there is concrete and reinforicnig deterioration on the wall. the goal isDetails
steel frame concrete wall repair ion the mechanical penthouse. the exterior steel frame supports a granite facade and is connected to the penhouse concrete walls. the steel frame has corrosion damage at the wall interface and there is concrete and reinforicnig deterioration on the wall. the goal is | $1,973,967 |
| Jun 24, 2026 | In progress issued Jun 2026 | 808 Brannan St | brick repairs to remove damaged brick above windows. clean and salvage. clean exposed steel and apply corrosion inhibitor. reinstall salvaged brick and blue diamond tiles to match (e) layout. (n) mortar to match (e) as closely as possible. mortar repairs-as needed to be replaced in kind. windowDetails
brick repairs to remove damaged brick above windows. clean and salvage. clean exposed steel and apply corrosion inhibitor. reinstall salvaged brick and blue diamond tiles to match (e) layout. (n) mortar to match (e) as closely as possible. mortar repairs-as needed to be replaced in kind. window | $285,000 |
| May 18, 2026 | In progress filed May 2026, not yet issued | 1065 Sutter St | ref 202505206819: installatin of carbon fiber reinforcing on select roof level beam support. new 2x carbon fiber reinforcing will be installed on top of existing beams to add flexure strengh at the roof level on top of roof slab between columns. new 2xcarbon fiber reinforcing will be installedDetails
ref 202505206819: installatin of carbon fiber reinforcing on select roof level beam support. new 2x carbon fiber reinforcing will be installed on top of existing beams to add flexure strengh at the roof level on top of roof slab between columns. new 2xcarbon fiber reinforcing will be installed | $152,073 |
| Apr 3, 2026 | In progress issued Apr 2026 | 100 John F Kennedy Dr | replace wood arch showing signs of wood decay with (n) arch member. replace in kind to match (e) construction assembly, profile, aesthetics, and structrual integrityDetails
replace wood arch showing signs of wood decay with (n) arch member. replace in kind to match (e) construction assembly, profile, aesthetics, and structrual integrity | $126,800 |
| Mar 25, 2026 | In progress issued Mar 2026 | 685 07th St | structural concrete repair of an existing loading dock. steel rebar and concrete replacement in an isolated area of damage as directed by holmes engineeringDetails
structural concrete repair of an existing loading dock. steel rebar and concrete replacement in an isolated area of damage as directed by holmes engineering | $20,700 |
| Mar 18, 2026 | In progress filed Mar 2026, not yet issued | 840 Ellis St | repair of existing damaged floor framing members. cracked concrete floor joists are to be repaired by epoxy injection and carbon fiber wrap. a portion of the floor slab and one beam near the north/west corner will be rebuilt.Details
repair of existing damaged floor framing members. cracked concrete floor joists are to be repaired by epoxy injection and carbon fiber wrap. a portion of the floor slab and one beam near the north/west corner will be rebuilt. | $188,000 |
| Jan 9, 2026 | Completed final sign-off Aug 2026 | 2695 19th Av | repair and reconstruction of west exterior wall assembly, including stud replacement, new waterproofing, and flashing. this scope is an addition to permit 202505146490.Details
repair and reconstruction of west exterior wall assembly, including stud replacement, new waterproofing, and flashing. this scope is an addition to permit 202505146490. | $90,000 |
| Dec 23, 2025 | In progress issued Jun 2026 | 1388 Gough St | common area repairs for all units (no work in units): miscellaneous waterproofing repairs at trench drains, standpipe, stair-to-podium joint, planter curbs and pedestrian ramps. tune-up repairs at traffic slab and monument wall claddingDetails
common area repairs for all units (no work in units): miscellaneous waterproofing repairs at trench drains, standpipe, stair-to-podium joint, planter curbs and pedestrian ramps. tune-up repairs at traffic slab and monument wall cladding | $550,000 |
| Nov 20, 2025 | Completed final sign-off Dec 2025 | 1208 Powell St | remove loose concrete, clean (e) reinforcing, treat reinforcing with corrosion inhibitor, and patch with repair mortar. concrete spalls on exterior walls of unit 4 and 6. (all work inside of units)Details
remove loose concrete, clean (e) reinforcing, treat reinforcing with corrosion inhibitor, and patch with repair mortar. concrete spalls on exterior walls of unit 4 and 6. (all work inside of units) | $19,327 |
| Sep 15, 2025 | In progress issued Sep 2025 | 747 Folsom St | revision to 202506128539. to document the replacement of metal decking in kind.Details
revision to 202506128539. to document the replacement of metal decking in kind. | |
| Aug 27, 2025 | Completed final sign-off Jun 2026 | 335 Powell St | reinforcing deteriorated common brick masonry and replacing deteriorated colusa sandstone at northwest corner of buildingDetails
reinforcing deteriorated common brick masonry and replacing deteriorated colusa sandstone at northwest corner of building | $140,000 |
| Jun 12, 2025 | In progress issued Jun 2025 | 747 Folsom St | remove existing standing seam roofing and plywood sheathing. inspect and repair metal decking. install pmma system: install new 5/8" dense deck sheathing. install siplast probase mb base sheet. install siplast parapro roofing system. window glazing and sealantDetails
remove existing standing seam roofing and plywood sheathing. inspect and repair metal decking. install pmma system: install new 5/8" dense deck sheathing. install siplast probase mb base sheet. install siplast parapro roofing system. window glazing and sealant | $171,780 |
| May 20, 2025 | In progress issued May 2025 | 1065 Sutter St | remove and replace (e) roof structure and roofing membrane (no hot work) or torchdown - liquid applied system. repl existing skylight as needed. all work in-kind.Details
remove and replace (e) roof structure and roofing membrane (no hot work) or torchdown - liquid applied system. repl existing skylight as needed. all work in-kind. | $337,003 |
| May 14, 2025 | Completed final sign-off Aug 2026 | 2695 19th Av | this is a maintenance project: repair 1.2k sqft of exterior west wall tiles temp winterization of west wall. repair north and south wall sealing. steel beam rust remediation/cleaning. roof coping replacement.Details
this is a maintenance project: repair 1.2k sqft of exterior west wall tiles temp winterization of west wall. repair north and south wall sealing. steel beam rust remediation/cleaning. roof coping replacement. | $380,000 |
| Dec 20, 2024 | In progress filed Dec 2024, not yet issued | 2 Turk St | basement floor- removal and in kind replacement of (e) basement partitionDetails
basement floor- removal and in kind replacement of (e) basement partition | $4,000 |
| Nov 20, 2024 | In progress issued Dec 2024 | 2 New Montgomery St | facade rehabilitation program comprising brick work repair/repointing, terracotta repair, facade cleaning, window replacementDetails
facade rehabilitation program comprising brick work repair/repointing, terracotta repair, facade cleaning, window replacement | $6,500,000 |
| Nov 6, 2024 | In progress issued Dec 2024 | 555 California St | penthouse level exterior work only to inlcude steel frame and concrete wall repair on the mechanical penthouse. exterior steel frame supports granite facade and is connected to the penthouse concrete walls. steel frame has corrosion damage at the wall interface and there is concrete and reinforcingDetails
penthouse level exterior work only to inlcude steel frame and concrete wall repair on the mechanical penthouse. exterior steel frame supports granite facade and is connected to the penthouse concrete walls. steel frame has corrosion damage at the wall interface and there is concrete and reinforcing | $200,160 |
| Sep 25, 2024 | Completed final sign-off Dec 2024 | 580 California St | remove 4'-5" of the top portions of 18 decorative finials from main roof and penthouse roof, this project has been initiated as a hazard reduction followng the failure of portions of two finials on the roof, install silicone sealant to cover the top surface or the remaining finial store the removedDetails
remove 4'-5" of the top portions of 18 decorative finials from main roof and penthouse roof, this project has been initiated as a hazard reduction followng the failure of portions of two finials on the roof, install silicone sealant to cover the top surface or the remaining finial store the removed | $18,110 |
| Sep 10, 2024 | Completed final sign-off May 2026 | 2 Turk St | to comply with nov 202420075 concrete sidewalk repair which include concrete spall repairs and steel rebar cleaning and preparation. (n) steel rebar will be installed. rwr will install shoring to stabilize the sidewalk and complete repairs from the underside in the basementDetails
to comply with nov 202420075 concrete sidewalk repair which include concrete spall repairs and steel rebar cleaning and preparation. (n) steel rebar will be installed. rwr will install shoring to stabilize the sidewalk and complete repairs from the underside in the basement | $213,502 |
| May 22, 2024 | In progress issued Jun 2024 | 520 Taylor St | repair front exterior deterionated steel reinforcing facing street . patch concrete spalls . no alter to the structure will be madeDetails
repair front exterior deterionated steel reinforcing facing street . patch concrete spalls . no alter to the structure will be made | $15,000 |
| Mar 7, 2024 | In progress issued Jun 2024 | 900 North Point St | roof repairs to clock tower (tiles, sheet metal, lighting)Details
roof repairs to clock tower (tiles, sheet metal, lighting) | $255,000 |
| Dec 7, 2023 | Completed final sign-off Jul 2024 | 595 12th Av | south facade brick veneer helical tie installation. window sealants and painting. exterior visible from front. exterior, visible from front.Details
south facade brick veneer helical tie installation. window sealants and painting. exterior visible from front. exterior, visible from front. | $135,000 |
| Nov 16, 2023 | In progress issued Mar 2024 | 2 Harrison St | on street-facing elevations, provide a sidewalk canopy for overhead protection. all work to be performed from swing stages. cut out (e) mortar from brick joints. repoint with new mortar to match (e) in color and compressive strength. repair damaged bricks. paint windows and seal window permeters.Details
on street-facing elevations, provide a sidewalk canopy for overhead protection. all work to be performed from swing stages. cut out (e) mortar from brick joints. repoint with new mortar to match (e) in color and compressive strength. repair damaged bricks. paint windows and seal window permeters. | $1,750,000 |
| Sep 26, 2023 | In progress issued Dec 2023 | 624 Taylor St | add structural steel and welding to (e) steel beams: 7 locations. treat remaining steel with epoxy and patch concrete. egress path to be clear at all times during construction.Details
add structural steel and welding to (e) steel beams: 7 locations. treat remaining steel with epoxy and patch concrete. egress path to be clear at all times during construction. | $50,000 |
| Jul 5, 2023 | Completed final sign-off Aug 2023 | 1844 Market St | #715 balcony: scope of work includes removal of the concrete topping slab and installinga a new layer of a waterproofing over the (e) waterproofing membrane, install pavers over the membrane once completeDetails
#715 balcony: scope of work includes removal of the concrete topping slab and installinga a new layer of a waterproofing over the (e) waterproofing membrane, install pavers over the membrane once complete | $55,925 |
| May 22, 2023 | Completed final sign-off Jan 2025 | 1 Powell St | exterior facade repairs of (e) historic granite stone & terra cotta masonry. prep & painting of hist. steel wndw frames. isolated locations of glass replacement on the windows. north facing facade require misc stucco & cement plaster repair. installation of elastomeric paint on majority of these...Details
exterior facade repairs of (e) historic granite stone & terra cotta masonry. prep & painting of hist. steel wndw frames. isolated locations of glass replacement on the windows. north facing facade require misc stucco & cement plaster repair. installation of elastomeric paint on majority of these... | $3,091,690 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 1333 Gough St | strengthening of existing concrete joist with the reinforcement of a steel beam assembly. patching of concrete spallsDetails
strengthening of existing concrete joist with the reinforcement of a steel beam assembly. patching of concrete spalls | $106,382 |
| Jan 20, 2023 | Completed final sign-off Jan 2025 | 1 Powell St | exterior facade repairs of existing historic granite stone and terra cotta unit masonry. these are detailed very specifically in the project plans and specifications. the project includes the preparation and painting of (e) historic steel window frames. there are isolated locations of glass facade..Details
exterior facade repairs of existing historic granite stone and terra cotta unit masonry. these are detailed very specifically in the project plans and specifications. the project includes the preparation and painting of (e) historic steel window frames. there are isolated locations of glass facade.. | $2,115,633 |
| Aug 25, 2022 | Completed final sign-off Dec 2023 | 343 Sansome St | exterior: reconstruction & repairs of the southwest corner of the brick masonary on the facade. floors 3-5 of the corner are to be reinforced to prevent masonry cracking.floors 6-8 completel removed and replaced with new brick masonary & mortar.new steel shelf angles will be welded in place on 6-8/fDetails
exterior: reconstruction & repairs of the southwest corner of the brick masonary on the facade. floors 3-5 of the corner are to be reinforced to prevent masonry cracking.floors 6-8 completel removed and replaced with new brick masonary & mortar.new steel shelf angles will be welded in place on 6-8/f | $508,496 |
| Mar 11, 2021 | Completed final sign-off Sep 2022 | 600 Treat Av | add (3) windows, replace entry storefront.Details
add (3) windows, replace entry storefront. | $115,000 |
| Dec 30, 2020 | Completed final sign-off Nov 2021 | 942 Market St | rooftop: add 6 new fall arrest anchorage and improve fall protection by adding railings where the (e) parapet is less than 42in high. note that the railing is set back fromthe edge of the building and will not impact the facades.Details
rooftop: add 6 new fall arrest anchorage and improve fall protection by adding railings where the (e) parapet is less than 42in high. note that the railing is set back fromthe edge of the building and will not impact the facades. | $100,000 |
| Oct 9, 2020 | Never finaled issued Dec 2020, no final | 111 Sutter St | re-roofing scope associated with pa 201909252682 filed at the request of dbi.Details
re-roofing scope associated with pa 201909252682 filed at the request of dbi. | |
| Aug 6, 2020 | Never finaled issued Mar 2021, no final | 2500 Steiner St | installation of a fall protection & access system for window washing.Details
installation of a fall protection & access system for window washing. | $160,000 |
| Feb 27, 2020 | Completed final sign-off Oct 2024 | 2121 Laguna St | common area: remove/reinstall cabinets & air ducts on n. wall of garage. prep cmu wall & repair cracks for waterproofing membrane. instl sheet waterproofing system/dowels. instl new shotcrete wall 6" thick, move fire hose cabinet (sep permit)to new location. nov #201918839. comply w/sffc 1103.7.6.1.Details
common area: remove/reinstall cabinets & air ducts on n. wall of garage. prep cmu wall & repair cracks for waterproofing membrane. instl sheet waterproofing system/dowels. instl new shotcrete wall 6" thick, move fire hose cabinet (sep permit)to new location. nov #201918839. comply w/sffc 1103.7.6.1. | $143,910 |
| Jan 13, 2020 | Never finaled issued Jan 2020, no final | 55 Cyril Magnin St | streer spaceDetails
streer space | |
| Sep 25, 2019 | Never finaled issued Dec 2020, no final | 111 Sutter St | historic facade repair & maintenance req'd to maintain/restore stable & water tight conditions of bldg enclosure, w/ intention of preserving the historic fabric of the bldg facades.Details
historic facade repair & maintenance req'd to maintain/restore stable & water tight conditions of bldg enclosure, w/ intention of preserving the historic fabric of the bldg facades. | $1,500,000 |
| Sep 10, 2019 | Completed final sign-off Sep 2020 | 505 Montgomery St | remoeve 1-2 ft of sidewalk adjacent to building to install waterproofing system where building walls meets structural slab. reinstall sidewalk to match existing. remove reinstall fire exit doors. remove fire proofing to install waterporoofing on steel beams, reinstall spray on fire proofing mahernotDetails
remoeve 1-2 ft of sidewalk adjacent to building to install waterproofing system where building walls meets structural slab. reinstall sidewalk to match existing. remove reinstall fire exit doors. remove fire proofing to install waterporoofing on steel beams, reinstall spray on fire proofing mahernot | $457,355 |
| Apr 3, 2019 | Never finaled issued Apr 2019, no final | 240 Powell St | street spaceDetails
street space | |
| Aug 24, 2018 | Completed final sign-off Mar 2019 | 2108 Broadway | replace column base with new concrete 4 locations.Details
replace column base with new concrete 4 locations. | $35,000 |
| Jun 1, 2018 | Never finaled issued Sep 2018, no final | 100 Bush St | repair terrocotta spalls with mortar and glaze. repaint window frames.Details
repair terrocotta spalls with mortar and glaze. repaint window frames. | $30,000 |
| May 31, 2018 | Completed final sign-off Jul 2019 | 631 Howard St | replacing steel lintels supporting brick vieneer above windowsDetails
replacing steel lintels supporting brick vieneer above windows | $50,000 |
| May 2, 2018 | Completed final sign-off Jul 2019 | 430 California St | repair of (e) precast concrete fins on exterior facade. precast concrete panels. crack repair & space repair of (e) concrete facade panels maher naDetails
repair of (e) precast concrete fins on exterior facade. precast concrete panels. crack repair & space repair of (e) concrete facade panels maher na | $109,845 |
| Apr 23, 2018 | Never finaled issued Apr 2018, no final | 989 Market St | street spaceDetails
street space | |
| Apr 23, 2018 | Never finaled issued Apr 2018, no final | 1275 Market St | street spaceDetails
street space | |
| Jan 16, 2018 | Never finaled issued Jan 2018, no final | 989 Market St | street spaceDetails
street space | |
| Sep 1, 2017 | Completed final sign-off Mar 2018 | 180 Howard St | facade access system improvements adding new intermittent stabilization anchors (isas) to the south east (howard st) & south west (main st) elevations. total of 64 isas. parapet extensions to be anchor bolts installed w/in 10" at each end at 3'-6" max spacingDetails
facade access system improvements adding new intermittent stabilization anchors (isas) to the south east (howard st) & south west (main st) elevations. total of 64 isas. parapet extensions to be anchor bolts installed w/in 10" at each end at 3'-6" max spacing | $133,000 |
| Mar 3, 2017 | Completed final sign-off Jun 2017 | 989 Market St | repairs to southwest corner of bld where there is significant crack and missing mortor. steel brackets to be installed to steel structural column and surrounding bricks tied to column with a continous steel wire. all mortor and masonry replaced in kind where necessary maher naDetails
repairs to southwest corner of bld where there is significant crack and missing mortor. steel brackets to be installed to steel structural column and surrounding bricks tied to column with a continous steel wire. all mortor and masonry replaced in kind where necessary maher na | $73,816 |
| Oct 25, 2016 | Completed final sign-off Mar 2017 | 1 Montgomery St | 3rd floor - to comply with complaint #201613126. install 6 ornamental column shells to replace extg cracked ornamental column shells surrounding extg tube steel columns.Details
3rd floor - to comply with complaint #201613126. install 6 ornamental column shells to replace extg cracked ornamental column shells surrounding extg tube steel columns. | $25,000 |
| Mar 31, 2016 | Completed final sign-off Aug 2016 | 1334 Van Ness Av | to comply with complaint # 201690652,(item # 2 only ) concrete spall & crack repairs on north & west elevations of east wing, 30 sq ft of spall repairs & 30 sq ft of crack repairs, this isless than 5% of the cross section of hte wall.Details
to comply with complaint # 201690652,(item # 2 only ) concrete spall & crack repairs on north & west elevations of east wing, 30 sq ft of spall repairs & 30 sq ft of crack repairs, this isless than 5% of the cross section of hte wall. | $17,600 |
| Mar 30, 2015 | Completed final sign-off Apr 2015 | 500 Beach St | removal of existing elastomeric waterproofing on seconf loor of parking structure. replace of elastomeric waterproofing in second floor parking structure. insulation of new parking stall striping with no changes to striping. n/a maher ord. # 155-13Details
removal of existing elastomeric waterproofing on seconf loor of parking structure. replace of elastomeric waterproofing in second floor parking structure. insulation of new parking stall striping with no changes to striping. n/a maher ord. # 155-13 | $309,620 |
| Nov 3, 2014 | Completed final sign-off Feb 2016 | 444 Stockton St | remove existing coating on deck, repair cracks. prep concrete dec (shot blast). apply new traffic coating, restripe parking spaces. maher n/a.Details
remove existing coating on deck, repair cracks. prep concrete dec (shot blast). apply new traffic coating, restripe parking spaces. maher n/a. | $500,000 |
| Oct 20, 2014 | Never finaled issued Dec 2014, no final | 260 California St | remove (e) granite slab at the entry way & (3) concrete squares adjacent . install new waterproofing @ entryway to tie into (e) waterproofing. install new concrete @ sidewalk to match adjacent sidewalk. reinstall original granite at entry.Details
remove (e) granite slab at the entry way & (3) concrete squares adjacent . install new waterproofing @ entryway to tie into (e) waterproofing. install new concrete @ sidewalk to match adjacent sidewalk. reinstall original granite at entry. | $17,700 |
| Oct 6, 2014 | Completed final sign-off Mar 2015 | 180 Sansome St | 2nd flr demo of existing concrete topping slab and existing waterproofing membrane. installation of new hot rubber waterproofing membrane. pour new concrete topping slab work at 2nd flr courtyard; maher n/aDetails
2nd flr demo of existing concrete topping slab and existing waterproofing membrane. installation of new hot rubber waterproofing membrane. pour new concrete topping slab work at 2nd flr courtyard; maher n/a | $395,000 |
| Oct 6, 2014 | Completed final sign-off Mar 2015 | 100 Bush St | work at 2nd flr courtyard: demolition of existing concrete topping slab and existing waterproofing membrane. installation of new hot rubber waterproofing membrane, pour new concrete topping slab. maher not reqDetails
work at 2nd flr courtyard: demolition of existing concrete topping slab and existing waterproofing membrane. installation of new hot rubber waterproofing membrane, pour new concrete topping slab. maher not req | $334,000 |
| May 13, 2014 | Completed final sign-off Oct 2015 | 1 Grant Av | remove broken roof access window; replace with metal door. remove north skylight glazing; replace with metal roof. r tom 5-13-14Details
remove broken roof access window; replace with metal door. remove north skylight glazing; replace with metal roof. r tom 5-13-14 | $25,000 |
| May 2, 2014 | Completed final sign-off Apr 2015 | 1 Grant Av | re-coat roof, repair skylights, repair elevator penthouse roof, repoint roof-level granite, repoint entry granite, seal concrete sidewalk cracks.Details
re-coat roof, repair skylights, repair elevator penthouse roof, repoint roof-level granite, repoint entry granite, seal concrete sidewalk cracks. | $300,000 |
| Nov 13, 2013 | Never finaled issued Jun 2014, no final | 315 Montgomery St | facade repairs including; repointing, replacement of cracked masonry and painting. masonry to be repaired/replaced "in-kind"Details
facade repairs including; repointing, replacement of cracked masonry and painting. masonry to be repaired/replaced "in-kind" | $407,000 |
| Aug 2, 2013 | Completed final sign-off Dec 2013 | 1550 Bryant St | brace interior hollow clay tile in chimneyDetails
brace interior hollow clay tile in chimney | $8,000 |
| May 18, 2012 | Never finaled issued May 2012, no final | 1 Harrison St | construct a temporary sign on the front exterior of the building for 30 days, per attached plans. all wall penatrations will be repaired once sign comes down.Details
construct a temporary sign on the front exterior of the building for 30 days, per attached plans. all wall penatrations will be repaired once sign comes down. | $5,000 |
| Oct 3, 2011 | Completed final sign-off Jan 2012 | 2790 Mission St | replace sash b glass in large center window same openingDetails
replace sash b glass in large center window same opening | $7,000 |
| Jul 21, 2010 | Completed final sign-off Dec 2010 | 703 Market St | to provide restorative and repair work to exterior, mortar and brick to original condition at the 13 th floorDetails
to provide restorative and repair work to exterior, mortar and brick to original condition at the 13 th floor | $10,000 |
| Jul 14, 2010 | Completed final sign-off Dec 2010 | 703 Market St | to comply with nov#201055889. for exploratory work and to asses (e) stone mortar condition attached to brick backing on the 13th. flr. area of work approx. 15'x5'. no exterior change.Details
to comply with nov#201055889. for exploratory work and to asses (e) stone mortar condition attached to brick backing on the 13th. flr. area of work approx. 15'x5'. no exterior change. | $10,000 |
| Mar 19, 2010 | Expired or cancelled cancelled Jan 2026 | 1910 Union St | install truss support as per sheet s1.0 & s2.0Details
install truss support as per sheet s1.0 & s2.0 | $11,260 |
| Jan 20, 2010 | Completed final sign-off Apr 2010 | 840 Ellis St | structural repairs to second floor slab 840 ellis st. expoxy inject moderate horizontal craks in ribs & slabs. spalling concrete chip-off loose concrete & patch. provide carbon fiber wrap repair. severe joist shear craking. provide carbon fiber wrap repair of entire length of joist & beam.Details
structural repairs to second floor slab 840 ellis st. expoxy inject moderate horizontal craks in ribs & slabs. spalling concrete chip-off loose concrete & patch. provide carbon fiber wrap repair. severe joist shear craking. provide carbon fiber wrap repair of entire length of joist & beam. | $46,000 |
| Mar 31, 2009 | Completed final sign-off May 2009 | 1333 Gough St | repair balustrades with brackets in kind. replace wheel for glass door & repair ceiling leaks in garage area. comply with his# 200991940. life safety under seperate permits.Details
repair balustrades with brackets in kind. replace wheel for glass door & repair ceiling leaks in garage area. comply with his# 200991940. life safety under seperate permits. | $4,600 |
| Feb 27, 2009 | Completed final sign-off Mar 2009 | 1 Market St | to obtain final inspection for work approved under pa 200806204979. all work has been completed.Details
to obtain final inspection for work approved under pa 200806204979. all work has been completed. | |
| Sep 11, 2008 | Completed final sign-off Mar 2009 | 1 Market St | install 3'x3'x2" thick concrete pavers on adjustable pedestals. the work area are 21000 sq. ft. all work will be done on the 7th floor in revision to permit # 200708079047 and 200806204979.Details
install 3'x3'x2" thick concrete pavers on adjustable pedestals. the work area are 21000 sq. ft. all work will be done on the 7th floor in revision to permit # 200708079047 and 200806204979. | $200,000 |
| Jul 18, 2008 | Completed final sign-off Sep 2008 | 555 North Point St | install cfrp (carbon fiber reinforcing polymer) to underside of garage concrete ceiling. replace fixtures in garage. work performed in anticipation of later floor leveling work noy part of this application.insulate fumes to area of wk ventilate area per req of manufacture of epoxy.Details
install cfrp (carbon fiber reinforcing polymer) to underside of garage concrete ceiling. replace fixtures in garage. work performed in anticipation of later floor leveling work noy part of this application.insulate fumes to area of wk ventilate area per req of manufacture of epoxy. | $154,000 |
| Jun 20, 2008 | Completed final sign-off Mar 2009 | 1 Market St | to correct address from 400 spear (3768-90) to 1 market st (blk 3713 lot 007) on application 200708079047Details
to correct address from 400 spear (3768-90) to 1 market st (blk 3713 lot 007) on application 200708079047 | |
| Jan 22, 2008 | Never finaled issued Sep 2008, no final | 225 Bush St | maintenance & repair to exterior brick and terra cotta walls and lay tile roofs. replacement of exterior sealant joints and broken tiles at each 20th floor balcony deck.Details
maintenance & repair to exterior brick and terra cotta walls and lay tile roofs. replacement of exterior sealant joints and broken tiles at each 20th floor balcony deck. | $5,000,000 |
| Aug 7, 2007 | Expired or cancelled cancelled Mar 2009 | 400 Spear St | waterproof 7th floor deck. remove topping and install 2 sheets of laurenco waterproofing. watertest and reinstall. 1 market plaza buildingDetails
waterproof 7th floor deck. remove topping and install 2 sheets of laurenco waterproofing. watertest and reinstall. 1 market plaza building | $255,000 |
| Jun 28, 2007 | Completed final sign-off Aug 2007 | 801 Fillmore St | install torque ties to (e) brick veneer 16" oc on front facadeDetails
install torque ties to (e) brick veneer 16" oc on front facade | $54,000 |
| May 15, 2007 | Completed final sign-off Apr 2008 | 2912 Pacific Av | remove and replace tile motorbed and plywood. stucco will be cut 12" around deck, install new t and g plywood, install pacific polymer. deck coating and new tile. the size of deck is about 800 sq ftDetails
remove and replace tile motorbed and plywood. stucco will be cut 12" around deck, install new t and g plywood, install pacific polymer. deck coating and new tile. the size of deck is about 800 sq ft | $93,859 |
| Feb 14, 2007 | Completed final sign-off Mar 2007 | 100 Post St | reroofing.Details
reroofing. | $45,000 |
| Jul 11, 2005 | Completed final sign-off Feb 2006 | 145 Gardenside Dr | renew appl#200309296004,200311039194 for final inspectionDetails
renew appl#200309296004,200311039194 for final inspection | |
| Jun 6, 2005 | Completed final sign-off Aug 2005 | 55 Child St | remove old tile, apply waterproofing membrane to deck, water tested paint walls & install new tile.Details
remove old tile, apply waterproofing membrane to deck, water tested paint walls & install new tile. | $5,664 |
| Apr 18, 2005 | Expired or cancelled expired May 2007 | 2205 Broderick St | waterproof front deck by removing old tile and plywood to expose joist, replace dry rot if needed.Details
waterproof front deck by removing old tile and plywood to expose joist, replace dry rot if needed. | $25,419 |
| Nov 3, 2003 | Expired or cancelled expired Feb 2006 | 145 Gardenside Dr | addition of secondary drainage systemDetails
addition of secondary drainage system | $25,000 |