Block 3768, lot 099
101 Harrison St
- City’s use
- Single Family Residential
- Built
- 1996
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 1,561 sq ft
- Zoning
- M1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 4, 2024 | In progress filed Apr 2024, not yet issued | 400 Spear St | Pyro-Comm Systems, Inc. | voluntary panel replacement like for like of the (e) facp with new n16e fire alarm panel and will be installed in the electrical room on 1/f.(e) wiring for each convential idc zone will be terminated to new addressable monitor module trnasponder ckt boards.all (e) smoke detectors are to remain willDetails
voluntary panel replacement like for like of the (e) facp with new n16e fire alarm panel and will be installed in the electrical room on 1/f.(e) wiring for each convential idc zone will be terminated to new addressable monitor module trnasponder ckt boards.all (e) smoke detectors are to remain will | $68,934 |
| Jun 13, 2017 | Completed final sign-off Oct 2017 | 400 Spear St | Bc United Construction Inc | unit 103: renew bldg pa# 201207306004. 1. replace shower valve; new kitchen switches. 2. install new track lighting & circuit in kitchen. all work is complete. for final inspection.Details
unit 103: renew bldg pa# 201207306004. 1. replace shower valve; new kitchen switches. 2. install new track lighting & circuit in kitchen. all work is complete. for final inspection. | |
| Jun 17, 2016 | Completed final sign-off Apr 2017 | 400 Spear St | Burke Construction | 1st floor, unit #115: convert (e) closet into 1/2 bathroom and small closet. lighting to be high eff. 1/2 bath to be vented to outside. maher naDetails
1st floor, unit #115: convert (e) closet into 1/2 bathroom and small closet. lighting to be high eff. 1/2 bath to be vented to outside. maher na | $20,000 |
| Apr 20, 2016 | Completed final sign-off Apr 2017 | 400 Spear St | Burke Construction | unit 115: kitchen remodel without plans, appliances to stay in same location, add an island, new flooring, lighting to be high efficacy. compliance with maher ordinance no 155-13Details
unit 115: kitchen remodel without plans, appliances to stay in same location, add an island, new flooring, lighting to be high efficacy. compliance with maher ordinance no 155-13 | $40,000 |
| Oct 9, 2014 | Completed final sign-off Mar 2015 | 400 Spear St | Home Evolution | #118 - update cabinets & countertop, move sink, move stove (swap locations of sink & stove), add 220v circuit, add eingineered flooring over existing slab, replace kitchen back splash. n/a maher ordinanceDetails
#118 - update cabinets & countertop, move sink, move stove (swap locations of sink & stove), add 220v circuit, add eingineered flooring over existing slab, replace kitchen back splash. n/a maher ordinance | $1,000 |
| Oct 1, 2014 | Completed final sign-off Oct 2014 | 400 Spear St | rev. to pa201407020363 - reduce scope of work i.e. not to relocate water heaterDetails
rev. to pa201407020363 - reduce scope of work i.e. not to relocate water heater | ||
| Jul 2, 2014 | Completed final sign-off Oct 2014 | 400 Spear St | Citybest Construction | unit#206. relocated electrical water heater. seismic support required. replaced kitchen cabinets.Details
unit#206. relocated electrical water heater. seismic support required. replaced kitchen cabinets. | $2,700 |
| Aug 16, 2013 | Expired or cancelled cancelled Jan 2026 | 400 Spear St | #103: do all finish electrical...Details
#103: do all finish electrical... | $2,175 | |
| Mar 1, 2013 | Never finaled issued Mar 2013, no final | 400 Spear St | bathroom remodel: no structural changes, replace sower pan & install tile. plumbing/sewer will not be altered. this is for only one bathroom. existing toilet & sink to remain noly shower stall & floor tile will be remodeledDetails
bathroom remodel: no structural changes, replace sower pan & install tile. plumbing/sewer will not be altered. this is for only one bathroom. existing toilet & sink to remain noly shower stall & floor tile will be remodeled | $3,000 | |
| Aug 3, 2012 | Never finaled issued Aug 2012, no final | 400 Spear St | street space permitDetails
street space permit | ||
| Jul 30, 2012 | Expired or cancelled expired Nov 2014 | 400 Spear St | C Green Consulting Dba Anchway Property | #103: new valve in (1) bathroom, replace (1) kitchen cabinets. lighting to comply with cec 150(k)Details
#103: new valve in (1) bathroom, replace (1) kitchen cabinets. lighting to comply with cec 150(k) | $17,000 |
| Apr 7, 2010 | Completed final sign-off May 2010 | 101 Harrison St | Hills Construction Inc | live work unit 121. cut arched opening in existig wall btn kitchen and dining rm.Details
live work unit 121. cut arched opening in existig wall btn kitchen and dining rm. | $2,000 |
| Sep 16, 2008 | Never finaled issued Sep 2008, no final | 400 Spear St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Jul 7, 2008 | Never finaled issued Jul 2008, no final | 400 Spear St | street spaceDetails
street space | ||
| May 13, 2008 | Never finaled issued May 2008, no final | 400 Spear St | street space.Details
street space. | ||
| Jan 30, 2008 | Never finaled issued Jan 2008, no final | 400 Spear St | street spaceDetails
street space | ||
| Oct 24, 2007 | Never finaled issued Oct 2007, no final | 400 Spear St | street spaceDetails
street space | ||
| Sep 25, 2007 | Completed final sign-off Feb 2009 | 400 Spear St | Saarman Construction,Ltd. | remove & re-seal windows/doors,install (n) sill pans.33 doors & 90 windows.install new siding & trim at specific locations (1260 s.f. siding) hardi plank.install 7 new storefront windows, replace in kind.aluni windows, install (n) flashing misc.location.repair roof drain,1 location.Details
remove & re-seal windows/doors,install (n) sill pans.33 doors & 90 windows.install new siding & trim at specific locations (1260 s.f. siding) hardi plank.install 7 new storefront windows, replace in kind.aluni windows, install (n) flashing misc.location.repair roof drain,1 location. | $600,000 |
| Aug 7, 2007 | Expired or cancelled cancelled Mar 2009 | 400 Spear St | Rainbow Waterproofing & Restor | waterproof 7th floor deck. remove topping and install 2 sheets of laurenco waterproofing. watertest and reinstall. 1 market plaza buildingDetails
waterproof 7th floor deck. remove topping and install 2 sheets of laurenco waterproofing. watertest and reinstall. 1 market plaza building | $255,000 |
| Oct 16, 2006 | Completed final sign-off Feb 2007 | 400 Spear St | (unit 105) upgrade existing closet opening install new steel frameDetails
(unit 105) upgrade existing closet opening install new steel frame | $3,500 | |
| Jun 20, 2005 | Never finaled issued Jun 2005, no final | 101 Harrison St | streetspaceDetails
streetspace | ||
| Jun 25, 2004 | Never finaled issued Jun 2004, no final | 400 Spear St | street spaceDetails
street space | ||
| Nov 3, 2003 | Completed final sign-off Apr 2004 | 400 Spear St | Acorn Construction | #108- remove (e)built-in shower, add new jacuzzi tub & valves. add new tile surrounding tub,relocateDetails
#108- remove (e)built-in shower, add new jacuzzi tub & valves. add new tile surrounding tub,relocate | $5,100 |
| Aug 9, 2000 | Expired or cancelled expired Nov 2003 | 101 Harrison St | Brian & Smart | remodel bathroom, new shower pan and valveDetails
remodel bathroom, new shower pan and valve | $9,500 |