Block 0267, lot 004
100 Bush St
144 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 10, 2026 | In progress filed Mar 2026, not yet issued | 100 Bush St | suite 110. ti for a coffee shop (+-1646 sf) at existing coffee shop. installation new partition walls, new electrical and plumbing. (no exterior work) | $50,000 | |
| Feb 16, 2022 | Never finaled filed Feb 2022, never issued | 100 Bush St | Everon Llc | elevator mod-add (1) smoke detector at 1st fl. lobby, add 1 control relay on 15th fl. machine room for hat functon (low rise) add (3) control relays on 29th fl. machine room for primary, alternate and hat function (high rise) | $32,000 |
| Feb 11, 2021 | Never finaled issued Mar 2021, no final | 100 Bush St | Everon Llc | ref #2020-1123-9552 sffd required as-builts for the 9th floor | |
| Dec 21, 2020 | Completed final sign-off Mar 2021 | 100 Bush St | Everon Llc | 15th fllor (elevator machine room): add (3) new smoke detectors, add (1) new wall speaker/strobe. | $8,500 |
| Nov 23, 2020 | Never finaled issued Dec 2020, no final | 100 Bush St | Everon Llc | 9th floor octave ti: ten (10) new ceiling speakers five (5) new speaker/strobes | $8,000 |
| Oct 28, 2020 | Completed final sign-off Dec 2020 | 100 Bush St | Pioneer Fire Inc. | relocate (6) sprinkler heads, add (2) sprinkler heads. | $4,500 |
| Jun 12, 2020 | Never finaled issued Oct 2020, no final | 100 Bush St | Rylko Builders Inc. | 9th fl/suite 900, t.i. includes demo of non-str. partitions and building new non-str. partitions; ada upgrades; new electrical work included in this permit; mech., plumbing, life safety and sprinklers will be design build if needed and submitted separately. building is fully sprinklered. | $150,000 |
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 100 Bush St | street space | ||
| Feb 6, 2020 | Never finaled issued Feb 2020, no final | 100 Bush St | Peacock Construction | 15th fl - modification to existing elevator lobby includes selective demo and construction of non-load bearing partitions. new door and frame and finishes | $49,767 |
| Oct 15, 2019 | Completed final sign-off Oct 2020 | 100 Bush St | Peacock Construction | create openings in floors on 28 & 29th floors, for hoistway for futur elevator work | $40,500 |
| Aug 15, 2019 | Never finaled filed Aug 2019, never issued | 100 Bush St | removal of sign "chez julien". new sign "sunshine donuts" approved under case no. 2019-015220prl. | $670 | |
| Aug 12, 2019 | Never finaled issued Oct 2019, no final | 100 Bush St | suite 110: to erect a single faced non-electical wall mount sign. (sunshine donuts). maher n/a. | $100 | |
| Jun 1, 2018 | Never finaled issued Sep 2018, no final | 100 Bush St | Rainbow Waterproofing & Restor | repair terrocotta spalls with mortar and glaze. repaint window frames. | $30,000 |
| Sep 22, 2017 | Never finaled issued Jun 2018, no final | 100 Bush St | Medrano Construction Corp | replace (e) sink, replace (e) water heater with new electric water heater, install (n) sink, install egg cooker prep area; install portable hood for egg cooker, install vinyl flooring in mezzanine area. maher na | $2,500 |
| Jun 6, 2017 | Never finaled issued Jun 2017, no final | 100 Bush St | street space | ||
| Mar 31, 2016 | Completed final sign-off Apr 2016 | 100 Bush St | Pioneer Fire Inc. | relocate 5 pendents, add 3 pendents and remove 1 pendent, t.i. pa#201601066447. n/a ordinance#155-13 | $4,300 |
| Mar 9, 2016 | Completed final sign-off Mar 2016 | 100 Bush St | Red Hawk Fire & Security Ca Llc | add (7) new ceiling speaker/strobes. add (6) new speakers. ref pa 2016-0106-6447. maher na | $8,000 |
| Jan 6, 2016 | Completed final sign-off Aug 2016 | 100 Bush St | Team Commercial Construction Inc. | tenant improvement of 3338 sf office space including new floor, paint, lighting, partitions, mech, fans, plumbing rough in | $365,644 |
| Nov 18, 2015 | Expired or cancelled cancelled Jan 2026 | 100 Bush St | 22nd flr- construct new men's & womens restrooms (accessible). demising of (e) suite into (2) suites. work includes (2) extended pipe to feed new suites, (1) new urinal, 3) toilets,(4) restroom lavatories. relcoate (e) lighting & add wall sconce lighting at restroom. new exhaust & supply duct & fans | $200,000 | |
| Oct 20, 2014 | Never finaled issued Oct 2014, no final | 100 Bush St | street space permit | ||
| Oct 6, 2014 | Completed final sign-off Mar 2015 | 100 Bush St | Rainbow Waterproofing & Restor | work at 2nd flr courtyard: demolition of existing concrete topping slab and existing waterproofing membrane. installation of new hot rubber waterproofing membrane, pour new concrete topping slab. maher not req | $334,000 |
| Jun 20, 2014 | Never finaled issued Jun 2014, no final | 100 Bush St | Red Hawk Fire & Security Ca Llc | 7th flr, ste 700: as built fire alarm drawings: add 1 speaker strobe, location changes, speaker strobes shown on ceiling changed to wall, add smoke detector in server rm, orig appn. 201405196064; compliance with ord 155-13 not required | |
| May 19, 2014 | Completed final sign-off Jun 2014 | 100 Bush St | Red Hawk Fire & Security Ca Llc | suite 700: relocate 3 existing speaker strobes. add 3 new strobes, 4 duct detectors, 4 conrol relays and 4 interposing relays for new ac units. reference ti 2014.0513.5637 maher not required | $8,000 |
| May 13, 2014 | Never finaled issued May 2014, no final | 100 Bush St | Team Commercial Construction Inc. | #700 install 4 new fan coile units and hard duct in existing space open ceiling. n/a for maher compliance ordinance #155-13. | $113,000 |
| Mar 10, 2014 | Never finaled issued Mar 2014, no final | 100 Bush St | Red Hawk Fire & Security Ca Llc | fire alarm replacement-replace like for like devices as per project review meeting w/sagivweiss-ishai on 9/27/12. compliance with maher ordinance # 155-13 does not apply. as built dwg | |
| Oct 2, 2013 | Completed final sign-off Jan 2014 | 100 Bush St | Red Hawk Fire & Security Ca Llc | on 1st floor & mezzr - addition of (2) strobes, (6) speaker/strobes for tenant notification. | $4,000 |
| Dec 10, 2012 | Never finaled issued Dec 2012, no final | 100 Bush St | Red Hawk Fire & Security Ca Llc | fire alarm replacement. replacement like for like device replacement. per sffd pre-app minutes dated 9/27/12. | $45,000 |
| Aug 22, 2012 | Never finaled issued Aug 2012, no final | 100 Bush St | Pioneer Fire Inc. | 10th floor:remodel of all outlined areas consisting of 6 uprights. ref #201206273621 | $4,489 |
| Jul 19, 2012 | Never finaled issued Jul 2012, no final | 100 Bush St | Red Hawk Fire & Security Ca Llc | 10th floor fire alarm - 1 dual monitor modules, 8 control relays, 5 smoke detectors, 7 duct detectors, 1 booster power supply, 1 ccis switchy module, 4 speakers, 3 ceiling speaker/strobes, 17 wall speaker/strobes. | $24,386 |
| Jun 27, 2012 | Completed final sign-off Oct 2012 | 100 Bush St | tenant improvment at the 10th floor of 100 bush st. revision to approved pa# 201203297157. b occupancy to remain the same (no change). adding (3) new offices, (1) conference room, brake room & (2) closet to existing space. mep & life safety under separate permit. | ||
| Mar 29, 2012 | Completed final sign-off Oct 2012 | 100 Bush St | tenent improvement: add 4 new offices, 3 conference rooms & a break room to existing space. mep and life safety under separate permits. | $150,000 | |
| Jan 10, 2012 | Completed final sign-off Apr 2012 | 100 Bush St | Eagle Bay Enterprises, Inc (Dba Garnett | to erect non-electric, single faced sign. | $1,877 |
| Oct 4, 2011 | Never finaled issued Oct 2011, no final | 100 Bush St | Pioneer Fire Inc. | return sprinkler system to shell condition. relocate 66 pendent heads to upright sprinklers-elimanting ceiling | $12,000 |
| Sep 27, 2011 | Completed final sign-off Nov 2011 | 100 Bush St | Red Road Construction | suite 1625: add small sink to break room; remove partition, move door to new location (non-egress); pathch and repair ceiling after demo as needed; install carpet and paint. | $18,000 |
| Jul 6, 2011 | Completed final sign-off Jan 2012 | 120 Bush St | Simplex Grinnell | add fire sprinkler to the tenant space on 1st floor and mezz. adding 43 heads, new piping and new bracing. and refer to arch pa# 2011-0308-1669 | $7,600 |
| Mar 24, 2011 | Never finaled issued Mar 2011, no final | 100 Bush St | Diversified Fire Products | fire alarm ti at 100 bush mezz. 1 new duct detector | $3,498 |
| Mar 8, 2011 | Never finaled issued Apr 2011, no final | 120 Bush St | Hughes-Nelson Painting Inc. Dba Apex Ima | t.i. of fedex office ship center for new casework, one low wall, relocation of light fixtures, finishes & electrical/data relocation/new locations | $8,000 |
| Jan 24, 2011 | Never finaled issued Jan 2011, no final | 100 Bush St | street space & sidewalk permit | ||
| Nov 22, 2010 | Completed final sign-off Apr 2011 | 100 Bush St | Columbia Mechanical Contractors | suite 2180: add 1 chilled water fan coil unit to provide cooling to this space | $34,500 |
| Nov 8, 2010 | Completed final sign-off Apr 2011 | 100 Bush St | Diversified Fire Products | 21st floor-fire alarm t.i. 6 speakers strobes ceiling, 1 strobe wall (note to district fire inspector: field verify that any existing supply fans and fan systems are 2000 cfm or less.) | $4,328 |
| Oct 19, 2010 | Completed final sign-off Apr 2011 | 100 Bush St | Pioneer Fire Inc. | floor 21 suite 2180 - relocate 11 fire sprinklers | $2,900 |
| Sep 24, 2010 | Completed final sign-off Apr 2011 | 100 Bush St | Team Commercial Construction Inc. | office ti on the 21st fl. demo of non struc partitions, build new non struc partitions. all new or revised hvac, plbg , sprinkler and ls work will be design build under separate permit. floor is fully sprinklered | $67,000 |
| Aug 5, 2010 | Completed final sign-off Apr 2011 | 100 Bush St | Acco Engineered Systems Inc. Dba Acco En | basement level & sub-basement - replace 2 (e) boilers, 1 (e) supply fan, 1 (e) feed water tank and 1 (e) chemical feeder. | $800,000 |
| Feb 9, 2010 | Never finaled issued Feb 2010, no final | 120 Bush St | Mina-Tree Signs, Inc | reface existing sign | $1,500 |
| Jun 1, 2009 | Never finaled issued Jun 2009, no final | 100 Bush St | All Applied Construction Inc | as built plan. revision to application 200905087996. move out front conter 12". add frezer at rear counter. accutual lighting & ventilation plan. address: 100 bush street, ste. #110. | |
| May 8, 2009 | Never finaled issued May 2009, no final | 100 Bush St | All Applied Construction Inc | suite 110 - remodel existing restaurant to a yogurt and ice cream restaurant. | $40,000 |
| Feb 24, 2009 | Completed final sign-off Feb 2009 | 100 Bush St | Dpw Inc. | renew pa# 2006/01/19/2508 to obtain final inspection. all work has been completed. | |
| Feb 24, 2009 | Completed final sign-off Feb 2009 | 100 Bush St | Dpw Inc. | renew pa# 2006/01/05/1505 to obtain final inspection. all work has been completed. | |
| Aug 22, 2008 | Never finaled issued Aug 2008, no final | 100 Bush St | Ayoob & Peery Plumbing Co Inc | relocate 3 fire sprinkler heads | $700 |
| Jul 3, 2008 | Expired or cancelled expired Apr 2011 | 100 Bush St | t.i. at 9th fl, ceiling height and partial height non-structural partitions. mech, life safety, sprinklers under separate permit, building is fully sprinklered. | $89,500 | |
| Mar 2, 2007 | Completed final sign-off Nov 2007 | 100 Bush St | Team Commercial Construction Inc. | oti-2, tmg partners, 25th floor, el, sp. | $75,000 |
| Feb 20, 2007 | Completed final sign-off Nov 2007 | 100 Bush St | A S F Electric Inc | 25th floor-fire alarm device, new layout-10 smoke detectors, 17 speakers, 14 strobes, 8 door holders. | $12,000 |
| Jan 26, 2007 | Completed final sign-off Nov 2007 | 100 Bush St | oti-1, tmg partners, 25th fl, el, me, ls, sp. | $320,000 | |
| Mar 6, 2006 | Expired or cancelled expired Jun 2011 | 100 Bush St | construction of new accessible mens/women toilet rooms including: interior wall construction, doors, finishes. mech,plumbing, electrical design build under sep permit app | $40,000 | |
| Jan 19, 2006 | Expired or cancelled expired Aug 2006 | 100 Bush St | Dpw Inc. | install a new sprinkler system for the 29th floor mech room tie in to extg 6" riser | $25,000 |
| Jan 5, 2006 | Expired or cancelled expired Aug 2006 | 100 Bush St | Dpw Inc. | tie in to (e) 2'2" riser in stairs. install loop only with welded outlets for future sprinkler branch lines on 25th fl. only | $8,500 |
| Dec 8, 2005 | Expired or cancelled expired Aug 2006 | 100 Bush St | Dpw Inc. | install a new wet type sprinkler system for ste 510 tie in to extg main | $9,000 |
| Aug 12, 2005 | Completed final sign-off Oct 2005 | 100 Bush St | Central Sign Services | erect sign for non electric, wall, single faced. | |
| Aug 12, 2005 | Completed final sign-off Oct 2005 | 100 Bush St | Central Sign Services | single faced electrical wall sign (door) | |
| Mar 3, 2005 | Expired or cancelled expired Aug 2006 | 100 Bush St | new accessble tilet rooms.remdl elev lobby.mech,elec&plumb design&demo under sep permit200503020581. | $50,000 | |
| Mar 2, 2005 | Expired or cancelled expired Aug 2006 | 100 Bush St | demo only as allow per adm bulletin 17.interior work only. no increase office space. | $150,000 | |
| Feb 24, 2005 | Completed final sign-off Jun 2005 | 100 Bush St | Mei Deisign | oti-1 28/f el, ls | $40,000 |
| Dec 10, 2004 | Expired or cancelled expired Aug 2006 | 100 Bush St | interior remodel suite 1550. interior walls installation, entry door to suite instal. coabinet, ** | $60,000 | |
| Aug 20, 2004 | Completed final sign-off Sep 2004 | 100 Bush St | Columbia Mechanical Contractors | oti -2 (4th fl) sp | $10,000 |
| Aug 18, 2004 | Completed final sign-off Sep 2004 | 100 Bush St | Rossi Builders Inc. | oti-2 4th floor el, me | $42,000 |
| Aug 13, 2004 | Completed final sign-off Oct 2004 | 100 Bush St | Mei Deisign | oti-2 5th floor me only | $30,000 |
| Aug 9, 2004 | Completed final sign-off Sep 2004 | 100 Bush St | Rossi Builders Inc. | oti-4, 4th floor, me | $19,000 |
| Aug 6, 2004 | Completed final sign-off Sep 2004 | 100 Bush St | Mei Deisign | renew app #200302056707/delay due to electrical fire safety | |
| Aug 3, 2004 | Completed final sign-off Sep 2004 | 100 Bush St | A S F Electric Inc | fire alarm for suite #420 | $1,500 |
| Aug 3, 2004 | Completed final sign-off Oct 2004 | 100 Bush St | A S F Electric Inc | fire alram #518-528 100 bush street. | $1,500 |
| Aug 3, 2004 | Completed final sign-off Sep 2004 | 100 Bush St | A S F Electric Inc | fire alarm #625 and #650 100 bush street. | $2,500 |
| Aug 3, 2004 | Completed final sign-off Sep 2004 | 100 Bush St | A S F Electric Inc | fire alarm-no. 428 100 bush street. | $1,500 |
| May 24, 2004 | Completed final sign-off Sep 2004 | 100 Bush St | minor t.i.: partitions extends to the deck, 2 (door) and acoustical ceiling. lighting fixtures shown | $60,000 | |
| May 21, 2004 | Completed final sign-off Sep 2004 | 100 Bush St | oti-1 4th fl el, me, fs,ls | $97,000 | |
| Apr 23, 2004 | Expired or cancelled cancelled Sep 2005 | 100 Bush St | oti-1 3/f el ls sp | $45,000 | |
| Apr 23, 2004 | Completed final sign-off Oct 2004 | 100 Bush St | Mei Deisign | oti-1 5/f el me ls sp | $60,000 |
| Mar 29, 2004 | Completed final sign-off Aug 2004 | 100 Bush St | Team Commercial Construction Inc. | oti-2 ls, sp 15th floor | $3,500 |
| Mar 29, 2004 | Completed final sign-off Aug 2004 | 100 Bush St | Team Commercial Construction Inc. | oti-2 6th floor sp | $10,000 |
| Nov 3, 2003 | Completed final sign-off Aug 2004 | 100 Bush St | A S F Electric Inc | fire alarm devices. 21st fl. interior work only. no change exterior | $3,500 |
| Oct 10, 2003 | Completed final sign-off Aug 2004 | 100 Bush St | Dpw Inc. | install branch line and sprinkler heads for new ceiling & walls in ste 2150 only; removal of ceiling | $4,500 |
| Oct 1, 2003 | Expired or cancelled cancelled Dec 2004 | 100 Bush St | Mei Deisign | oti-2 21st floor, me | $18,000 |
| Sep 19, 2003 | Completed final sign-off Oct 2003 | 100 Bush St | Dpw Inc. | ti 15 sprinklers form new walls and ceiling for ste 501 only | $3,500 |
| Aug 27, 2003 | Expired or cancelled expired May 2004 | 100 Bush St | A S F Electric Inc | fire alarm prints | $3,000 |
| Aug 5, 2003 | Expired or cancelled expired May 2004 | 100 Bush St | exit corridor extend, 2 new 20 min rated doors, 1 hr walls and minor ceiling extension . elec,mech, | $15,000 | |
| Jul 22, 2003 | Completed final sign-off Aug 2004 | 100 Bush St | Mei Deisign | oti-1 21st flr,el,me,ls,sp | $120,000 |
| Jun 20, 2003 | Completed final sign-off Oct 2003 | 100 Bush St | oti-1 5th floor, el, me, ls, sp | $90,000 | |
| May 13, 2003 | Expired or cancelled expired Feb 2004 | 100 Bush St | A S F Electric Inc | fire alarm new devices at 6th floor. no increase of office space | $5,000 |
| May 12, 2003 | Completed final sign-off Aug 2004 | 100 Bush St | Team Commercial Construction Inc. | oti-1 (15th fl) el/ls/sp | $30,000 |
| Apr 14, 2003 | Completed final sign-off Jun 2003 | 100 Bush St | West Coast Commercial Interiors | oti-2 2nd floor sp | $5,500 |
| Apr 4, 2003 | Completed final sign-off Jun 2003 | 100 Bush St | Dynalectric Company | add new fire alarm 5 strobes, 3 speakers, 5 duct detectors-work rel. to pa#2002/10/11/8847 | $4,500 |
| Feb 14, 2003 | Never finaled issued Feb 2003, no final | 100 Bush St | sidewalk | ||
| Feb 12, 2003 | Expired or cancelled expired Feb 2004 | 100 Bush St | revision to appln #2002/09/25/7396 install 2 type 2 hoods and ducting involved 1 loover vent hvac | $12,000 | |
| Feb 5, 2003 | Expired or cancelled expired Aug 2004 | 100 Bush St | barrier removal only | $25,000 | |
| Feb 5, 2003 | Completed final sign-off Aug 2004 | 100 Bush St | Team Commercial Construction Inc. | interior remodel: interior partitions, doors, ceiling and lighting only on 6th floor | $90,000 |
| Jan 27, 2003 | Completed final sign-off Dec 2003 | 100 Bush St | barrier removal only unisex bathroom only | $25,000 | |
| Jan 22, 2003 | Completed final sign-off Jun 2003 | 100 Bush St | Columbia Mechanical Contractors | oti-2 2nd floor, me | $45,000 |
| Jan 16, 2003 | Expired or cancelled expired Mar 2004 | 110 Bush St | C E Hill Construction **See Note*** | install life safety unit in tenant improvement on g/f only engineered and constructed b diversified | $6,000 |
| Jan 3, 2003 | Expired or cancelled expired Feb 2004 | 100 Bush St | Team Commercial Construction Inc. | oti-2, lighting, sprinklers at 14th floor, el sp | $3,500 |
| Dec 11, 2002 | Completed final sign-off Feb 2003 | 100 Bush St | Cosco Fire Protection Inc. | install a pipe schedule sprinkler system in a retail sandwich space (19 sprinkler heads) | $3,800 |
| Nov 15, 2002 | Completed final sign-off Dec 2002 | 100 Bush St | A S F Electric Inc | fire alarm permit 23rd floor | $3,500 |
| Oct 11, 2002 | Completed final sign-off Jun 2003 | 100 Bush St | oti-1 2nd floor el, me, l/s, sp | $80,300 | |
| Oct 3, 2002 | Never finaled issued Oct 2002, no final | 100 Bush St | street space | ||
| Sep 25, 2002 | Expired or cancelled expired Feb 2004 | 100 Bush St | provide mechanical electical and plumbing title 24 archit upgrade archit. upgrade under | $75,000 | |
| Sep 13, 2002 | Completed final sign-off Oct 2002 | 100 Bush St | A S F Electric Inc | fire alarm plan only at 20th floor under this permit | $12,000 |
| Sep 11, 2002 | Expired or cancelled expired Feb 2004 | 100 Bush St | Dpw Inc. | fuly sprinkle 10th floor per approved plan.we will tie -in to exist sys riser. total 86 heads. | $35,000 |
| Sep 11, 2002 | Completed final sign-off Oct 2002 | 100 Bush St | Rossi Builders Inc. | oti-3 20th floor, me | $9,000 |
| Sep 4, 2002 | Completed final sign-off Oct 2002 | 100 Bush St | Rossi Builders Inc. | oti-2 20th floor, el | $20,000 |
| Aug 29, 2002 | Completed final sign-off Dec 2002 | 100 Bush St | oti-1 23rd floor l/s | $37,000 | |
| Aug 29, 2002 | Expired or cancelled expired Feb 2004 | 100 Bush St | t/i alt interior non structural to a vacant store area located on the sidewalk level of a multi- | $75,000 | |
| Aug 29, 2002 | Completed final sign-off Oct 2002 | 100 Bush St | Allan Automatic Sprinkler | (e) sprinklered office on 20th floor of building, will relocate and add heads as necessary | $5,024 |
| Aug 27, 2002 | Expired or cancelled expired Feb 2004 | 100 Bush St | Team Commercial Construction Inc. | oti- 2, 2nd floor, ls, sp | $7,500 |
| Jul 24, 2002 | Expired or cancelled expired Feb 2004 | 100 Bush St | Team Commercial Construction Inc. | oti-2 24th floor, mech, ls, spr | $22,934 |
| Jun 18, 2002 | Completed final sign-off Oct 2002 | 100 Bush St | oti-1, 20th floor, el, ls, sp | $180,000 | |
| Jun 17, 2002 | Completed final sign-off Jul 2002 | 100 Bush St | Mei Deisign | 19/fl. t.i., install speakers, horsn, strobs in various rooms tie into (e) fa system | $11,500 |
| Jun 11, 2002 | Expired or cancelled expired Feb 2004 | 100 Bush St | Team Commercial Construction Inc. | oti-1 24th floor, el, me, ls, sp | $190,770 |
| May 15, 2002 | Completed final sign-off Jul 2002 | 100 Bush St | Mei Deisign | oti-1 19th floor el, me, ls, sp | $11,000 |
| May 8, 2002 | Completed final sign-off May 2002 | 100 Bush St | A S F Electric Inc | fire alarm devices tenant improvement first floor public area | $4,500 |
| Apr 16, 2002 | Completed final sign-off May 2002 | 100 Bush St | Dpw Inc. | reroute (e) piping gn (n) handkap ramp and relocate head in new corridor on grd fl for head space. 8 | $4,000 |
| Mar 28, 2002 | Expired or cancelled expired Feb 2004 | 100 Bush St | Team Commercial Construction Inc. | oti-1 2nd fl (#201) el, me, ls, sp | $17,300 |
| Mar 15, 2002 | Expired or cancelled expired Feb 2004 | 100 Bush St | Team Commercial Construction Inc. | oti-1 (14th floor) el, l/, sp | $31,000 |
| Nov 2, 2001 | Expired or cancelled expired Feb 2004 | 100 Bush St | 1/fl-remove barrier-create ramped access/corridor to (e)toilets, remodel men's room/pkg garage/offic | $89,000 | |
| Oct 30, 2001 | Expired or cancelled expired Jul 2002 | 100 Bush St | Dpw Inc. | relocate sprinkler heads 24th floor for new ti work per approved plan | $15,000 |
| Oct 23, 2001 | Expired or cancelled expired Feb 2002 | 100 Bush St | Chen's Plumbing Inc | add one fire sprinkler hd at room 930 | $500 |
| Sep 12, 2001 | Expired or cancelled expired Jan 2002 | 100 Bush St | minor demo of carpet/new wall and door/new carpet/relocate 1 (2x4) fixture and switch | $1,800 | |
| Jul 17, 2001 | Expired or cancelled expired Jan 2002 | 100 Bush St | Dpw Inc. | relocate (e) sprinkler piping on 23 floor only for new t.i. work | $10,000 |
| Jun 13, 2001 | Expired or cancelled expired Oct 2001 | 100 Bush St | A S F Electric Inc | fire alarm drawing, speaker strobes, smoke detectors | $3,000 |
| Jun 13, 2001 | Expired or cancelled expired Oct 2001 | 100 Bush St | A S F Electric Inc | fire alarm drawing 23rd fl speaker strobes smoke detectors | $2,500 |
| May 30, 2001 | Expired or cancelled expired Dec 2001 | 100 Bush St | Mei Deisign | oti-1 10th floor, el, me, l/s, sp | $25,000 |
| May 17, 2001 | Expired or cancelled expired Jul 2002 | 100 Bush St | Mei Deisign | oti-1 24th flr, el & me | $20,417 |
| May 17, 2001 | Expired or cancelled expired Dec 2001 | 100 Bush St | Mei Deisign | oti-1 23rd flr el, me & l/s | $11,645 |
| Mar 8, 2001 | Expired or cancelled expired Jul 2001 | 100 Bush St | Dpw Inc. | relocate sprinklers heads as per plans | $4,000 |
| Feb 28, 2001 | Expired or cancelled expired Feb 2002 | 100 Bush St | Comm Air Mechanical | instal fan coils assoc ductwrk chw pipingfire smoker dampers airoutlets app #200102162427 | $64,000 |
| Feb 16, 2001 | Expired or cancelled expired Feb 2002 | 100 Bush St | minor ti w/selective demo n/parti,doors,glazing reloc ex sprk hvac,elec 13th fl mech seperate | $56,700 | |
| Feb 1, 2001 | Expired or cancelled expired Feb 2002 | 100 Bush St | new ada comply restrms work include new framing & partitions, toilet fixtures, lighting elec. finish | $80,000 | |
| Aug 22, 2000 | Expired or cancelled expired Sep 2001 | 100 Bush St | A S F Electric Inc | fire alarm devices at 13th floor | $7,500 |
| Aug 22, 2000 | Expired or cancelled expired Sep 2001 | 100 Bush St | A S F Electric Inc | fire alarm devices at 11th fl | $7,500 |
| Aug 15, 2000 | Expired or cancelled expired Dec 2000 | 100 Bush St | A S F Electric Inc | car elevator recall fire alarm system | $2,500 |
| Jul 12, 2000 | Expired or cancelled expired Jul 2001 | 100 Bush St | Dpw Inc. | installation of new sprinkler system on floors 11 and 13 | $36,800 |
| May 18, 2000 | Expired or cancelled expired May 2001 | 100 Bush St | Mei Deisign | demo tenant space. new walls,doors,framing,fixtures,ceiling,mechanical,electrical,plumbing,life safe | $120,000 |
| Mar 9, 2000 | Expired or cancelled expired Jul 2000 | 100 Bush St | revision to pa 9925660 | $4,000 | |
| Feb 22, 2000 | Completed final sign-off Oct 2000 | 120 Bush St | oti-1, ground floor finishes sanitary upgrade | $8,222 | |
| Feb 4, 2000 | Expired or cancelled expired Jun 2000 | 100 Bush St | oti-4 l/s 2nd floor | $3,000 | |
| Feb 4, 2000 | Expired or cancelled expired Jun 2000 | 100 Bush St | A S F Electric Inc | oti-4 l/s only 7th floor | $3,000 |
| Feb 1, 2000 | Expired or cancelled expired Jun 2000 | 100 Bush St | tenant improvement of existing fire sprinklers |