Velba Villanueva
- Listed as
- architect, authorized agent-others
- Firm
- Mcginnis Chen Assoc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to Nov 2022
11 permits since 2000 (architect on 9 permits, authorized agent-others on 2 permits): 6 completed, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2022 | Completed final sign-off May 2023 | 932 Minnesota St | Saarman Construction,Ltd. | remove and replace (e) siding w/hardie plank at south elevation. remove and reinstall two windows at south elevation. water proof light wellDetails
remove and replace (e) siding w/hardie plank at south elevation. remove and reinstall two windows at south elevation. water proof light well | $100,000 |
| Mar 7, 2022 | Expired or cancelled withdrawn Apr 2022 | 1019 Mission St | modify (e) interior partitions at 1/f (n) office spaces.Details
modify (e) interior partitions at 1/f (n) office spaces. | $20,000 | |
| Nov 16, 2020 | Completed final sign-off Nov 2021 | 110 Sutter St | Giampolini & Co Dba Giampolini/Courtney | facade repair and maintenance at sutter street and trinity street include sandstone crack & spall repair, refurbishement of (e) windows and (e) guardrails. maher n/aDetails
facade repair and maintenance at sutter street and trinity street include sandstone crack & spall repair, refurbishement of (e) windows and (e) guardrails. maher n/a | $600,000 |
| Jun 1, 2018 | Never finaled issued Sep 2018, no final | 100 Bush St | Rainbow Waterproofing & Restor | repair terrocotta spalls with mortar and glaze. repaint window frames.Details
repair terrocotta spalls with mortar and glaze. repaint window frames. | $30,000 |
| May 11, 2015 | Expired or cancelled cancelled Jan 2026 | 169 Steuart St | remove and reinstall extg bay windows at 2nd floor pool. repair structural steel at bay windows. all work on steuart street side of bldg and is to be performed from interior. n/a for maher.Details
remove and reinstall extg bay windows at 2nd floor pool. repair structural steel at bay windows. all work on steuart street side of bldg and is to be performed from interior. n/a for maher. | $30,000 | |
| Dec 8, 2010 | Never finaled issued Jan 2011, no final | 130 Sutter St | Everest Waterproofing & Restoration Inc. | to comply with nov #201063153. emergency structural repaire to second floor balcony + fire escapes.Details
to comply with nov #201063153. emergency structural repaire to second floor balcony + fire escapes. | $150,000 |
| May 14, 2010 | Completed final sign-off Apr 2012 | 2310 Hyde St | W E Lyons Construction Co | removal of (e) siding in-kind to match (e) apperance, color and material. perform spot re-pointing and masonry repairs as neccessary @ all sides.Details
removal of (e) siding in-kind to match (e) apperance, color and material. perform spot re-pointing and masonry repairs as neccessary @ all sides. | $350,000 |
| Mar 27, 2009 | Completed final sign-off Oct 2009 | 101 Lombard St | Saarman Construction,Ltd. | private roof landing remediation: demo (e) concrete roof landing, patch roofing membrane, install treads metal edge to adjust stair riser heights, apply new traffic coating at stairs, to comply with nov# 200994035, revision to pa# 2008-0402-8644Details
private roof landing remediation: demo (e) concrete roof landing, patch roofing membrane, install treads metal edge to adjust stair riser heights, apply new traffic coating at stairs, to comply with nov# 200994035, revision to pa# 2008-0402-8644 | $9,554 |
| Mar 6, 2009 | Completed final sign-off May 2009 | 175 Bluxome St | Draeger Construction Inc. | second floor unit 201 window leak investigation remove 50 sq. ft. hardi panel gyp and building paper reflash window replace hardi panel in kind paint to match existingDetails
second floor unit 201 window leak investigation remove 50 sq. ft. hardi panel gyp and building paper reflash window replace hardi panel in kind paint to match existing | $25,000 |
| Sep 5, 2008 | Expired or cancelled expired Oct 2012 | 217 Francisco St | improvements to existing guardrail on roof deck, new guardrail with base, top rail and infill will be installed, new steel supports. glass rail 3' 6" hight at front of bldg. on roof.Details
improvements to existing guardrail on roof deck, new guardrail with base, top rail and infill will be installed, new steel supports. glass rail 3' 6" hight at front of bldg. on roof. | $30,000 | |
| Jul 20, 2005 | Completed final sign-off Dec 2005 | 50 03rd St | remodel of exterior plaze area. new plaza level landscaping replace (e) plaze and new concrete.Details
remodel of exterior plaze area. new plaza level landscaping replace (e) plaze and new concrete. | $50,000 |