Block 0288, lot 027
140 Sutter St
- City’s use
- Commercial Retail
- Built
- 1917
- Stories
- 7
- Units
- 3
- Rooms
- 15 bathrooms
- Building
- 108,432 sq ft
- Lot
- 16,169 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
79 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 130 Sutter St | 3/f: install (5) privacy pods. reverse swing of door at men's toilet room to improve accessibility. any mep or life safety work permitted separately.Details
3/f: install (5) privacy pods. reverse swing of door at men's toilet room to improve accessibility. any mep or life safety work permitted separately. | $25,000 | |
| Jun 10, 2026 | Completed final sign-off Jul 2026 | 130 Sutter St | Novo Construction Inc | to obtain final inspection for work approved under pa# 202503273183. all work is complete.Details
to obtain final inspection for work approved under pa# 202503273183. all work is complete. | |
| Mar 27, 2025 | Expired or cancelled expired Jul 2026 | 130 Sutter St | Novo Construction Inc | installation of secure door hardware at 2 locationsDetails
installation of secure door hardware at 2 locations | $5,000 |
| Nov 25, 2024 | In progress filed Nov 2024, not yet issued | 130 Sutter St | remove sign and change hardware from latchset to lockset on door into 7th floor tennat space from elevator lobby. new door hardware to include panic bar exit device.Details
remove sign and change hardware from latchset to lockset on door into 7th floor tennat space from elevator lobby. new door hardware to include panic bar exit device. | $500 | |
| Jul 30, 2024 | Completed final sign-off Sep 2024 | 130 Sutter St | revision to 202312082171 reduction in demolition scope. some walls to remain. tenant space remain vacant per ab-017Details
revision to 202312082171 reduction in demolition scope. some walls to remain. tenant space remain vacant per ab-017 | ||
| May 31, 2024 | Completed final sign-off Feb 2025 | 130 Sutter St | United California Glass And Door | g/f: furnish and install dual ada operators for main entry pair changing the swing of the rh door making both the lh and rh doors egress outward.Details
g/f: furnish and install dual ada operators for main entry pair changing the swing of the rh door making both the lh and rh doors egress outward. | $23,060 |
| Mar 8, 2024 | Expired or cancelled withdrawn May 2024 | 130 Sutter St | main lobby: minor remodel. new entry doors, lighting and finishes. electrical and any title 24 under separate permit.Details
main lobby: minor remodel. new entry doors, lighting and finishes. electrical and any title 24 under separate permit. | $20,000 | |
| Dec 8, 2023 | Completed final sign-off Sep 2024 | 130 Sutter St | selective interior demolition at 6th floor tenant spaceDetails
selective interior demolition at 6th floor tenant space | $15,000 | |
| Jul 12, 2023 | Completed final sign-off Aug 2024 | 140 Sutter St | Arrow Sign Company | erect non-electric double faced projecting sign.Details
erect non-electric double faced projecting sign. | $5,000 |
| Jul 12, 2023 | Completed final sign-off Aug 2024 | 140 Sutter St | Arrow Sign Company | erect 1 set of electric illuminated lettersDetails
erect 1 set of electric illuminated letters | $6,500 |
| Jun 8, 2023 | Completed final sign-off Oct 2024 | 140 Sutter St | H C I Systems Inc | f/a system, add (2)relays, (1)av shutdown, (1)rtu supply shutdown, relocate (1)relay for fsd shutdown to storage room @ bps loc, update slc addresses, add (1)dd to rtu supply on roof, remove rts switches for fc units. ref bpa#202302081589Details
f/a system, add (2)relays, (1)av shutdown, (1)rtu supply shutdown, relocate (1)relay for fsd shutdown to storage room @ bps loc, update slc addresses, add (1)dd to rtu supply on roof, remove rts switches for fc units. ref bpa#202302081589 | |
| May 12, 2023 | Completed final sign-off Jul 2024 | 140 Sutter St | H C I Systems Inc | fire alarm addition of 2 new pull stations as built: 202302081589Details
fire alarm addition of 2 new pull stations as built: 202302081589 | $27,100 |
| May 5, 2023 | Completed final sign-off Sep 2024 | 140 Sutter St | Bcci Construction Company | 1/f: revision to bpa#202103226995 & 202203099554, changes to cafe/catering kitchen, includes extension of cafe counter, removal of accoustic panel & changes to kitchen equipmentDetails
1/f: revision to bpa#202103226995 & 202203099554, changes to cafe/catering kitchen, includes extension of cafe counter, removal of accoustic panel & changes to kitchen equipment | $50,000 |
| Feb 8, 2023 | Completed final sign-off Jul 2024 | 140 Sutter St | H C I Systems Inc | installation of a new bps 10 amp inside the storage room at the ground floor. all new notification devices to be tied into a new bps. installation of new (3) control relay modules, (7) duct detectors to shutdown hvac units. this building will tie into an (e) edwards est3 located @ 130 sutterDetails
installation of a new bps 10 amp inside the storage room at the ground floor. all new notification devices to be tied into a new bps. installation of new (3) control relay modules, (7) duct detectors to shutdown hvac units. this building will tie into an (e) edwards est3 located @ 130 sutter | $27,100 |
| Mar 9, 2022 | Completed final sign-off Aug 2024 | 140 Sutter St | Bcci Construction Company | revision bpa#202103226995 - 1/f: reivision to ductwork, floor construction, elevations & minor workDetails
revision bpa#202103226995 - 1/f: reivision to ductwork, floor construction, elevations & minor work | |
| Mar 22, 2021 | Completed final sign-off Sep 2024 | 140 Sutter St | Bcci Construction Company | 1st fl: scope to include gallery display, lecture hall, meeting rooms and cafe/retail on ground level. office work space in upper level. change in occupancy from m to a-3.Details
1st fl: scope to include gallery display, lecture hall, meeting rooms and cafe/retail on ground level. office work space in upper level. change in occupancy from m to a-3. | $1,400,000 |
| Aug 26, 2020 | Completed final sign-off Feb 2021 | 140 Sutter St | Bcci Construction Company | 1st fl: demo only of partitions, casework and decorative ceilings at ground floor and mezzanine level within existing building envelope. existing storefront & exterior to remain. tenant improvement to be deferred per ab-017.Details
1st fl: demo only of partitions, casework and decorative ceilings at ground floor and mezzanine level within existing building envelope. existing storefront & exterior to remain. tenant improvement to be deferred per ab-017. | $16,000 |
| Feb 4, 2020 | Completed final sign-off Mar 2021 | 130 Sutter St | J M E Construction Services Inc | revision to app#201911016184 to clarify fire rating of 2 hour wallDetails
revision to app#201911016184 to clarify fire rating of 2 hour wall | |
| Nov 20, 2019 | Completed final sign-off Jan 2020 | 130 Sutter St | M C S Construction Services | 4/f: added title 24 electrical compliance drawings to building permit 201910215012Details
4/f: added title 24 electrical compliance drawings to building permit 201910215012 | $20,000 |
| Nov 1, 2019 | Completed final sign-off Mar 2021 | 130 Sutter St | J M E Construction Services Inc | construction of new elevator machikne room in basement for (e) frieght elevator. mep/title 24 energy calcs, fire sprinklers and life saety under seperate permit. maher n/a.Details
construction of new elevator machikne room in basement for (e) frieght elevator. mep/title 24 energy calcs, fire sprinklers and life saety under seperate permit. maher n/a. | $15,000 |
| Oct 21, 2019 | Completed final sign-off Jan 2020 | 130 Sutter St | M C S Construction Services | demo. toilet room fixtures and accessories installation of (n) non-structural partitions, doors and glazing, reinstall toilet room fixtures and accesssories, new carpet, paint and base, patch (e) finishes, no change in occupancy or use, mep life safety, and sprinklers under separate permitDetails
demo. toilet room fixtures and accessories installation of (n) non-structural partitions, doors and glazing, reinstall toilet room fixtures and accesssories, new carpet, paint and base, patch (e) finishes, no change in occupancy or use, mep life safety, and sprinklers under separate permit | $75,000 |
| Apr 16, 2019 | Never finaled issued Apr 2019, no final | 130 Sutter St | street space/mta metersDetails
street space/mta meters | ||
| Sep 15, 2017 | Completed final sign-off Dec 2017 | 130 Sutter St | H C I Systems Inc | basement: replacement of extg fire alarm control panel to new edwards est3. reutilize extg location, wires, and conduits.Details
basement: replacement of extg fire alarm control panel to new edwards est3. reutilize extg location, wires, and conduits. | $19,500 |
| Jul 31, 2015 | Completed final sign-off Jan 2016 | 130 Sutter St | Peacock Construction | 4th floor:for documentation of installation of smoke guard doors at elevator doors for work done under app#201505065513.Details
4th floor:for documentation of installation of smoke guard doors at elevator doors for work done under app#201505065513. | |
| Jul 23, 2015 | Completed final sign-off Aug 2015 | 130 Sutter St | H C I Systems Inc | on 4th floor - fire alarm ti: add 20 horn strobes, 9 strobes, 1 bps to existing fire alarm system in 4th fl ti space. 2 e smoke dete replace with new spDetails
on 4th floor - fire alarm ti: add 20 horn strobes, 9 strobes, 1 bps to existing fire alarm system in 4th fl ti space. 2 e smoke dete replace with new sp | $12,100 |
| May 6, 2015 | Completed final sign-off Jan 2016 | 130 Sutter St | Peacock Construction | 4th floor: new non structural partitions, doors, casework, restrooms, lighting and accostic ceilings includes mechanical, electrical & plumbing. life safety under seperate permit.Details
4th floor: new non structural partitions, doors, casework, restrooms, lighting and accostic ceilings includes mechanical, electrical & plumbing. life safety under seperate permit. | $938,000 |
| Apr 24, 2015 | Completed final sign-off Sep 2015 | 130 Sutter St | Peacock Construction | 4th floor: demo partitions, ceiling, lighting, millwork and finishes. ab-017. t.i. under permit.Details
4th floor: demo partitions, ceiling, lighting, millwork and finishes. ab-017. t.i. under permit. | $23,000 |
| Apr 21, 2015 | Expired or cancelled withdrawn May 2015 | 140 Sutter St | Tri-North Builders Inc | r&r wall - build 10'x4' wall unitDetails
r&r wall - build 10'x4' wall unit | $5,000 |
| Mar 6, 2014 | Completed final sign-off May 2014 | 130 Sutter St | Marina Mechanical Services | revision to appl #2013.11.12.1655- reclassify hvac duct, as pass through of a rated wall delete smoke fire damper, move location of relief damper.Details
revision to appl #2013.11.12.1655- reclassify hvac duct, as pass through of a rated wall delete smoke fire damper, move location of relief damper. | |
| Feb 27, 2014 | Completed final sign-off Jul 2014 | 130 Sutter St | H C I Systems Inc | 7th floor: add new fire alarm devices to an extg fa system in a new t.i. space. this includes 18 horn strobes, 9 strobes, 2 door holders, 1 bps, 2 smokes, 8 duct detectors. ref app#201311121655Details
7th floor: add new fire alarm devices to an extg fa system in a new t.i. space. this includes 18 horn strobes, 9 strobes, 2 door holders, 1 bps, 2 smokes, 8 duct detectors. ref app#201311121655 | $11,200 |
| Dec 23, 2013 | Completed final sign-off Jan 2014 | 140 Sutter St | build 3 non-structural chases to conceal plumbing. new linoluem and paint walls. create barber shop in extg retail space.Details
build 3 non-structural chases to conceal plumbing. new linoluem and paint walls. create barber shop in extg retail space. | $4,000 | |
| Nov 12, 2013 | Completed final sign-off Jul 2014 | 130 Sutter St | 7th floor full floor tenant improvement to include new non-structural partitions, restrooms, millwork, electrical & hvac. fsd included. no elevator lobby locks under this permit.sprinkler & life safety are under separate permit.Details
7th floor full floor tenant improvement to include new non-structural partitions, restrooms, millwork, electrical & hvac. fsd included. no elevator lobby locks under this permit.sprinkler & life safety are under separate permit. | $770,000 | |
| Sep 13, 2013 | Completed final sign-off Feb 2014 | 130 Sutter St | Tear-N-It-Up Demolition Ince | demolition only of existing non structural tenant improvements. t.i. under separate permit.Details
demolition only of existing non structural tenant improvements. t.i. under separate permit. | $15,000 |
| Dec 5, 2012 | Completed final sign-off Jun 2013 | 130 Sutter St | Cannon Constructors North Inc | remediation of some (e) windows at south facade (sutter street facade). windows are visible from street. remediation consists of repair or replacement in king of (e) steel window frames and sashes.Details
remediation of some (e) windows at south facade (sutter street facade). windows are visible from street. remediation consists of repair or replacement in king of (e) steel window frames and sashes. | $400,000 |
| Oct 2, 2012 | Never finaled issued Dec 2012, no final | 130 Sutter St | 6th floor-revisions to orig pa# 2008-0813-9025 (expired & renewed under pa# 2010-0129-5581) comprising inclusion of permit set handwritten notes, showing orig door swing, door hardware revision, addition of wall & ceiling details & test info. minor restroom revisions, latest renew pa# 2011-0708-9743Details
6th floor-revisions to orig pa# 2008-0813-9025 (expired & renewed under pa# 2010-0129-5581) comprising inclusion of permit set handwritten notes, showing orig door swing, door hardware revision, addition of wall & ceiling details & test info. minor restroom revisions, latest renew pa# 2011-0708-9743 | ||
| Jul 27, 2012 | Completed final sign-off Aug 2012 | 130 Sutter St | G C Electric | relocated 3 fire alarm strobes. tie in 2 duct detectors, 1 smoke detector to extg fire alarm.Details
relocated 3 fire alarm strobes. tie in 2 duct detectors, 1 smoke detector to extg fire alarm. | $3,000 |
| Apr 24, 2012 | Completed final sign-off Apr 2013 | 130 Sutter St | O'connor Plumbing & Fire Protection | remove & install new fire pump in basement, existing fire pump out dated.Details
remove & install new fire pump in basement, existing fire pump out dated. | $19,500 |
| Mar 6, 2012 | Completed final sign-off Aug 2012 | 130 Sutter St | Peacock Construction Inc | 2nd floor-demo (e) non struct walls, new walls, new suspended ceiling in some areas, new finishes. remove & reconfigure (e) interior storefront. electrical, fire alarm & plumbing under seperate permits. 2nd floor office tiDetails
2nd floor-demo (e) non struct walls, new walls, new suspended ceiling in some areas, new finishes. remove & reconfigure (e) interior storefront. electrical, fire alarm & plumbing under seperate permits. 2nd floor office ti | $420,000 |
| Feb 9, 2012 | Never finaled issued Feb 2012, no final | 130 Sutter St | streetspaceDetails
streetspace | ||
| Nov 4, 2011 | Never finaled issued Mar 2012, no final | 130 Sutter St | Cannon Constructors North Inc | comply with nov# 201063153-removal of (e) exterior balconies & sheetmetal at south facade for structural repairs. remediate (e) windows & improve exterior waterproofing. re-install balconies, sheetmetal & windows after repairs.Details
comply with nov# 201063153-removal of (e) exterior balconies & sheetmetal at south facade for structural repairs. remediate (e) windows & improve exterior waterproofing. re-install balconies, sheetmetal & windows after repairs. | $250,000 |
| Jul 8, 2011 | Completed final sign-off Jan 2013 | 130 Sutter St | to obtain final inspection for work approved under pa# 200808139025. all work is complete.Details
to obtain final inspection for work approved under pa# 200808139025. all work is complete. | ||
| Dec 8, 2010 | Never finaled issued Jan 2011, no final | 130 Sutter St | Everest Waterproofing & Restoration Inc. | to comply with nov #201063153. emergency structural repaire to second floor balcony + fire escapes.Details
to comply with nov #201063153. emergency structural repaire to second floor balcony + fire escapes. | $150,000 |
| Apr 20, 2010 | Never finaled issued Jul 2010, no final | 130 Sutter St | Everest Waterproofing & Restoration Inc. | remove sections of ornametal frieze panels on 2nd floor balcony (as shown on drawings), panels have become a falling hazard. label crate & store removed panels, investigate tie-ins. engineer & conservation to determine repair profileDetails
remove sections of ornametal frieze panels on 2nd floor balcony (as shown on drawings), panels have become a falling hazard. label crate & store removed panels, investigate tie-ins. engineer & conservation to determine repair profile | $20,000 |
| Apr 5, 2010 | Never finaled issued Apr 2010, no final | 130 Sutter St | street spaceDetails
street space | ||
| Jan 29, 2010 | Never finaled issued Jan 2010, no final | 130 Sutter St | Siena Pacific, Inc. | to obtain final inspection work completed final inspection required 200808139025. all work is complete.Details
to obtain final inspection work completed final inspection required 200808139025. all work is complete. | |
| Jul 14, 2009 | Never finaled issued Jul 2009, no final | 130 Sutter St | sidewalk permitDetails
sidewalk permit | ||
| Mar 11, 2009 | Completed final sign-off May 2009 | 130 Sutter St | G C Electric | relocate two strobes for new conference rooms on the 2nd floorDetails
relocate two strobes for new conference rooms on the 2nd floor | $800 |
| Jan 14, 2009 | Never finaled issued Jan 2009, no final | 130 Sutter St | street space only.Details
street space only. | ||
| Oct 17, 2008 | Never finaled issued Oct 2008, no final | 130 Sutter St | Emerald Plbg & Fire Protection | to finalize work approved under appl#9206998Details
to finalize work approved under appl#9206998 | |
| Aug 13, 2008 | Never finaled issued Aug 2008, no final | 130 Sutter St | Siena Pacific, Inc. | t.i. at 6th fl: renovation including alteration of walls, new walls, hvac replacement, new finishes and lighting. interior only.Details
t.i. at 6th fl: renovation including alteration of walls, new walls, hvac replacement, new finishes and lighting. interior only. | $250,000 |
| Jun 30, 2008 | Completed final sign-off Jul 2008 | 130 Sutter St | Bcci Construction Company | renew pa# 2007/10/11/5173 for final inspection only. (pa# 2007/10/11/5173 was a renewal of pa# 2006/05/26/2589 & pa# 2006/05/23/2250).Details
renew pa# 2007/10/11/5173 for final inspection only. (pa# 2007/10/11/5173 was a renewal of pa# 2006/05/26/2589 & pa# 2006/05/23/2250). | |
| Apr 17, 2008 | Completed final sign-off Apr 2009 | 130 Sutter St | 2nd floor-minor remodel to (e) office space (tenant improvement). enclose 2 conference rooms only. one (e) conference space and one newDetails
2nd floor-minor remodel to (e) office space (tenant improvement). enclose 2 conference rooms only. one (e) conference space and one new | $90,000 | |
| Mar 27, 2008 | Never finaled issued Mar 2008, no final | 130 Sutter St | street space permit only.Details
street space permit only. | ||
| Mar 12, 2008 | Expired or cancelled cancelled Jan 2026 | 130 Sutter St | remove metal section for investigation of rusting conditions 0n 2nd floor balcony exteriorDetails
remove metal section for investigation of rusting conditions 0n 2nd floor balcony exterior | ||
| Feb 19, 2008 | Never finaled issued Feb 2008, no final | 130 Sutter St | street space onlyDetails
street space only | ||
| Feb 14, 2008 | Never finaled issued Feb 2008, no final | 130 Sutter St | Siena Pacific, Inc. | remove carpet and exploratory demolition of t-bar ceiling for existing vacant office space. accessability to comply with future future permits. "salter & associates".Details
remove carpet and exploratory demolition of t-bar ceiling for existing vacant office space. accessability to comply with future future permits. "salter & associates". | $5,000 |
| Nov 8, 2007 | Never finaled issued Nov 2007, no final | 130 Sutter St | street space only.Details
street space only. | ||
| Oct 11, 2007 | Expired or cancelled expired Jul 2008 | 130 Sutter St | Bcci Construction Company | renew app #200607106109/200605262589/200605232250 for final inspection and sign offDetails
renew app #200607106109/200605262589/200605232250 for final inspection and sign off | |
| Jul 3, 2007 | Never finaled issued Jul 2007, no final | 130 Sutter St | street spaceDetails
street space | ||
| Jun 26, 2007 | Completed final sign-off Oct 2010 | 130 Sutter St | G C Electric | provide andio/visual alarms for tenant space, q fire alarm booter panel, a smoke detector, firehorns strobes, fire storbesDetails
provide andio/visual alarms for tenant space, q fire alarm booter panel, a smoke detector, firehorns strobes, fire storbes | $3,500 |
| May 14, 2007 | Completed final sign-off Oct 2010 | 130 Sutter St | Fisher Development Inc | holmes culley eng., suite 400: oti-1 4th floor el, meDetails
holmes culley eng., suite 400: oti-1 4th floor el, me | $215,000 |
| Aug 10, 2006 | Expired or cancelled expired May 2008 | 130 Sutter St | G C Electric | replace (e) f/a devices as built plans, replace 2 gentenx 8100 smoke detector, install new sys. sensor photo det. replace 4 fire horns/strobes, 2 fire strobes, 1 synch. moduleDetails
replace (e) f/a devices as built plans, replace 2 gentenx 8100 smoke detector, install new sys. sensor photo det. replace 4 fire horns/strobes, 2 fire strobes, 1 synch. module | $2,000 |
| Jul 10, 2006 | Expired or cancelled expired Jul 2008 | 130 Sutter St | Bcci Construction Company | revision to oti-1 appl# 200605232250-new panic hardware, new one hour rated partition. existing gwb partition to remain.Details
revision to oti-1 appl# 200605232250-new panic hardware, new one hour rated partition. existing gwb partition to remain. | $500 |
| May 26, 2006 | Expired or cancelled expired Jul 2008 | 130 Sutter St | Bcci Construction Company | oti-2 6th floor, me.Details
oti-2 6th floor, me. | $40,000 |
| May 23, 2006 | Expired or cancelled expired Jul 2008 | 130 Sutter St | Bcci Construction Company | oti-1 6/floor el, me, ls, spDetails
oti-1 6/floor el, me, ls, sp | $303,000 |
| Apr 6, 2006 | Completed final sign-off Aug 2006 | 130 Sutter St | Ams Of Sacramento Inc | install new colling only, wall-mounted, split ac system in existing & un-occupanied server room with necessary refrig. & condensate piping.Details
install new colling only, wall-mounted, split ac system in existing & un-occupanied server room with necessary refrig. & condensate piping. | $7,000 |
| Apr 6, 2006 | Completed final sign-off Apr 2007 | 130 Sutter St | Bcci Construction Company | pre-construction, non structural, interior demolition done under provisions of sfab-017- area to remain unoccupied as requestDetails
pre-construction, non structural, interior demolition done under provisions of sfab-017- area to remain unoccupied as request | $9,000 |
| Feb 23, 2005 | Completed final sign-off Apr 2005 | 130 Sutter St | demo only permit for removal or some non bering walls and finishes,carpet per ab-17Details
demo only permit for removal or some non bering walls and finishes,carpet per ab-17 | $5,000 | |
| Feb 16, 2005 | Completed final sign-off Apr 2005 | 130 Sutter St | remodel of (e) office space, demo of some non-bearing partitions & carpet installation of some new nDetails
remodel of (e) office space, demo of some non-bearing partitions & carpet installation of some new n | $52,800 | |
| Mar 12, 2004 | Never finaled issued Mar 2004, no final | 130 Sutter St | Cosco Fire Protection Inc. | fire alarm modification -install fire alarm devices. on 3rd flDetails
fire alarm modification -install fire alarm devices. on 3rd fl | $2,500 |
| Jan 27, 2004 | Expired or cancelled expired May 2008 | 130 Sutter St | 3/f- suspended drywall ceilingDetails
3/f- suspended drywall ceiling | $80,000 | |
| Dec 16, 2003 | Completed final sign-off Feb 2004 | 130 Sutter St | interior demolition. no structural work. 3rd fl. t.i to be submitted seperatie. no increase in officDetails
interior demolition. no structural work. 3rd fl. t.i to be submitted seperatie. no increase in offic | $15,000 | |
| Jun 28, 2002 | Expired or cancelled expired Oct 2002 | 130 Sutter St | street space permitDetails
street space permit | ||
| Sep 28, 2001 | Expired or cancelled expired Jan 2002 | 130 Sutter St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| May 23, 2001 | Completed final sign-off Jan 2002 | 130 Sutter St | Hathaway Dinwiddie Co. | oti-4 2nd flr l/s onlyDetails
oti-4 2nd flr l/s only | $6,200 |
| Apr 20, 2001 | Completed final sign-off Jan 2002 | 130 Sutter St | Hathaway Dinwiddie Co. | oti-3 2nd floor mech onlyDetails
oti-3 2nd floor mech only | $4,000 |
| Apr 13, 2001 | Completed final sign-off Jan 2002 | 130 Sutter St | Hathaway Dinwiddie Co. | oti-2, 2nd floor, ltg onlyDetails
oti-2, 2nd floor, ltg only | $150,000 |
| Mar 23, 2001 | Completed final sign-off Jan 2002 | 130 Sutter St | Hathaway Dinwiddie Co. | oti-1, 2nd floor, ltg, mech, ls,Details
oti-1, 2nd floor, ltg, mech, ls, | $220,000 |
| Feb 21, 2001 | Completed final sign-off Jan 2002 | 130 Sutter St | Hathaway Dinwiddie Co. | soft interior dmo partitions carpet glass 2nd floor tenant imprv/accessibility sep permitDetails
soft interior dmo partitions carpet glass 2nd floor tenant imprv/accessibility sep permit | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (10), H C I Systems Inc (6), Hathaway Dinwiddie Co. (5), G C Electric (4), Peacock Construction (3), Siena Pacific, Inc. (3), Arrow Sign Company (2), Cannon Constructors North Inc (2), Everest Waterproofing & Restoration Inc. (2), J M E Construction Services Inc (2), M C S Construction Services (2), Novo Construction Inc (2), Ams Of Sacramento Inc, Cosco Fire Protection Inc., Emerald Plbg & Fire Protection, Fisher Development Inc, Marina Mechanical Services, O'connor Plumbing & Fire Protection, Peacock Construction Inc, Tear-N-It-Up Demolition Ince, Tri-North Builders Inc, United California Glass And Door
- Architects
- Michael Zucker (7), Shane Curnyn (4), John Grossmann (2), Justin Martinkovic (2), Annie Lo, George D. Boskin, George Soskin, James Stefanski, Michael Mcgonagle, Omied Arvin, Quezada Architects Quezada Architects, Rudy Marcham, Velba Villanueva, Yi-Tso Jeff Chen
- Engineers
- Zack Kardon (3), Robert Pittman (2), Calvin Lee, David Murphy, Greg Thomas, Habtom Nugusse Tewelde, Mansour Firouzian, Rey Solidum, Thomas Schindler, Zhen Chao Xiong
- Authorized agent-otherss
- Nick Vetzmadian
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.