Omied Arvin
- Listed as
- architect
- Firm
- Fennie & Mehl Architects
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to Sep 2026
52 permits since 2000 (architect on 52 permits): 32 completed, 13 in progress, 6 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Oct 2026 | 140 New Montgomery St | West Coast Build Aka Fairway Constructio | office t.i new non structural partitons, doors, ceilings, lighting fixtures, finishesDetails
office t.i new non structural partitons, doors, ceilings, lighting fixtures, finishes | $800,000 |
| Sep 4, 2026 | In progress issued Sep 2026 | 600 Montgomery St | Truebeck Construction | demolition of some (e) doors, construction of new full-height partitions, doors, millwork, finishes, associated electrical power/lightning distribution, associated system distribution, associated plumbing, associated life-safety system changes.Details
demolition of some (e) doors, construction of new full-height partitions, doors, millwork, finishes, associated electrical power/lightning distribution, associated system distribution, associated plumbing, associated life-safety system changes. | $1,500,000 |
| Aug 21, 2026 | In progress issued Aug 2026 | 100 California St | Gci, Inc | 10th floor: interior tenant improvement to construct new partitions, doors glazing and finishes. mep deferred.Details
10th floor: interior tenant improvement to construct new partitions, doors glazing and finishes. mep deferred. | $56,800 |
| Jul 20, 2026 | In progress issued Aug 2026 | 350 Rhode Island St | B N Builders Inc | 3/fl- construction of (n) full height non load bearing paritions, doors, glazing millwork, finishes, plumbing, associated electrical power lighting distruction associated mep and fixtures.Details
3/fl- construction of (n) full height non load bearing paritions, doors, glazing millwork, finishes, plumbing, associated electrical power lighting distruction associated mep and fixtures. | $6,000,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 350 Rhode Island St | B N Builders Inc | demo of selective e) full height partitions (non-load bearing), associated electrical power/lighting distribution, associated plumbing fixtures per ab-017Details
demo of selective e) full height partitions (non-load bearing), associated electrical power/lighting distribution, associated plumbing fixtures per ab-017 | $167,000 |
| Jun 23, 2026 | In progress issued Jun 2026 | 345 California St | Source Planning And Construction Inc | mep deferred. partial 24th floor office ti. demo of some interior non bearing walls, ceiling, lighting, electrical. construction of new full height partitions, doors, glazing, millwork, and finishes.Details
mep deferred. partial 24th floor office ti. demo of some interior non bearing walls, ceiling, lighting, electrical. construction of new full height partitions, doors, glazing, millwork, and finishes. | $342,850 |
| Jun 5, 2026 | Completed final sign-off Aug 2026 | 100 California St | West Coast Build Aka Fairway Constructio | 7/fl- interior install demising wall in (e) tenant space, non rated wallDetails
7/fl- interior install demising wall in (e) tenant space, non rated wall | $50,000 |
| Apr 22, 2026 | In progress issued May 2026 | 345 California St | Skyline Construction | administrative permit to document aasembly loads reference bpa: 202509024365Details
administrative permit to document aasembly loads reference bpa: 202509024365 | |
| Apr 21, 2026 | In progress issued May 2026 | 425 Market St | Gci, Inc | demo of non-load bearing partions, doors, glazing, lighting & finishes & new constructionDetails
demo of non-load bearing partions, doors, glazing, lighting & finishes & new construction | $150,000 |
| Apr 3, 2026 | In progress issued Apr 2026 | 140 New Montgomery St | West Coast Build Aka Fairway Constructio | 5/f: new phone booths added to (e) space.Details
5/f: new phone booths added to (e) space. | $10,000 |
| Apr 1, 2026 | In progress issued May 2026 | 345 California St | Skyline Construction | 4th fl - ti @ existing fitness center to include demo & construction to create fitness studio. new washer/dryer @ storage 0413. mep under separate permitDetails
4th fl - ti @ existing fitness center to include demo & construction to create fitness studio. new washer/dryer @ storage 0413. mep under separate permit | $175,000 |
| Jan 29, 2026 | In progress issued Mar 2026 | 345 California St | Skyline Construction | t.i. on 5th flr to include construction of full height partitions, doors, glazing millwork and finishes. mechanical and electrical under sep permit.Details
t.i. on 5th flr to include construction of full height partitions, doors, glazing millwork and finishes. mechanical and electrical under sep permit. | $350,000 |
| Dec 31, 2025 | Completed final sign-off Jul 2026 | 100 California St | Gci, Inc | 10th fl suite 110: demo of (e) ceiling height partitions. construction of full height partitions, doors, glazing & finishes.Details
10th fl suite 110: demo of (e) ceiling height partitions. construction of full height partitions, doors, glazing & finishes. | $200,000 |
| Sep 2, 2025 | In progress issued Nov 2025 | 345 California St | Skyline Construction | floor 5: common amenity suite for use by building tenants, includes two conference rooms, pantry, storage, lounge with break area and golf simulator. upgrades to existing mens/womens restroom, new womens restroom, wellness room, two vacant tenant suites & rated corridor.Details
floor 5: common amenity suite for use by building tenants, includes two conference rooms, pantry, storage, lounge with break area and golf simulator. upgrades to existing mens/womens restroom, new womens restroom, wellness room, two vacant tenant suites & rated corridor. | $3,500,000 |
| Sep 2, 2025 | In progress issued Dec 2025 | 345 California St | Skyline Construction | floor 5, new exterior pedestral deck over (e) roof structure. extension of interior corridor to new exteriorDetails
floor 5, new exterior pedestral deck over (e) roof structure. extension of interior corridor to new exterior | $2,450,000 |
| Jul 11, 2025 | Completed final sign-off Jul 2026 | 100 California St | 10th fl: demo of some (e) ceiling height partitions. construction of (n) full ht partitions, doors, glazing & finishes. associated electrical power/lighting distribution. mep deferred. associated life safety system charges.Details
10th fl: demo of some (e) ceiling height partitions. construction of (n) full ht partitions, doors, glazing & finishes. associated electrical power/lighting distribution. mep deferred. associated life safety system charges. | $900,000 | |
| Mar 27, 2025 | Expired or cancelled expired Jul 2026 | 130 Sutter St | Novo Construction Inc | installation of secure door hardware at 2 locationsDetails
installation of secure door hardware at 2 locations | $5,000 |
| Mar 26, 2025 | Completed final sign-off Aug 2025 | 2 Embarcadero Center | Hathaway Dinwiddie Co. | 19/flr- demo of non load bearing partitions, finishes, ceilings construction of (n) full height partitions, doors, glazing, assoocated electrical power lighting, associates mechanical system distribution and finishes.Details
19/flr- demo of non load bearing partitions, finishes, ceilings construction of (n) full height partitions, doors, glazing, assoocated electrical power lighting, associates mechanical system distribution and finishes. | $400,000 |
| Oct 21, 2024 | Completed final sign-off Oct 2025 | 425 Market St | Hathaway Dinwiddie Co. | floor 2: new non load bearing partitons, ceiling systems, finishes, casework, asoociated elec power/lighting distribution associated with plumbing fixtures. add a-3 occupancy existing pa: 200705010104Details
floor 2: new non load bearing partitons, ceiling systems, finishes, casework, asoociated elec power/lighting distribution associated with plumbing fixtures. add a-3 occupancy existing pa: 200705010104 | $5,925,500 |
| Sep 17, 2024 | Completed final sign-off Mar 2025 | 2 Embarcadero Center | Hathaway Dinwiddie Co. | 19th/f: demo of non-load bearing partitions, finishes & ceiling. construction of new full height partitions, interior finishes, associated electrical power/lighting distribution. mech & plumbingDetails
19th/f: demo of non-load bearing partitions, finishes & ceiling. construction of new full height partitions, interior finishes, associated electrical power/lighting distribution. mech & plumbing | $600,000 |
| May 23, 2024 | Completed final sign-off Dec 2024 | 425 Market St | Hathaway Dinwiddie Co. | demo only: full floor- 2nd floor: including interior paritions, ceilings, finishes, and mep. tenet space remains vacant under ab-017Details
demo only: full floor- 2nd floor: including interior paritions, ceilings, finishes, and mep. tenet space remains vacant under ab-017 | $450,000 |
| Feb 2, 2024 | Completed final sign-off Jul 2024 | 2415 03rd St | Dajani Construction | 2/f: demolition of some ceiling partitions, new partition walls, tenant improvements. ti to establish office use per permitnumber 2018-0615-1968Details
2/f: demolition of some ceiling partitions, new partition walls, tenant improvements. ti to establish office use per permitnumber 2018-0615-1968 | $175,000 |
| Dec 27, 2023 | Completed final sign-off Jul 2024 | 140 New Montgomery St | Principal Builders Inc. | 2/f: t.i. demo of (e) and construction of (n) non structural partitions, doors, glazing, finishes, millwork, mechanical and electrical.Details
2/f: t.i. demo of (e) and construction of (n) non structural partitions, doors, glazing, finishes, millwork, mechanical and electrical. | $1,200,000 |
| Dec 12, 2023 | Completed final sign-off May 2024 | 140 New Montgomery St | Principal Builders Inc. | 4/f: t.i. demo (e) and construct new non structural partitions, doors, mep, finishes. elevator lobby upgrade and accessibility upgrade under pa# 202112104161.Details
4/f: t.i. demo (e) and construct new non structural partitions, doors, mep, finishes. elevator lobby upgrade and accessibility upgrade under pa# 202112104161. | $400,000 |
| Nov 9, 2023 | Completed final sign-off Mar 2026 | 140 New Montgomery St | West Coast Build Aka Fairway Constructio | 5/f: new non-structural partitions, ceilings, light fixtures, finishes. mep and life safety deferred.Details
5/f: new non-structural partitions, ceilings, light fixtures, finishes. mep and life safety deferred. | $968,016 |
| Jun 13, 2023 | Completed final sign-off Sep 2023 | 2101 Mission St | A M Rocca Inc. | unit 200: change of n demising wall separating ste 200 & 201. change in use from design prof (5964 sf) to type b tutoring/mentoring personal service (8714 sf). construct new full hght partitions, partial hght partitions, door frams, glazing, accordian style door. reconfigure interior layout.Details
unit 200: change of n demising wall separating ste 200 & 201. change in use from design prof (5964 sf) to type b tutoring/mentoring personal service (8714 sf). construct new full hght partitions, partial hght partitions, door frams, glazing, accordian style door. reconfigure interior layout. | $551,000 |
| Mar 24, 2023 | Never finaled issued Aug 2023, no final | 140 New Montgomery St | Bcci Construction Company | 6/f: demolitions of some (e) ceiling height partitions, lighting fixutures & finishes per ab-017.Details
6/f: demolitions of some (e) ceiling height partitions, lighting fixutures & finishes per ab-017. | $49,167 |
| Mar 24, 2023 | Never finaled issued Aug 2023, no final | 140 New Montgomery St | Bcci Construction Company | demo of some (e) ceiling height partitions, lighting fixtures, and finishes 7th fl.Details
demo of some (e) ceiling height partitions, lighting fixtures, and finishes 7th fl. | $49,167 |
| Mar 23, 2023 | Completed final sign-off Jun 2023 | 140 New Montgomery St | Bcci Construction Company | architectural interior demo unoccupied 5th fl per sfdbi ab-017 only. sprinkler permit under pa 202304276558Details
architectural interior demo unoccupied 5th fl per sfdbi ab-017 only. sprinkler permit under pa 202304276558 | $49,167 |
| May 9, 2022 | Completed final sign-off Apr 2023 | 250 Montgomery St | Novo Construction Inc | 15/f: demolition of (e) ceiling height partitions, construction of (n) full height partitions, associated disabled access path of travel upgrades. work on the 15th floorDetails
15/f: demolition of (e) ceiling height partitions, construction of (n) full height partitions, associated disabled access path of travel upgrades. work on the 15th floor | $1,940,000 |
| Mar 22, 2022 | Completed final sign-off Dec 2022 | 300 Brannan St | Modern Construction Inc | infill pit at the corner of the ground floor commercial space. g/f retail of use remained, ti works under separate permit.Details
infill pit at the corner of the ground floor commercial space. g/f retail of use remained, ti works under separate permit. | $40,000 |
| Mar 8, 2022 | Completed final sign-off Jun 2022 | 300 Brannan St | Modern Construction Inc | ground floor: barrier removal, restroom upgrade. demo of (e) partitions, construction of (n) partitions, plumbing fixtures, associated mechanical and electrical.Details
ground floor: barrier removal, restroom upgrade. demo of (e) partitions, construction of (n) partitions, plumbing fixtures, associated mechanical and electrical. | $70,000 |
| Mar 11, 2021 | Never finaled issued Jan 2022, no final | 148 Townsend St | techanical infeasibility or unreasonable hardship per ordinance 51-16. techanical infeasibility of a barrier removal upon surveying the entrance of 178 townsend for the accessible business entrance program.Details
techanical infeasibility or unreasonable hardship per ordinance 51-16. techanical infeasibility of a barrier removal upon surveying the entrance of 178 townsend for the accessible business entrance program. | ||
| Oct 30, 2020 | Never finaled issued Aug 2021, no final | 2101 Mission St | A M Rocca Inc. | revision to bpa# 202002245209. base building improvements by property owner, including finishes, lighting & deferred electrical & plumbing. no longer ab-017; t.i. for spaces to be occupied.Details
revision to bpa# 202002245209. base building improvements by property owner, including finishes, lighting & deferred electrical & plumbing. no longer ab-017; t.i. for spaces to be occupied. | $125,000 |
| Dec 20, 2019 | Completed final sign-off Jul 2020 | 342 09th St | Principal Builders Inc. | floor 2: barrier removal. demolition of some existing ceiling height partitions and plumbing fixtures. construction of full height partitions, doors, frames, restroom upgrades, finishes, associated mech, plumbing, and lighting. mep deferredDetails
floor 2: barrier removal. demolition of some existing ceiling height partitions and plumbing fixtures. construction of full height partitions, doors, frames, restroom upgrades, finishes, associated mech, plumbing, and lighting. mep deferred | $125,000 |
| Oct 2, 2019 | Completed final sign-off Dec 2019 | 909 Montgomery St | Principal Builders Inc. | 2nd fl - partial ti to demo ceiling height partitions, construct full height partitions, millwork, glazing, doors, ceiling and finishes. mep, life safety & fire sprinklers under separate permitDetails
2nd fl - partial ti to demo ceiling height partitions, construct full height partitions, millwork, glazing, doors, ceiling and finishes. mep, life safety & fire sprinklers under separate permit | $300,000 |
| Jul 26, 2019 | Completed final sign-off Nov 2019 | 415 Jackson St | Dome Construction Corp | 2/f: minor demo project consists of new flooring, paint, mionr partitions & minor ele/plm distribution. new millwork (e) ceiling & lighting to remain. fire/life safety deferredDetails
2/f: minor demo project consists of new flooring, paint, mionr partitions & minor ele/plm distribution. new millwork (e) ceiling & lighting to remain. fire/life safety deferred | $500,000 |
| Jul 17, 2019 | Completed final sign-off Jan 2020 | 501 02nd St | R.M.R. Construction Company | demo of some existing ceiling-height partitions, millwork, finishes, cieling elements, assoc. lighting, electrical and plumbing. maher na ref 201707035041Details
demo of some existing ceiling-height partitions, millwork, finishes, cieling elements, assoc. lighting, electrical and plumbing. maher na ref 201707035041 | $100,000 |
| May 9, 2019 | Completed final sign-off Feb 2020 | 2741 16th St | Centric Construction Inc | revision to pa 2018-1018-3533, split production 110 into two equal size rooms. add new secure door at stair @ ground floor with panic hardware for free egress at all timesDetails
revision to pa 2018-1018-3533, split production 110 into two equal size rooms. add new secure door at stair @ ground floor with panic hardware for free egress at all times | |
| Apr 4, 2019 | Completed final sign-off Jan 2020 | 300 Brannan St | Peacock Construction | construction of non rated partitions, asciated electrical, plumbing, life safety and finish upgrades.Details
construction of non rated partitions, asciated electrical, plumbing, life safety and finish upgrades. | $46,000 |
| Mar 28, 2019 | Never finaled issued Apr 2019, no final | 300 Brannan St | Peacock Construction | interior demo: only demo of (e) non-rated partitions, associated elec, associated mech. demo and finishes. no ceiling demo or life safety demo to occur prior to approval of fire sprinkler and fire alarm permits.Details
interior demo: only demo of (e) non-rated partitions, associated elec, associated mech. demo and finishes. no ceiling demo or life safety demo to occur prior to approval of fire sprinkler and fire alarm permits. | |
| Jan 17, 2019 | Completed final sign-off Feb 2020 | 2741 16th St | Centric Construction Inc | construction of new roof deck & guardrail revision to pa 2018-1018-3533Details
construction of new roof deck & guardrail revision to pa 2018-1018-3533 | |
| Oct 18, 2018 | Completed final sign-off Feb 2020 | 2741 16th St | Centric Construction Inc | building and core interior alterations. **maher n/a**Details
building and core interior alterations. **maher n/a** | $2,250,000 |
| Sep 25, 2018 | Completed final sign-off Feb 2020 | 2741 16th St | Centric Construction Inc | soft demo only on 1st and 2nd floor. roof and mezzanine remain vacancy under ab-017Details
soft demo only on 1st and 2nd floor. roof and mezzanine remain vacancy under ab-017 | $50,000 |
| Dec 21, 2017 | Completed final sign-off Aug 2018 | 50 Hawthorne St | Principal Builders Inc. | 2nd fl ti. partial demo of partitions. (n) partitions. mep. (n) finishes. fire safety under seperate permit.Details
2nd fl ti. partial demo of partitions. (n) partitions. mep. (n) finishes. fire safety under seperate permit. | $1,200,000 |
| Dec 21, 2017 | Completed final sign-off Aug 2018 | 50 Hawthorne St | Principal Builders Inc. | 3rd fl ti. partial demo of partitions. (n) partitions. mep. (n) finishes. fire safety under seperate permit.Details
3rd fl ti. partial demo of partitions. (n) partitions. mep. (n) finishes. fire safety under seperate permit. | $1,200,000 |
| Dec 21, 2017 | Never finaled issued Feb 2018, no final | 50 Hawthorne St | Principal Builders Inc. | 1st fl ti. partial demo of (e) partitions. (n) partitions. mep. (n) finishes, (n) louver on 1st floor level (kaplan) to provide ventilation for (n) showers. fire safety under seperate permit.Details
1st fl ti. partial demo of (e) partitions. (n) partitions. mep. (n) finishes, (n) louver on 1st floor level (kaplan) to provide ventilation for (n) showers. fire safety under seperate permit. | $1,200,000 |
| Nov 20, 2017 | Completed final sign-off Aug 2018 | 50 Hawthorne St | Principal Builders Inc. | 1,2,3 floors:interior demo of partitions, doors, glazing, millwork and finishes. space to remain vacant per ab-017 and ada will be addresses on future ti permit. no exterior work.Details
1,2,3 floors:interior demo of partitions, doors, glazing, millwork and finishes. space to remain vacant per ab-017 and ada will be addresses on future ti permit. no exterior work. | $315,000 |
| Aug 18, 2016 | Completed final sign-off Feb 2017 | 303 02nd St | Novo Construction Inc | 8th floor: ti- demo of non load bearing partitions, new non load bearing partitions, finishes. mep/fire/life safety under sep permit maher naDetails
8th floor: ti- demo of non load bearing partitions, new non load bearing partitions, finishes. mep/fire/life safety under sep permit maher na | $20,000 |
| Nov 23, 2015 | Completed final sign-off Jun 2016 | 560 03rd St | Nelson Jameson Construction Inc | barrier removal of demo partitions & finishes, new accessible toilet rooms, new compliant millwork, new stairs & handrails, new walkway connecting two areas of 2nd floor. deferred mep. new finishesDetails
barrier removal of demo partitions & finishes, new accessible toilet rooms, new compliant millwork, new stairs & handrails, new walkway connecting two areas of 2nd floor. deferred mep. new finishes | $44,000 |
| Sep 10, 2013 | Completed final sign-off May 2015 | 275 Battery St | Hathaway Dinwiddie Co. | 24th floor-t.i consists of new partitions, electrified workstations. new ceiling, wall & floor finishes. new idf closet & electrical work. electrical, mechanical & fire alarm/srpinklers under seperate permitDetails
24th floor-t.i consists of new partitions, electrified workstations. new ceiling, wall & floor finishes. new idf closet & electrical work. electrical, mechanical & fire alarm/srpinklers under seperate permit | $383,390 |
| Apr 26, 2013 | Completed final sign-off Aug 2013 | 555 Mission St | Marketone Builders Inc | office tenant improvements on multiple single tenant floors, 6 th flr, add door & casework, 7th flr, door relocation,10/11th flrs, addtional elec outlets, 12th flr add acoustical wall/move elec, 25th flr, convert copy room to 3 officesDetails
office tenant improvements on multiple single tenant floors, 6 th flr, add door & casework, 7th flr, door relocation,10/11th flrs, addtional elec outlets, 12th flr add acoustical wall/move elec, 25th flr, convert copy room to 3 offices | $127,500 |