58 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 1, 2013 | Completed final sign-off Mar 2014 | 555 Mission St | Marketone Builders Inc | office tenant improvement on 14th fl. mechanical relocations for 201309066193Details
office tenant improvement on 14th fl. mechanical relocations for 201309066193 | $25,000 |
| Apr 26, 2013 | Completed final sign-off Aug 2013 | 555 Mission St | Marketone Builders Inc | office tenant improvements on multiple single tenant floors, 6 th flr, add door & casework, 7th flr, door relocation,10/11th flrs, addtional elec outlets, 12th flr add acoustical wall/move elec, 25th flr, convert copy room to 3 officesDetails
office tenant improvements on multiple single tenant floors, 6 th flr, add door & casework, 7th flr, door relocation,10/11th flrs, addtional elec outlets, 12th flr add acoustical wall/move elec, 25th flr, convert copy room to 3 offices | $127,500 |
| Sep 25, 2012 | Completed final sign-off Nov 2012 | 555 Mission St | Marketone Builders Inc | interior tenant improvement: replace elevator lobby hardwareDetails
interior tenant improvement: replace elevator lobby hardware | $2,000 |
| Sep 25, 2012 | Completed final sign-off Nov 2012 | 555 Mission St | Marketone Builders Inc | interior tenant improvement: replace elevator lobby hardwareDetails
interior tenant improvement: replace elevator lobby hardware | $2,000 |
| Sep 11, 2012 | Completed final sign-off Nov 2012 | 555 Mission St | Marketone Builders Inc | 10th floor-replace elevator lobby door hardwareDetails
10th floor-replace elevator lobby door hardware | $2,000 |
| May 2, 2012 | Never finaled issued Aug 2012, no final | 555 Mission St | tenant improvement. new construction includes new 1 hour rated partitions, interior ptns, doors, glazing, millwork, plumbing, ceiling, finishes, electrical and 524 calculations included in this submittal. upgrades to restroom facility. life safety deferred submittal.Details
tenant improvement. new construction includes new 1 hour rated partitions, interior ptns, doors, glazing, millwork, plumbing, ceiling, finishes, electrical and 524 calculations included in this submittal. upgrades to restroom facility. life safety deferred submittal. | $25,500 | |
| Sep 6, 2011 | Completed final sign-off Dec 2011 | 555 Mission St | Metropolitan Electrical Construction | basement (b1)- the installation of the head end room, consisting of (2) rbs cabinets, (4) rru units, 75 kva transformer/dist panel, 1 dc power unit, telco racks, (2) mech units & some room finishes (painting/flooring).Details
basement (b1)- the installation of the head end room, consisting of (2) rbs cabinets, (4) rru units, 75 kva transformer/dist panel, 1 dc power unit, telco racks, (2) mech units & some room finishes (painting/flooring). | $98,000 |
| Aug 2, 2011 | Expired or cancelled expired Mar 2015 | 555 Mission St | Bcci Construction Company | 3rd floor-t.i includes only partial floor of work, new partitionDetails
3rd floor-t.i includes only partial floor of work, new partition | $25,000 |
| Jun 22, 2011 | Completed final sign-off Sep 2011 | 555 Mission St | Pacific Auxiliary Fire Alarm | add 4 smoke detectors, 47 speaker strobes, 9 speakers, 2 addressable modules, 3 relay as prt of tenant improvement on the 5th flDetails
add 4 smoke detectors, 47 speaker strobes, 9 speakers, 2 addressable modules, 3 relay as prt of tenant improvement on the 5th fl | $36,000 |
| Jun 21, 2011 | Completed final sign-off Aug 2011 | 555 Mission St | Ayoob & Peery Plumbing Co Inc | 25th floor-add & relocate fire sprinkler heads per t.i.-add 41 & relocate 107Details
25th floor-add & relocate fire sprinkler heads per t.i.-add 41 & relocate 107 | $70,000 |
| Jun 9, 2011 | Completed final sign-off Aug 2011 | 555 Mission St | Westates Mechanical Corporation Inc | install new 32 pendents and 8 sidewall fire sprinkler headsDetails
install new 32 pendents and 8 sidewall fire sprinkler heads | $22,000 |
| May 17, 2011 | Completed final sign-off Feb 2012 | 555 Mission St | Turner Construction Co | 25th floor - t.i. new construction includes new one-hour rated partitions, interior partitions, doors, glazing, millwork, ceiling & finishes. plumbing, mechanical, electrical & fire, title 24 calculations includes in this submitted. life safety engry submitted under separate permit.Details
25th floor - t.i. new construction includes new one-hour rated partitions, interior partitions, doors, glazing, millwork, ceiling & finishes. plumbing, mechanical, electrical & fire, title 24 calculations includes in this submitted. life safety engry submitted under separate permit. | $1,600,000 |
| Apr 29, 2011 | Completed final sign-off Feb 2012 | 555 Mission St | Turner Construction Co | (5th floor) t.i. new 1 hr rated partitions, interior partitions, doors, glazing, millwork, mep included, title 24 included. life safety under serparate permit.Details
(5th floor) t.i. new 1 hr rated partitions, interior partitions, doors, glazing, millwork, mep included, title 24 included. life safety under serparate permit. | $900,000 |
| Mar 17, 2011 | Completed final sign-off May 2011 | 555 Mission St | Dpr Construction | install interior cat walk to access (e) mechanicalduct work at ground mezzanine.Details
install interior cat walk to access (e) mechanicalduct work at ground mezzanine. | $21,000 |
| Mar 17, 2011 | Completed final sign-off Aug 2011 | 555 Mission St | Howard S. Wright Constructors Lp | new 3245 sq ft ground floor t.i. of (e) leased space for a branch bank. work includes new exterior & interior atm's, no9n structural partitions, ceilings, soffits, finishes, furniture, related hvac, electrical & plumbing workDetails
new 3245 sq ft ground floor t.i. of (e) leased space for a branch bank. work includes new exterior & interior atm's, no9n structural partitions, ceilings, soffits, finishes, furniture, related hvac, electrical & plumbing work | $353,705 |
| Mar 8, 2011 | Completed final sign-off Jul 2011 | 555 Mission St | Intelligent Technologies & Services Inc | 4th floor server room install pre-action detection.Details
4th floor server room install pre-action detection. | $5,800 |
| Jan 24, 2011 | Completed final sign-off Nov 2011 | 555 Mission St | Skyline Construction | demo of open office work station area and ceiling. addition of converence room, converting file room into break room mep included. fire sp and life safety under sep permitDetails
demo of open office work station area and ceiling. addition of converence room, converting file room into break room mep included. fire sp and life safety under sep permit | $80,000 |
| Jan 5, 2011 | Completed final sign-off Sep 2011 | 555 Mission St | Turner Construction Co | 4th fl: ti new construction includes new one hour rated partitions, interior partitions, doors, glaszing, millwork, plumbing, ceiling and finishes. mech and electrical. life safety sep permitDetails
4th fl: ti new construction includes new one hour rated partitions, interior partitions, doors, glaszing, millwork, plumbing, ceiling and finishes. mech and electrical. life safety sep permit | $1,580,000 |
| Jan 5, 2011 | Completed final sign-off Feb 2012 | 555 Mission St | Turner Construction Co | 6th fl ti: new construction , new 1 hr rated paritions, interior partitions, door, etc. plumbing, mechanical, electrical, title 24 calcs life safety sep permitDetails
6th fl ti: new construction , new 1 hr rated paritions, interior partitions, door, etc. plumbing, mechanical, electrical, title 24 calcs life safety sep permit | $1,900,000 |
| Jan 5, 2011 | Completed final sign-off Sep 2011 | 555 Mission St | Turner Construction Co | 10th fl: ti new construction includes new 1 hr rated construction partitions, doors, glazing, millwork, plumb, ceiling, and finishes. mech and elec. life safety sep permitDetails
10th fl: ti new construction includes new 1 hr rated construction partitions, doors, glazing, millwork, plumb, ceiling, and finishes. mech and elec. life safety sep permit | $1,580,000 |
| Dec 3, 2010 | Completed final sign-off Sep 2011 | 555 Mission St | Turner Construction Co | 07thh fl: ti new construction, new 1 hr rated partitions, interior partitions, doors, etc. plumbing,mech, elec, title 24 lf sep permitDetails
07thh fl: ti new construction, new 1 hr rated partitions, interior partitions, doors, etc. plumbing,mech, elec, title 24 lf sep permit | $1,580,000 |
| Dec 3, 2010 | Completed final sign-off Sep 2011 | 555 Mission St | Turner Construction Co | 14th fl: ti new construction new 1 hr rated partitions, interior partitions, doors etc. plumbing,mech, elec, title 24 calcs (life safety under sep permit)Details
14th fl: ti new construction new 1 hr rated partitions, interior partitions, doors etc. plumbing,mech, elec, title 24 calcs (life safety under sep permit) | $1,580,000 |
| Dec 3, 2010 | Completed final sign-off Sep 2011 | 555 Mission St | Turner Construction Co | 11th fl: ti new construction, new 1 hr rated partitions, interior partitions, doors, etc. plumbing,mech, elec, title 24 lf sep permitDetails
11th fl: ti new construction, new 1 hr rated partitions, interior partitions, doors, etc. plumbing,mech, elec, title 24 lf sep permit | $1,580,000 |
| Dec 3, 2010 | Completed final sign-off Sep 2011 | 555 Mission St | Turner Construction Co | 15th fl. ti new construction, new 1 hr rated partitions, interior partitions, doors etc. plumbing, mech, elec,title 24. (life safety under sep permit)Details
15th fl. ti new construction, new 1 hr rated partitions, interior partitions, doors etc. plumbing, mech, elec,title 24. (life safety under sep permit) | $1,580,000 |
| Dec 3, 2010 | Completed final sign-off Sep 2011 | 555 Mission St | Turner Construction Co | 12th fl: ti new construction, new 1 hr rated partitions, interior partitions, doors, etc. plumbing,mech, elec, title 24 lf sep permitDetails
12th fl: ti new construction, new 1 hr rated partitions, interior partitions, doors, etc. plumbing,mech, elec, title 24 lf sep permit | $1,580,000 |
| Nov 16, 2010 | Completed final sign-off Apr 2011 | 555 Mission St | Swinerton Builders | 19th floor: new construction to include non structural partitions, finishes, ceilings, lighting and other interior finishes. new elec supply/cabling, data cabling, mech hvac systems, plumbingDetails
19th floor: new construction to include non structural partitions, finishes, ceilings, lighting and other interior finishes. new elec supply/cabling, data cabling, mech hvac systems, plumbing | $708,400 |
| Jul 15, 2010 | Completed final sign-off Jun 2011 | 555 Mission St | Ad Art Inc. | provide and install sign supports for building sign ' de loitte ' under pa# 2010.04.19.0468Details
provide and install sign supports for building sign ' de loitte ' under pa# 2010.04.19.0468 | $15,000 |
| Apr 22, 2010 | Completed final sign-off Jul 2010 | 555 Mission St | Anderson, Rowe & Buckley, Inc. | level bi: tenant improvement to existing fire sprinkler system. 1 relocated sprinklerDetails
level bi: tenant improvement to existing fire sprinkler system. 1 relocated sprinkler | $500 |
| Apr 21, 2010 | Completed final sign-off Jul 2010 | 555 Mission St | Skyline Construction | interior build-out of elevator vestibule. work includes furring-out (e) cmu partitions, (n) lighting, ceiling, rated doors and finishes.Details
interior build-out of elevator vestibule. work includes furring-out (e) cmu partitions, (n) lighting, ceiling, rated doors and finishes. | $6,000 |
| Apr 19, 2010 | Completed final sign-off Jun 2011 | 555 Mission St | Ad Art Inc. | to erect single faced electric signDetails
to erect single faced electric sign | $10,000 |
| Dec 23, 2009 | Completed final sign-off Jun 2010 | 555 Mission St | Skyline Construction | const of new ceiling-height & slab to slab partitions, assoc elec, power/light distrib, assoc mech sys distr & assoc life-safety system.Details
const of new ceiling-height & slab to slab partitions, assoc elec, power/light distrib, assoc mech sys distr & assoc life-safety system. | $2,400,000 |
| Nov 4, 2009 | Completed final sign-off Feb 2010 | 555 Mission St | Bcci Construction Company | 2nd floor mechanical & electrical work associated with approved pa #200910280022.Details
2nd floor mechanical & electrical work associated with approved pa #200910280022. | $22,000 |
| Oct 28, 2009 | Completed final sign-off Feb 2010 | 555 Mission St | Bcci Construction Company | interior buildout of elevator lobby, corridor, and demising partitions including ceiling lighting, and partitions. mechanical, lighting, sprinklers and life safety under permitDetails
interior buildout of elevator lobby, corridor, and demising partitions including ceiling lighting, and partitions. mechanical, lighting, sprinklers and life safety under permit | $198,000 |
| Oct 16, 2009 | Completed final sign-off Mar 2010 | 555 Mission St | R L H Fire Protection Inc | t/i: upgrade on the (e) fire sprinkler system; add 153-pendants. ref. appl. #2009/0916/6933.Details
t/i: upgrade on the (e) fire sprinkler system; add 153-pendants. ref. appl. #2009/0916/6933. | $30,600 |
| Oct 16, 2009 | Completed final sign-off May 2010 | 555 Mission St | R L H Fire Protection Inc | t/i: upgrade on the (e) fire sprinkler system; 120-add pendants.Details
t/i: upgrade on the (e) fire sprinkler system; 120-add pendants. | $24,000 |
| Sep 9, 2009 | Completed final sign-off Dec 2009 | 555 Mission St | Turner Construction Co | fall protection system on roofDetails
fall protection system on roof | $55,000 |
| Nov 4, 2008 | Never finaled issued Nov 2008, no final | 555 Mission St | revision to application 200110130668 s-5, to provide sprinkler and fire alarm system. as-builts. minor changes to sprinkler/fire alarm to accomodate mep changes, adding 1 new ftm-1 control module to fire alarm system & equipment counts changed.Details
revision to application 200110130668 s-5, to provide sprinkler and fire alarm system. as-builts. minor changes to sprinkler/fire alarm to accomodate mep changes, adding 1 new ftm-1 control module to fire alarm system & equipment counts changed. | $1,000 | |
| Oct 16, 2008 | Completed final sign-off Feb 2009 | 555 Mission St | Pacific Auxiliary Fire Alarm | at 19th fl: adding 13 speaker/strobes, 1 detector & 1 relay to the f.a. system due to a partial t.i. improvement.Details
at 19th fl: adding 13 speaker/strobes, 1 detector & 1 relay to the f.a. system due to a partial t.i. improvement. | $32,000 |
| Oct 14, 2008 | Completed final sign-off Mar 2009 | 555 Mission St | Skyline Construction | g/f - interior build out of private office, open office and future tenant generator work including new partition, ceiling lighting and mechanical work. generator under seperate permit.Details
g/f - interior build out of private office, open office and future tenant generator work including new partition, ceiling lighting and mechanical work. generator under seperate permit. | $50,000 |
| Oct 10, 2008 | Completed final sign-off Mar 2009 | 555 Mission St | R L H Fire Protection Inc | ti upgrade of existing fire sprinkler system. relocate 4 sprinkler headsDetails
ti upgrade of existing fire sprinkler system. relocate 4 sprinkler heads | $800 |
| Oct 9, 2008 | Completed final sign-off Mar 2009 | 555 Mission St | Skyline Construction | new full floor tenant on previously unbuild, unoccupied floor. new non load bearing partitions, finishes, lighting electrical and mechanical work. no structural on job. fire and life safety under sep permitDetails
new full floor tenant on previously unbuild, unoccupied floor. new non load bearing partitions, finishes, lighting electrical and mechanical work. no structural on job. fire and life safety under sep permit | $24,000,000 |
| Sep 24, 2008 | Completed final sign-off Feb 2009 | 555 Mission St | Pacific Auxiliary Fire Alarm | adding 1 speaker/strobe as part of a tenant improvment on the b1 garage levelDetails
adding 1 speaker/strobe as part of a tenant improvment on the b1 garage level | $2,000 |
| Jul 16, 2008 | Completed final sign-off Apr 2009 | 555 Mission St | Principal Builders Inc. | tenant improvement on floors 20,21,22,23,& 24. non bearing partition walls, electrical, hvac, plumbing, carpet, ceilings, structural support for extra floor loading due to high density of filesDetails
tenant improvement on floors 20,21,22,23,& 24. non bearing partition walls, electrical, hvac, plumbing, carpet, ceilings, structural support for extra floor loading due to high density of files | $7,000,000 |
| Jul 9, 2008 | Completed final sign-off Nov 2008 | 555 Mission St | revision to pa #200110130668 s4 & 200806023431 for as built and disabled compliance w/ 2007 cbc, chapter 11b. compliance verification for core and shell to include path of travel from building entry to tenant spaces, restrooms, elevators, drinking fountains, parking and signage for all floors.Details
revision to pa #200110130668 s4 & 200806023431 for as built and disabled compliance w/ 2007 cbc, chapter 11b. compliance verification for core and shell to include path of travel from building entry to tenant spaces, restrooms, elevators, drinking fountains, parking and signage for all floors. | ||
| Jul 9, 2008 | Completed final sign-off Nov 2008 | 555 Mission St | revision to pa 200110130668s4 to change door ratings, from floor b1 to 33rd floor.Details
revision to pa 200110130668s4 to change door ratings, from floor b1 to 33rd floor. | ||
| Jun 5, 2008 | Completed final sign-off Feb 2009 | 555 Mission St | Turner Construction Co | 19th floor: inteior build-out of elevator lobby, multi-tenant corridor and new t.i. space. work includes new partitions, ceiling, lighting, plumbing, & finishes. ss34 sq.ft., sprinkler & life safety under seperate permit.Details
19th floor: inteior build-out of elevator lobby, multi-tenant corridor and new t.i. space. work includes new partitions, ceiling, lighting, plumbing, & finishes. ss34 sq.ft., sprinkler & life safety under seperate permit. | $200,000 |
| Jun 2, 2008 | Completed final sign-off Nov 2008 | 555 Mission St | revision to 200110130668-s4. accessible stall door swings to be reversed to comply with 2007 code, floors 2-34.Details
revision to 200110130668-s4. accessible stall door swings to be reversed to comply with 2007 code, floors 2-34. | ||
| May 30, 2008 | Completed final sign-off Nov 2008 | 555 Mission St | revision to 200110130668/s5 for fire fighters smoke control panel, a deferred item from addendum 5.Details
revision to 200110130668/s5 for fire fighters smoke control panel, a deferred item from addendum 5. | ||
| Apr 22, 2008 | Completed final sign-off Nov 2008 | 555 Mission St | revision to application # 20010130668s5 change all sprinklers in loading dock to 286 degree temp. rating, add sprinkler water curtain at opening between generator room and loading dock to provide hydraulic calcs. verifying added water curtain and loading dock sprinklers can be adeq. supplied.Details
revision to application # 20010130668s5 change all sprinklers in loading dock to 286 degree temp. rating, add sprinkler water curtain at opening between generator room and loading dock to provide hydraulic calcs. verifying added water curtain and loading dock sprinklers can be adeq. supplied. | ||
| Jan 18, 2008 | Completed final sign-off Feb 2009 | 555 Mission St | revision to 200110130668 to correct documentation of number of stories of occupancy from 30 to 33 as reflected on approved site plans.Details
revision to 200110130668 to correct documentation of number of stories of occupancy from 30 to 33 as reflected on approved site plans. | ||
| Jun 1, 2007 | Completed final sign-off May 2008 | 555 Mission St | Turner Construction Co | erect towner crane per ab23 for pa# 200110130668.Details
erect towner crane per ab23 for pa# 200110130668. | $100,000 |
| May 21, 2007 | Completed final sign-off Nov 2008 | 555 Mission St | revision to pa# 200110130668-foundation revision due to as built condition. grade beams and slab on grade, reinforcement are added to resist additional eccentric moment due to pile offset. steel tension piles are added, sump pit, sewage and interceptor are added "as built".Details
revision to pa# 200110130668-foundation revision due to as built condition. grade beams and slab on grade, reinforcement are added to resist additional eccentric moment due to pile offset. steel tension piles are added, sump pit, sewage and interceptor are added "as built". | ||
| Feb 27, 2007 | Completed final sign-off Nov 2008 | 555 Mission St | install lnew 6 inch fire service to building no interior work.l sprinklers to be installed under pa200110130668-s4 includes meterDetails
install lnew 6 inch fire service to building no interior work.l sprinklers to be installed under pa200110130668-s4 includes meter | $12,000 | |
| Mar 27, 2006 | Completed final sign-off Nov 2008 | 555 Mission St | provide indicator piles, pa no. 200110130668Details
provide indicator piles, pa no. 200110130668 | $10,000 | |
| May 13, 2004 | Completed final sign-off May 2008 | 555 Mission St | shoring and excavation for new bldg appl 200110130668.Details
shoring and excavation for new bldg appl 200110130668. | $9,000 | |
| Oct 13, 2001 | Completed final sign-off Jun 2005 | 553 Mission St | demolish a two story retail/office bldgDetails
demolish a two story retail/office bldg | ||
| Oct 13, 2001 | Completed final sign-off Feb 2009 | 555 Mission St | t0 erect 30 stories of office buildingDetails
t0 erect 30 stories of office building | $5,000,000 | |
| Jun 1, 2000 | Expired or cancelled expired Oct 2000 | 555 Mission St | street spaceDetails
street space |