Block 0163, lot 005
909 Montgomery St
- City’s use
- Commercial Office
- Built
- 1983
- Stories
- 6
- Building
- 110,000 sq ft
- Lot
- 18,906 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
120 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 31, 2023 | Never finaled issued Mar 2023, no final | 909 Montgomery St | Source Planning And Construction Inc | to obtain final inspection for work approved under pa# 2019-0221-3439 & pa# 2018-0831-8868Details
to obtain final inspection for work approved under pa# 2019-0221-3439 & pa# 2018-0831-8868 | |
| Mar 30, 2022 | Never finaled issued Apr 2022, no final | 909 Montgomery St | Skyline Construction | 3rd fl: revision to pa# 202112104153. change ceiling type for hallway 339.Details
3rd fl: revision to pa# 202112104153. change ceiling type for hallway 339. | |
| Feb 23, 2022 | Completed final sign-off Jun 2022 | 909 Montgomery St | Pyro-Comm Systems, Inc. | fire alarm: 3rd floor. this is a modification to an extg fire alarm system. 1 remote power supply, 3 smoke detectors, 17 duct detectors, 1 control module, 18 relay modules, 7 ceiling strobes and 16 horn strobes will be added to provide proper coverage. arch pa ref #202112104153/202202246507Details
fire alarm: 3rd floor. this is a modification to an extg fire alarm system. 1 remote power supply, 3 smoke detectors, 17 duct detectors, 1 control module, 18 relay modules, 7 ceiling strobes and 16 horn strobes will be added to provide proper coverage. arch pa ref #202112104153/202202246507 | $13,000 |
| Jan 24, 2022 | Completed final sign-off Nov 2022 | 909 Montgomery St | Skyline Construction | 3/f: mechanical & electrical work for t.i. ref bpa#202112104153Details
3/f: mechanical & electrical work for t.i. ref bpa#202112104153 | $150,000 |
| Jan 20, 2022 | Completed final sign-off Nov 2022 | 909 Montgomery St | Skyline Construction | 3/f: structural work for operable partition. ref bpa#202112104153Details
3/f: structural work for operable partition. ref bpa#202112104153 | $10,000 |
| Jan 11, 2022 | Completed final sign-off Nov 2022 | 909 Montgomery St | Skyline Construction | 3/f: replacing (4) existing sliding glass doors with (2) new single egress doors, and sidelites and (2) new double doors. bldg is non sprinklerd. t.i permit was submitted under pa# 202112104153Details
3/f: replacing (4) existing sliding glass doors with (2) new single egress doors, and sidelites and (2) new double doors. bldg is non sprinklerd. t.i permit was submitted under pa# 202112104153 | $145,000 |
| Dec 10, 2021 | Completed final sign-off Nov 2022 | 909 Montgomery St | Skyline Construction | 3/f: t.i. new non-structural partitions, all new or reused meps and life safety work will be design build and submitted separtely. maher n/a.Details
3/f: t.i. new non-structural partitions, all new or reused meps and life safety work will be design build and submitted separtely. maher n/a. | $1,017,829 |
| Sep 13, 2021 | Never finaled issued Sep 2021, no final | 909 Montgomery St | Skyline Construction | 3rd fl demo only. partitions, millwork, finishes, ceiling and lighting. ab-017 applies.Details
3rd fl demo only. partitions, millwork, finishes, ceiling and lighting. ab-017 applies. | $88,000 |
| Mar 25, 2021 | Completed final sign-off May 2021 | 909 Montgomery St | Charles Pankow Builders Ltd | 4th fl: electrical & mechanical design. title 24. ref pa# 202010196842.Details
4th fl: electrical & mechanical design. title 24. ref pa# 202010196842. | $35,000 |
| Feb 10, 2021 | Completed final sign-off May 2021 | 909 Montgomery St | Charles Pankow Builders Ltd | suite #400: revision to app#202010196842. modifications to extg a0.0 cover sheet regarding sprinkler system and construction type. all revisions clouded as bulletin 01, delta 2.2Details
suite #400: revision to app#202010196842. modifications to extg a0.0 cover sheet regarding sprinkler system and construction type. all revisions clouded as bulletin 01, delta 2.2 | |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 909 Montgomery St | Pyro-Comm Systems, Inc. | fire alarm. 3 ceiling horn strobes to be added to existing facu.Details
fire alarm. 3 ceiling horn strobes to be added to existing facu. | $1,500 |
| Jan 5, 2021 | Completed final sign-off Mar 2021 | 909 Montgomery St | Pyro-Comm Systems, Inc. | fire alarm. 1 duct detector and 1 ceiling horn strobe to be added to existing facu.Details
fire alarm. 1 duct detector and 1 ceiling horn strobe to be added to existing facu. | $1,500 |
| Dec 22, 2020 | Never finaled issued Feb 2021, no final | 909 Montgomery St | Charles Pankow Builders Ltd | we are submitting electrical design drawings for approval. current project has a bldg permit# 202009234856Details
we are submitting electrical design drawings for approval. current project has a bldg permit# 202009234856 | $300,000 |
| Oct 19, 2020 | Completed final sign-off May 2021 | 909 Montgomery St | Charles Pankow Builders Ltd | suite #400: modification to an existing ti. new non-bearing partitions, modify existing ceiling, lighting and electrical for new parition layout. relocate existing mech for new parition layout.Details
suite #400: modification to an existing ti. new non-bearing partitions, modify existing ceiling, lighting and electrical for new parition layout. relocate existing mech for new parition layout. | $300,000 |
| Sep 23, 2020 | Completed final sign-off Apr 2021 | 909 Montgomery St | Charles Pankow Builders Ltd | removal of existing internal communicating stair & associated structural between 3rd and 4th floor. also infill of slab at the 4th floor.Details
removal of existing internal communicating stair & associated structural between 3rd and 4th floor. also infill of slab at the 4th floor. | $225,000 |
| Aug 11, 2020 | Never finaled issued Aug 2020, no final | 909 Montgomery St | street spaceDetails
street space | ||
| Jul 6, 2020 | Completed final sign-off Aug 2020 | 909 Montgomery St | Source Planning And Construction Inc | 2nd floor: ste 260. revision to pa# 201908229602. electrical t-24 for project.Details
2nd floor: ste 260. revision to pa# 201908229602. electrical t-24 for project. | |
| Jun 25, 2020 | Completed final sign-off Dec 2020 | 909 Montgomery St | Signtech Electrical Advertising Inc. | install 1 door vinyl sign for blue bottleDetails
install 1 door vinyl sign for blue bottle | $500 |
| Jun 25, 2020 | Completed final sign-off Dec 2020 | 909 Montgomery St | Signtech Electrical Advertising Inc. | install 1 interior painted wall sign for blue bottleDetails
install 1 interior painted wall sign for blue bottle | $500 |
| Jan 30, 2020 | Completed final sign-off Aug 2020 | 909 Montgomery St | Pyro-Comm Systems, Inc. | ste 103: fire alarm: 7 wall horn strobes, 3 wall strobes, 6 duct detector, 6 control, 6 multi-volt relays to be added to extg facu. ref app#201902213439.Details
ste 103: fire alarm: 7 wall horn strobes, 3 wall strobes, 6 duct detector, 6 control, 6 multi-volt relays to be added to extg facu. ref app#201902213439. | $8,000 |
| Dec 5, 2019 | Completed final sign-off Feb 2020 | 909 Montgomery St | Pyro-Comm Systems, Inc. | suite #200: fire alarm 8 ceiling horn strobes to be added to existing facuDetails
suite #200: fire alarm 8 ceiling horn strobes to be added to existing facu | $4,000 |
| Oct 23, 2019 | Completed final sign-off Dec 2019 | 909 Montgomery St | Source Planning And Construction Inc | 6th floor: demolition of extg finishes, casework and construction of new non structural partitions, doors, glazing, power, finishes, and lighting.Details
6th floor: demolition of extg finishes, casework and construction of new non structural partitions, doors, glazing, power, finishes, and lighting. | $40,000 |
| Oct 2, 2019 | Completed final sign-off Dec 2019 | 909 Montgomery St | Principal Builders Inc. | 2nd fl - partial ti to demo ceiling height partitions, construct full height partitions, millwork, glazing, doors, ceiling and finishes. mep, life safety & fire sprinklers under separate permitDetails
2nd fl - partial ti to demo ceiling height partitions, construct full height partitions, millwork, glazing, doors, ceiling and finishes. mep, life safety & fire sprinklers under separate permit | $300,000 |
| Aug 22, 2019 | Completed final sign-off Sep 2020 | 909 Montgomery St | Source Planning And Construction Inc | suite 260: demolition of non load bearing partitions, new partitions, millwork, lighting, lec, finishes. mech/elec, life safety sep permitDetails
suite 260: demolition of non load bearing partitions, new partitions, millwork, lighting, lec, finishes. mech/elec, life safety sep permit | $304,440 |
| Mar 19, 2019 | Completed final sign-off Dec 2020 | 909 Montgomery St | Signtech Electrical Advertising Inc. | install 1 non-illuminated double-faced projecting sign for blue bottleDetails
install 1 non-illuminated double-faced projecting sign for blue bottle | $2,000 |
| Mar 8, 2019 | Completed final sign-off Oct 2020 | 909 Montgomery St | Aegis Enterprises Inc | fire sprinkler, add 23 ssps to accomodate new ti changesDetails
fire sprinkler, add 23 ssps to accomodate new ti changes | $4,000 |
| Mar 5, 2019 | Expired or cancelled cancelled Jan 2026 | 909 Montgomery St | Arrow Sign Company | relocate 1 sign. non electric wall mounted single faced signDetails
relocate 1 sign. non electric wall mounted single faced sign | $2,000 |
| Feb 27, 2019 | Completed final sign-off Oct 2020 | 909 Montgomery St | Pyro-Comm Systems, Inc. | 1st fl - fire alarm ti adding 1 rps, 1 pull station, 1 smoke detector, 2 duct detectors, 2 strobes and 4 horn strobes to be hooked up to existing facp. ref pa 2018-1031-4631Details
1st fl - fire alarm ti adding 1 rps, 1 pull station, 1 smoke detector, 2 duct detectors, 2 strobes and 4 horn strobes to be hooked up to existing facp. ref pa 2018-1031-4631 | $6,500 |
| Feb 21, 2019 | Never finaled issued Dec 2019, no final | 909 Montgomery St | Source Planning And Construction Inc | 1st fl suite 103 (e) tenat space to include construction f non-load bearing partitions (n) doors/frames etc. new mezz and stairs(structural) demo permit 201808318868Details
1st fl suite 103 (e) tenat space to include construction f non-load bearing partitions (n) doors/frames etc. new mezz and stairs(structural) demo permit 201808318868 | $320,000 |
| Dec 20, 2018 | Never finaled issued Dec 2018, no final | 909 Montgomery St | Aegis Enterprises Inc | to provide new wet automatic fire sprinkler riser for future 1st fl tenant spaceDetails
to provide new wet automatic fire sprinkler riser for future 1st fl tenant space | $10,000 |
| Oct 31, 2018 | Completed final sign-off Nov 2020 | 909 Montgomery St | J R E Construction | coffee bar - millwork, partitions, ceilings, mech, elec, plumbing. all interior, no structural.Details
coffee bar - millwork, partitions, ceilings, mech, elec, plumbing. all interior, no structural. | $224,980 |
| Aug 31, 2018 | Never finaled issued Sep 2018, no final | 909 Montgomery St | Source Planning And Construction Inc | suite 103. selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, plumbing and finishesDetails
suite 103. selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, plumbing and finishes | $14,000 |
| Aug 29, 2018 | Completed final sign-off Nov 2018 | 909 Montgomery St | Newman General Construction Inc. | 3rd fl.: remove the interior wall between office 2 & 3, replacing one existing window with the new casement window, no new electrical work, no hvac or mechanical systems work, no life safety modifications,Details
3rd fl.: remove the interior wall between office 2 & 3, replacing one existing window with the new casement window, no new electrical work, no hvac or mechanical systems work, no life safety modifications, | $3,500 |
| Aug 24, 2018 | Never finaled issued Aug 2018, no final | 909 Montgomery St | D A Pope Inc | demolition of extg interior office non-structural bearing walls. new transformer and electrical panel and stub ups for plumbing for market ready suite 105. ab-017.Details
demolition of extg interior office non-structural bearing walls. new transformer and electrical panel and stub ups for plumbing for market ready suite 105. ab-017. | $75,000 |
| Jul 5, 2018 | Completed final sign-off Nov 2020 | 909 Montgomery St | J R E Construction | replace (e) storefront with matching system doors. maher n/a.Details
replace (e) storefront with matching system doors. maher n/a. | $30,000 |
| Jan 14, 2016 | Completed final sign-off Jan 2016 | 909 Montgomery St | Aegis Enterprises Inc | dry standpipe relocation as-builts for 201510220488Details
dry standpipe relocation as-builts for 201510220488 | $28,000 |
| Oct 22, 2015 | Completed final sign-off Jan 2016 | 909 Montgomery St | Aegis Enterprises Inc | replacement standpipe to be same size as existing at 4" dynaflow. new hose valves to be added at 1st floor stairwells. there is no record plan for the existing system. system shall connect to (e) fire dept connections located on montgomery st and pacific ave.Details
replacement standpipe to be same size as existing at 4" dynaflow. new hose valves to be added at 1st floor stairwells. there is no record plan for the existing system. system shall connect to (e) fire dept connections located on montgomery st and pacific ave. | $28,000 |
| Apr 23, 2015 | Completed final sign-off Nov 2015 | 909 Montgomery St | interior remodel to add 3 offices and 1 interior wallDetails
interior remodel to add 3 offices and 1 interior wall | $160,000 | |
| Aug 15, 2014 | Never finaled issued Oct 2014, no final | 909 Montgomery St | Corporate Sign Systems | to erect non-electric, wall, single-faced, non-illuminated (n) sign. install wall sign on 1st floor.Details
to erect non-electric, wall, single-faced, non-illuminated (n) sign. install wall sign on 1st floor. | $2,000 |
| May 30, 2014 | Completed final sign-off Jun 2014 | 909 Montgomery St | Bilcor Inc | as built to pa# 201405125527, instlal 1 control relay module.Details
as built to pa# 201405125527, instlal 1 control relay module. | $400 |
| May 12, 2014 | Completed final sign-off Jun 2014 | 909 Montgomery St | Bilcor Inc | remove 2 wall mount horn-strobes & 2 wall horn, install 3 wall mount-strobes, install 9 ceiling mount horn-strobes, install 3 ceiling mount strobes, install 5 control relay modules, 5 duct detectors, 3 smoke detectors with base, remove and replace 2 pull stations.ref.2014.0210.8188Details
remove 2 wall mount horn-strobes & 2 wall horn, install 3 wall mount-strobes, install 9 ceiling mount horn-strobes, install 3 ceiling mount strobes, install 5 control relay modules, 5 duct detectors, 3 smoke detectors with base, remove and replace 2 pull stations.ref.2014.0210.8188 | $13,600 |
| Mar 6, 2014 | Completed final sign-off Jun 2014 | 909 Montgomery St | Principal Builders Inc. | title 24 mechanical and electrical to install new equipment and fixture in partial 5th floor. t.i. ref app#201402108188Details
title 24 mechanical and electrical to install new equipment and fixture in partial 5th floor. t.i. ref app#201402108188 | $60,000 |
| Mar 4, 2014 | Expired or cancelled withdrawn Aug 2014 | 909 Montgomery St | Corporate Sign Systems | install (1) flush mount non-electric wall sign. channel letters, 1/2" fco aluminum, non-illuminated.Details
install (1) flush mount non-electric wall sign. channel letters, 1/2" fco aluminum, non-illuminated. | $8,000 |
| Feb 10, 2014 | Completed final sign-off Jun 2014 | 909 Montgomery St | Principal Builders Inc. | full floor t.i. to construct new partitions, doors and finishes on the 5th floor t. iDetails
full floor t.i. to construct new partitions, doors and finishes on the 5th floor t. i | $750,000 |
| Dec 23, 2013 | Completed final sign-off Jun 2014 | 909 Montgomery St | Principal Builders Inc. | 5th floor. demolition of non-load bearing partitions, ceilings & lighting fixts. space to remain vacant under ab-017. all ada will be addressed under future ti permit.Details
5th floor. demolition of non-load bearing partitions, ceilings & lighting fixts. space to remain vacant under ab-017. all ada will be addressed under future ti permit. | $150,000 |
| May 23, 2013 | Never finaled issued May 2013, no final | 909 Montgomery St | Tri-Signal Integration Inc. | basement & 1st floor-replace 9 smoke detectors, 4 manual pull station. add 4 dual monitor modules & 1 manual pull station. 1 horn/strobe & 2 new strobes to (e) fire alarm systemDetails
basement & 1st floor-replace 9 smoke detectors, 4 manual pull station. add 4 dual monitor modules & 1 manual pull station. 1 horn/strobe & 2 new strobes to (e) fire alarm system | $9,000 |
| Mar 20, 2009 | Completed final sign-off Oct 2009 | 909 Montgomery St | Teamwrkx Inc. | renew pa# 2006/01/11/1921 to obtain final inspection. all work has been completed.Details
renew pa# 2006/01/11/1921 to obtain final inspection. all work has been completed. | |
| Mar 18, 2009 | Completed final sign-off Apr 2009 | 909 Montgomery St | Simplex Grinnell | removing existing horn/strobe/replace with new horn/strobe add 2 new horn/strobes to exisitng notification circuit on 1st floor of building.Details
removing existing horn/strobe/replace with new horn/strobe add 2 new horn/strobes to exisitng notification circuit on 1st floor of building. | $2,000 |
| Feb 20, 2009 | Completed final sign-off Apr 2009 | 909 Montgomery St | Manriquez Construction Inc | at 1st fl: t.i. demolition of wall, door, two low walls, build out of a copy room, new office rm mill work.Details
at 1st fl: t.i. demolition of wall, door, two low walls, build out of a copy room, new office rm mill work. | $68,000 |
| Sep 29, 2008 | Never finaled issued Sep 2008, no final | 909 Montgomery St | Pacific Auxiliary Fire Alarm | adding 1 smoke detector and 2 horn strobes on the 1st floor.Details
adding 1 smoke detector and 2 horn strobes on the 1st floor. | $3,000 |
| Aug 29, 2008 | Completed final sign-off Nov 2008 | 909 Montgomery St | Cannon Constructors North Inc | tenant improvement 200807187005.mechanical renovations & title 24 electrical.Details
tenant improvement 200807187005.mechanical renovations & title 24 electrical. | $52,000 |
| Jul 18, 2008 | Completed final sign-off Nov 2008 | 909 Montgomery St | ground floor-tenant improvements-minor demolition of (e) partitions, build new offices with storage space, coffee area and built in casework. electrical & plumbing work under seperate permitDetails
ground floor-tenant improvements-minor demolition of (e) partitions, build new offices with storage space, coffee area and built in casework. electrical & plumbing work under seperate permit | $85,000 | |
| Jul 9, 2008 | Never finaled issued Jul 2008, no final | 909 Montgomery St | Platinum Roofing Inc | install a new 60 mill black eddm. with seam lapped and adhered with pre-coated adhesive. over existing 60 mill black eddm. 192 sqs on the roof system.Details
install a new 60 mill black eddm. with seam lapped and adhered with pre-coated adhesive. over existing 60 mill black eddm. 192 sqs on the roof system. | $178,110 |
| Mar 11, 2008 | Completed final sign-off Mar 2008 | 909 Montgomery St | Ward Alan Emery Construction Inc. | renew pa 200701302870 for final inspection.Details
renew pa 200701302870 for final inspection. | |
| Mar 11, 2008 | Never finaled issued Mar 2008, no final | 909 Montgomery St | Ward Alan Emery Construction Inc. | renew pa #200702285144 for final inspection.Details
renew pa #200702285144 for final inspection. | |
| Sep 11, 2007 | Completed final sign-off Nov 2007 | 909 Montgomery St | build partition to convert (e)office into 2 smaller offices on the 3rd floor. no increase in office space. mech and lighting under separate permit. no exterior work.Details
build partition to convert (e)office into 2 smaller offices on the 3rd floor. no increase in office space. mech and lighting under separate permit. no exterior work. | $17,000 | |
| Aug 28, 2007 | Completed final sign-off Nov 2007 | 909 Montgomery St | Dome Construction Corp | renew pa#200702214520,#200702063454 for final inspection.Details
renew pa#200702214520,#200702063454 for final inspection. | |
| Feb 28, 2007 | Never finaled issued Feb 2007, no final | 909 Montgomery St | Ward Alan Emery Construction Inc. | seneca capital mgmt. - oti-1 5th floor, el, me, ls, spDetails
seneca capital mgmt. - oti-1 5th floor, el, me, ls, sp | $14,800 |
| Feb 21, 2007 | Completed final sign-off Nov 2007 | 909 Montgomery St | Dome Construction Corp | oti-3 2nd floor, suite 230, meDetails
oti-3 2nd floor, suite 230, me | $90,000 |
| Feb 21, 2007 | Expired or cancelled expired Nov 2007 | 909 Montgomery St | Dome Construction Corp | oti-1 rev. 2nd floor meDetails
oti-1 rev. 2nd floor me | $100 |
| Feb 9, 2007 | Completed final sign-off May 2007 | 909 Montgomery St | Teamwrkx Inc. | demonstrate existing corridor wall as one-hour rated.Details
demonstrate existing corridor wall as one-hour rated. | |
| Feb 9, 2007 | Completed final sign-off Mar 2007 | 909 Montgomery St | Teamwrkx Inc. | demonstrate restroom wall to tenant space as existing to remain. change hardware on restroom doors to push/pull plate system.Details
demonstrate restroom wall to tenant space as existing to remain. change hardware on restroom doors to push/pull plate system. | $500 |
| Feb 9, 2007 | Completed final sign-off Mar 2007 | 909 Montgomery St | Teamwrkx Inc. | request hardship, add door operator control button, demonstrate existing corridor wall as one-hour rated.Details
request hardship, add door operator control button, demonstrate existing corridor wall as one-hour rated. | $9,000 |
| Feb 6, 2007 | Never finaled issued Feb 2007, no final | 909 Montgomery St | Simplex Grinnell | it @ 2nd floor. adding replacing 11 horn stobes, 1 storbe. adding 2 door holders and 21 smoke detectors.Details
it @ 2nd floor. adding replacing 11 horn stobes, 1 storbe. adding 2 door holders and 21 smoke detectors. | $8,600 |
| Feb 6, 2007 | Expired or cancelled expired Nov 2007 | 909 Montgomery St | Dome Construction Corp | brereton architects, oti-2 2nd floor el. electrical only.Details
brereton architects, oti-2 2nd floor el. electrical only. | $25,000 |
| Jan 30, 2007 | Expired or cancelled expired Mar 2008 | 909 Montgomery St | Simplex Grinnell | fire alarm t.i. on 2nd floor. includes replacement of ( 10) horn strobes with new with locations to be relocated per new wall layout. addtion of 1 strobe 2nd floor onlyDetails
fire alarm t.i. on 2nd floor. includes replacement of ( 10) horn strobes with new with locations to be relocated per new wall layout. addtion of 1 strobe 2nd floor only | $6,200 |
| Jan 11, 2007 | Completed final sign-off Mar 2008 | 909 Montgomery St | Ward Alan Emery Construction Inc. | provide 2 new heat pumps. relocate 2 heat pumps. replace 6 existing heat pumps. miscellaneous ducting for th enew heat pump configuration. 8 new hp total. mechanical work only. ref to appl #200612220485 city approved permit. 1 new fire demper (fsd).Details
provide 2 new heat pumps. relocate 2 heat pumps. replace 6 existing heat pumps. miscellaneous ducting for th enew heat pump configuration. 8 new hp total. mechanical work only. ref to appl #200612220485 city approved permit. 1 new fire demper (fsd). | $30,000 |
| Jan 3, 2007 | Never finaled issued Jan 2007, no final | 909 Montgomery St | street space permitDetails
street space permit | ||
| Dec 22, 2006 | Completed final sign-off Mar 2008 | 909 Montgomery St | tenant improvement partial remodel of existing suite. new reception and conference room upgrade lighting. mech,elec sep permit. no increase in office space. no structuralDetails
tenant improvement partial remodel of existing suite. new reception and conference room upgrade lighting. mech,elec sep permit. no increase in office space. no structural | $190,000 | |
| Dec 20, 2006 | Completed final sign-off Nov 2007 | 909 Montgomery St | oti-1 2nd floor, el, me, ls, spDetails
oti-1 2nd floor, el, me, ls, sp | $250,000 | |
| Dec 19, 2006 | Expired or cancelled expired Apr 2009 | 909 Montgomery St | Ward Alan Emery Construction Inc. | interior demolition of drywall partitions, acoustic ceiling, doors and finishes. no structural demo. comply with ab-017, life safety to remain operational.Details
interior demolition of drywall partitions, acoustic ceiling, doors and finishes. no structural demo. comply with ab-017, life safety to remain operational. | $9,400 |
| Nov 3, 2006 | Completed final sign-off Nov 2006 | 909 Montgomery St | Bevilacqua & Sons | revision to app#200610044101 demolition of 2 non-structural. non fire rated units. interior non structural demolition only under this permit. handicapped access issues to comply with administration bulletin # ab 017 sfbc 2001 under tenant improvement under seperate permitDetails
revision to app#200610044101 demolition of 2 non-structural. non fire rated units. interior non structural demolition only under this permit. handicapped access issues to comply with administration bulletin # ab 017 sfbc 2001 under tenant improvement under seperate permit | |
| Oct 4, 2006 | Completed final sign-off Nov 2006 | 909 Montgomery St | Bevilacqua & Sons | demolition of 2 non structural, non fire rated walls. soft demo only.Details
demolition of 2 non structural, non fire rated walls. soft demo only. | $5,000 |
| Sep 18, 2006 | Completed final sign-off Mar 2007 | 909 Montgomery St | Teamwrkx Inc. | restroom upgrade: demolition, new construction, plumbing, electrical, lighting, finishesDetails
restroom upgrade: demolition, new construction, plumbing, electrical, lighting, finishes | $60,000 |
| Sep 18, 2006 | Completed final sign-off May 2007 | 909 Montgomery St | Teamwrkx Inc. | restroom upgrade: demolition, new construction, plumbing, electrical, lighting, finishesDetails
restroom upgrade: demolition, new construction, plumbing, electrical, lighting, finishes | $60,000 |
| Sep 13, 2006 | Never finaled issued Sep 2006, no final | 520 Pacific Av | additional addressDetails
additional address | ||
| Jul 18, 2006 | Completed final sign-off Jan 2007 | 909 Montgomery St | Pacific Auxiliary Fire Alarm | as built of appl#200606023051 additions include relocation of 8 smoke detectors installed in the supply ducts of the heat pumps serving the floor. smoke detectors were previously area smoke coverage. delete 2 sd's overall.Details
as built of appl#200606023051 additions include relocation of 8 smoke detectors installed in the supply ducts of the heat pumps serving the floor. smoke detectors were previously area smoke coverage. delete 2 sd's overall. | $2,000 |
| Jun 27, 2006 | Completed final sign-off Sep 2006 | 909 Montgomery St | Cannon Constructors North Inc | renew appl#200510216212, 200509163151, 200509163153 for final inspectionDetails
renew appl#200510216212, 200509163151, 200509163153 for final inspection | |
| Jun 19, 2006 | Completed final sign-off Jan 2007 | 909 Montgomery St | Skyline Construction | oti-3, 6th floor, elDetails
oti-3, 6th floor, el | $50,000 |
| Jun 19, 2006 | Completed final sign-off Jan 2007 | 909 Montgomery St | Skyline Construction | oti-2, 6th floor, me.Details
oti-2, 6th floor, me. | $20,000 |
| Jun 2, 2006 | Completed final sign-off Jan 2007 | 909 Montgomery St | Pacific Auxiliary Fire Alarm | 6th floor - installation of 13 smoke detectors, 2 manual alarms, 4 strobes and 12 horn/strobes due to a remodel of the 6th floor. also includes installation of a new power supply.Details
6th floor - installation of 13 smoke detectors, 2 manual alarms, 4 strobes and 12 horn/strobes due to a remodel of the 6th floor. also includes installation of a new power supply. | $20,000 |
| Jun 1, 2006 | Completed final sign-off Jan 2007 | 909 Montgomery St | Skyline Construction | oti-1 6th floor el, me, l/sDetails
oti-1 6th floor el, me, l/s | $200,000 |
| May 9, 2006 | Completed final sign-off Sep 2006 | 909 Montgomery St | Cannon Constructors North Inc | renew appl#200502034697 for final inspectionDetails
renew appl#200502034697 for final inspection | |
| May 9, 2006 | Never finaled issued May 2006, no final | 909 Montgomery St | Cannon Constructors North Inc | renew appl#200507056815, 200412070847 for final inspectionDetails
renew appl#200507056815, 200412070847 for final inspection | |
| Mar 22, 2006 | Completed final sign-off Jun 2006 | 909 Montgomery St | Skyline Construction | soft demo e office space only. vacant space. no increae in office space.Details
soft demo e office space only. vacant space. no increae in office space. | $10,000 |
| Mar 16, 2006 | Never finaled issued Mar 2006, no final | 909 Montgomery St | streetspaceDetails
streetspace | ||
| Feb 28, 2006 | Completed final sign-off Jul 2006 | 909 Montgomery St | Pacific Auxiliary Fire Alarm | revision to appl#200509163151 to provide accurate as builts. 4 additional duct detectors.Details
revision to appl#200509163151 to provide accurate as builts. 4 additional duct detectors. | $2,000 |
| Feb 28, 2006 | Completed final sign-off Sep 2006 | 909 Montgomery St | Pacific Auxiliary Fire Alarm | revision to appl#200509163153 to provide accurate as builts. revision include 6 duct detectors.Details
revision to appl#200509163153 to provide accurate as builts. revision include 6 duct detectors. | $2,500 |
| Jan 11, 2006 | Expired or cancelled expired Feb 2009 | 909 Montgomery St | demo extg single story stair (5th to 6th floor) infill extg stiar openings at 6th floor.Details
demo extg single story stair (5th to 6th floor) infill extg stiar openings at 6th floor. | $5,000 | |
| Jan 9, 2006 | Completed final sign-off Mar 2007 | 909 Montgomery St | removal restroom non-load bearing partitons,fixtures,accessories&finishes.install new restroom non-load bearing partitions,fixtures,accessories,&finishes.barrier removal work only under this permit @ 5th & 6th floor only.Details
removal restroom non-load bearing partitons,fixtures,accessories&finishes.install new restroom non-load bearing partitions,fixtures,accessories,&finishes.barrier removal work only under this permit @ 5th & 6th floor only. | $25,000 | |
| Dec 30, 2005 | Never finaled issued Dec 2005, no final | 909 Montgomery St | remove intercommunication stair between 5th and 6th floorsDetails
remove intercommunication stair between 5th and 6th floors | $15,000 | |
| Dec 7, 2005 | Never finaled issued Dec 2005, no final | 909 Montgomery St | revision to approved plans toilet room upgrades ref. #200510276777/no increase in office space/revision to floors 3rd and 4th floorDetails
revision to approved plans toilet room upgrades ref. #200510276777/no increase in office space/revision to floors 3rd and 4th floor | ||
| Oct 27, 2005 | Never finaled issued Oct 2005, no final | 909 Montgomery St | remodel existing base bldng toilet rms flors one through 6 mens & womens new fixtures & flr & wall finishes- upgrade lighting. no increase in office spaceDetails
remodel existing base bldng toilet rms flors one through 6 mens & womens new fixtures & flr & wall finishes- upgrade lighting. no increase in office space | $180,000 | |
| Oct 21, 2005 | Expired or cancelled expired Sep 2006 | 909 Montgomery St | Dpw Inc. | replace (e) omega sprinkler head for fire damage on 4th floor and replace omega heads on 3rd floor only.Details
replace (e) omega sprinkler head for fire damage on 4th floor and replace omega heads on 3rd floor only. | $11,000 |
| Sep 21, 2005 | Completed final sign-off Jul 2006 | 909 Montgomery St | Cannon Constructors North Inc | oti-3, 3rd floor, el. otiDetails
oti-3, 3rd floor, el. oti | $182,000 |
| Sep 21, 2005 | Completed final sign-off Sep 2006 | 909 Montgomery St | Cannon Constructors North Inc | oti-3, 4th floor, me.Details
oti-3, 4th floor, me. | $49,750 |
| Sep 16, 2005 | Expired or cancelled expired Sep 2006 | 909 Montgomery St | Pacific Auxiliary Fire Alarm | additions ~the fire alarm system on the 4th floor due to tenant improvement on the 4th flrDetails
additions ~the fire alarm system on the 4th floor due to tenant improvement on the 4th flr | $20,000 |
| Sep 16, 2005 | Completed final sign-off Jul 2006 | 909 Montgomery St | Pacific Auxiliary Fire Alarm | additional devices being added to the fire alarm system due to a tenant improvement on the 3rd flr.Details
additional devices being added to the fire alarm system due to a tenant improvement on the 3rd flr. | $20,000 |
| Sep 15, 2005 | Completed final sign-off Sep 2006 | 909 Montgomery St | Cannon Constructors North Inc | oti-2 4th/fl-el.Details
oti-2 4th/fl-el. | $154,000 |
| Sep 15, 2005 | Completed final sign-off Jul 2006 | 909 Montgomery St | Cannon Constructors North Inc | oti-2, 3rd floor, me.Details
oti-2, 3rd floor, me. | $63,000 |
| Aug 15, 2005 | Completed final sign-off Sep 2006 | 909 Montgomery St | Cannon Constructors North Inc | build a new connecting stair between the 3rd & 4th floor. structural reinforcement & stair detailsDetails
build a new connecting stair between the 3rd & 4th floor. structural reinforcement & stair details | $60,000 |
| Jul 11, 2005 | Completed final sign-off Jul 2006 | 909 Montgomery St | oti-1, 3rd floor, el, me,ls, spDetails
oti-1, 3rd floor, el, me,ls, sp | $375,000 | |
| Jul 11, 2005 | Completed final sign-off Sep 2006 | 909 Montgomery St | oti-1, 4th floor, el, me, ls,spDetails
oti-1, 4th floor, el, me, ls,sp | $325,000 | |
| Jul 7, 2005 | Never finaled issued Jul 2005, no final | 909 Montgomery St | street space permitDetails
street space permit | ||
| Jul 5, 2005 | Never finaled issued Jul 2005, no final | 909 Montgomery St | Cannon Constructors North Inc | close the existing hole with composite slab to match existing no increase in office spaceDetails
close the existing hole with composite slab to match existing no increase in office space | $22,500 |
| Mar 17, 2005 | Never finaled issued Mar 2005, no final | 909 Montgomery St | streetspaceDetails
streetspace | ||
| Feb 18, 2005 | Never finaled issued Feb 2005, no final | 909 Montgomery St | street spaceDetails
street space | ||
| Feb 3, 2005 | Expired or cancelled expired Sep 2006 | 909 Montgomery St | repari fire damage-no chg fr orig conditions repair or replace.fireproofing,mech.ductwork&equip.....Details
repari fire damage-no chg fr orig conditions repair or replace.fireproofing,mech.ductwork&equip..... | $145,000 | |
| Jan 11, 2005 | Never finaled issued Jan 2005, no final | 909 Montgomery St | street spaceDetails
street space | ||
| Dec 7, 2004 | Never finaled issued Dec 2004, no final | 909 Montgomery St | remove the existing stair which connects the 2nd and 3rd floor close the (e) hole with compositeDetails
remove the existing stair which connects the 2nd and 3rd floor close the (e) hole with composite | $22,500 | |
| Mar 24, 2003 | Completed final sign-off Apr 2003 | 909 Montgomery St | Hathaway Dinwiddie Co. | decrease in scope of work for permitted project appln #2003/02/05/6730 permit #989164Details
decrease in scope of work for permitted project appln #2003/02/05/6730 permit #989164 | $100 |
| Mar 14, 2003 | Expired or cancelled expired Jan 2004 | 909 Montgomery St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvements. 10heads on 04 flr.Details
relocate fire sprinkler heads per tenant improvements. 10heads on 04 flr. | $1,600 |
| Mar 6, 2003 | Expired or cancelled expired Jan 2004 | 909 Montgomery St | Honeywell International, Inc | to provide access control connecting to existing controller. cabling for cardreader contact, prx. 1Details
to provide access control connecting to existing controller. cabling for cardreader contact, prx. 1 | $5,000 |
| Feb 13, 2003 | Expired or cancelled expired Jan 2004 | 909 Montgomery St | Pacific Auxiliary Fire Alarm | add to existing fire alarm system on 4th floorDetails
add to existing fire alarm system on 4th floor | $7,000 |
| Feb 5, 2003 | Expired or cancelled expired May 2006 | 909 Montgomery St | Hathaway Dinwiddie Co. | oti-1 6th floor, el, lsDetails
oti-1 6th floor, el, ls | $75,000 |
| Feb 3, 2003 | Expired or cancelled expired Jan 2004 | 909 Montgomery St | oti-2 4th flr, el,me no additiona office spaceDetails
oti-2 4th flr, el,me no additiona office space | $12,500 | |
| Nov 4, 2002 | Expired or cancelled expired Jan 2004 | 909 Montgomery St | oti-1 4th floor, el, me, ls, spDetails
oti-1 4th floor, el, me, ls, sp | $100,000 | |
| Oct 26, 2001 | Expired or cancelled expired Feb 2002 | 909 Montgomery St | Hathaway Dinwiddie Co. | renew app #9924920 9925787 9926444 200104207343 no increase in office spaceDetails
renew app #9924920 9925787 9926444 200104207343 no increase in office space | |
| Apr 20, 2001 | Expired or cancelled expired Aug 2001 | 909 Montgomery St | Hathaway Dinwiddie Co. | to renew app#'s 09924920,09925787,09926494 for final inspection.Details
to renew app#'s 09924920,09925787,09926494 for final inspection. | |
| Apr 6, 2000 | Expired or cancelled expired Oct 2000 | 909 Montgomery St | Pacific Auxiliary Fire Alarm | add to existing fire alarm system at 1st floor onlyDetails
add to existing fire alarm system at 1st floor only | $5,895 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cannon Constructors North Inc (10), Skyline Construction (10), Pacific Auxiliary Fire Alarm (9), Pyro-Comm Systems, Inc. (6), Source Planning And Construction Inc (6), Teamwrkx Inc. (6), Charles Pankow Builders Ltd (5), Ward Alan Emery Construction Inc. (5), Aegis Enterprises Inc (4), Dome Construction Corp (4), Hathaway Dinwiddie Co. (4), Principal Builders Inc. (4), Signtech Electrical Advertising Inc. (3), Simplex Grinnell (3), Bevilacqua & Sons (2), Bilcor Inc (2), Corporate Sign Systems (2), J R E Construction (2), Arrow Sign Company, Ayoob & Peery Plumbing Co Inc, D A Pope Inc, Dpw Inc., Honeywell International, Inc, Manriquez Construction Inc, Newman General Construction Inc., Platinum Roofing Inc, Tri-Signal Integration Inc.
- Architects
- Aston Pereira (5), Kevin Dearborn (5), Ariane Lebrilla (3), Ken Eng (3), Ken Eng (3), Gregory Mattola (2), Ken Eng (2), Douglas Mehl, F M E Atchitecture, Greg Sheppard, Huntsman Arch Group, Ingemar San Juan Gosiengfiao, John T. Hood, Nicholas Brereton, Omied Arvin
- Engineers
- Craig Ristow, Kam Wing Yan, Kent Laws, Kerry Mccoy, Lars P. Mortensen, Mozart Faizi
- Authorized agent-otherss
- Kevin Dearborn
- Designers
- Michael Joseph Donahue
- Pmt consultant/expediters
- Gail Galli