Edward Rivera
- Listed as
- architect, designer, engineer
- Firm
- Rivera Consulting Group
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Sep 2026
69 permits since 2000 (engineer on 65 permits, architect on 3 permits, designer on 1 permit): 44 completed, 9 in progress, 9 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 1 Market St | 1st fl - interior renovation and fitout of approx. 26,480sf commercial kitchen, bar, grab-and-go, and seating areas. mep and kitchen/food service drawings under separate permit. no change of use. structural drawings included.Details
1st fl - interior renovation and fitout of approx. 26,480sf commercial kitchen, bar, grab-and-go, and seating areas. mep and kitchen/food service drawings under separate permit. no change of use. structural drawings included. | $3,760,160 | |
| Jul 24, 2026 | In progress filed Jul 2026, not yet issued | 1 Front St | deferred submittal for mechanical, electrical, plumbing, food service. gr fl restaurant. ref 202605261845Details
deferred submittal for mechanical, electrical, plumbing, food service. gr fl restaurant. ref 202605261845 | $1,800,000 | |
| Jun 24, 2026 | In progress issued Jun 2026 | 150 California St | Matrix Hg Inc | replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse.Details
replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse. | $198,000 |
| May 11, 2026 | In progress issued May 2026 | 650 California St | Skyline Construction | 12 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred.Details
12 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred. | $1,630,160 |
| Apr 8, 2026 | In progress issued May 2026 | 300 Clay St | Matrix Hg Inc | installation of a mechanical service access platform and ladder in the street level fan roomDetails
installation of a mechanical service access platform and ladder in the street level fan room | $75,000 |
| Apr 8, 2026 | In progress issued Apr 2026 | 300 Clay St | Matrix Hg Inc | 26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused.Details
26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused. | $90,000 |
| Sep 10, 2025 | Completed final sign-off Mar 2026 | 301 Howard St | Skyline Construction | 8/f suite 830: install (3) new freestanding phone booths.Details
8/f suite 830: install (3) new freestanding phone booths. | $18,000 |
| Jul 31, 2025 | In progress issued Sep 2025 | 4 Embarcadero Center | Bcci Construction Company | 13t/14th. interconnecting stair between floors 13&14 as part of office t.i. mep deferred.Details
13t/14th. interconnecting stair between floors 13&14 as part of office t.i. mep deferred. | $300,000 |
| May 21, 2025 | Completed final sign-off Jan 2026 | 1 Front St | Field Construction Inc. | 35/f and 36/f: removal of interconnecting stair beteween flrs 35-36, and infill of slabs on fl 36. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal.Details
35/f and 36/f: removal of interconnecting stair beteween flrs 35-36, and infill of slabs on fl 36. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal. | $200,000 |
| May 21, 2025 | Completed final sign-off Jan 2026 | 1 Front St | Field Construction Inc. | removal of interconnecting stair beteween flrs 33-34, and infill of slabs on fl 34. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal.Details
removal of interconnecting stair beteween flrs 33-34, and infill of slabs on fl 34. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal. | $200,000 |
| May 21, 2025 | Completed final sign-off Jan 2026 | 1 Front St | Field Construction Inc. | 34/f and 35/f: removal of interconnecting stair beteween flrs 34-35, and infill of slabs on fl 35. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal.Details
34/f and 35/f: removal of interconnecting stair beteween flrs 34-35, and infill of slabs on fl 35. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal. | $200,000 |
| Jan 14, 2025 | In progress issued Jun 2025 | 1 Market St | Field Construction Inc. | level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions, planters, and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate.Details
level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions, planters, and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate. | $8,000,000 |
| Nov 7, 2024 | Completed final sign-off Mar 2025 | 475 Sansome St | Principal Builders Inc. | 16/f: removal of (e) tenant stairs and slab infill. salvage of (e) selected materials if possible.Details
16/f: removal of (e) tenant stairs and slab infill. salvage of (e) selected materials if possible. | $50,000 |
| Sep 3, 2024 | In progress issued Oct 2024 | 1 Montgomery St | C E Toland & Son | repairs to an existing bldg maintance unit track system for window washing at the 38-story office bldg located at 1 montgomery street. sf. the repairs include removal of all paint, rust and corrosion from the surface of the pipe track located at th premier of the roof and the additional of steel....Details
repairs to an existing bldg maintance unit track system for window washing at the 38-story office bldg located at 1 montgomery street. sf. the repairs include removal of all paint, rust and corrosion from the surface of the pipe track located at th premier of the roof and the additional of steel.... | $225,000 |
| May 2, 2024 | Completed final sign-off Nov 2024 | 475 Sansome St | Principal Builders Inc. | 8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep.Details
8/f suite 800: interior tenant improvement - new non-load bearing partitions, doors, ceilings, lighting, and finishes. structural support for operable partition and mep. | $3,051,349 |
| Jan 25, 2024 | Completed final sign-off Jul 2025 | 300 Clay St | Bcci Construction Company | commencement and completion of work under permit # 200005261165.install bott flag bracing as shown on plans at 17th and 18th floor.Details
commencement and completion of work under permit # 200005261165.install bott flag bracing as shown on plans at 17th and 18th floor. | $150,000 |
| Sep 15, 2023 | Completed final sign-off Apr 2024 | 580 California St | Skyline Construction | structural work for atm and ups anchorage and core holes at community room 1908 and pre-action 1913. ref bpa#202306089570Details
structural work for atm and ups anchorage and core holes at community room 1908 and pre-action 1913. ref bpa#202306089570 | $5,000 |
| Aug 22, 2022 | Completed final sign-off Dec 2023 | 1430 Noriega St | Transworld Construction | revisions to bpa 202201266651. replace (e) rear portion of building due to unsafe structural condition. replace like for like. no design changes.Details
revisions to bpa 202201266651. replace (e) rear portion of building due to unsafe structural condition. replace like for like. no design changes. | $50,000 |
| Aug 8, 2022 | Completed final sign-off Mar 2024 | 1 Dr Carlton B Goodlett Pl | Emcor Services/Mesa Energy Systems Inc | roof - demo (2) ct demo ocp piping removal, (2) new cooling towers, extend/add vfd to electricalDetails
roof - demo (2) ct demo ocp piping removal, (2) new cooling towers, extend/add vfd to electrical | $300,000 |
| Jun 22, 2022 | Completed final sign-off Jan 2023 | 1 Lombard St | Bcci Construction Company | 3rd fl office t.i. to include new partitions & mepDetails
3rd fl office t.i. to include new partitions & mep | $1,100,000 |
| Mar 11, 2022 | Completed final sign-off Feb 2023 | 140 New Montgomery St | Richlen Construction | 4/f: deferred structural submittal in support of approved fire door installation under permit 202112104161.Details
4/f: deferred structural submittal in support of approved fire door installation under permit 202112104161. | $38,000 |
| Mar 2, 2022 | Completed final sign-off Aug 2022 | 444 Battery St | Gci, Inc | barrier removal only. architectural and structural alteration to an existing non-comforming ramp.Details
barrier removal only. architectural and structural alteration to an existing non-comforming ramp. | $38,000 |
| Feb 4, 2022 | Completed final sign-off Feb 2023 | 140 New Montgomery St | Richlen Construction | 3/f: install new 3 hour fire rated door and 2 hour fire rated enclosure.Details
3/f: install new 3 hour fire rated door and 2 hour fire rated enclosure. | $126,000 |
| Dec 9, 2021 | Completed final sign-off Apr 2023 | 33 New Montgomery St | Peacock Construction | basement: demo non load partitions, restrooms, concrete ramp, stair and small elevator, suspended ceiling and light fixtures, gypsum ceiling, and electrical. new construction: fill in ceiling, restrooms, doors, frames and hardware, ada lift, call button, card readers, fire extg, cabinet, finishes.Details
basement: demo non load partitions, restrooms, concrete ramp, stair and small elevator, suspended ceiling and light fixtures, gypsum ceiling, and electrical. new construction: fill in ceiling, restrooms, doors, frames and hardware, ada lift, call button, card readers, fire extg, cabinet, finishes. | $500,000 |
| Aug 5, 2021 | Never finaled issued Aug 2021, no final | 300 Clay St | Bcci Construction Company | recommencement of work pertaining to permit application n0. 200005261165. grouting of partially grouted reinforced concrete block walls on the 26th floor, (mechanical floor). ref app# 201708023712. fiber wrap wall on line 5 on 26th flr.Details
recommencement of work pertaining to permit application n0. 200005261165. grouting of partially grouted reinforced concrete block walls on the 26th floor, (mechanical floor). ref app# 201708023712. fiber wrap wall on line 5 on 26th flr. | $400,000 |
| Apr 21, 2021 | Completed final sign-off Apr 2022 | 650 California St | Bcci Construction Company | 31st fl: structural onlly installation of the support framing for an operable partition. ref pa 202102164700.Details
31st fl: structural onlly installation of the support framing for an operable partition. ref pa 202102164700. | $15,000 |
| Feb 18, 2021 | Completed final sign-off Sep 2021 | 1 Market St | Bcci Construction Company | 31st floor: structural only permit to show the support framing for an operable partition. ref app#202010227185Details
31st floor: structural only permit to show the support framing for an operable partition. ref app#202010227185 | $20,000 |
| Jan 22, 2021 | Completed final sign-off Sep 2021 | 1 Market St | Bcci Construction Company | 28th fl - installation of the support framing for an operable partition. ref pa 202-1022-7184Details
28th fl - installation of the support framing for an operable partition. ref pa 202-1022-7184 | $25,000 |
| Nov 12, 2020 | Completed final sign-off Mar 2023 | 1 Beach St | replacement of 1st floor slab on grad with reinforce concrete structural slab. interior structural work only all other work under pa# 2019-0923-2380.Details
replacement of 1st floor slab on grad with reinforce concrete structural slab. interior structural work only all other work under pa# 2019-0923-2380. | $400,000 | |
| Sep 26, 2020 | Never finaled issued Jan 2021, no final | 1 Market St | Gci, Inc | construction of housekeeping pad for new replacement chiller in lower basement (route to ming ge for reviewing building and structural)Details
construction of housekeeping pad for new replacement chiller in lower basement (route to ming ge for reviewing building and structural) | $7,500 |
| Sep 12, 2020 | Never finaled issued Jan 2021, no final | 301 Howard St | Skyline Construction | 18/f: accessibility upgrade of (e) balcony serving full floor tenant. interior ramp, balcony doors, raised floor paver system, illuminated exit sign, guard extensions.Details
18/f: accessibility upgrade of (e) balcony serving full floor tenant. interior ramp, balcony doors, raised floor paver system, illuminated exit sign, guard extensions. | $82,505 |
| Jul 23, 2020 | Expired or cancelled withdrawn Aug 2020 | 2500 Steiner St | installation of window washing access system to accommodate controlled decent apparatus in a 12 story residential building. the access system consists of exterior tiebacks anchors,steel cables and other supports necessary for securing workmens primary and secondary suspension line ropes.Details
installation of window washing access system to accommodate controlled decent apparatus in a 12 story residential building. the access system consists of exterior tiebacks anchors,steel cables and other supports necessary for securing workmens primary and secondary suspension line ropes. | $160,000 | |
| Jan 13, 2020 | Completed final sign-off May 2021 | 4 Embarcadero Center | Source Planning And Construction Inc | 39th fl, ste 3950 - ti include the modification to the exterior opening to comply with ada code and the addition of a guardrail at the existing parapet. (life safety work will be design build under separate permit. bldg fully sprinkleredDetails
39th fl, ste 3950 - ti include the modification to the exterior opening to comply with ada code and the addition of a guardrail at the existing parapet. (life safety work will be design build under separate permit. bldg fully sprinklered | $100,000 |
| Nov 15, 2019 | Completed final sign-off Mar 2021 | 101 Spear St | Marchetti Group | project scope includes the installation of atrium doors assembly structural frame support framing on ground level slab. reference pa# 2019-0828-0119Details
project scope includes the installation of atrium doors assembly structural frame support framing on ground level slab. reference pa# 2019-0828-0119 | $25,000 |
| Oct 11, 2019 | Completed final sign-off Dec 2020 | 450 Sansome St | Emcor Services/Mesa Energy Systems Inc | rooftop: remove & replace 1 chiller & 2 pumps. maher n/a.Details
rooftop: remove & replace 1 chiller & 2 pumps. maher n/a. | $198,500 |
| Mar 29, 2019 | Completed final sign-off Jan 2020 | 1 Maritime Pz | Gci, Inc | alterations to elevator shaft in preparation for future elevator stops at floor 10,11 and 12. alterations require removal of a section of the partially grouted block wall and construction of a temporary 2 hr rated stud wallDetails
alterations to elevator shaft in preparation for future elevator stops at floor 10,11 and 12. alterations require removal of a section of the partially grouted block wall and construction of a temporary 2 hr rated stud wall | $36,000 |
| Mar 4, 2019 | Never finaled issued Mar 2019, no final | 199 Fremont St | Tim Rhones Installation Department | install 1 electric single faced wall sign "stubhub"Details
install 1 electric single faced wall sign "stubhub" | $2,000 |
| Feb 8, 2019 | Completed final sign-off Sep 2019 | 1 Maritime Pz | Bcci Construction Company | revision to permit app #201901099947. eliminated added unistrut members, provided beam flange conn. to met. deck.Details
revision to permit app #201901099947. eliminated added unistrut members, provided beam flange conn. to met. deck. | |
| Dec 20, 2018 | Expired or cancelled cancelled Apr 2023 | 1 Maritime Pz | new door opening in existing concrete wall. scope inludes wall strengtheningDetails
new door opening in existing concrete wall. scope inludes wall strengthening | $30,000 | |
| Sep 12, 2018 | Completed final sign-off Apr 2019 | 50 Beale St | Field Construction Inc. | ground floor - fireproofing abatement of existing steel columns due to presence of asbestos. apply new fireproofing to replace existing. revision to pa# 201807134497 special inspection is requiredDetails
ground floor - fireproofing abatement of existing steel columns due to presence of asbestos. apply new fireproofing to replace existing. revision to pa# 201807134497 special inspection is required | |
| May 31, 2018 | Completed final sign-off Oct 2018 | 211 Main St | Lewis M Merlo Inc | remove an 8'x8' section of a garage slab to permit drain pipe repair, repair slab, drain pipe repair under seperate permit maher naDetails
remove an 8'x8' section of a garage slab to permit drain pipe repair, repair slab, drain pipe repair under seperate permit maher na | $65,000 |
| May 10, 2018 | Never finaled issued May 2018, no final | 2815 Bryant St | Doherty Restoration, Inc. | field revision to permit application #201701106892. includes foundation revision & steel moment frame substitution.Details
field revision to permit application #201701106892. includes foundation revision & steel moment frame substitution. | |
| Nov 8, 2017 | Completed final sign-off Sep 2018 | 116 New Montgomery St | D W Nicholson Corporation | 9/f roof- revision to pa#201607142351, add lateral bracing to supports for davits. all construction is below (e) parapet. n/a ordinance #155-13Details
9/f roof- revision to pa#201607142351, add lateral bracing to supports for davits. all construction is below (e) parapet. n/a ordinance #155-13 | $20,000 |
| Sep 26, 2017 | Completed final sign-off Aug 2018 | 450 Toland St | Charles Pankow Builders Ltd | revision to pa#201606281072-s2, remove existing plywood sheathing (3/8") and replace with new 1/2" plywood as required for roofing warranty. clarification & proposed bldg us as 41 (auto repair). n/a ordinance #155-13Details
revision to pa#201606281072-s2, remove existing plywood sheathing (3/8") and replace with new 1/2" plywood as required for roofing warranty. clarification & proposed bldg us as 41 (auto repair). n/a ordinance #155-13 | $150,000 |
| Sep 12, 2017 | Expired or cancelled withdrawn Nov 2019 | 40 Tiffany Av | soft story retrofit per sfebc chapter 4d, fema p-807.Details
soft story retrofit per sfebc chapter 4d, fema p-807. | $45,000 | |
| Aug 25, 2017 | Completed final sign-off Mar 2019 | 530 Bartlett St | Doherty Restoration, Inc. | soft story wood frame seismic retrofit of 1st level. soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4.Details
soft story wood frame seismic retrofit of 1st level. soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4. | $80,000 |
| Aug 2, 2017 | Never finaled issued Aug 2017, no final | 300 Clay St | recommencement of work approved under pa#200005261165: one maritime plaza seismic strengthening.Details
recommencement of work approved under pa#200005261165: one maritime plaza seismic strengthening. | $100,001 | |
| Jul 19, 2017 | Completed final sign-off Sep 2020 | 300 Clay St | Gci, Inc | partial phase 2 seismic upgrade on tenant floor 14th, strengthen floor 15th only. see m.o.u. dated 8/17/2002 ref. to pa# 2000-0526-1165 (renewed by pa# 2017-0802-3712)Details
partial phase 2 seismic upgrade on tenant floor 14th, strengthen floor 15th only. see m.o.u. dated 8/17/2002 ref. to pa# 2000-0526-1165 (renewed by pa# 2017-0802-3712) | $42,000 |
| May 12, 2017 | Expired or cancelled cancelled Jan 2026 | 1664 Washington St | soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4. | $190,000 | |
| May 3, 2017 | Completed final sign-off Dec 2017 | 201 California St | Matrix Hg Inc | roof- remove 2 cooling towers, 3 pumps install similar like & kind 2 cooling towers, 2 pumps. disconnect & reconnect electrical, install 4 new vfd's for towers & pumps, disconnect & reconnect pipingDetails
roof- remove 2 cooling towers, 3 pumps install similar like & kind 2 cooling towers, 2 pumps. disconnect & reconnect electrical, install 4 new vfd's for towers & pumps, disconnect & reconnect piping | $96,897 |
| Feb 9, 2017 | Completed final sign-off Jul 2018 | 511 Waller St | Nabi Construction & Engineering Inc | soft story retrofit in complian ce with sfbc for existing buildings. retrofit consists of plywood shear walls in basement. iebc app a4.Details
soft story retrofit in complian ce with sfbc for existing buildings. retrofit consists of plywood shear walls in basement. iebc app a4. | $35,000 |
| Feb 3, 2017 | Never finaled issued Feb 2017, no final | 285 Geary St | Sequoia Construction Services Inc | grd fl demo: remove extg non-bearing wall between spaces, remove ceiling, remove counters and cabinets. remove wood floor and tile floor. t.i. apply sf ab-017 accessibility provided under seperate permit. ground floor work to retail space at 285/287 geary street.Details
grd fl demo: remove extg non-bearing wall between spaces, remove ceiling, remove counters and cabinets. remove wood floor and tile floor. t.i. apply sf ab-017 accessibility provided under seperate permit. ground floor work to retail space at 285/287 geary street. | $20,000 |
| Jan 10, 2017 | Completed final sign-off Sep 2018 | 2815 Bryant St | Doherty Restoration, Inc. | weak story seismic retrofit. installation of a simpson strong frame. sfvc chapter-34b. fema p-807.Details
weak story seismic retrofit. installation of a simpson strong frame. sfvc chapter-34b. fema p-807. | $25,000 |
| Jan 10, 2017 | Completed final sign-off Nov 2018 | 520 Bartlett St | Doherty Restoration, Inc. | weak soft story seismic retrofit per sfebc chapter 4d. installation of simpson strong frame and shearwalls per cebc appendix a-4. n/a for maher ordinance.Details
weak soft story seismic retrofit per sfebc chapter 4d. installation of simpson strong frame and shearwalls per cebc appendix a-4. n/a for maher ordinance. | $35,000 |
| Jan 10, 2017 | Completed final sign-off Sep 2018 | 24 Felton St | Doherty Restoration, Inc. | weak story seismic retrofit. installation of a simpson strong frame. sfbc chapter-34b. fema p-807.Details
weak story seismic retrofit. installation of a simpson strong frame. sfbc chapter-34b. fema p-807. | $20,000 |
| Nov 16, 2016 | Completed final sign-off May 2017 | 1 Maritime Pz | Hathaway Dinwiddie Co. | 19/f- demo & renovate (e) partial floor office tenant to combine into full floor single tenant occupancy, new partitions, suspended ceilings, lighting & architectural finishes. related modify hvac & electrical systems. no modify to base bldg structure or life safety systems. n/a ordinance #155-13Details
19/f- demo & renovate (e) partial floor office tenant to combine into full floor single tenant occupancy, new partitions, suspended ceilings, lighting & architectural finishes. related modify hvac & electrical systems. no modify to base bldg structure or life safety systems. n/a ordinance #155-13 | $450,000 |
| Sep 1, 2016 | Completed final sign-off Jun 2019 | 3440 Pierce St | D Cappelletti & Sons Inc | weak story seismic retrofit work scope includes the installation of 2 steel moment resisting frames and foundations per asce 41-13Details
weak story seismic retrofit work scope includes the installation of 2 steel moment resisting frames and foundations per asce 41-13 | $25,000 |
| Jul 14, 2016 | Completed final sign-off Aug 2018 | 116 New Montgomery St | Dome Construction Corp | install structural steel supports on roof to support a davit system for window washing and facade maintenance. not visable from street. n/a ordinance #155-13Details
install structural steel supports on roof to support a davit system for window washing and facade maintenance. not visable from street. n/a ordinance #155-13 | $140,000 |
| Jun 7, 2016 | Completed final sign-off Feb 2017 | 2099 Market St | Wickman Development And Construction | shoring during excavation of grade beams.Details
shoring during excavation of grade beams. | $1,500 |
| May 23, 2016 | Completed final sign-off Mar 2017 | 300 Clay St | Hathaway Dinwiddie Co. | 19th floor: renovation of (e) partial floor office tenant space including new partitions, suspended ceilings, lighting, arch finishes, limited plumbing. related modifications to hvac, elect systems. no modifications to base building structure, core or life safety systems.Details
19th floor: renovation of (e) partial floor office tenant space including new partitions, suspended ceilings, lighting, arch finishes, limited plumbing. related modifications to hvac, elect systems. no modifications to base building structure, core or life safety systems. | $900,000 |
| Apr 28, 2016 | Expired or cancelled expired Jul 2021 | 108 Albion St | soft story retrofit per sfbc chapter 34b engineering criteria per asce 41-13 includes plywood shear walls, simpson strong walls and strong frame, and grade beams.Details
soft story retrofit per sfbc chapter 34b engineering criteria per asce 41-13 includes plywood shear walls, simpson strong walls and strong frame, and grade beams. | $40,000 | |
| Mar 22, 2016 | Completed final sign-off May 2016 | 116 New Montgomery St | Dome Construction Corp | change of anchorage for exterior windows on 3rd and 4th floors. revision to app#201503231577; maher n/aDetails
change of anchorage for exterior windows on 3rd and 4th floors. revision to app#201503231577; maher n/a | |
| Feb 22, 2016 | Expired or cancelled cancelled Jan 2026 | 444 Battery St | Matrix Hg Inc | demo & remove existing hvac system, replace with new hvac system except for air handler & furnace serving 444 battery, this portion to remain. aka as 9 maritime. n/a ordinance #155-13Details
demo & remove existing hvac system, replace with new hvac system except for air handler & furnace serving 444 battery, this portion to remain. aka as 9 maritime. n/a ordinance #155-13 | $283,394 |
| Nov 5, 2015 | Never finaled issued Jan 2016, no final | 1 Market St | installation of a temporary tent to be used for superbowl 50 events. tent to be erected on the roof plaza of steuart tower (7th floor) ** maher: n/a **Details
installation of a temporary tent to be used for superbowl 50 events. tent to be erected on the roof plaza of steuart tower (7th floor) ** maher: n/a ** | $50,000 | |
| Mar 27, 2015 | Never finaled issued Nov 2015, no final | 1880 Pine St | Nibbi Bros Assoc Inc. | moh rad program. rehabilitation of an (e) affordable senor & disabled housing high rise. work will include voluntary structural upgrades, accessibility upgrades to common areas. accessibility & finish upgrades to 24 units, & upgradees to exterior common areas. scope of work include: arch, landscape,Details
moh rad program. rehabilitation of an (e) affordable senor & disabled housing high rise. work will include voluntary structural upgrades, accessibility upgrades to common areas. accessibility & finish upgrades to 24 units, & upgradees to exterior common areas. scope of work include: arch, landscape, | $7,936,478 |
| Apr 9, 2008 | Completed final sign-off Oct 2008 | 1 Market St | Hathaway Dinwiddie Co. | 27th floor, steuart tower - addition of structural members below deck fot i.t. room ups battery, addition of steel platform in i.t. room for server cabinets, revision to pa# 2007-1128-9077Details
27th floor, steuart tower - addition of structural members below deck fot i.t. room ups battery, addition of steel platform in i.t. room for server cabinets, revision to pa# 2007-1128-9077 | $10,000 |
| Dec 7, 2007 | Completed final sign-off Feb 2009 | 580 California St | Bcci Construction Company | removal of (e) stairwells (abandoned -communication stairs) at 22nd - 23rd floor & 21st - 22nd floor. infill of slabs at same. barrier removal at restrooms on 22nd + 23rd floor.Details
removal of (e) stairwells (abandoned -communication stairs) at 22nd - 23rd floor & 21st - 22nd floor. infill of slabs at same. barrier removal at restrooms on 22nd + 23rd floor. | $60,000 |
| Mar 15, 2006 | Completed final sign-off Mar 2009 | 900 North Point St | the project scope includes alteration & seismic strengthening of ghirardelli square.seismic strengthening consists of anchorage of (e)brick walls to wood floors & roof,install plywood sheathing to (e)timber floor system,new steel braces & steel collectors located within bldg. interior,Details
the project scope includes alteration & seismic strengthening of ghirardelli square.seismic strengthening consists of anchorage of (e)brick walls to wood floors & roof,install plywood sheathing to (e)timber floor system,new steel braces & steel collectors located within bldg. interior, | $3,000,000 | |
| Jan 11, 2006 | Expired or cancelled expired Feb 2009 | 909 Montgomery St | demo extg single story stair (5th to 6th floor) infill extg stiar openings at 6th floor.Details
demo extg single story stair (5th to 6th floor) infill extg stiar openings at 6th floor. | $5,000 |