Ryan Paul January
- Listed as
- engineer
- Firm
- Brand Energy & Infrastructure
- Based in
- Kansas City
- On San Francisco permits
- Apr 2006 to Nov 2015
21 permits since 2000 (engineer on 21 permits): 15 completed, 4 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 5, 2015 | Never finaled issued Jan 2016, no final | 1 Market St | installation of a temporary tent to be used for superbowl 50 events. tent to be erected on the roof plaza of steuart tower (7th floor) ** maher: n/a **Details
installation of a temporary tent to be used for superbowl 50 events. tent to be erected on the roof plaza of steuart tower (7th floor) ** maher: n/a ** | $50,000 | |
| Aug 18, 2015 | Completed final sign-off Feb 2017 | 75 Hawthorne St | Turner Construction Co | structural strengthening of one rail supporting a bldg maintenance unit on the roof. repair in kind.Details
structural strengthening of one rail supporting a bldg maintenance unit on the roof. repair in kind. | $6,078 |
| May 29, 2015 | Completed final sign-off Dec 2016 | 201 Mission St | Richlen Construction | roof-mounted track strengthening for building maintenance unit replacement. n/a ordinance #155-13Details
roof-mounted track strengthening for building maintenance unit replacement. n/a ordinance #155-13 | $135,000 |
| May 28, 2014 | Never finaled issued Jun 2014, no final | 100 Spear St | Acco Engineered Systems Inc. Dba Acco En | remove & replace 500 ton cooling tower and vfd. n/a ordinance #155-13Details
remove & replace 500 ton cooling tower and vfd. n/a ordinance #155-13 | $350,000 |
| Jan 8, 2014 | Completed final sign-off Feb 2014 | 1050 Battery St | Western Allied Mechanical Inc. | revision to pa# 201302190390 revised structural drawing s3.01, revise (4) existing posts up thru roof in lieu of installing new steel post for new frame. attach new steel frame are weld detail. (compliance with ord no 155-13 not required)Details
revision to pa# 201302190390 revised structural drawing s3.01, revise (4) existing posts up thru roof in lieu of installing new steel post for new frame. attach new steel frame are weld detail. (compliance with ord no 155-13 not required) | |
| Dec 20, 2013 | Completed final sign-off Nov 2016 | 75 Hawthorne St | Turner Construction Co | full 11th floor t.i. selective demo, partitions, mep. structural limited to server room. sprinklers & fire alarm on separate permit. interim controls - market street & soma: permit for structural or architectural work above ground floor.Details
full 11th floor t.i. selective demo, partitions, mep. structural limited to server room. sprinklers & fire alarm on separate permit. interim controls - market street & soma: permit for structural or architectural work above ground floor. | $1,898,641 |
| Dec 20, 2013 | Completed final sign-off Jan 2017 | 75 Hawthorne St | Turner Construction Co | full 1st&13/fl ti.partial 2/fl ti. restroom fully upgraded. mep,sprinkler,fire alarm & ti on separate permit. accessory child care use on grd fl. interim controls - market street & soma: permit for structural or architectural work above ground floor.Details
full 1st&13/fl ti.partial 2/fl ti. restroom fully upgraded. mep,sprinkler,fire alarm & ti on separate permit. accessory child care use on grd fl. interim controls - market street & soma: permit for structural or architectural work above ground floor. | $9,498,301 |
| Jul 30, 2013 | Completed final sign-off Apr 2014 | 637 Commercial St | Western Allied Mechanical Inc. | hvac retrofit, replace existing a/c unit on roof with new air cooled a/c unit. replace existing boiler and hot water pump on roof.Details
hvac retrofit, replace existing a/c unit on roof with new air cooled a/c unit. replace existing boiler and hot water pump on roof. | $250,000 |
| Feb 19, 2013 | Completed final sign-off Feb 2014 | 1050 Battery St | Western Allied Mechanical Inc. | replace existing 40-ton split rooftop air conditioning unit with new 40-ton packaged rooftop air conditioning unitDetails
replace existing 40-ton split rooftop air conditioning unit with new 40-ton packaged rooftop air conditioning unit | $120,000 |
| Jan 14, 2013 | Completed final sign-off Oct 2014 | 50 Fremont St | Hathaway Dinwiddie Co. | installation of convenience stairs between floors levels 25 and 26. fire alarm submittal to reprogram 25 & 26 as a single zone.Details
installation of convenience stairs between floors levels 25 and 26. fire alarm submittal to reprogram 25 & 26 as a single zone. | $126,000 |
| Nov 20, 2012 | Completed final sign-off May 2013 | 1 Market St | Hathaway Dinwiddie Co. | renovation of existing interconnecting stair including new, non-structural walls & finishes and associated demolition.Details
renovation of existing interconnecting stair including new, non-structural walls & finishes and associated demolition. | $50,000 |
| Aug 20, 2012 | Never finaled issued Aug 2012, no final | 201 Mission St | Jones Lang La Salle Construction Company | ti to demo and construct new partitions, doors, and finishes on the 7th fl. structural work to support high density file system. elec, mech, sprinklers,life safety on sep permitDetails
ti to demo and construct new partitions, doors, and finishes on the 7th fl. structural work to support high density file system. elec, mech, sprinklers,life safety on sep permit | $273,000 |
| May 25, 2011 | Completed final sign-off Jan 2012 | 201 Mission St | Turner Construction Co | roof and basement work. replace cooling towers on roof. 3 new cooling towers. work to be done in three phases. structural work, mechanical and electrical. some work to be done in basementDetails
roof and basement work. replace cooling towers on roof. 3 new cooling towers. work to be done in three phases. structural work, mechanical and electrical. some work to be done in basement | $1,649,177 |
| Mar 21, 2011 | Completed final sign-off Jan 2016 | 717 Battery St | Bcci Construction Company | installation of structural shoring for umb construction. this work associated with umb pa# 2010/05/06/1863.Details
installation of structural shoring for umb construction. this work associated with umb pa# 2010/05/06/1863. | $105,000 |
| Jun 22, 2010 | Completed final sign-off Apr 2011 | 1 Maritime Pz | Hathaway Dinwiddie Co. | remove / demolish (e) interconnecting stair, enlarge slab opening, provide new interconnecting stair between floors 24 & 25. office t.i. per permits: 25th floor: pa# 2010/06/03/3746 & 24th floor: pa# 2010/05/18/2646.Details
remove / demolish (e) interconnecting stair, enlarge slab opening, provide new interconnecting stair between floors 24 & 25. office t.i. per permits: 25th floor: pa# 2010/06/03/3746 & 24th floor: pa# 2010/05/18/2646. | $50,000 |
| Nov 25, 2008 | Completed final sign-off Apr 2009 | 750 Sutter St | Webcor Construction Lp | revision to addendum pa# 2007-0307-5620s (architectural addendum)-replace 2 (e) elevators with 1 new elevator. scope of work schall be identified as follows: architecture delta 5Details
revision to addendum pa# 2007-0307-5620s (architectural addendum)-replace 2 (e) elevators with 1 new elevator. scope of work schall be identified as follows: architecture delta 5 | |
| Sep 29, 2008 | Expired or cancelled withdrawn Dec 2008 | 300 Clay St | Bcci Construction Company | at 18th fl: structural work associated w/ approved permit #200808250002, structural work at server room floor.Details
at 18th fl: structural work associated w/ approved permit #200808250002, structural work at server room floor. | $18,000 |
| May 14, 2008 | Completed final sign-off Oct 2008 | 1 Market St | #1320- revision to pa# 2008/03/19/7497 to include structural reinforcement for new file room.Details
#1320- revision to pa# 2008/03/19/7497 to include structural reinforcement for new file room. | $47,643 | |
| Apr 10, 2008 | Never finaled issued Apr 2008, no final | 1 Market St | Hathaway Dinwiddie Co. | providing beam penetrations for waste pipe below deck of level 27, revision to pa #200711289077Details
providing beam penetrations for waste pipe below deck of level 27, revision to pa #200711289077 | $5,000 |
| Sep 22, 2006 | Expired or cancelled expired Mar 2009 | 201 Mission St | fabrication and installation of a steel framed catwalk system at the penthouse level of the tower for cooling tower maintenance.Details
fabrication and installation of a steel framed catwalk system at the penthouse level of the tower for cooling tower maintenance. | $50,000 | |
| Apr 20, 2006 | Completed final sign-off Mar 2011 | 900 North Point St | remediation of loose to medium dense soils below existing building foundations by per meation grouting. buildings included in this scope include chocolate, mustard and cocaDetails
remediation of loose to medium dense soils below existing building foundations by per meation grouting. buildings included in this scope include chocolate, mustard and coca | $450,000 |