Permit GraphShortlistSan Francisco building permits since 2000

Block 3718, lot 026

201 Mission St

City’s use
Commercial Office
Built
1981
Stories
30
Building
547,960 sq ft
Lot
69,268 sq ft
Zoning
C3O
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 29, 2026In progress
issued Nov 2026
201 Mission StRichlen Construction27th floor: ref pa#202610018880 instulation new sink and faucets at breakroom areas. replacing existing electric tank water heater serving core restroom fixtures for the associates level. replacing existing restroom fixtures with new low flow ones. adding leak protection devices to plumbing
Details
Permit
202610290097
Permit issued
Nov 5, 2026

27th floor: ref pa#202610018880 instulation new sink and faucets at breakroom areas. replacing existing electric tank water heater serving core restroom fixtures for the associates level. replacing existing restroom fixtures with new low flow ones. adding leak protection devices to plumbing

Open the permit page

$20,000
Oct 16, 2026In progress
issued Oct 2026
201 Mission StRichlen Constructionnew power and signal devices throughout the space. new 2025 tiltle 24 compliant lighting and controls
Details
Permit
202610169548
Permit issued
Oct 23, 2026

new power and signal devices throughout the space. new 2025 tiltle 24 compliant lighting and controls

Open the permit page

$752,879
Oct 16, 2026In progress
issued Oct 2026
201 Mission StRichlen Constructiondemo exist ductwork, diffusers, grilles and 4 wshps with associated ductwork and condenser water piping to bldg mains cap piping;retain vav boxes and health water piping.new work inst new hp/lp ductwork, vav plenums, insulation, diffusers, grilles, fire smoke damper,repair insulation, modify duct
Details
Permit
202610169529
Permit issued
Oct 29, 2026

demo exist ductwork, diffusers, grilles and 4 wshps with associated ductwork and condenser water piping to bldg mains cap piping;retain vav boxes and health water piping.new work inst new hp/lp ductwork, vav plenums, insulation, diffusers, grilles, fire smoke damper,repair insulation, modify duct

Open the permit page

$350,465
Oct 12, 2026In progress
filed Oct 2026, not yet issued
201 Mission Stremoval of existing building generator and installation of new building generator. expansion of existing concrete pad for generator. no new partitions, ceilings, etc.
Details
Permit
202609168170

removal of existing building generator and installation of new building generator. expansion of existing concrete pad for generator. no new partitions, ceilings, etc.

Open the permit page

$286,644
Oct 1, 2026In progress
issued Oct 2026
201 Mission StRichlen Constructionsuites 2700 & 2750 interior demo & construction of elements including but not limited to interior partitions, doors finishes, acoustic ceiings, open ceiilngs & light fixtures. alteration work to rr's elev lobby & common corridor on 27th floor. path of travel approved separated under pa 202303012812
Details
Permit
202610018880
Permit issued
Oct 5, 2026

suites 2700 & 2750 interior demo & construction of elements including but not limited to interior partitions, doors finishes, acoustic ceiings, open ceiilngs & light fixtures. alteration work to rr's elev lobby & common corridor on 27th floor. path of travel approved separated under pa 202303012812

Open the permit page

$715,000
Sep 11, 2026In progress
issued Sep 2026
201 Mission StRichlen Constructionmech: replace duct work, transfer fan relocation, supply air diffusers, rework flexible inlet duct connectors, install new balancing dampers where required. check all hvac equip. elec: new lighting fixtures and associated circuiting /controls, new power and signal devices and associated wiring. ref
Details
Permit
202609118019
Permit issued
Sep 16, 2026

mech: replace duct work, transfer fan relocation, supply air diffusers, rework flexible inlet duct connectors, install new balancing dampers where required. check all hvac equip. elec: new lighting fixtures and associated circuiting /controls, new power and signal devices and associated wiring. ref

Open the permit page

$337,875
Aug 25, 2026In progress
issued Sep 2026
201 Mission StRichlen Constructionref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical.
Details
Permit
202608257109
Permit issued
Sep 1, 2026

ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical.

Open the permit page

$322,135
Jul 29, 2026In progress
issued Jul 2026
201 Mission StSpecialized Graphics Incemergency evacuation map installation/inspection
Details
Permit
202607295762
Permit issued
Jul 29, 2026

emergency evacuation map installation/inspection

Open the permit page

$5,000
Jun 24, 2026In progress
issued Aug 2026
201 Mission StRichlen Construction14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits.
Details
Permit
202606243869
Permit issued
Aug 21, 2026

14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits.

Open the permit page

$285,000
Jun 17, 2026Completed
final sign-off Jul 2026
201 Mission StRichlen Construction23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location.
Details
Permit
202606173393
Permit issued
Jun 30, 2026
Final sign-off
Jul 24, 2026

23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location.

Open the permit page

$56,543
Jun 4, 2026Completed
final sign-off Aug 2026
201 Mission StRichlen Construction22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles.
Details
Permit
202606042522
Permit issued
Jun 4, 2026
Final sign-off
Aug 27, 2026

22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles.

Open the permit page

$190,288
Jun 4, 2026Completed
final sign-off Sep 2026
201 Mission StRichlen Construction21 fl - ste: 2150 - hvac relocate (e) difusers, air grills, modify heat pump add thermostats. mech deferred for 202605201639
Details
Permit
202606042534
Permit issued
Jun 10, 2026
Final sign-off
Sep 10, 2026

21 fl - ste: 2150 - hvac relocate (e) difusers, air grills, modify heat pump add thermostats. mech deferred for 202605201639

Open the permit page

$60,000
Jun 4, 2026Completed
final sign-off Sep 2026
201 Mission StRichlen Construction21fl - ste 2150: def electrical for 202605201639 : new light fixtures and ciruits/ controls new power signal devices.
Details
Permit
202606042547
Permit issued
Jun 10, 2026
Final sign-off
Sep 10, 2026

21fl - ste 2150: def electrical for 202605201639 : new light fixtures and ciruits/ controls new power signal devices.

Open the permit page

$127,465
May 20, 2026Completed
final sign-off Sep 2026
201 Mission StRichlen Construction21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved
Details
Permit
202605201639
Permit issued
Jun 3, 2026
Final sign-off
Sep 10, 2026

21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved

Open the permit page

$218,435
Apr 23, 2026Completed
final sign-off Aug 2026
201 Mission StRichlen Constructionfloor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit.
Details
Permit
202604239932
Permit issued
Apr 28, 2026
Final sign-off
Aug 27, 2026

floor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit.

Open the permit page

$341,000
Mar 27, 2026In progress
issued Mar 2026
201 Mission StTerra Visual Incinstall new electric internally illuminated channel letter address sign (201)
Details
Permit
202603278440
Permit issued
Mar 31, 2026

install new electric internally illuminated channel letter address sign (201)

Open the permit page

$5,000
Mar 9, 2026Completed
final sign-off Jun 2026
201 Mission StRichlen Constructionsuite 2350: deferred mep for pa # 2026-0121-4223. new ducts & air distribution. new lighting, power & plumbing.
Details
Permit
202603097157
Permit issued
Mar 12, 2026
Final sign-off
Jun 29, 2026

suite 2350: deferred mep for pa # 2026-0121-4223. new ducts & air distribution. new lighting, power & plumbing.

Open the permit page

$25,000
Feb 12, 2026Completed
final sign-off May 2026
201 Mission StEveron Llcfire alarm t.i. suite 2350 replace (1) existing speaker with speaker strobe remove (2) speakers ref pa# 2026-0121-4223.
Details
Permit
202602125880
Permit issued
Feb 12, 2026
Final sign-off
May 29, 2026

fire alarm t.i. suite 2350 replace (1) existing speaker with speaker strobe remove (2) speakers ref pa# 2026-0121-4223.

Open the permit page

$1,000
Feb 12, 2026In progress
issued Feb 2026
201 Mission StPribuss Engineering Incmodify sprinkler head locations to accommodate new ceiling and partition layout for new office space of suite 2350. ref pa# 2026-0121-4223 total sprinklers
Details
Permit
202602125821
Permit issued
Feb 26, 2026

modify sprinkler head locations to accommodate new ceiling and partition layout for new office space of suite 2350. ref pa# 2026-0121-4223 total sprinklers

Open the permit page

$19,950
Feb 5, 2026Completed
final sign-off Mar 2026
201 Mission StRichlen Constructionpatio demo. remove exisitng planting beds & security fencing
Details
Permit
202602055297
Permit issued
Mar 12, 2026
Final sign-off
Mar 19, 2026

patio demo. remove exisitng planting beds & security fencing

Open the permit page

$46,484
Feb 4, 2026In progress
issued Feb 2026
201 Mission StEveron Llc29th/f provide 1 control relay for access control
Details
Permit
202602045208
Permit issued
Feb 4, 2026

29th/f provide 1 control relay for access control

Open the permit page

$1,000
Feb 2, 2026In progress
issued Feb 2026
201 Mission StEveron Llcfire alarm t.i. on the 23rd floor-common corridor area. replace 1 existing strobe & 1 existing speaker/strobe. add 1 duct detector with relay for fsc. ref pa #202510308608
Details
Permit
202602025021
Permit issued
Feb 4, 2026

fire alarm t.i. on the 23rd floor-common corridor area. replace 1 existing strobe & 1 existing speaker/strobe. add 1 duct detector with relay for fsc. ref pa #202510308608

Open the permit page

$3,500
Jan 22, 2026Completed
final sign-off Jul 2026
201 Mission StRichlen Construction23rd flr. mep permit for approved architectual scope. new fsd and supply diffusers. new lighting and power. ref pa#: 202510308608.
Details
Permit
202601224304
Permit issued
Feb 12, 2026
Final sign-off
Jul 20, 2026

23rd flr. mep permit for approved architectual scope. new fsd and supply diffusers. new lighting and power. ref pa#: 202510308608.

Open the permit page

$249,348
Jan 21, 2026Completed
final sign-off Jun 2026
201 Mission StRichlen Constructionste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permits
Details
Permit
202601214223
Permit issued
Feb 2, 2026
Final sign-off
Jun 29, 2026

ste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permits

Open the permit page

$255,000
Jan 8, 2026Completed
final sign-off Jan 2026
201 Mission StPioneer Fire Inc.23/f: relocate 8 uprights. ref t.i permit 202510308608.
Details
Permit
202601083446
Permit issued
Jan 8, 2026
Final sign-off
Jan 20, 2026

23/f: relocate 8 uprights. ref t.i permit 202510308608.

Open the permit page

$2,000
Dec 23, 2025Completed
final sign-off Sep 2026
201 Mission StEveron Llc1st & 2nd fl fire alarm t.i. add(27)speaker/strobes. replace(2)existing speaker/strobes, add(1)weatherproof speaker/strobes, add (3) duct detector w/ relays for heat pumps. relocate existing 2-way sub-station, remote anneciator & manual pull to new guard's desk.ref#: 202504214848
Details
Permit
202512232556
Permit issued
Dec 30, 2025
Final sign-off
Sep 22, 2026

1st & 2nd fl fire alarm t.i. add(27)speaker/strobes. replace(2)existing speaker/strobes, add(1)weatherproof speaker/strobes, add (3) duct detector w/ relays for heat pumps. relocate existing 2-way sub-station, remote anneciator & manual pull to new guard's desk.ref#: 202504214848

Open the permit page

$25,000
Dec 18, 2025In progress
issued Jul 2026
201 Mission StRichlen Construction1st floor: convert 2449 sqft of retail space to office to provide tenant amenities.
Details
Permit
202512182148
Permit issued
Jul 7, 2026

1st floor: convert 2449 sqft of retail space to office to provide tenant amenities.

Open the permit page

$550,000
Nov 13, 2025Completed
final sign-off Dec 2025
201 Mission StEveron Llc5/f suite 560: fire alarm t.i - add 1 duct detector with relay for heat pump. ref permit 202509306380
Details
Permit
202511139553
Permit issued
Nov 13, 2025
Final sign-off
Dec 8, 2025

5/f suite 560: fire alarm t.i - add 1 duct detector with relay for heat pump. ref permit 202509306380

Open the permit page

$2,500
Nov 7, 2025Completed
final sign-off Jan 2026
201 Mission StRichlen Construction5/f: administrative permit to revise scope of work per building inspector. verbiage change from mep deferred to no mep required. ref pa# 202510066828.
Details
Permit
202511079208
Permit issued
Jan 12, 2026
Final sign-off
Jan 20, 2026

5/f: administrative permit to revise scope of work per building inspector. verbiage change from mep deferred to no mep required. ref pa# 202510066828.

Open the permit page

Oct 30, 2025Completed
final sign-off Jul 2026
201 Mission StRichlen Construction23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as-is. new finishes & plumbing fixtures at existing mens & womens rrs to be ada compliant.
Details
Permit
202510308608
Permit issued
Nov 6, 2025
Final sign-off
Jul 20, 2026

23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as-is. new finishes & plumbing fixtures at existing mens & womens rrs to be ada compliant.

Open the permit page

$657,000
Oct 15, 2025Completed
final sign-off Jul 2026
201 Mission StAnderson, Rowe & Buckley, Inc.1st & 2nd fl - fire sprinkler ti, relocate 51 and add 07. total 58. ref pa 202504214848
Details
Permit
202510157367
Permit issued
Dec 12, 2025
Final sign-off
Jul 8, 2026

1st & 2nd fl - fire sprinkler ti, relocate 51 and add 07. total 58. ref pa 202504214848

Open the permit page

$29,848
Oct 9, 2025Completed
final sign-off Nov 2025
201 Mission StEveron Llc5th fl, ste 510 - fire alarm ti add 2 speakers only. ref pa 202510066828
Details
Permit
202510097124
Permit issued
Nov 4, 2025
Final sign-off
Nov 25, 2025

5th fl, ste 510 - fire alarm ti add 2 speakers only. ref pa 202510066828

Open the permit page

$1,000
Oct 6, 2025Completed
final sign-off Jan 2026
201 Mission StRichlen Constructionsuite 510. new partitions, offices and conference rooms. mep deferred. no plumbing fixtures.
Details
Permit
202510066828
Permit issued
Oct 29, 2025
Final sign-off
Jan 20, 2026

suite 510. new partitions, offices and conference rooms. mep deferred. no plumbing fixtures.

Open the permit page

$220,000
Sep 30, 2025Completed
final sign-off Jan 2026
201 Mission StAma Design-Build Llcunit#560: non structural partitions, offices and conference rooms. mep deferred. s.c
Details
Permit
202509306380
Permit issued
Oct 22, 2025
Final sign-off
Jan 13, 2026

unit#560: non structural partitions, offices and conference rooms. mep deferred. s.c

Open the permit page

$190,000
Aug 15, 2025In progress
issued Aug 2025
201 Mission StEveron Llcsuite 1900. fire alarm t.i. on 19th flr. replace 1 speaker/strobe w/ speaker and add 1 speaker only.
Details
Permit
202508153164
Permit issued
Aug 15, 2025

suite 1900. fire alarm t.i. on 19th flr. replace 1 speaker/strobe w/ speaker and add 1 speaker only.

Open the permit page

$1,400
Jul 17, 2025Completed
final sign-off Sep 2025
201 Mission StRichlen Constructionsuite 1900. interior tenant improvement. removal of non structural partition, new non structural partitions, door assembly, sidelight and electrical outlets. no plumbing fixtures.
Details
Permit
202507171031
Permit issued
Jul 21, 2025
Final sign-off
Sep 8, 2025

suite 1900. interior tenant improvement. removal of non structural partition, new non structural partitions, door assembly, sidelight and electrical outlets. no plumbing fixtures.

Open the permit page

$120,000
Jun 16, 2025Completed
final sign-off Aug 2025
201 Mission StEveron Llcreplace e) annunciator & 2-way comm. command center (desk phone) to temporary guard's desk
Details
Permit
202506168758
Permit issued
Jun 16, 2025
Final sign-off
Aug 4, 2025

replace e) annunciator & 2-way comm. command center (desk phone) to temporary guard's desk

Open the permit page

$2,000
Apr 21, 2025Completed
final sign-off Oct 2026
201 Mission StBcci Construction Companyfloor 1, remodel main entry portal, remodal of escalator, remove int water feature, new reception/security counter, remodel elev lobbies,floor wall and ceiling finish updates, lighting replacement and addition throughout, no change to back of house, int demo of prior retail space with new work for
Details
Permit
202504214848
Permit issued
Oct 28, 2025
Final sign-off
Oct 26, 2026

floor 1, remodel main entry portal, remodal of escalator, remove int water feature, new reception/security counter, remodel elev lobbies,floor wall and ceiling finish updates, lighting replacement and addition throughout, no change to back of house, int demo of prior retail space with new work for

Open the permit page

$4,913,284
Apr 21, 2025Completed
final sign-off Oct 2026
201 Mission StBcci Construction Company1st fl - remove concrete stair #9, remove column supporting landing @ floor 2; 2nd fl - remove portion of stair #9 landing, infill guardrail wall @ stair landing removal area; refinish guardrail wall and add drink (floor 2)
Details
Permit
202504214865
Permit issued
Oct 27, 2025
Final sign-off
Oct 13, 2026

1st fl - remove concrete stair #9, remove column supporting landing @ floor 2; 2nd fl - remove portion of stair #9 landing, infill guardrail wall @ stair landing removal area; refinish guardrail wall and add drink (floor 2)

Open the permit page

$120,000
Nov 22, 2024Completed
final sign-off Dec 2024
201 Mission StEveron Llcfire alarm t.i. on 13th floor: add 1 speaker strobes, 1 speaker only and relocate 1 existing smoke detector. ref pa#202410022144
Details
Permit
202411225576
Permit issued
Nov 22, 2024
Final sign-off
Dec 11, 2024

fire alarm t.i. on 13th floor: add 1 speaker strobes, 1 speaker only and relocate 1 existing smoke detector. ref pa#202410022144

Open the permit page

$2,500
Nov 6, 2024In progress
issued Nov 2024
201 Mission StGolden Gate Fire Protection Inc13th flr. relocate 2 pendent sprinklers on the 13th flr suite 1380. ref pa 202410022144
Details
Permit
202411064477
Permit issued
Nov 8, 2024

13th flr. relocate 2 pendent sprinklers on the 13th flr suite 1380. ref pa 202410022144

Open the permit page

$2,000
Oct 24, 2024Completed
final sign-off Dec 2024
201 Mission StRichlen Construction13/fl- ti (n) cased opening to combine suite 1300 and 1310 and (n) undercounter low-temp dishwasher (ada). no mech work
Details
Permit
202410243686
Permit issued
Nov 1, 2024
Final sign-off
Dec 17, 2024

13/fl- ti (n) cased opening to combine suite 1300 and 1310 and (n) undercounter low-temp dishwasher (ada). no mech work

Open the permit page

$40,000
Oct 2, 2024Completed
final sign-off Dec 2024
201 Mission StRichlen Construction13th fl, ste 1380 - interior ti removal of select existing non-structural partition and addition of new office and millwork at existing break area
Details
Permit
202410022144
Permit issued
Oct 23, 2024
Final sign-off
Dec 17, 2024

13th fl, ste 1380 - interior ti removal of select existing non-structural partition and addition of new office and millwork at existing break area

Open the permit page

$139,748
May 14, 2024In progress
issued Jan 2025
201 Mission StBcci Construction Companyoffice ti - to 9 elevator hoistway from basement to underside of l2 demo of partitions and concrete deck at ground floor to extend elevator hoistway to basement for elevator sevice to . (n) fire rated partitions to continue hoistway protection for fire and smoke separation . (n) structural pads and
Details
Permit
202405142112
Permit issued
Jan 30, 2025

office ti - to 9 elevator hoistway from basement to underside of l2 demo of partitions and concrete deck at ground floor to extend elevator hoistway to basement for elevator sevice to . (n) fire rated partitions to continue hoistway protection for fire and smoke separation . (n) structural pads and

Open the permit page

$2,400,000
Apr 25, 2024Completed
final sign-off May 2024
201 Mission StPioneer Fire Inc.relocate (2) pendents, add (1) upright, (1) pendent convert (4) uprights to pendents 25th fl. gc ti #202310037884.
Details
Permit
202404250720
Permit issued
Apr 25, 2024
Final sign-off
May 31, 2024

relocate (2) pendents, add (1) upright, (1) pendent convert (4) uprights to pendents 25th fl. gc ti #202310037884.

Open the permit page

$1,200
Apr 11, 2024In progress
issued Apr 2024
201 Mission StPribuss Engineering Incref 202402286712- 5th floor office space to modify sprinkler head locations to accommodate (n) ceiling and partition layout
Details
Permit
202404119764
Permit issued
Apr 11, 2024

ref 202402286712- 5th floor office space to modify sprinkler head locations to accommodate (n) ceiling and partition layout

Open the permit page

$1,542
Apr 11, 2024Completed
final sign-off Apr 2024
201 Mission StPribuss Engineering Incref 202402145870- 18th floor office space to modify sprinkler head locations to accommodate (n) ceiling and partition layout
Details
Permit
202404119763
Permit issued
Apr 11, 2024
Final sign-off
Apr 25, 2024

ref 202402145870- 18th floor office space to modify sprinkler head locations to accommodate (n) ceiling and partition layout

Open the permit page

$1,028
Apr 11, 2024In progress
issued Apr 2024
201 Mission StPribuss Engineering Incref 202402286715- 18th floor modify sprinkler head locations to accommodate (n) ceiling and partition layout for (e) elevator lobby
Details
Permit
202404119762
Permit issued
Apr 11, 2024

ref 202402286715- 18th floor modify sprinkler head locations to accommodate (n) ceiling and partition layout for (e) elevator lobby

Open the permit page

$2,056
Apr 1, 2024Completed
final sign-off May 2024
201 Mission StEveron Llcfire alarm t.i. on 5th fl. elevator lobby replace 1 smoke detector and 1 speaker strobe with new ref pa# 2024-0228-6712
Details
Permit
202404019041
Permit issued
Apr 5, 2024
Final sign-off
May 30, 2024

fire alarm t.i. on 5th fl. elevator lobby replace 1 smoke detector and 1 speaker strobe with new ref pa# 2024-0228-6712

Open the permit page

$1,500
Apr 1, 2024Completed
final sign-off May 2024
201 Mission StEveron Llc18/f: fire alarm ti on 18th floor - elevator lobby. add (5) duct detectors for fsds, relocate (4) smoke detectors, and repalce (2) smoke detectors and (2) speaker strobes with new. ref # 202402286715
Details
Permit
202404019038
Permit issued
Apr 5, 2024
Final sign-off
May 24, 2024

18/f: fire alarm ti on 18th floor - elevator lobby. add (5) duct detectors for fsds, relocate (4) smoke detectors, and repalce (2) smoke detectors and (2) speaker strobes with new. ref # 202402286715

Open the permit page

$8,000
Apr 1, 2024Completed
final sign-off Apr 2024
201 Mission StEveron Llc18th/f: fire alarm t.i. ste # 1850: replace 3 speaker strobes w/ new, add 1 speaker strobe, 1 speaker, & 1 smoke detector. ref to 202402145870
Details
Permit
202404019034
Permit issued
Apr 1, 2024
Final sign-off
Apr 11, 2024

18th/f: fire alarm t.i. ste # 1850: replace 3 speaker strobes w/ new, add 1 speaker strobe, 1 speaker, & 1 smoke detector. ref to 202402145870

Open the permit page

$4,200
Mar 14, 2024Completed
final sign-off May 2024
201 Mission StRichlen Constructionrevision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference.
Details
Permit
202403147792
Permit issued
Mar 20, 2024
Final sign-off
May 2, 2024

revision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference.

Open the permit page

Mar 11, 2024Completed
final sign-off Jul 2025
201 Mission StCapitol Electric Constelectrical generator tap can to be installed- ground floor
Details
Permit
202403117576
Permit issued
Jun 18, 2024
Final sign-off
Jul 7, 2025

electrical generator tap can to be installed- ground floor

Open the permit page

$75,000
Feb 28, 2024Completed
final sign-off Jun 2024
201 Mission StRichlen Constructioninterior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to remain as is. no exterior work. sprinkler system & l/s mod under separate permit.
Details
Permit
202402286715
Permit issued
Mar 20, 2024
Final sign-off
Jun 5, 2024

interior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to remain as is. no exterior work. sprinkler system & l/s mod under separate permit.

Open the permit page

$158,000
Feb 28, 2024Completed
final sign-off Jun 2024
201 Mission StRichlen Constructioninterior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is. no exterior work. sprinkler, lw mod under sep permit.
Details
Permit
202402286712
Permit issued
Mar 20, 2024
Final sign-off
Jun 5, 2024

interior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is. no exterior work. sprinkler, lw mod under sep permit.

Open the permit page

$60,000
Feb 21, 2024Completed
final sign-off Mar 2024
201 Mission StGolden Gate Fire Protection Inc22/f suite 2230: fire sprinkles relocate 24 pendents. ref ti pa 202311090499
Details
Permit
202402216223
Permit issued
Feb 21, 2024
Final sign-off
Mar 12, 2024

22/f suite 2230: fire sprinkles relocate 24 pendents. ref ti pa 202311090499

Open the permit page

$14,500
Feb 14, 2024Completed
final sign-off May 2024
201 Mission StRichlen Construction18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities or
Details
Permit
202402145870
Permit issued
Mar 6, 2024
Final sign-off
May 29, 2024

18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities or

Open the permit page

$216,353
Feb 9, 2024Completed
final sign-off Mar 2024
201 Mission StEveron Llcfire alarm ti, ste 710 add 4 speaker strobes & 6 speakers only. ref pa 2023-1109-0493
Details
Permit
202402095664
Permit issued
Feb 12, 2024
Final sign-off
Mar 21, 2024

fire alarm ti, ste 710 add 4 speaker strobes & 6 speakers only. ref pa 2023-1109-0493

Open the permit page

$6,000
Feb 9, 2024Completed
final sign-off Mar 2024
201 Mission StEveron Llcfire alarm ti, ste 2230. add 4 speaker strobes & 3 speakers only ref pa 2023-1109-0499
Details
Permit
202402095662
Permit issued
Feb 12, 2024
Final sign-off
Mar 21, 2024

fire alarm ti, ste 2230. add 4 speaker strobes & 3 speakers only ref pa 2023-1109-0499

Open the permit page

$4,200
Feb 9, 2024Completed
final sign-off Apr 2024
201 Mission StGolden Gate Fire Protection Incfire sprinkler: relocate 24 pendents in ste 710 on the 7/f. ref ti. 202311090493
Details
Permit
202402095612
Permit issued
Feb 9, 2024
Final sign-off
Apr 30, 2024

fire sprinkler: relocate 24 pendents in ste 710 on the 7/f. ref ti. 202311090493

Open the permit page

$14,500
Feb 2, 2024Completed
final sign-off Mar 2024
201 Mission StEveron Llcfire alarm t.i. suite #510: add 5 speaker strobe and 2 speaker. ref# pa #202311090512
Details
Permit
202402025163
Permit issued
Feb 12, 2024
Final sign-off
Mar 21, 2024

fire alarm t.i. suite #510: add 5 speaker strobe and 2 speaker. ref# pa #202311090512

Open the permit page

$3,500
Feb 1, 2024Completed
final sign-off May 2024
201 Mission StRichlen Construction22/f-ste 2230: revison to pa# 202311090499, men's restroom scope has been revised to show no push buttons at entry door as 18" pull side clearance is achiered.
Details
Permit
202402015053
Permit issued
Feb 6, 2024
Final sign-off
May 20, 2024

22/f-ste 2230: revison to pa# 202311090499, men's restroom scope has been revised to show no push buttons at entry door as 18" pull side clearance is achiered.

Open the permit page

Jan 26, 2024Completed
final sign-off Feb 2024
201 Mission StGolden Gate Fire Protection Inc5/f: fire sprinklers, relocate (29+) pendents in suite 500 and put in new end of line bracing. ref ti# 202311090512
Details
Permit
202401264725
Permit issued
Jan 26, 2024
Final sign-off
Feb 6, 2024

5/f: fire sprinklers, relocate (29+) pendents in suite 500 and put in new end of line bracing. ref ti# 202311090512

Open the permit page

$17,980
Jan 12, 2024Completed
final sign-off Jul 2024
201 Mission StEveron Llcfire alarm t.i. on 25th floor: add 4 speaker strobes, 1 duct detector with relay for fsd, and one 2 way communication call station. ref #202310037884
Details
Permit
202401123930
Permit issued
May 9, 2024
Final sign-off
Jul 16, 2024

fire alarm t.i. on 25th floor: add 4 speaker strobes, 1 duct detector with relay for fsd, and one 2 way communication call station. ref #202310037884

Open the permit page

$6,000
Jan 4, 2024Completed
final sign-off Apr 2024
201 Mission StRichlen Constructionadding ada passenger drop-off/ loading zone in parking lot.
Details
Permit
202401043425
Permit issued
Feb 16, 2024
Final sign-off
Apr 1, 2024

adding ada passenger drop-off/ loading zone in parking lot.

Open the permit page

$500
Nov 9, 2023Completed
final sign-off Apr 2024
201 Mission StRichlen Constructionsuite #510:limited interior demolition of non-structural elements including interior partitions,doors,ceiling and lighting and finishes contruction of newglass fronts,frames,power & teldate,act ceiling/lighting,millsowrk and finishes.
Details
Permit
202311090512
Permit issued
Jan 23, 2024
Final sign-off
Apr 29, 2024

suite #510:limited interior demolition of non-structural elements including interior partitions,doors,ceiling and lighting and finishes contruction of newglass fronts,frames,power & teldate,act ceiling/lighting,millsowrk and finishes.

Open the permit page

$486,433
Nov 9, 2023Completed
final sign-off May 2024
201 Mission StRichlen Construction7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.
Details
Permit
202311090493
Permit issued
Jan 23, 2024
Final sign-off
May 2, 2024

7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.

Open the permit page

$504,622
Nov 9, 2023Completed
final sign-off May 2024
201 Mission StRichlen Construction22/f - #2230: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.
Details
Permit
202311090499
Permit issued
Jan 23, 2024
Final sign-off
May 20, 2024

22/f - #2230: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.

Open the permit page

$442,270
Oct 3, 2023Completed
final sign-off Aug 2024
201 Mission StField Construction Inc.tenant improvement to 25th fl. removal of (3) existing conference rooms & (8) existing open office space to create (7) new single offices lights & mechanical proposed no chang to (e) occupancy, occupancy load or egress
Details
Permit
202310037884
Permit issued
Apr 11, 2024
Final sign-off
Aug 9, 2024

tenant improvement to 25th fl. removal of (3) existing conference rooms & (8) existing open office space to create (7) new single offices lights & mechanical proposed no chang to (e) occupancy, occupancy load or egress

Open the permit page

$188,570
Apr 11, 2023Completed
final sign-off Jun 2023
201 Mission StEveron Llc3/f: add (1) 2-way communication call staiton at 3/f elevator lobby, tie into existing 2-way communication system. ref 202012301946.
Details
Permit
202304115468
Permit issued
Apr 11, 2023
Final sign-off
Jun 7, 2023

3/f: add (1) 2-way communication call staiton at 3/f elevator lobby, tie into existing 2-way communication system. ref 202012301946.

Open the permit page

$1,000
Mar 1, 2023Completed
final sign-off Aug 2023
201 Mission StRichlen Constructionproject documents (e) ada accessibility compliant path of travel conditions.
Details
Permit
202303012812
Permit issued
Jul 11, 2023
Final sign-off
Aug 23, 2023

project documents (e) ada accessibility compliant path of travel conditions.

Open the permit page

Jan 10, 2023Completed
final sign-off Sep 2023
201 Mission StRichlen Constructionrevision to pa# 202208291499, to include structural scope. structural scope previously deferred.
Details
Permit
202301109948
Permit issued
Jan 18, 2023
Final sign-off
Sep 12, 2023

revision to pa# 202208291499, to include structural scope. structural scope previously deferred.

Open the permit page

$52,000
Dec 15, 2022Completed
final sign-off Mar 2023
201 Mission StGci, Increvision to 202202178192 to include new phone booths and structural work for new phone booths
Details
Permit
202212158406
Permit issued
Dec 20, 2022
Final sign-off
Mar 15, 2023

revision to 202202178192 to include new phone booths and structural work for new phone booths

Open the permit page

$15,000
Dec 13, 2022Completed
final sign-off Feb 2023
201 Mission StEveron Llc29th/flr: fire alarm & two way communication system- madd 4 speaker strobes, 2 speakers, relocate 4 existing speakers & add 1 2-way call station at elevator lobby.
Details
Permit
202212138198
Permit issued
Dec 13, 2022
Final sign-off
Feb 3, 2023

29th/flr: fire alarm & two way communication system- madd 4 speaker strobes, 2 speakers, relocate 4 existing speakers & add 1 2-way call station at elevator lobby.

Open the permit page

$5,000
Nov 22, 2022Completed
final sign-off Feb 2023
201 Mission StPioneer Fire Inc.ste 2900 - 29th flr - relocate (8) pendents, add (1) pendents, add (5) side-wall sprinkler heads. gcti # 202202178192.
Details
Permit
202211226992
Permit issued
Nov 22, 2022
Final sign-off
Feb 7, 2023

ste 2900 - 29th flr - relocate (8) pendents, add (1) pendents, add (5) side-wall sprinkler heads. gcti # 202202178192.

Open the permit page

$7,680
Nov 10, 2022Completed
final sign-off Jun 2023
201 Mission StTruebeck Constructionfl 2,3,16: minor casework and accessibility upgrade: interior work only. existing hvac system to remain.
Details
Permit
202211106345
Permit issued
Nov 30, 2022
Final sign-off
Jun 27, 2023

fl 2,3,16: minor casework and accessibility upgrade: interior work only. existing hvac system to remain.

Open the permit page

$27,000
Oct 6, 2022Never finaled
issued Oct 2022, no final
201 Mission StEveron Llc1st fl: fire alarm t.i.. add 14 speaker strobes. add 4 weatherproof speaker strobes. ref pa# 202207269284.
Details
Permit
202210063909
Permit issued
Oct 14, 2022

1st fl: fire alarm t.i.. add 14 speaker strobes. add 4 weatherproof speaker strobes. ref pa# 202207269284.

Open the permit page

$11,000
Sep 8, 2022Completed
final sign-off Mar 2023
201 Mission StAyoob & Peery Plumbing Co Inc1/f: add 12 fire sprinkler heads, relocate 19 per t.i. pa 202207269284.
Details
Permit
202209082119
Permit issued
Sep 9, 2022
Final sign-off
Mar 10, 2023

1/f: add 12 fire sprinkler heads, relocate 19 per t.i. pa 202207269284.

Open the permit page

$15,950
Aug 29, 2022Completed
final sign-off Sep 2023
201 Mission StRichlen Constructioninstall security gate @ ground level only. gates include (2) 4-leaf bi-folding gates & ada complaint exit swing gate @ main entry plaza. (1) ada compliant exit swing gate & ramp from parking lot to natoma st (1) motorized 2-leaf swinging parking gate @ howard st parking entry
Details
Permit
202208291499
Permit issued
Oct 11, 2022
Final sign-off
Sep 12, 2023

install security gate @ ground level only. gates include (2) 4-leaf bi-folding gates & ada complaint exit swing gate @ main entry plaza. (1) ada compliant exit swing gate & ramp from parking lot to natoma st (1) motorized 2-leaf swinging parking gate @ howard st parking entry

Open the permit page

$160,000
Jul 26, 2022Completed
final sign-off Apr 2023
201 Mission StRichlen Construction1/f: interior demo & construction of non-structural elements: interior partitions, doors, finishes, ceiling, lighting, electrical switches. new bike storage room, locker rooms, gender neutral restrooms & restroom ada upgrades. fire/life saftety under sep permit. maher n/a.
Details
Permit
202207269284
Permit issued
Aug 3, 2022
Final sign-off
Apr 7, 2023

1/f: interior demo & construction of non-structural elements: interior partitions, doors, finishes, ceiling, lighting, electrical switches. new bike storage room, locker rooms, gender neutral restrooms & restroom ada upgrades. fire/life saftety under sep permit. maher n/a.

Open the permit page

$800,000
May 12, 2022Completed
final sign-off Aug 2022
201 Mission StEveron Llc19/f: fire alarm t.i. add 15 speaker strobes. relocate 8 speaker strobe , 7 spearkers. t.i. 202112083962 202112083965 202112083970. maher n/a
Details
Permit
202205124165
Permit issued
May 23, 2022
Final sign-off
Aug 8, 2022

19/f: fire alarm t.i. add 15 speaker strobes. relocate 8 speaker strobe , 7 spearkers. t.i. 202112083962 202112083965 202112083970. maher n/a

Open the permit page

$8,000
May 10, 2022Completed
final sign-off Aug 2022
201 Mission StEveron Llcfire alarm t.i. on 5th floor, ste 500. add (3) speaker strobes, add (1) speaker, relocate (2) speakers, add (1) smoke detector & remove (4) wall mount strobes only. add 1 speaker. ref 202112083977.
Details
Permit
202205103916
Permit issued
May 10, 2022
Final sign-off
Aug 8, 2022

fire alarm t.i. on 5th floor, ste 500. add (3) speaker strobes, add (1) speaker, relocate (2) speakers, add (1) smoke detector & remove (4) wall mount strobes only. add 1 speaker. ref 202112083977.

Open the permit page

$5,000
May 10, 2022Completed
final sign-off Jun 2022
201 Mission StGolden Gate Fire Protection Inc5th fl: fire sprinklers. relocate 17 pendents in ste 500 and put in new end of line bracing. ref pa# 202112083977.
Details
Permit
202205103869
Permit issued
May 12, 2022
Final sign-off
Jun 9, 2022

5th fl: fire sprinklers. relocate 17 pendents in ste 500 and put in new end of line bracing. ref pa# 202112083977.

Open the permit page

$8,925
May 10, 2022Completed
final sign-off Jun 2022
201 Mission StGolden Gate Fire Protection Inc19th fl: fire sprinklers. relocate 35 pendents in ste 1900. relocate 14 pendents in ste 1930. relocate 18 pendents in ste 1940. new end of line bracing in all 3 suites. ref ti ste1900: pa# 202112083962. ref ti ste1930: pa# 202112083965. ref ti ste1940: pa# 202112083970.
Details
Permit
202205103867
Permit issued
May 25, 2022
Final sign-off
Jun 9, 2022

19th fl: fire sprinklers. relocate 35 pendents in ste 1900. relocate 14 pendents in ste 1930. relocate 18 pendents in ste 1940. new end of line bracing in all 3 suites. ref ti ste1900: pa# 202112083962. ref ti ste1930: pa# 202112083965. ref ti ste1940: pa# 202112083970.

Open the permit page

$35,175
Mar 11, 2022Completed
final sign-off Jun 2022
201 Mission StGolden Gate Fire Protection Inc20th fl: fire sprinklers; relocate 5 pendant sprinklers on the 20th fl suite 2020. ti ref: 202111051896
Details
Permit
202203119810
Permit issued
Mar 14, 2022
Final sign-off
Jun 6, 2022

20th fl: fire sprinklers; relocate 5 pendant sprinklers on the 20th fl suite 2020. ti ref: 202111051896

Open the permit page

$3,000
Mar 11, 2022Completed
final sign-off Apr 2022
201 Mission StEveron Llcsuite 650: add 1 speaker strobe, relocate 5 speaker/strobes. relocate 2 spearker only.
Details
Permit
202203119808
Permit issued
Mar 11, 2022
Final sign-off
Apr 18, 2022

suite 650: add 1 speaker strobe, relocate 5 speaker/strobes. relocate 2 spearker only.

Open the permit page

$1,000
Mar 1, 2022Completed
final sign-off Mar 2022
201 Mission StGolden Gate Fire Protection Inc6/f suite 650: fire sprinklers: relocate 6 pendent sprinklers. ref ti permit 202112164549.
Details
Permit
202203018926
Permit issued
Mar 1, 2022
Final sign-off
Mar 10, 2022

6/f suite 650: fire sprinklers: relocate 6 pendent sprinklers. ref ti permit 202112164549.

Open the permit page

$3,000
Feb 17, 2022Completed
final sign-off Feb 2023
201 Mission StGci, Inc29/f: construction of non-structural new walls for new interview room & breakroom, millwork & new finiehes. minor adition of power / data and ceiling work. sprinler system modification and fire life safety is under sep permit. maher n/a. minor demolition to create (1) conference rm.
Details
Permit
202202178192
Permit issued
Oct 11, 2022
Final sign-off
Feb 27, 2023

29/f: construction of non-structural new walls for new interview room & breakroom, millwork & new finiehes. minor adition of power / data and ceiling work. sprinler system modification and fire life safety is under sep permit. maher n/a. minor demolition to create (1) conference rm.

Open the permit page

$200,000
Feb 16, 2022Completed
final sign-off Apr 2022
201 Mission StEveron Llcfire alarm t.i. on 20th floor. add 1 smoke detector and 6 speaker strobes, remove 7 extg notification appliances per plan. ref pa#202111051896
Details
Permit
202202168116
Permit issued
Feb 16, 2022
Final sign-off
Apr 18, 2022

fire alarm t.i. on 20th floor. add 1 smoke detector and 6 speaker strobes, remove 7 extg notification appliances per plan. ref pa#202111051896

Open the permit page

$5,000
Dec 16, 2021Completed
final sign-off Jun 2022
201 Mission StRichlen Constructionsuite 650: non-structural demo of (e) sidelight and construction of glass conference room. sprinkler mod and fls under sep permit. maher n/a.
Details
Permit
202112164549
Permit issued
Jan 20, 2022
Final sign-off
Jun 8, 2022

suite 650: non-structural demo of (e) sidelight and construction of glass conference room. sprinkler mod and fls under sep permit. maher n/a.

Open the permit page

$120,000
Dec 8, 2021Completed
final sign-off Sep 2022
201 Mission StRichlen Constructionsuite 500: non-structural demo of (e) walls & constructon of (n) office glass fronts, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a
Details
Permit
202112083977
Permit issued
Mar 29, 2022
Final sign-off
Sep 22, 2022

suite 500: non-structural demo of (e) walls & constructon of (n) office glass fronts, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a

Open the permit page

$200,000
Dec 8, 2021Completed
final sign-off Sep 2022
201 Mission StRichlen Constructionsuite 1940: non-structural demo of (e) walls & constructon of (n) office glass fronts, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a
Details
Permit
202112083970
Permit issued
Mar 29, 2022
Final sign-off
Sep 22, 2022

suite 1940: non-structural demo of (e) walls & constructon of (n) office glass fronts, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a

Open the permit page

$120,000
Dec 8, 2021Completed
final sign-off Sep 2022
201 Mission StRichlen Constructionsuite 1930: non-structural demo of (e) walls & constructon of (n) office glass frongs, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a
Details
Permit
202112083965
Permit issued
Mar 29, 2022
Final sign-off
Sep 22, 2022

suite 1930: non-structural demo of (e) walls & constructon of (n) office glass frongs, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a

Open the permit page

$100,000
Dec 8, 2021Completed
final sign-off Sep 2022
201 Mission StRichlen Constructionsuite 1900: non-structural demo of (e) walls & constructon of (n) office glass frongs, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a
Details
Permit
202112083962
Permit issued
Mar 29, 2022
Final sign-off
Sep 22, 2022

suite 1900: non-structural demo of (e) walls & constructon of (n) office glass frongs, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a

Open the permit page

$120,000
Dec 6, 2021Completed
final sign-off Jan 2022
201 Mission StRichlen Constructionste 2250: demo permit. includes minor demo of (e) non-structural walls & finishes. electrical permit under seperate permit. space not occupied.
Details
Permit
202112063746
Permit issued
Dec 6, 2021
Final sign-off
Jan 21, 2022

ste 2250: demo permit. includes minor demo of (e) non-structural walls & finishes. electrical permit under seperate permit. space not occupied.

Open the permit page

$37,700
Nov 5, 2021Completed
final sign-off Jun 2022
201 Mission StRichlen Constructionsuite 2020: tenant improvement - demo of partitions, lighting and finishes. includes new partions, finsihes and lighting.
Details
Permit
202111051896
Permit issued
Dec 1, 2021
Final sign-off
Jun 27, 2022

suite 2020: tenant improvement - demo of partitions, lighting and finishes. includes new partions, finsihes and lighting.

Open the permit page

$430,000
Oct 4, 2021Completed
final sign-off Nov 2021
201 Mission StEveron Llcfire alarm t.i.- 13th floor, ste 1310/1320/1380: add 2 smoke detectors, 14 speaker/strobes, 7 speakers. remove 7 speakers. remove 10 strobes. ref app#202105039702, 202105200718, 202105261114.
Details
Permit
202110049747
Permit issued
Oct 4, 2021
Final sign-off
Nov 10, 2021

fire alarm t.i.- 13th floor, ste 1310/1320/1380: add 2 smoke detectors, 14 speaker/strobes, 7 speakers. remove 7 speakers. remove 10 strobes. ref app#202105039702, 202105200718, 202105261114.

Open the permit page

$10,000
Sep 17, 2021Completed
final sign-off Oct 2021
201 Mission StGolden Gate Fire Protection Incfire sprinklers; relocate 21 pendent sprinkelrs on the 13/f ste 1320. ref t.i. pa# 202105200718
Details
Permit
202109178646
Permit issued
Sep 21, 2021
Final sign-off
Oct 12, 2021

fire sprinklers; relocate 21 pendent sprinkelrs on the 13/f ste 1320. ref t.i. pa# 202105200718

Open the permit page

$11,025
Sep 17, 2021Completed
final sign-off Sep 2021
201 Mission StGolden Gate Fire Protection Incfire sprinklers; relocate 9 pendent sprinklers and 36 upright sprinklers on the 2nd fl. suite 280 add 4 uprights t.i. 202106162570
Details
Permit
202109178607
Permit issued
Sep 17, 2021
Final sign-off
Sep 29, 2021

fire sprinklers; relocate 9 pendent sprinklers and 36 upright sprinklers on the 2nd fl. suite 280 add 4 uprights t.i. 202106162570

Open the permit page

$25,725
Sep 17, 2021Completed
final sign-off Oct 2021
201 Mission StGolden Gate Fire Protection Incfire sprinklers. relocate 13 pendent sprinklers on the 13th fl. suite 1310 ref pa# 2021-0503-9702
Details
Permit
202109178634
Permit issued
Sep 21, 2021
Final sign-off
Oct 12, 2021

fire sprinklers. relocate 13 pendent sprinklers on the 13th fl. suite 1310 ref pa# 2021-0503-9702

Open the permit page

$6,825
Sep 17, 2021Completed
final sign-off Sep 2021
201 Mission StGolden Gate Fire Protection Inc20th floor: fire sprinklers; relocate 69 pendent sprinklers on the 20th floor suite 2000. t.i. ref app#202105271191
Details
Permit
202109178614
Permit issued
Sep 17, 2021
Final sign-off
Sep 29, 2021

20th floor: fire sprinklers; relocate 69 pendent sprinklers on the 20th floor suite 2000. t.i. ref app#202105271191

Open the permit page

$36,225
Sep 17, 2021Completed
final sign-off Oct 2021
201 Mission StGolden Gate Fire Protection Incfire sprinkler; relocate 27 pendent sprinkler on the 13/f ste 1380. refer to t.i 202105261114
Details
Permit
202109178650
Permit issued
Sep 21, 2021
Final sign-off
Oct 12, 2021

fire sprinkler; relocate 27 pendent sprinkler on the 13/f ste 1380. refer to t.i 202105261114

Open the permit page

$14,175
Sep 2, 2021Completed
final sign-off Nov 2021
201 Mission StEveron Llcsuite 2000: (5) t.i., add (1) smoke detector, (12) speaker strobes, (2) speakers & relocate (6) modification appliances, ref bpa#202105271191
Details
Permit
202109027707
Permit issued
Sep 3, 2021
Final sign-off
Nov 4, 2021

suite 2000: (5) t.i., add (1) smoke detector, (12) speaker strobes, (2) speakers & relocate (6) modification appliances, ref bpa#202105271191

Open the permit page

$7,000
Sep 2, 2021Completed
final sign-off Oct 2021
201 Mission StEveron Llcfive alarm t.i. suite 280, add (5) speaker strobes, (7) duct detectors for hvac units w/control relays, relocate (2) speaker strobes. ref bpa#202106162570
Details
Permit
202109027699
Permit issued
Sep 3, 2021
Final sign-off
Oct 20, 2021

five alarm t.i. suite 280, add (5) speaker strobes, (7) duct detectors for hvac units w/control relays, relocate (2) speaker strobes. ref bpa#202106162570

Open the permit page

$8,000
Jun 16, 2021Completed
final sign-off Jan 2022
201 Mission StRichlen Constructionste 280 - demo of portion of (e) non structural walls and (e) idf room. (n) finishes and millwork, and some construction of new non structural walls. sprinkler/life safety under separate permit
Details
Permit
202106162570
Permit issued
Jul 16, 2021
Final sign-off
Jan 7, 2022

ste 280 - demo of portion of (e) non structural walls and (e) idf room. (n) finishes and millwork, and some construction of new non structural walls. sprinkler/life safety under separate permit

Open the permit page

$120,000
Jun 10, 2021Completed
final sign-off Aug 2021
201 Mission StGolden Gate Fire Protection Incfire sprinklers; relocate 21 pendent sprinklers and relocare 28 uprights on the 23rd floor. t.i. ref # 2020-1030-7899 & 2021-0503-9699
Details
Permit
202106102097
Permit issued
Jul 16, 2021
Final sign-off
Aug 5, 2021

fire sprinklers; relocate 21 pendent sprinklers and relocare 28 uprights on the 23rd floor. t.i. ref # 2020-1030-7899 & 2021-0503-9699

Open the permit page

$25,725
Jun 7, 2021Completed
final sign-off Sep 2021
201 Mission StEveron Llcfire alarm t.i. - suite 2375 - add (4) speaker strobes & relocate existing notification appliances to be reuse. ref # 2020-1030-7899 & 2021-0503-9699
Details
Permit
202106071750
Permit issued
Jul 19, 2021
Final sign-off
Sep 13, 2021

fire alarm t.i. - suite 2375 - add (4) speaker strobes & relocate existing notification appliances to be reuse. ref # 2020-1030-7899 & 2021-0503-9699

Open the permit page

$2,500
May 27, 2021Completed
final sign-off Jan 2022
201 Mission StRichlen Construction20/f: suite 2000: demo of (e) non-structural wlals and (e) idf room. new finiehs and millwork and some construction of (n) non-structural walls. f/s l/s systems mod under sep permit. maher n/a.
Details
Permit
202105271191
Permit issued
Jul 16, 2021
Final sign-off
Jan 7, 2022

20/f: suite 2000: demo of (e) non-structural wlals and (e) idf room. new finiehs and millwork and some construction of (n) non-structural walls. f/s l/s systems mod under sep permit. maher n/a.

Open the permit page

$120,000
May 26, 2021Completed
final sign-off Dec 2021
201 Mission StSkyline Construction13th fl t.i.: demo (e) non-structural walls. (n) finishes & (n) glass office fronts. sprinkler and life safety will be under separate permit.
Details
Permit
202105261114
Permit issued
Aug 26, 2021
Final sign-off
Dec 28, 2021

13th fl t.i.: demo (e) non-structural walls. (n) finishes & (n) glass office fronts. sprinkler and life safety will be under separate permit.

Open the permit page

$120,000
May 20, 2021Completed
final sign-off Dec 2021
201 Mission StSkyline Constructionnonstructural demo of (e) walls & construction of new office glass fronts, millwork, ceiling & power/data work, finishes, sprinkler system modification & fire life safety is under separate permit
Details
Permit
202105200718
Permit issued
Aug 24, 2021
Final sign-off
Dec 28, 2021

nonstructural demo of (e) walls & construction of new office glass fronts, millwork, ceiling & power/data work, finishes, sprinkler system modification & fire life safety is under separate permit

Open the permit page

$120,000
May 3, 2021Completed
final sign-off Dec 2021
201 Mission StSkyline Constructionste 1310: demo of non-structural walls & construction of new walls, millwork, ceiling, power/data work & finishes. sprinkler/life safety modification under separate permit.
Details
Permit
202105039702
Permit issued
Aug 24, 2021
Final sign-off
Dec 28, 2021

ste 1310: demo of non-structural walls & construction of new walls, millwork, ceiling, power/data work & finishes. sprinkler/life safety modification under separate permit.

Open the permit page

$198,000
May 3, 2021Completed
final sign-off Sep 2021
201 Mission StRichlen Constructionrevision to pa# 202010307899. ste 2375 ti. demo of (e) non-structural walls, ceiling tiles/grid, lighting, finishes & millwork. new work: (n) partitions, doors, frames & hardware, ceiling tiles/grid, lighting, power/data, finishes + millwork. mep, sprinkler/life safety mod under separate permit.
Details
Permit
202105039699
Permit issued
May 24, 2021
Final sign-off
Sep 22, 2021

revision to pa# 202010307899. ste 2375 ti. demo of (e) non-structural walls, ceiling tiles/grid, lighting, finishes & millwork. new work: (n) partitions, doors, frames & hardware, ceiling tiles/grid, lighting, power/data, finishes + millwork. mep, sprinkler/life safety mod under separate permit.

Open the permit page

Apr 15, 2021Completed
final sign-off Jun 2021
201 Mission StEveron Llcfire alarm t.i. on 9th flr. - add (27) speaker strobes, (8) speakers, (5) smoke detectors for door holders, (2) duct detectors for fsd w/relays, (2) smoke detectors for fsd, (1) control relay for door access, & (1) 2-way call station in elevator lobby. ref# 2020 1022 7134
Details
Permit
202104158666
Permit issued
Jun 4, 2021
Final sign-off
Jun 16, 2021

fire alarm t.i. on 9th flr. - add (27) speaker strobes, (8) speakers, (5) smoke detectors for door holders, (2) duct detectors for fsd w/relays, (2) smoke detectors for fsd, (1) control relay for door access, & (1) 2-way call station in elevator lobby. ref# 2020 1022 7134

Open the permit page

$12,000
Mar 4, 2021Completed
final sign-off Apr 2021
201 Mission StGolden Gate Fire Protection Incfire sprinklers; relocate 4 pendent sprinklers in the elevator lobby. relocate 3 pendent sprinklers in each of the men's and women's restrooms. t.i. ref # 2020-10-22-7125
Details
Permit
202103045911
Permit issued
Mar 30, 2021
Final sign-off
Apr 8, 2021

fire sprinklers; relocate 4 pendent sprinklers in the elevator lobby. relocate 3 pendent sprinklers in each of the men's and women's restrooms. t.i. ref # 2020-10-22-7125

Open the permit page

Feb 18, 2021Completed
final sign-off Apr 2021
201 Mission StGolden Gate Fire Protection Incfire sprinklers. relocate 10 pendent sprinklers and relocate 11 uprights on the 9th floor.
Details
Permit
202102184982
Permit issued
Apr 20, 2021
Final sign-off
Apr 28, 2021

fire sprinklers. relocate 10 pendent sprinklers and relocate 11 uprights on the 9th floor.

Open the permit page

$10,500
Feb 18, 2021Completed
final sign-off Mar 2021
201 Mission StEveron Llcfire alarm ti on 22nd floor - suite 2250. add (5) speaker strobes, (1) speaker. relocate & remove existing notification appliances. ref # 2020-1022-7156
Details
Permit
202102184914
Permit issued
Mar 16, 2021
Final sign-off
Mar 19, 2021

fire alarm ti on 22nd floor - suite 2250. add (5) speaker strobes, (1) speaker. relocate & remove existing notification appliances. ref # 2020-1022-7156

Open the permit page

$5,000
Jan 14, 2021Completed
final sign-off Feb 2021
201 Mission StEveron Llcfire alarm t.i. on 7th floor. provide (12) combo speaker strobes, & removal of (10) existing strobe only.
Details
Permit
202101142748
Permit issued
Feb 17, 2021
Final sign-off
Feb 25, 2021

fire alarm t.i. on 7th floor. provide (12) combo speaker strobes, & removal of (10) existing strobe only.

Open the permit page

$8,000
Dec 30, 2020Completed
final sign-off Aug 2021
201 Mission StEveron Llcprovide building 2-way communication system & riser backbone. scope include (1) command center, (1) sub station @ security desk, (10 76 zones distribution module & power supply on 16th flr, (1) stairwell door lock release button in fcc, add (1) 2-way call station on 26th flr elevator lobby, (1) dual
Details
Permit
202012301946
Permit issued
Feb 9, 2021
Final sign-off
Aug 4, 2021

provide building 2-way communication system & riser backbone. scope include (1) command center, (1) sub station @ security desk, (10 76 zones distribution module & power supply on 16th flr, (1) stairwell door lock release button in fcc, add (1) 2-way call station on 26th flr elevator lobby, (1) dual

Open the permit page

$30,000
Nov 25, 2020Completed
final sign-off Mar 2022
201 Mission StField Construction Inc.parking lot lighting. demo of existing asphalt paving and curbs repaving w/new asphalt surface sloped to drain, construction of new curbs & lighting.
Details
Permit
202011259763
Permit issued
May 21, 2021
Final sign-off
Mar 9, 2022

parking lot lighting. demo of existing asphalt paving and curbs repaving w/new asphalt surface sloped to drain, construction of new curbs & lighting.

Open the permit page

$260,000
Oct 30, 2020Completed
final sign-off Sep 2021
201 Mission StRichlen Constructionti for suite 2375 on 23rd fl. scope includes demolition of existing non-structural walls. new finishes and millwork, and some construction of new non-structural walls. mep included. sprinkler/life safety modification under separate permit.
Details
Permit
202010307899
Permit issued
Apr 12, 2021
Final sign-off
Sep 22, 2021

ti for suite 2375 on 23rd fl. scope includes demolition of existing non-structural walls. new finishes and millwork, and some construction of new non-structural walls. mep included. sprinkler/life safety modification under separate permit.

Open the permit page

$728,053
Oct 22, 2020Completed
final sign-off Jul 2021
201 Mission StRichlen Constructionalteration to restrooms, elev lobby & corridor. scope does not affect (e) tenant suites, access, path of egress or exit stalls. (n) finishes & plumbing fixtures at (e) krs (e) toilets & urinals to be demo'd. (n) ceiling, lighting & power / data locations. sprinkler system & life safety serparte pa.
Details
Permit
202010227125
Permit issued
Feb 26, 2021
Final sign-off
Jul 15, 2021

alteration to restrooms, elev lobby & corridor. scope does not affect (e) tenant suites, access, path of egress or exit stalls. (n) finishes & plumbing fixtures at (e) krs (e) toilets & urinals to be demo'd. (n) ceiling, lighting & power / data locations. sprinkler system & life safety serparte pa.

Open the permit page

$573,453
Oct 22, 2020Completed
final sign-off May 2021
201 Mission StRichlen Constructionste 2250 - t.i. demo partitions of exsiting non structural walls and existing idf room. new finishes & millwork, and some contruction of non structural walls.
Details
Permit
202010227156
Permit issued
Jan 11, 2021
Final sign-off
May 13, 2021

ste 2250 - t.i. demo partitions of exsiting non structural walls and existing idf room. new finishes & millwork, and some contruction of non structural walls.

Open the permit page

$279,904
Oct 22, 2020Completed
final sign-off Jul 2021
201 Mission StRichlen Constructionsuite 900. t.i. demo portions of (e) walls (non-structural) & (e) idf room, (n) finishes and millwork. construct (n) non-structural walls. sprinkler, life safety mods under separate permit.
Details
Permit
202010227134
Permit issued
Mar 15, 2021
Final sign-off
Jul 15, 2021

suite 900. t.i. demo portions of (e) walls (non-structural) & (e) idf room, (n) finishes and millwork. construct (n) non-structural walls. sprinkler, life safety mods under separate permit.

Open the permit page

$1,166,035
Oct 1, 2020Completed
final sign-off Jan 2021
201 Mission StPacific Restoration Inc Dba Servproreroofing. demo e roof to concrete subtrate. adhere insulation cover board and 60 mil puv membrane. tear off 1 layer, class a, no resheet. pitch 1/4 " perft
Details
Permit
202010015617
Permit issued
Oct 1, 2020
Final sign-off
Jan 22, 2021

reroofing. demo e roof to concrete subtrate. adhere insulation cover board and 60 mil puv membrane. tear off 1 layer, class a, no resheet. pitch 1/4 " perft

Open the permit page

$720,046
Jan 16, 2020Completed
final sign-off Jan 2021
201 Mission StRichlen Constructionste 2020 - build-out consists of minor consists of minor demo & new finishes. no mep, sprinklers system & life safety modification. ab-017 applies. space remians vacant & separate ti permit required.
Details
Permit
202001162030
Permit issued
Jan 23, 2020
Final sign-off
Jan 13, 2021

ste 2020 - build-out consists of minor consists of minor demo & new finishes. no mep, sprinklers system & life safety modification. ab-017 applies. space remians vacant & separate ti permit required.

Open the permit page

$32,000
Dec 19, 2019Completed
final sign-off May 2021
201 Mission StRichlen Constructionsuite1400 on multi-tenant floor. work scope includes demo of portion of (e) demising wall between two suites to create full floor tenant suite. new finishes & powr & data at selected areas of floor. no other construction scope. sprinkler system modification to be under sep. deferred permit. maher na
Details
Permit
201912190004
Permit issued
Jan 8, 2020
Final sign-off
May 13, 2021

suite1400 on multi-tenant floor. work scope includes demo of portion of (e) demising wall between two suites to create full floor tenant suite. new finishes & powr & data at selected areas of floor. no other construction scope. sprinkler system modification to be under sep. deferred permit. maher na

Open the permit page

$40,000
Oct 23, 2019Completed
final sign-off Feb 2020
201 Mission StR.M.R. Construction Company18th fl - project consists of demo of interior partitions, glazing & doors, ceiling & lighting to remain. existing mechanical, electrical & sprinkler system modification is under separate permit
Details
Permit
201910235302
Permit issued
Dec 6, 2019
Final sign-off
Feb 6, 2020

18th fl - project consists of demo of interior partitions, glazing & doors, ceiling & lighting to remain. existing mechanical, electrical & sprinkler system modification is under separate permit

Open the permit page

$30,000
Sep 27, 2019Completed
final sign-off Oct 2019
201 Mission StRed Hawk Fire & Security Ca Llc23rd fl l- add 1 speaker strobe. existing suite voluntary upgrade
Details
Permit
201909272949
Permit issued
Sep 27, 2019
Final sign-off
Oct 7, 2019

23rd fl l- add 1 speaker strobe. existing suite voluntary upgrade

Open the permit page

$600
Aug 2, 2019Completed
final sign-off Aug 2019
201 Mission StRed Hawk Fire & Security Ca Llcfire alarm ti on 13th flr - add 5 ceiling speaker systems & relocate (2) speaker/strobes 1 speakers & 1 smk det ref 201906203986
Details
Permit
201908027752
Permit issued
Aug 2, 2019
Final sign-off
Aug 16, 2019

fire alarm ti on 13th flr - add 5 ceiling speaker systems & relocate (2) speaker/strobes 1 speakers & 1 smk det ref 201906203986

Open the permit page

$4,000
Aug 1, 2019Expired or cancelled
cancelled Oct 2021
201 Mission Stfire sprinkler permit. relocate 15 sprinklers on the 13th floor. ti #2019-0620-3986.
Details
Permit
201908017547
Permit issued
Aug 5, 2019

fire sprinkler permit. relocate 15 sprinklers on the 13th floor. ti #2019-0620-3986.

Open the permit page

$3,500
Jul 16, 2019Never finaled
issued Jul 2019, no final
201 Mission StRed Hawk Fire & Security Ca Llcfire alarm as-built drawing for pa #201905140617 per field inspector requirements. 6th fl
Details
Permit
201907166024
Permit issued
Jul 16, 2019

fire alarm as-built drawing for pa #201905140617 per field inspector requirements. 6th fl

Open the permit page

Jul 11, 2019Never finaled
issued Jul 2019, no final
201 Mission StRed Hawk Fire & Security Ca Llcfire alarm on 27th flr - add 1 new duct det for heat pump unit w/control
Details
Permit
201907115678
Permit issued
Jul 12, 2019

fire alarm on 27th flr - add 1 new duct det for heat pump unit w/control

Open the permit page

$1,000
Jun 20, 2019Completed
final sign-off Jan 2021
201 Mission StRichlen Construction13th floor: tenant improvement on a multi tenant floor consisting of mnor demo of e walls and construction of new partitions and glazing. new ceiling, light fixtures, finishes
Details
Permit
201906203986
Permit issued
Jun 26, 2019
Final sign-off
Jan 12, 2021

13th floor: tenant improvement on a multi tenant floor consisting of mnor demo of e walls and construction of new partitions and glazing. new ceiling, light fixtures, finishes

Open the permit page

$155,000
Jun 5, 2019Never finaled
issued Jun 2019, no final
201 Mission StComfort Dynamics Inc.emergency replacement of server room a/c in-kind, same location
Details
Permit
201906052607
Permit issued
Jun 5, 2019

emergency replacement of server room a/c in-kind, same location

Open the permit page

$12,765
May 14, 2019Never finaled
issued May 2019, no final
201 Mission StRed Hawk Fire & Security Ca Llc6th fl - fire alarm, add 15 speaker strobes, 1 control relay for door release, 2 smoke detectors, 3 duct detectors for heat pumps. ref pa 2019-0214-2948
Details
Permit
201905140617
Permit issued
May 17, 2019

6th fl - fire alarm, add 15 speaker strobes, 1 control relay for door release, 2 smoke detectors, 3 duct detectors for heat pumps. ref pa 2019-0214-2948

Open the permit page

$8,600
Apr 30, 2019Completed
final sign-off Jul 2019
201 Mission Stsuite 1550. demo (e) walls & associated power data. construct (n) wall & glazing configuration, minor ceiling & power data and finishes. (e) mech, electr & sprinkler system modification under separate permit.
Details
Permit
201904309259
Permit issued
May 3, 2019
Final sign-off
Jul 12, 2019

suite 1550. demo (e) walls & associated power data. construct (n) wall & glazing configuration, minor ceiling & power data and finishes. (e) mech, electr & sprinkler system modification under separate permit.

Open the permit page

$77,000
Apr 5, 2019Completed
final sign-off May 2019
201 Mission StGolden Gate Fire Protection Inc6th flr, suite 600 - relocate 60 pendent sprinkers ref 201902142948
Details
Permit
201904057251
Permit issued
Apr 5, 2019
Final sign-off
May 3, 2019

6th flr, suite 600 - relocate 60 pendent sprinkers ref 201902142948

Open the permit page

$20,000
Feb 26, 2019Never finaled
issued Feb 2019, no final
201 Mission StGci, Incto obtain final inspection for work approved under pa#201508063509. all work is complete.
Details
Permit
201902263871
Permit issued
Feb 27, 2019

to obtain final inspection for work approved under pa#201508063509. all work is complete.

Open the permit page

Feb 14, 2019Completed
final sign-off Mar 2020
201 Mission StRichlen Constructionsuite 600. tenant improvement. multi-tenant flr project. demo partitions, doors, power & data, lighting & finshes. build-out (n) partitions, doors, lighting, power & data, millwork and finishes. sprinkler system & life-safety mods under separate.
Details
Permit
201902142948
Permit issued
Feb 21, 2019
Final sign-off
Mar 13, 2020

suite 600. tenant improvement. multi-tenant flr project. demo partitions, doors, power & data, lighting & finshes. build-out (n) partitions, doors, lighting, power & data, millwork and finishes. sprinkler system & life-safety mods under separate.

Open the permit page

$387,000
Jan 31, 2019Never finaled
issued Jan 2019, no final
201 Mission StRed Hawk Fire & Security Ca Llcref pa# 201901049643; fire alarm as-built
Details
Permit
201901311805
Permit issued
Jan 31, 2019

ref pa# 201901049643; fire alarm as-built

Open the permit page

Jan 30, 2019Completed
final sign-off Jan 2021
201 Mission StRichlen Constructionproject consists of a ti on a multi tenant floor. build-out consists of adding a new office. mep, sprinkler modification & alarm modification under separate permit
Details
Permit
201901301599
Permit issued
Feb 5, 2019
Final sign-off
Jan 13, 2021

project consists of a ti on a multi tenant floor. build-out consists of adding a new office. mep, sprinkler modification & alarm modification under separate permit

Open the permit page

$58,000
Jan 4, 2019Completed
final sign-off Jan 2019
201 Mission StRed Hawk Fire & Security Ca Llcfire alarm ti. on 26th floor. add 1 smoke detector for heat pump, 3 duct detector for heat pump. 1 duct detectro for fsd and 5 centrol relays for shutdown. add 19 sprinkler strob, 4 wall moun tspeaker strobs. 6 ceiling speakers and reloacate devices as shown. ref# 2018-0921-0984
Details
Permit
201901049643
Permit issued
Jan 4, 2019
Final sign-off
Jan 18, 2019

fire alarm ti. on 26th floor. add 1 smoke detector for heat pump, 3 duct detector for heat pump. 1 duct detectro for fsd and 5 centrol relays for shutdown. add 19 sprinkler strob, 4 wall moun tspeaker strobs. 6 ceiling speakers and reloacate devices as shown. ref# 2018-0921-0984

Open the permit page

$15,000
Dec 20, 2018Completed
final sign-off Jan 2019
201 Mission StRed Hawk Fire & Security Ca Llcref pa# 201811196252; fire alarm t.i. on 18th fl. add 4 speakrs only
Details
Permit
201812208842
Permit issued
Dec 20, 2018
Final sign-off
Jan 17, 2019

ref pa# 201811196252; fire alarm t.i. on 18th fl. add 4 speakrs only

Open the permit page

$1,600
Dec 19, 2018Completed
final sign-off Jun 2019
201 Mission StAcco Engineered Systems Inc. Dba Acco Endemo & replace tenant condenser water supply and return risers form the mech penthouse down to floor l2 of th ebuilding (28 stories). maher na
Details
Permit
201812198698
Permit issued
Dec 19, 2018
Final sign-off
Jun 18, 2019

demo & replace tenant condenser water supply and return risers form the mech penthouse down to floor l2 of th ebuilding (28 stories). maher na

Open the permit page

$982,000
Dec 14, 2018Completed
final sign-off Dec 2018
201 Mission StGolden Gate Fire Protection Inc18th fl - fire sprinklers; relocate 2 upright sprinklers; add 3 pendent sprinklers. ref pa 2018-1119-6252
Details
Permit
201812148331
Permit issued
Dec 14, 2018
Final sign-off
Dec 31, 2018

18th fl - fire sprinklers; relocate 2 upright sprinklers; add 3 pendent sprinklers. ref pa 2018-1119-6252

Open the permit page

$2,625
Dec 14, 2018Completed
final sign-off Jan 2019
201 Mission StRed Hawk Fire & Security Ca Llc24th flr fire alarm ti - remove 6 speaker/strobes, 2 strobe only, 15 speaker only, relocate 1 fire alarm terminal cabinet, 2 control relay, 1 smk det add 10 new speaker/strobes 1 relay for heat pump ref 201810153199
Details
Permit
201812148340
Permit issued
Dec 17, 2018
Final sign-off
Jan 17, 2019

24th flr fire alarm ti - remove 6 speaker/strobes, 2 strobe only, 15 speaker only, relocate 1 fire alarm terminal cabinet, 2 control relay, 1 smk det add 10 new speaker/strobes 1 relay for heat pump ref 201810153199

Open the permit page

$8,000
Dec 6, 2018Completed
final sign-off Apr 2021
201 Mission StRichlen Constructionbarrier removal, adding automatic door operator activator at bld main entry
Details
Permit
201812067594
Permit issued
Dec 17, 2018
Final sign-off
Apr 8, 2021

barrier removal, adding automatic door operator activator at bld main entry

Open the permit page

$30,000
Nov 19, 2018Completed
final sign-off Feb 2021
201 Mission StRichlen Constructionsuite 1800, 18th flr. t.i, multi-tenant floor. build-out 3 phone rooms, assciated (n) ceilings, power / data work, some new finishes. mep, sprinkler system and life saftey mods under separate permit
Details
Permit
201811196252
Permit issued
Nov 20, 2018
Final sign-off
Feb 23, 2021

suite 1800, 18th flr. t.i, multi-tenant floor. build-out 3 phone rooms, assciated (n) ceilings, power / data work, some new finishes. mep, sprinkler system and life saftey mods under separate permit

Open the permit page

$75,000
Nov 16, 2018Completed
final sign-off Nov 2018
201 Mission StRed Hawk Fire & Security Ca Llcfire alarm ti on 16th fl: add 1 control relay for card readers, 36 ceiling speakers strobes, relocate 4 existing smoke detectors, rleocate 10 existing spekaer strobes & removal of 6 existing smoke detectors as showm. add 5 duct detectors w/control for heat pumps.
Details
Permit
201811166125
Permit issued
Nov 16, 2018
Final sign-off
Nov 26, 2018

fire alarm ti on 16th fl: add 1 control relay for card readers, 36 ceiling speakers strobes, relocate 4 existing smoke detectors, rleocate 10 existing spekaer strobes & removal of 6 existing smoke detectors as showm. add 5 duct detectors w/control for heat pumps.

Open the permit page

$18,000
Nov 2, 2018Completed
final sign-off Dec 2018
201 Mission StAyoob & Peery Plumbing Co Inc27th flr - add 1 relocate 3 change out 1 and plug 1 sprinkler to conform with new wall/ceiling layout of ti ref 201810153199 maher na
Details
Permit
201811024915
Permit issued
Nov 5, 2018
Final sign-off
Dec 5, 2018

27th flr - add 1 relocate 3 change out 1 and plug 1 sprinkler to conform with new wall/ceiling layout of ti ref 201810153199 maher na

Open the permit page

$1,425
Oct 23, 2018Completed
final sign-off Dec 2018
201 Mission StPioneer Fire Inc.26th floor - relocate 68 pendents, relocate 8 uprights, relocate 47 concealers, remove 8 pendents. ref 201809210984
Details
Permit
201810233905
Permit issued
Oct 23, 2018
Final sign-off
Dec 5, 2018

26th floor - relocate 68 pendents, relocate 8 uprights, relocate 47 concealers, remove 8 pendents. ref 201809210984

Open the permit page

$37,311
Oct 17, 2018Completed
final sign-off Dec 2018
201 Mission StRed Hawk Fire & Security Ca Llcfire alarm ti - 13th fl corridor - add (4) duct detectors for fsds with control function. ref #201808248281.
Details
Permit
201810173487
Permit issued
Oct 17, 2018
Final sign-off
Dec 7, 2018

fire alarm ti - 13th fl corridor - add (4) duct detectors for fsds with control function. ref #201808248281.

Open the permit page

$5,000
Oct 15, 2018Completed
final sign-off Feb 2019
201 Mission StA M A Design Build Incorporatedsuite #2750: t.i. includes demolition of extg non-structural partitions, lighting, electrical, plumbing, mechanical, casework and finishes. n/a for maher.
Details
Permit
201810153199
Permit issued
Oct 25, 2018
Final sign-off
Feb 15, 2019

suite #2750: t.i. includes demolition of extg non-structural partitions, lighting, electrical, plumbing, mechanical, casework and finishes. n/a for maher.

Open the permit page

$600,000
Sep 26, 2018Completed
final sign-off Nov 2018
201 Mission St16th flr - fire sprinklers relocate 84, add 47 and delete 16 ref 201809049003 maher na new bracing calc's , hydro required. n/a for maher.
Details
Permit
201809261403
Permit issued
Sep 26, 2018
Final sign-off
Nov 15, 2018

16th flr - fire sprinklers relocate 84, add 47 and delete 16 ref 201809049003 maher na new bracing calc's , hydro required. n/a for maher.

Open the permit page

$41,000
Sep 21, 2018Completed
final sign-off Oct 2021
201 Mission StSkyline Construction26th fl.: non structural demo (n) non-structural partitions doors, glazing, ceiling, lights, millork, finishes, no change in occupancy, use or area
Details
Permit
201809210984
Permit issued
Sep 26, 2018
Final sign-off
Oct 6, 2021

26th fl.: non structural demo (n) non-structural partitions doors, glazing, ceiling, lights, millork, finishes, no change in occupancy, use or area

Open the permit page

$1,730,936
Sep 19, 2018Completed
final sign-off Oct 2018
201 Mission StRed Hawk Fire & Security Ca Llc8th flr - fire alarm ti add 2 speaker strobes and add 1 speaker. ref 201806121638 maher na
Details
Permit
201809190745
Permit issued
Sep 21, 2018
Final sign-off
Oct 1, 2018

8th flr - fire alarm ti add 2 speaker strobes and add 1 speaker. ref 201806121638 maher na

Open the permit page

$1,000
Sep 17, 2018Never finaled
issued Sep 2018, no final
201 Mission StField Construction Inc.8th flr, suite 800 mech/ele ref pa 201806121638 maher na
Details
Permit
201809170408
Permit issued
Sep 20, 2018

8th flr, suite 800 mech/ele ref pa 201806121638 maher na

Open the permit page

$50,698
Sep 7, 2018Completed
final sign-off May 2025
201 Mission StAyoob & Peery Plumbing Co Inc13th flr - reloate 3 sprinkler to conform with the new wall/ceiling layout of the ti ref 201808248281 job#18-706. maher n/a
Details
Permit
201809079411
Permit issued
Sep 7, 2018
Final sign-off
May 12, 2025

13th flr - reloate 3 sprinkler to conform with the new wall/ceiling layout of the ti ref 201808248281 job#18-706. maher n/a

Open the permit page

$675
Sep 4, 2018Completed
final sign-off Oct 2019
201 Mission StNovo Construction Inc16th flr - construction of full height partitions, partial height partitions doors, frames, and interior glazing, restroom upgrades, finishes. millwork, ceiling grids, mep included maher na
Details
Permit
201809049003
Permit issued
Sep 5, 2018
Final sign-off
Oct 3, 2019

16th flr - construction of full height partitions, partial height partitions doors, frames, and interior glazing, restroom upgrades, finishes. millwork, ceiling grids, mep included maher na

Open the permit page

$3,000,000
Aug 24, 2018Completed
final sign-off Sep 2018
201 Mission StAyoob & Peery Plumbing Co Inc13th flr. relocate and add fire sprinklers per tenant improvement, 18 relocates, 1 add. ref # 201805098615, job # 18-706. maher n/a
Details
Permit
201808248281
Permit issued
Aug 24, 2018
Final sign-off
Sep 21, 2018

13th flr. relocate and add fire sprinklers per tenant improvement, 18 relocates, 1 add. ref # 201805098615, job # 18-706. maher n/a

Open the permit page

$4,575
Aug 24, 2018Completed
final sign-off Sep 2018
201 Mission StAyoob & Peery Plumbing Co Inc8th flr. relocate and add fire sprinklers per tenant improvements, 11 relocates. ref pa # 201806121638 job # 18-679. maher n/a
Details
Permit
201808248279
Permit issued
Aug 24, 2018
Final sign-off
Sep 7, 2018

8th flr. relocate and add fire sprinklers per tenant improvements, 11 relocates. ref pa # 201806121638 job # 18-679. maher n/a

Open the permit page

$2,475
Aug 17, 2018Completed
final sign-off Dec 2018
201 Mission StRed Hawk Fire & Security Ca Llcfire alarm t.i. on 19th and 21st floor: 19th floor add 4 duct detectors with relays for fsd & 2 control relay at elevator lobby for fsd. 21st floor: add 3 speaker strobes, 4 duct detectors with relay for fsd and 2 control relay at elevator lobby for fsd
Details
Permit
201808177708
Permit issued
Sep 21, 2018
Final sign-off
Dec 20, 2018

fire alarm t.i. on 19th and 21st floor: 19th floor add 4 duct detectors with relays for fsd & 2 control relay at elevator lobby for fsd. 21st floor: add 3 speaker strobes, 4 duct detectors with relay for fsd and 2 control relay at elevator lobby for fsd

Open the permit page

$7,500
Aug 2, 2018Completed
final sign-off Aug 2018
201 Mission StPribuss Engineering Incfire sprinkler t.i. on the 21st fl. relocate sprinklers =(18), added sprinklers=(1)total (19) ($514.00)
Details
Permit
201808026209
Permit issued
Aug 2, 2018
Final sign-off
Aug 17, 2018

fire sprinkler t.i. on the 21st fl. relocate sprinklers =(18), added sprinklers=(1)total (19) ($514.00)

Open the permit page

$9,252
Jul 19, 2018Expired or cancelled
cancelled Jan 2020
201 Mission StRed Hawk Fire & Security Ca Llcfire alarm ti on 9th fl. add (1) control relay air security interface
Details
Permit
201807195034
Permit issued
Jul 20, 2018

fire alarm ti on 9th fl. add (1) control relay air security interface

Open the permit page

$600
Jul 12, 2018Completed
final sign-off Jul 2018
201 Mission StPribuss Engineering Incfire sprinkler ti on ste 1350, relocated 1 head, ref pa 2018-0509-8615
Details
Permit
201807124360
Permit issued
Jul 17, 2018
Final sign-off
Jul 19, 2018

fire sprinkler ti on ste 1350, relocated 1 head, ref pa 2018-0509-8615

Open the permit page

$514
Jul 5, 2018Completed
final sign-off Aug 2018
201 Mission StPribuss Engineering Inc19th flr fire sprinkler ti relocate 25 hd, add 4
Details
Permit
201807053749
Permit issued
Jul 5, 2018
Final sign-off
Aug 13, 2018

19th flr fire sprinkler ti relocate 25 hd, add 4

Open the permit page

$14,906
Jun 15, 2018Completed
final sign-off Jul 2018
201 Mission Stdemolition of existing non-structural partitions, door frames & interior glazing fire sprinkler demo - remove (e) drops and place fire sprinkler heads at roof level
Details
Permit
201806151972
Permit issued
Jun 15, 2018
Final sign-off
Jul 3, 2018

demolition of existing non-structural partitions, door frames & interior glazing fire sprinkler demo - remove (e) drops and place fire sprinkler heads at roof level

Open the permit page

$75,000
Jun 15, 2018Completed
final sign-off Dec 2018
201 Mission StSwinerton Builders13th flr - project consists of interior aleration work to the elevator lobby and corridor. does not affect (e) suites, exit access, egress paths, or exit stairs. (e) exiting to remain as is. (e) sprinkler and life-safety systems to be under separate permit
Details
Permit
201806152003
Permit issued
Aug 24, 2018
Final sign-off
Dec 14, 2018

13th flr - project consists of interior aleration work to the elevator lobby and corridor. does not affect (e) suites, exit access, egress paths, or exit stairs. (e) exiting to remain as is. (e) sprinkler and life-safety systems to be under separate permit

Open the permit page

$200,000
Jun 12, 2018Completed
final sign-off Nov 2018
201 Mission StField Construction Inc.suite 800 - selective renovation of (e) office space to create four private offices and an open office area with six work stations maher na
Details
Permit
201806121638
Permit issued
Aug 8, 2018
Final sign-off
Nov 7, 2018

suite 800 - selective renovation of (e) office space to create four private offices and an open office area with six work stations maher na

Open the permit page

May 18, 2018Completed
final sign-off Jan 2019
201 Mission StRichlen Construction21/f: interior alteration to the restrooms, elevator lobby and corridor. scope does not affect (e) tneant suites, exit access, paths of egress or exit stairs. existing exiting to remain as is. existing sprinkler system, life safety modification to be under sep permit
Details
Permit
201805189522
Permit issued
Jun 14, 2018
Final sign-off
Jan 31, 2019

21/f: interior alteration to the restrooms, elevator lobby and corridor. scope does not affect (e) tneant suites, exit access, paths of egress or exit stairs. existing exiting to remain as is. existing sprinkler system, life safety modification to be under sep permit

Open the permit page

$420,000
May 18, 2018Completed
final sign-off Jan 2019
201 Mission StRichlen Constructionproject consists of interior alteration to the restrooms, elevator lobby, and corridor on the 19th fl. this scope does not affect existing tenant suites, exit access, paths of egress or exit stairs. existing exiting to remain as is. existing sprinkler system, life safety modification to be under sep
Details
Permit
201805189520
Permit issued
Jun 14, 2018
Final sign-off
Jan 31, 2019

project consists of interior alteration to the restrooms, elevator lobby, and corridor on the 19th fl. this scope does not affect existing tenant suites, exit access, paths of egress or exit stairs. existing exiting to remain as is. existing sprinkler system, life safety modification to be under sep

Open the permit page

$420,000
May 16, 2018Completed
final sign-off May 2018
201 Mission StRed Hawk Fire & Security Ca Llc2nd floor: fire alarm as built for pa 2018-0406-5666 include duct detectors for heat pumps & fan boxes. update notification devices location
Details
Permit
201805169329
Permit issued
May 17, 2018
Final sign-off
May 18, 2018

2nd floor: fire alarm as built for pa 2018-0406-5666 include duct detectors for heat pumps & fan boxes. update notification devices location

Open the permit page

$10,000
May 9, 2018Completed
final sign-off Nov 2018
201 Mission StRichlen Constructionsuite #1350: on a multi-tenant floor. build out consists of minor demo of extg walls and construction of new partitions and glazing, power/data work, millwork and finishes. mep & extg sprinkler system and life safty modification is under seperate permit. n/a for maher
Details
Permit
201805098615
Permit issued
Jun 6, 2018
Final sign-off
Nov 1, 2018

suite #1350: on a multi-tenant floor. build out consists of minor demo of extg walls and construction of new partitions and glazing, power/data work, millwork and finishes. mep & extg sprinkler system and life safty modification is under seperate permit. n/a for maher

Open the permit page

$190,000
May 9, 2018Expired or cancelled
cancelled Jan 2026
201 Mission Stsuite #2750: project consists of a t.i. on a multi-tenant floor. build out consits of minor demo of extg walls & millwork & construction of new power/data work, millwork and finishes. mep, and extg sprinkler system and life safty modification is under seperate permit. n/a for maher
Details
Permit
201805098620

suite #2750: project consists of a t.i. on a multi-tenant floor. build out consits of minor demo of extg walls & millwork & construction of new power/data work, millwork and finishes. mep, and extg sprinkler system and life safty modification is under seperate permit. n/a for maher

Open the permit page

$160,000
Apr 30, 2018Completed
final sign-off Jun 2018
201 Mission StRed Hawk Fire & Security Ca Llcfire alarm - ti suite 2310 remove 3 (e) speaker/strobes. 1 (e) strobe, relocate 4 speaker strobes and 1 smk det. n/a for maher. ref 201802151370
Details
Permit
201804307812
Permit issued
May 1, 2018
Final sign-off
Jun 14, 2018

fire alarm - ti suite 2310 remove 3 (e) speaker/strobes. 1 (e) strobe, relocate 4 speaker strobes and 1 smk det. n/a for maher. ref 201802151370

Open the permit page

$2,600
Apr 18, 2018Completed
final sign-off May 2018
201 Mission Stfire sprinkler permit - install 24 new pendents and 68 new uprights; relocate 21 and delete pendents on the 2nd floor. ref pa 201801178781
Details
Permit
201804186691
Permit issued
May 3, 2018
Final sign-off
May 18, 2018

fire sprinkler permit - install 24 new pendents and 68 new uprights; relocate 21 and delete pendents on the 2nd floor. ref pa 201801178781

Open the permit page

$25,000
Apr 18, 2018Never finaled
issued Apr 2018, no final
201 Mission StJ B Signssuite 100. install 1 illuminated & 1 non-illuminated signs
Details
Permit
201804186685
Permit issued
Apr 18, 2018

suite 100. install 1 illuminated & 1 non-illuminated signs

Open the permit page

$1,000
Apr 18, 2018Never finaled
issued Apr 2018, no final
201 Mission StJ B Signssuite 100. install 1 illuminated & 1 non-illuminated signs
Details
Permit
201804186680
Permit issued
Apr 18, 2018

suite 100. install 1 illuminated & 1 non-illuminated signs

Open the permit page

$1,505
Apr 6, 2018Completed
final sign-off May 2018
201 Mission StRed Hawk Fire & Security Ca Llcfire t.i. on 2nd fl. add (23) speaker strobes, (5) speakers only & (2) smoke detectors. ref pa # 201801178781 n/a maher
Details
Permit
201804065666
Permit issued
Apr 6, 2018
Final sign-off
May 18, 2018

fire t.i. on 2nd fl. add (23) speaker strobes, (5) speakers only & (2) smoke detectors. ref pa # 201801178781 n/a maher

Open the permit page

$15,200
Apr 2, 2018Completed
final sign-off Apr 2018
201 Mission StGolden Gate Fire Protection Inc23rd floor: fire sprinkler only. relocate 50 pendents for spec suite #2310. n/a for maher ref app#201802151370
Details
Permit
201804025240
Permit issued
Apr 2, 2018
Final sign-off
Apr 23, 2018

23rd floor: fire sprinkler only. relocate 50 pendents for spec suite #2310. n/a for maher ref app#201802151370

Open the permit page

$12,500
Mar 22, 2018Completed
final sign-off Mar 2021
201 Mission StRichlen Constructionsuite 560: project consists of a tenant improvemen on a multi tenant floor. build out consists of minor demo of e walls and construction of new power data work and finishes. mep and existing ls under separate permit
Details
Permit
201803224316
Permit issued
Mar 30, 2018
Final sign-off
Mar 1, 2021

suite 560: project consists of a tenant improvemen on a multi tenant floor. build out consists of minor demo of e walls and construction of new power data work and finishes. mep and existing ls under separate permit

Open the permit page

$27,000
Mar 6, 2018Never finaled
issued Mar 2018, no final
201 Mission StAnderson, Rowe & Buckley, Inc.9th flr -(e) fire sprinklers system ti 1 relocated, 6 changeed ref 201802050406 maher na
Details
Permit
201803063018
Permit issued
Mar 6, 2018

9th flr -(e) fire sprinklers system ti 1 relocated, 6 changeed ref 201802050406 maher na

Open the permit page

$3,500
Mar 5, 2018Never finaled
issued Mar 2018, no final
201 Mission StGolden Gate Sign Company Inc.#100: revision to 201709137859 sign a1, a2 size locations-installed. revision to 201709137858 sign b1,b2 revised location-installed
Details
Permit
201803052813
Permit issued
Mar 14, 2018

#100: revision to 201709137859 sign a1, a2 size locations-installed. revision to 201709137858 sign b1,b2 revised location-installed

Open the permit page

Feb 15, 2018Completed
final sign-off Sep 2018
201 Mission StRichlen Constructionsuite 2310: ti on a multi-tenant floor. build-out consist of demo of (e) walls & ceiling & construction of new walls & glazing configuration, finishes, ceiling, & power/data work. sprinkler system & fire life safety suite 23190modification is under separate permit. maher na
Details
Permit
201802151370
Permit issued
Mar 2, 2018
Final sign-off
Sep 14, 2018

suite 2310: ti on a multi-tenant floor. build-out consist of demo of (e) walls & ceiling & construction of new walls & glazing configuration, finishes, ceiling, & power/data work. sprinkler system & fire life safety suite 23190modification is under separate permit. maher na

Open the permit page

$564,568
Feb 15, 2018Completed
final sign-off Mar 2019
201 Mission StNovo Construction Inc2/f: mechanical and electrical work for ti. ref pa 2018-0117-8781
Details
Permit
201802151356
Permit issued
Feb 27, 2018
Final sign-off
Mar 22, 2019

2/f: mechanical and electrical work for ti. ref pa 2018-0117-8781

Open the permit page

$150,000
Feb 8, 2018Never finaled
issued Feb 2018, no final
201 Mission StRed Hawk Fire & Security Ca Llcfire alarm ti on 24th fl add 9 smoke detectors for door holder maher not req
Details
Permit
201802080754
Permit issued
Feb 8, 2018

fire alarm ti on 24th fl add 9 smoke detectors for door holder maher not req

Open the permit page

$5,700
Feb 5, 2018Completed
final sign-off Mar 2018
201 Mission StPrincipal Builders Inc.9th fl: ti to build new partitions, door frames, glazing & millwork/finishes and mep systems. fire alarms & sprinklers under sep permits. maher na
Details
Permit
201802050406
Permit issued
Feb 6, 2018
Final sign-off
Mar 16, 2018

9th fl: ti to build new partitions, door frames, glazing & millwork/finishes and mep systems. fire alarms & sprinklers under sep permits. maher na

Open the permit page

$100,000
Jan 19, 2018Completed
final sign-off Mar 2018
201 Mission StPrincipal Builders Inc.demo of non structural partitions, doors framing, millwork, finishes to prepare for future t.i. to remain vacant under ab 017 adn ada will be issued with future architectural permit. n/a for maher
Details
Permit
201801199086
Permit issued
Jan 23, 2018
Final sign-off
Mar 16, 2018

demo of non structural partitions, doors framing, millwork, finishes to prepare for future t.i. to remain vacant under ab 017 adn ada will be issued with future architectural permit. n/a for maher

Open the permit page

$42,000
Jan 17, 2018Completed
final sign-off Mar 2019
201 Mission StNovo Construction Inctenant improvement to consist of new non load bearing partitions door frames, interior glazing, finishes and millwork. mep & life safety under separate permit
Details
Permit
201801178781
Permit issued
Feb 7, 2018
Final sign-off
Mar 22, 2019

tenant improvement to consist of new non load bearing partitions door frames, interior glazing, finishes and millwork. mep & life safety under separate permit

Open the permit page

$300,000
Jan 11, 2018Completed
final sign-off May 2018
201 Mission St2nd floor: fire sprinkler demolition of extg fire sprinkler drops raise sprinker protction to roof level. 119 heads. ref app#201801108260. n/a for maher
Details
Permit
201801118414
Permit issued
Jan 11, 2018
Final sign-off
May 7, 2018

2nd floor: fire sprinkler demolition of extg fire sprinkler drops raise sprinker protction to roof level. 119 heads. ref app#201801108260. n/a for maher

Open the permit page

$10,600
Jan 10, 2018Completed
final sign-off Mar 2019
201 Mission StNovo Construction Incdemo of (e) non structural partitions, doors, frames & interior glazing finishes, millwork, ceiling grid soffits and associated mech. ele and lighting maher na sprinkler ref pa 201801118414
Details
Permit
201801108260
Permit issued
Jan 16, 2018
Final sign-off
Mar 22, 2019

demo of (e) non structural partitions, doors, frames & interior glazing finishes, millwork, ceiling grid soffits and associated mech. ele and lighting maher na sprinkler ref pa 201801118414

Open the permit page

$140,000
Dec 26, 2017Completed
final sign-off Jan 2018
201 Mission StRed Hawk Fire & Security Ca Llc17th floor: fire alarm t.i. to add 1 duct detector with control relay for heat pump. ref app#201707050975. n/a for maher
Details
Permit
201712267361
Permit issued
Dec 26, 2017
Final sign-off
Jan 3, 2018

17th floor: fire alarm t.i. to add 1 duct detector with control relay for heat pump. ref app#201707050975. n/a for maher

Open the permit page

$1,000
Dec 20, 2017Never finaled
issued Dec 2017, no final
201 Mission StRed Hawk Fire & Security Ca Llcfire alarm ti suite 640, add 2 speaker strobes and 1 smoke detector. ref#2017 1025 2219. n/a for maher.
Details
Permit
201712206944
Permit issued
Dec 20, 2017

fire alarm ti suite 640, add 2 speaker strobes and 1 smoke detector. ref#2017 1025 2219. n/a for maher.

Open the permit page

$1,700
Nov 30, 2017Completed
final sign-off Dec 2017
201 Mission StRed Hawk Fire & Security Ca Llcsuite 1500: fire alarm ti add 8 speaker strobes, 1 speaker only & relocate (e) devices as shown ref 2017100404276 maher na
Details
Permit
201711305139
Permit issued
Nov 30, 2017
Final sign-off
Dec 20, 2017

suite 1500: fire alarm ti add 8 speaker strobes, 1 speaker only & relocate (e) devices as shown ref 2017100404276 maher na

Open the permit page

$4,500
Nov 29, 2017Completed
final sign-off Dec 2017
201 Mission StGolden Gate Fire Protection Inc6th flr: fire sprinkler only, relocate 3 head, add 1 head for blue crest ref201710252219; maher na
Details
Permit
201711295032
Permit issued
Nov 29, 2017
Final sign-off
Dec 8, 2017

6th flr: fire sprinkler only, relocate 3 head, add 1 head for blue crest ref201710252219; maher na

Open the permit page

$1,250
Nov 29, 2017Completed
final sign-off Dec 2017
201 Mission StGolden Gate Fire Protection Inc15th flr: fire sprinkler only, relocate 10 pendents in #1500; maher na ref 201710040427
Details
Permit
201711295031
Permit issued
Nov 29, 2017
Final sign-off
Dec 8, 2017

15th flr: fire sprinkler only, relocate 10 pendents in #1500; maher na ref 201710040427

Open the permit page

$4,000
Nov 16, 2017Completed
final sign-off Dec 2017
201 Mission StRed Hawk Fire & Security Ca Llc27th floor: t.i. suite 2775: fire alarm to add 2 new speaker strobes and relocate 1 speaker per plan. ref app#201710040421 n/a for maher
Details
Permit
201711164177
Permit issued
Nov 20, 2017
Final sign-off
Dec 4, 2017

27th floor: t.i. suite 2775: fire alarm to add 2 new speaker strobes and relocate 1 speaker per plan. ref app#201710040421 n/a for maher

Open the permit page

$1,500
Nov 8, 2017Completed
final sign-off Nov 2017
201 Mission St5/f #510- fire sprinkler permit, relocate 7 pendent sprinklers. t.i. pa#201706220129. n/a ordinance #155-13
Details
Permit
201711083435
Permit issued
Nov 8, 2017
Final sign-off
Nov 27, 2017

5/f #510- fire sprinkler permit, relocate 7 pendent sprinklers. t.i. pa#201706220129. n/a ordinance #155-13

Open the permit page

$2,000
Nov 8, 2017Completed
final sign-off Nov 2017
201 Mission St5/f #560- fire sprinkler permit, relocate 1 pendent sprinkler. t.i. pa#201709087343. n/a ordinance #155-13
Details
Permit
201711083437
Permit issued
Nov 8, 2017
Final sign-off
Nov 27, 2017

5/f #560- fire sprinkler permit, relocate 1 pendent sprinkler. t.i. pa#201709087343. n/a ordinance #155-13

Open the permit page

$1,000
Nov 8, 2017Never finaled
issued Nov 2017, no final
201 Mission St14/f- fire sprinkler permit, relocate 15, add 1 and delete 2 sprinklers. t.i. pa#201709087352. n/a ordinance #155-13
Details
Permit
201711083438
Permit issued
Nov 8, 2017

14/f- fire sprinkler permit, relocate 15, add 1 and delete 2 sprinklers. t.i. pa#201709087352. n/a ordinance #155-13

Open the permit page

$4,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Richlen Construction (63), Everon Llc (31), Red Hawk Fire & Security Ca Llc (22), Golden Gate Fire Protection Inc (21), Pribuss Engineering Inc (7), Ayoob & Peery Plumbing Co Inc (5), Field Construction Inc. (4), Novo Construction Inc (4), Pioneer Fire Inc. (4), Skyline Construction (4), Bcci Construction Company (3), Gci, Inc (3), Anderson, Rowe & Buckley, Inc. (2), J B Signs (2), Principal Builders Inc. (2), A M A Design Build Incorporated, Acco Engineered Systems Inc. Dba Acco En, Ama Design-Build Llc, Capitol Electric Const, Comfort Dynamics Inc., Golden Gate Sign Company Inc., Pacific Restoration Inc Dba Servpro, R.M.R. Construction Company, Specialized Graphics Inc, Swinerton Builders, Terra Visual Inc, Truebeck Construction
Architects
Scott Clement (24), Stanley Lew (11), Yong Yin Park (5), Candace Chan (3), Douglas Mehl (2), Claudette Bleijenberg, Ilyes Nouizi, Kyle Rapaun, Levi G. Abarte, Martha Breed, Rlh Fire Design Rlh Fire Design, Sashikala Murthy, Stanley Lew, Teresa Emery, Xiang Liu
Engineers
Amit Wadhwa (15), Levi Abarte (14), Xiang Liu (4), Alexander Joseph Pacheco (3), Edward Rivera (3), Michael Orosco, Peter Bekey, Rudolfo P Bustos Iii, Sashikala Murthy, Scott Clement, Sherry Chaumpluke
Authorized agents
Twyla Summers (3), Benson Chiang (2), Joyce Mizuhara, Roger Cruz
Designers
Brian Willis (4), Golden Gate Fire Protection (2), Aaron Benz, Pioneer Fire Inc.

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.