| Oct 1, 2026 | In progress | 201 Mission St | suites 2700 & 2750 interior demo & construction of elements including but not limited to interior partitions, doors finishes, acoustic ceiings, open ceiilngs & light fixtures. alteration work to rr's elev lobby & common corridor on 27th floor. path of travel approed separated under pa 202303012812 | $715,000 | |
| Sep 16, 2026 | In progress | 201 Mission St | removal of existing building generator and installation of new building generator. expansion of existing concrete pad for generator. no new partitions, ceilings, etc. | $286,644 | |
| Sep 11, 2026 | In progress | 201 Mission St | Richlen Construction | mech: replace duct work, transfer fan relocation, supply air diffusers, rework flexible inlet duct connectors, install new balancing dampers where required. check all hvac equip. elec: new lighting fixtures and associated circuiting /controls, new power and signal devices and associated wiring. ref | $337,875 |
| Aug 25, 2026 | In progress | 201 Mission St | Richlen Construction | ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical. | $322,135 |
| Jul 29, 2026 | In progress | 201 Mission St | Specialized Graphics Inc | emergency evacuation map installation/inspection | $5,000 |
| Jun 24, 2026 | In progress | 201 Mission St | Richlen Construction | 14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits. | $285,000 |
| Jun 17, 2026 | Completed | 201 Mission St | Richlen Construction | 23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location. | $56,543 |
| Jun 4, 2026 | Completed | 201 Mission St | Richlen Construction | 22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles. | $190,288 |
| Jun 4, 2026 | Completed | 201 Mission St | Richlen Construction | 21fl - ste 2150: def electrical for 202605201639 : new light fixtures and ciruits/ controls new power signal devices. | $127,465 |
| Jun 4, 2026 | Completed | 201 Mission St | Richlen Construction | 21 fl - ste: 2150 - hvac relocate (e) difusers, air grills, modify heat pump add thermostats. mech deferred for 202605201639 | $60,000 |
| May 20, 2026 | Completed | 201 Mission St | Richlen Construction | 21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved | $218,435 |
| Apr 23, 2026 | Completed | 201 Mission St | Richlen Construction | floor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit. | $341,000 |
| Mar 27, 2026 | In progress | 201 Mission St | Terra Visual Inc | install new electric internally illuminated channel letter address sign (201) | $5,000 |
| Mar 9, 2026 | Completed | 201 Mission St | Richlen Construction | suite 2350: deferred mep for pa # 2026-0121-4223. new ducts & air distribution. new lighting, power & plumbing. | $25,000 |
| Feb 12, 2026 | In progress | 201 Mission St | Pribuss Engineering Inc | modify sprinkler head locations to accommodate new ceiling and partition layout for new office space of suite 2350. ref pa# 2026-0121-4223 total sprinklers | $19,950 |
| Feb 12, 2026 | Completed | 201 Mission St | Everon Llc | fire alarm t.i. suite 2350 replace (1) existing speaker with speaker strobe remove (2) speakers ref pa# 2026-0121-4223. | $1,000 |
| Feb 5, 2026 | Completed | 201 Mission St | Richlen Construction | patio demo. remove exisitng planting beds & security fencing | $46,484 |
| Feb 4, 2026 | In progress | 201 Mission St | Everon Llc | 29th/f provide 1 control relay for access control | $1,000 |
| Feb 2, 2026 | In progress | 201 Mission St | Everon Llc | fire alarm t.i. on the 23rd floor-common corridor area. replace 1 existing strobe & 1 existing speaker/strobe. add 1 duct detector with relay for fsc. ref pa #202510308608 | $3,500 |
| Jan 22, 2026 | Completed | 201 Mission St | Richlen Construction | 23rd flr. mep permit for approved architectual scope. new fsd and supply diffusers. new lighting and power. ref pa#: 202510308608. | $249,348 |
| Jan 21, 2026 | Completed | 201 Mission St | Richlen Construction | ste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permits | $255,000 |
| Jan 8, 2026 | Completed | 201 Mission St | Pioneer Fire Inc. | 23/f: relocate 8 uprights. ref t.i permit 202510308608. | $2,000 |
| Dec 23, 2025 | Completed | 201 Mission St | Everon Llc | 1st & 2nd fl fire alarm t.i. add(27)speaker/strobes. replace(2)existing speaker/strobes, add(1)weatherproof speaker/strobes, add (3) duct detector w/ relays for heat pumps. relocate existing 2-way sub-station, remote anneciator & manual pull to new guard's desk.ref#: 202504214848 | $25,000 |
| Dec 18, 2025 | In progress | 201 Mission St | Richlen Construction | 1st floor: convert 2449 sqft of retail space to office to provide tenant amenities. | $550,000 |
| Nov 13, 2025 | Completed | 201 Mission St | Everon Llc | 5/f suite 560: fire alarm t.i - add 1 duct detector with relay for heat pump. ref permit 202509306380 | $2,500 |
| Nov 7, 2025 | Completed | 201 Mission St | Richlen Construction | 5/f: administrative permit to revise scope of work per building inspector. verbiage change from mep deferred to no mep required. ref pa# 202510066828. | |
| Oct 30, 2025 | Completed | 201 Mission St | Richlen Construction | 23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as-is. new finishes & plumbing fixtures at existing mens & womens rrs to be ada compliant. | $657,000 |
| Oct 15, 2025 | Completed | 201 Mission St | Anderson, Rowe & Buckley, Inc. | 1st & 2nd fl - fire sprinkler ti, relocate 51 and add 07. total 58. ref pa 202504214848 | $29,848 |
| Oct 9, 2025 | Completed | 201 Mission St | Everon Llc | 5th fl, ste 510 - fire alarm ti add 2 speakers only. ref pa 202510066828 | $1,000 |
| Oct 6, 2025 | Completed | 201 Mission St | Richlen Construction | suite 510. new partitions, offices and conference rooms. mep deferred. no plumbing fixtures. | $220,000 |
| Sep 30, 2025 | Completed | 201 Mission St | Ama Design-Build Llc | unit#560: non structural partitions, offices and conference rooms. mep deferred. s.c | $190,000 |
| Aug 15, 2025 | In progress | 201 Mission St | Everon Llc | suite 1900. fire alarm t.i. on 19th flr. replace 1 speaker/strobe w/ speaker and add 1 speaker only. | $1,400 |
| Jul 17, 2025 | Completed | 201 Mission St | Richlen Construction | suite 1900. interior tenant improvement. removal of non structural partition, new non structural partitions, door assembly, sidelight and electrical outlets. no plumbing fixtures. | $120,000 |
| Jun 16, 2025 | Completed | 201 Mission St | Everon Llc | replace e) annunciator & 2-way comm. command center (desk phone) to temporary guard's desk | $2,000 |
| Apr 21, 2025 | In progress | 201 Mission St | Bcci Construction Company | floor 1, remodel main entry portal, remodal of escalator, remove int water feature, new reception/security counter, remodel elev lobbies,floor wall and ceiling finish updates, lighting replacement and addition throughout, no change to back of house, int demo of prior retail space with new work for | $4,913,284 |
| Apr 21, 2025 | In progress | 201 Mission St | Bcci Construction Company | 1st fl - remove concrete stair #9, remove column supporting landing @ floor 2; 2nd fl - remove portion of stair #9 landing, infill guardrail wall @ stair landing removal area; refinish guardrail wall and add drink (floor 2) | $120,000 |
| Nov 22, 2024 | Completed | 201 Mission St | Everon Llc | fire alarm t.i. on 13th floor: add 1 speaker strobes, 1 speaker only and relocate 1 existing smoke detector. ref pa#202410022144 | $2,500 |
| Nov 6, 2024 | In progress | 201 Mission St | Golden Gate Fire Protection Inc | 13th flr. relocate 2 pendent sprinklers on the 13th flr suite 1380. ref pa 202410022144 | $2,000 |
| Oct 24, 2024 | Completed | 201 Mission St | Richlen Construction | 13/fl- ti (n) cased opening to combine suite 1300 and 1310 and (n) undercounter low-temp dishwasher (ada). no mech work | $40,000 |
| Oct 2, 2024 | Completed | 201 Mission St | Richlen Construction | 13th fl, ste 1380 - interior ti removal of select existing non-structural partition and addition of new office and millwork at existing break area | $139,748 |
| May 14, 2024 | In progress | 201 Mission St | Bcci Construction Company | office ti - to 9 elevator hoistway from basement to underside of l2 demo of partitions and concrete deck at ground floor to extend elevator hoistway to basement for elevator sevice to . (n) fire rated partitions to continue hoistway protection for fire and smoke separation . (n) structural pads and | $2,400,000 |
| Apr 25, 2024 | Completed | 201 Mission St | Pioneer Fire Inc. | relocate (2) pendents, add (1) upright, (1) pendent convert (4) uprights to pendents 25th fl. gc ti #202310037884. | $1,200 |
| Apr 11, 2024 | In progress | 201 Mission St | Pribuss Engineering Inc | ref 202402286712- 5th floor office space to modify sprinkler head locations to accommodate (n) ceiling and partition layout | $1,542 |
| Apr 11, 2024 | In progress | 201 Mission St | Pribuss Engineering Inc | ref 202402286715- 18th floor modify sprinkler head locations to accommodate (n) ceiling and partition layout for (e) elevator lobby | $2,056 |
| Apr 11, 2024 | Completed | 201 Mission St | Pribuss Engineering Inc | ref 202402145870- 18th floor office space to modify sprinkler head locations to accommodate (n) ceiling and partition layout | $1,028 |
| Apr 1, 2024 | Completed | 201 Mission St | Everon Llc | 18/f: fire alarm ti on 18th floor - elevator lobby. add (5) duct detectors for fsds, relocate (4) smoke detectors, and repalce (2) smoke detectors and (2) speaker strobes with new. ref # 202402286715 | $8,000 |
| Apr 1, 2024 | Completed | 201 Mission St | Everon Llc | fire alarm t.i. on 5th fl. elevator lobby replace 1 smoke detector and 1 speaker strobe with new ref pa# 2024-0228-6712 | $1,500 |
| Apr 1, 2024 | Completed | 201 Mission St | Everon Llc | 18th/f: fire alarm t.i. ste # 1850: replace 3 speaker strobes w/ new, add 1 speaker strobe, 1 speaker, & 1 smoke detector. ref to 202402145870 | $4,200 |
| Mar 14, 2024 | Completed | 201 Mission St | Richlen Construction | revision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference. | |
| Mar 11, 2024 | Completed | 201 Mission St | Capitol Electric Const | electrical generator tap can to be installed- ground floor | $75,000 |
| Feb 28, 2024 | Completed | 201 Mission St | Richlen Construction | interior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to remain as is. no exterior work. sprinkler system & l/s mod under separate permit. | $158,000 |
| Feb 28, 2024 | Completed | 201 Mission St | Richlen Construction | interior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is. no exterior work. sprinkler, lw mod under sep permit. | $60,000 |
| Feb 21, 2024 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 22/f suite 2230: fire sprinkles relocate 24 pendents. ref ti pa 202311090499 | $14,500 |
| Feb 14, 2024 | Completed | 201 Mission St | Richlen Construction | 18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities or | $216,353 |
| Feb 9, 2024 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | fire sprinkler: relocate 24 pendents in ste 710 on the 7/f. ref ti. 202311090493 | $14,500 |
| Feb 9, 2024 | Completed | 201 Mission St | Everon Llc | fire alarm ti, ste 2230. add 4 speaker strobes & 3 speakers only ref pa 2023-1109-0499 | $4,200 |
| Feb 9, 2024 | Completed | 201 Mission St | Everon Llc | fire alarm ti, ste 710 add 4 speaker strobes & 6 speakers only. ref pa 2023-1109-0493 | $6,000 |
| Feb 2, 2024 | Completed | 201 Mission St | Everon Llc | fire alarm t.i. suite #510: add 5 speaker strobe and 2 speaker. ref# pa #202311090512 | $3,500 |
| Feb 1, 2024 | Completed | 201 Mission St | Richlen Construction | 22/f-ste 2230: revison to pa# 202311090499, men's restroom scope has been revised to show no push buttons at entry door as 18" pull side clearance is achiered. | |
| Jan 26, 2024 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 5/f: fire sprinklers, relocate (29+) pendents in suite 500 and put in new end of line bracing. ref ti# 202311090512 | $17,980 |
| Jan 12, 2024 | Completed | 201 Mission St | Everon Llc | fire alarm t.i. on 25th floor: add 4 speaker strobes, 1 duct detector with relay for fsd, and one 2 way communication call station. ref #202310037884 | $6,000 |
| Jan 4, 2024 | Completed | 201 Mission St | Richlen Construction | adding ada passenger drop-off/ loading zone in parking lot. | $500 |
| Nov 9, 2023 | Completed | 201 Mission St | Richlen Construction | 7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes. | $504,622 |
| Nov 9, 2023 | Completed | 201 Mission St | Richlen Construction | suite #510:limited interior demolition of non-structural elements including interior partitions,doors,ceiling and lighting and finishes contruction of newglass fronts,frames,power & teldate,act ceiling/lighting,millsowrk and finishes. | $486,433 |
| Nov 9, 2023 | Completed | 201 Mission St | Richlen Construction | 22/f - #2230: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes. | $442,270 |
| Oct 3, 2023 | Completed | 201 Mission St | Field Construction Inc. | tenant improvement to 25th fl. removal of (3) existing conference rooms & (8) existing open office space to create (7) new single offices lights & mechanical proposed no chang to (e) occupancy, occupancy load or egress | $188,570 |
| Apr 11, 2023 | Completed | 201 Mission St | Everon Llc | 3/f: add (1) 2-way communication call staiton at 3/f elevator lobby, tie into existing 2-way communication system. ref 202012301946. | $1,000 |
| Mar 1, 2023 | Completed | 201 Mission St | Richlen Construction | project documents (e) ada accessibility compliant path of travel conditions. | |
| Jan 10, 2023 | Completed | 201 Mission St | Richlen Construction | revision to pa# 202208291499, to include structural scope. structural scope previously deferred. | $52,000 |
| Dec 15, 2022 | Completed | 201 Mission St | Gci, Inc | revision to 202202178192 to include new phone booths and structural work for new phone booths | $15,000 |
| Dec 13, 2022 | Completed | 201 Mission St | Everon Llc | 29th/flr: fire alarm & two way communication system- madd 4 speaker strobes, 2 speakers, relocate 4 existing speakers & add 1 2-way call station at elevator lobby. | $5,000 |
| Nov 22, 2022 | Completed | 201 Mission St | Pioneer Fire Inc. | ste 2900 - 29th flr - relocate (8) pendents, add (1) pendents, add (5) side-wall sprinkler heads. gcti # 202202178192. | $7,680 |
| Nov 10, 2022 | Completed | 201 Mission St | Truebeck Construction | fl 2,3,16: minor casework and accessibility upgrade: interior work only. existing hvac system to remain. | $27,000 |
| Oct 6, 2022 | Never finaled | 201 Mission St | Everon Llc | 1st fl: fire alarm t.i.. add 14 speaker strobes. add 4 weatherproof speaker strobes. ref pa# 202207269284. | $11,000 |
| Sep 8, 2022 | Completed | 201 Mission St | Ayoob & Peery Plumbing Co Inc | 1/f: add 12 fire sprinkler heads, relocate 19 per t.i. pa 202207269284. | $15,950 |
| Aug 29, 2022 | Completed | 201 Mission St | Richlen Construction | install security gate @ ground level only. gates include (2) 4-leaf bi-folding gates & ada complaint exit swing gate @ main entry plaza. (1) ada compliant exit swing gate & ramp from parking lot to natoma st (1) motorized 2-leaf swinging parking gate @ howard st parking entry | $160,000 |
| Jul 26, 2022 | Completed | 201 Mission St | Richlen Construction | 1/f: interior demo & construction of non-structural elements: interior partitions, doors, finishes, ceiling, lighting, electrical switches. new bike storage room, locker rooms, gender neutral restrooms & restroom ada upgrades. fire/life saftety under sep permit. maher n/a. | $800,000 |
| May 12, 2022 | Completed | 201 Mission St | Everon Llc | 19/f: fire alarm t.i. add 15 speaker strobes. relocate 8 speaker strobe , 7 spearkers. t.i. 202112083962 202112083965 202112083970. maher n/a | $8,000 |
| May 10, 2022 | Completed | 201 Mission St | Everon Llc | fire alarm t.i. on 5th floor, ste 500. add (3) speaker strobes, add (1) speaker, relocate (2) speakers, add (1) smoke detector & remove (4) wall mount strobes only. add 1 speaker. ref 202112083977. | $5,000 |
| May 10, 2022 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 5th fl: fire sprinklers. relocate 17 pendents in ste 500 and put in new end of line bracing. ref pa# 202112083977. | $8,925 |
| May 10, 2022 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 19th fl: fire sprinklers. relocate 35 pendents in ste 1900. relocate 14 pendents in ste 1930. relocate 18 pendents in ste 1940. new end of line bracing in all 3 suites. ref ti ste1900: pa# 202112083962. ref ti ste1930: pa# 202112083965. ref ti ste1940: pa# 202112083970. | $35,175 |
| Mar 11, 2022 | Completed | 201 Mission St | Everon Llc | suite 650: add 1 speaker strobe, relocate 5 speaker/strobes. relocate 2 spearker only. | $1,000 |
| Mar 11, 2022 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 20th fl: fire sprinklers; relocate 5 pendant sprinklers on the 20th fl suite 2020. ti ref: 202111051896 | $3,000 |
| Mar 1, 2022 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 6/f suite 650: fire sprinklers: relocate 6 pendent sprinklers. ref ti permit 202112164549. | $3,000 |
| Feb 17, 2022 | Completed | 201 Mission St | Gci, Inc | 29/f: construction of non-structural new walls for new interview room & breakroom, millwork & new finiehes. minor adition of power / data and ceiling work. sprinler system modification and fire life safety is under sep permit. maher n/a. minor demolition to create (1) conference rm. | $200,000 |
| Feb 16, 2022 | Completed | 201 Mission St | Everon Llc | fire alarm t.i. on 20th floor. add 1 smoke detector and 6 speaker strobes, remove 7 extg notification appliances per plan. ref pa#202111051896 | $5,000 |
| Dec 16, 2021 | Completed | 201 Mission St | Richlen Construction | suite 650: non-structural demo of (e) sidelight and construction of glass conference room. sprinkler mod and fls under sep permit. maher n/a. | $120,000 |
| Dec 8, 2021 | Completed | 201 Mission St | Richlen Construction | suite 1930: non-structural demo of (e) walls & constructon of (n) office glass frongs, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a | $100,000 |
| Dec 8, 2021 | Completed | 201 Mission St | Richlen Construction | suite 500: non-structural demo of (e) walls & constructon of (n) office glass fronts, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a | $200,000 |
| Dec 8, 2021 | Completed | 201 Mission St | Richlen Construction | suite 1940: non-structural demo of (e) walls & constructon of (n) office glass fronts, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a | $120,000 |
| Dec 8, 2021 | Completed | 201 Mission St | Richlen Construction | suite 1900: non-structural demo of (e) walls & constructon of (n) office glass frongs, millwork, ceiling and power/data work & finishes. sep permit for fire sprinklers system mods and life safety. maher n/a | $120,000 |
| Dec 6, 2021 | Completed | 201 Mission St | Richlen Construction | ste 2250: demo permit. includes minor demo of (e) non-structural walls & finishes. electrical permit under seperate permit. space not occupied. | $37,700 |
| Nov 5, 2021 | Completed | 201 Mission St | Richlen Construction | suite 2020: tenant improvement - demo of partitions, lighting and finishes. includes new partions, finsihes and lighting. | $430,000 |
| Oct 4, 2021 | Completed | 201 Mission St | Everon Llc | fire alarm t.i.- 13th floor, ste 1310/1320/1380: add 2 smoke detectors, 14 speaker/strobes, 7 speakers. remove 7 speakers. remove 10 strobes. ref app#202105039702, 202105200718, 202105261114. | $10,000 |
| Sep 17, 2021 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | fire sprinklers. relocate 13 pendent sprinklers on the 13th fl. suite 1310 ref pa# 2021-0503-9702 | $6,825 |
| Sep 17, 2021 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 9 pendent sprinklers and 36 upright sprinklers on the 2nd fl. suite 280 add 4 uprights t.i. 202106162570 | $25,725 |
| Sep 17, 2021 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 21 pendent sprinkelrs on the 13/f ste 1320. ref t.i. pa# 202105200718 | $11,025 |
| Sep 17, 2021 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 20th floor: fire sprinklers; relocate 69 pendent sprinklers on the 20th floor suite 2000. t.i. ref app#202105271191 | $36,225 |
| Sep 17, 2021 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | fire sprinkler; relocate 27 pendent sprinkler on the 13/f ste 1380. refer to t.i 202105261114 | $14,175 |
| Sep 2, 2021 | Completed | 201 Mission St | Everon Llc | five alarm t.i. suite 280, add (5) speaker strobes, (7) duct detectors for hvac units w/control relays, relocate (2) speaker strobes. ref bpa#202106162570 | $8,000 |
| Sep 2, 2021 | Completed | 201 Mission St | Everon Llc | suite 2000: (5) t.i., add (1) smoke detector, (12) speaker strobes, (2) speakers & relocate (6) modification appliances, ref bpa#202105271191 | $7,000 |
| Jun 16, 2021 | Completed | 201 Mission St | Richlen Construction | ste 280 - demo of portion of (e) non structural walls and (e) idf room. (n) finishes and millwork, and some construction of new non structural walls. sprinkler/life safety under separate permit | $120,000 |
| Jun 10, 2021 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 21 pendent sprinklers and relocare 28 uprights on the 23rd floor. t.i. ref # 2020-1030-7899 & 2021-0503-9699 | $25,725 |
| Jun 7, 2021 | Completed | 201 Mission St | Everon Llc | fire alarm t.i. - suite 2375 - add (4) speaker strobes & relocate existing notification appliances to be reuse. ref # 2020-1030-7899 & 2021-0503-9699 | $2,500 |
| May 27, 2021 | Completed | 201 Mission St | Richlen Construction | 20/f: suite 2000: demo of (e) non-structural wlals and (e) idf room. new finiehs and millwork and some construction of (n) non-structural walls. f/s l/s systems mod under sep permit. maher n/a. | $120,000 |
| May 26, 2021 | Completed | 201 Mission St | Skyline Construction | 13th fl t.i.: demo (e) non-structural walls. (n) finishes & (n) glass office fronts. sprinkler and life safety will be under separate permit. | $120,000 |
| May 20, 2021 | Completed | 201 Mission St | Skyline Construction | nonstructural demo of (e) walls & construction of new office glass fronts, millwork, ceiling & power/data work, finishes, sprinkler system modification & fire life safety is under separate permit | $120,000 |
| May 3, 2021 | Completed | 201 Mission St | Skyline Construction | ste 1310: demo of non-structural walls & construction of new walls, millwork, ceiling, power/data work & finishes. sprinkler/life safety modification under separate permit. | $198,000 |
| May 3, 2021 | Completed | 201 Mission St | Richlen Construction | revision to pa# 202010307899. ste 2375 ti. demo of (e) non-structural walls, ceiling tiles/grid, lighting, finishes & millwork. new work: (n) partitions, doors, frames & hardware, ceiling tiles/grid, lighting, power/data, finishes + millwork. mep, sprinkler/life safety mod under separate permit. | |
| Apr 15, 2021 | Completed | 201 Mission St | Everon Llc | fire alarm t.i. on 9th flr. - add (27) speaker strobes, (8) speakers, (5) smoke detectors for door holders, (2) duct detectors for fsd w/relays, (2) smoke detectors for fsd, (1) control relay for door access, & (1) 2-way call station in elevator lobby. ref# 2020 1022 7134 | $12,000 |
| Mar 4, 2021 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 4 pendent sprinklers in the elevator lobby. relocate 3 pendent sprinklers in each of the men's and women's restrooms. t.i. ref # 2020-10-22-7125 | |
| Feb 18, 2021 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | fire sprinklers. relocate 10 pendent sprinklers and relocate 11 uprights on the 9th floor. | $10,500 |
| Feb 18, 2021 | Completed | 201 Mission St | Everon Llc | fire alarm ti on 22nd floor - suite 2250. add (5) speaker strobes, (1) speaker. relocate & remove existing notification appliances. ref # 2020-1022-7156 | $5,000 |
| Jan 14, 2021 | Completed | 201 Mission St | Everon Llc | fire alarm t.i. on 7th floor. provide (12) combo speaker strobes, & removal of (10) existing strobe only. | $8,000 |
| Dec 30, 2020 | Completed | 201 Mission St | Everon Llc | provide building 2-way communication system & riser backbone. scope include (1) command center, (1) sub station @ security desk, (10 76 zones distribution module & power supply on 16th flr, (1) stairwell door lock release button in fcc, add (1) 2-way call station on 26th flr elevator lobby, (1) dual | $30,000 |
| Nov 25, 2020 | Completed | 201 Mission St | Field Construction Inc. | parking lot lighting. demo of existing asphalt paving and curbs repaving w/new asphalt surface sloped to drain, construction of new curbs & lighting. | $260,000 |
| Oct 30, 2020 | Completed | 201 Mission St | Richlen Construction | ti for suite 2375 on 23rd fl. scope includes demolition of existing non-structural walls. new finishes and millwork, and some construction of new non-structural walls. mep included. sprinkler/life safety modification under separate permit. | $728,053 |
| Oct 22, 2020 | Completed | 201 Mission St | Richlen Construction | ste 2250 - t.i. demo partitions of exsiting non structural walls and existing idf room. new finishes & millwork, and some contruction of non structural walls. | $279,904 |
| Oct 22, 2020 | Completed | 201 Mission St | Richlen Construction | alteration to restrooms, elev lobby & corridor. scope does not affect (e) tenant suites, access, path of egress or exit stalls. (n) finishes & plumbing fixtures at (e) krs (e) toilets & urinals to be demo'd. (n) ceiling, lighting & power / data locations. sprinkler system & life safety serparte pa. | $573,453 |
| Oct 22, 2020 | Completed | 201 Mission St | Richlen Construction | suite 900. t.i. demo portions of (e) walls (non-structural) & (e) idf room, (n) finishes and millwork. construct (n) non-structural walls. sprinkler, life safety mods under separate permit. | $1,166,035 |
| Oct 1, 2020 | Completed | 201 Mission St | Pacific Restoration Inc Dba Servpro | reroofing. demo e roof to concrete subtrate. adhere insulation cover board and 60 mil puv membrane. tear off 1 layer, class a, no resheet. pitch 1/4 " perft | $720,046 |
| Jan 16, 2020 | Completed | 201 Mission St | Richlen Construction | ste 2020 - build-out consists of minor consists of minor demo & new finishes. no mep, sprinklers system & life safety modification. ab-017 applies. space remians vacant & separate ti permit required. | $32,000 |
| Dec 19, 2019 | Completed | 201 Mission St | Richlen Construction | suite1400 on multi-tenant floor. work scope includes demo of portion of (e) demising wall between two suites to create full floor tenant suite. new finishes & powr & data at selected areas of floor. no other construction scope. sprinkler system modification to be under sep. deferred permit. maher na | $40,000 |
| Oct 23, 2019 | Completed | 201 Mission St | R.M.R. Construction Company | 18th fl - project consists of demo of interior partitions, glazing & doors, ceiling & lighting to remain. existing mechanical, electrical & sprinkler system modification is under separate permit | $30,000 |
| Sep 27, 2019 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | 23rd fl l- add 1 speaker strobe. existing suite voluntary upgrade | $600 |
| Aug 2, 2019 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 13th flr - add 5 ceiling speaker systems & relocate (2) speaker/strobes 1 speakers & 1 smk det ref 201906203986 | $4,000 |
| Aug 1, 2019 | Expired or cancelled | 201 Mission St | R L H Fire Protection Inc | fire sprinkler permit. relocate 15 sprinklers on the 13th floor. ti #2019-0620-3986. | $3,500 |
| Jul 16, 2019 | Never finaled | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm as-built drawing for pa #201905140617 per field inspector requirements. 6th fl | |
| Jul 11, 2019 | Never finaled | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm on 27th flr - add 1 new duct det for heat pump unit w/control | $1,000 |
| Jun 20, 2019 | Completed | 201 Mission St | Richlen Construction | 13th floor: tenant improvement on a multi tenant floor consisting of mnor demo of e walls and construction of new partitions and glazing. new ceiling, light fixtures, finishes | $155,000 |
| Jun 5, 2019 | Never finaled | 201 Mission St | Comfort Dynamics Inc. | emergency replacement of server room a/c in-kind, same location | $12,765 |
| May 14, 2019 | Never finaled | 201 Mission St | Red Hawk Fire & Security Ca Llc | 6th fl - fire alarm, add 15 speaker strobes, 1 control relay for door release, 2 smoke detectors, 3 duct detectors for heat pumps. ref pa 2019-0214-2948 | $8,600 |
| Apr 30, 2019 | Completed | 201 Mission St | suite 1550. demo (e) walls & associated power data. construct (n) wall & glazing configuration, minor ceiling & power data and finishes. (e) mech, electr & sprinkler system modification under separate permit. | $77,000 | |
| Apr 5, 2019 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 6th flr, suite 600 - relocate 60 pendent sprinkers ref 201902142948 | $20,000 |
| Feb 26, 2019 | Never finaled | 201 Mission St | Gci, Inc | to obtain final inspection for work approved under pa#201508063509. all work is complete. | |
| Feb 14, 2019 | Completed | 201 Mission St | Richlen Construction | suite 600. tenant improvement. multi-tenant flr project. demo partitions, doors, power & data, lighting & finshes. build-out (n) partitions, doors, lighting, power & data, millwork and finishes. sprinkler system & life-safety mods under separate. | $387,000 |
| Jan 31, 2019 | Never finaled | 201 Mission St | Red Hawk Fire & Security Ca Llc | ref pa# 201901049643; fire alarm as-built | |
| Jan 30, 2019 | Completed | 201 Mission St | Richlen Construction | project consists of a ti on a multi tenant floor. build-out consists of adding a new office. mep, sprinkler modification & alarm modification under separate permit | $58,000 |
| Jan 4, 2019 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti. on 26th floor. add 1 smoke detector for heat pump, 3 duct detector for heat pump. 1 duct detectro for fsd and 5 centrol relays for shutdown. add 19 sprinkler strob, 4 wall moun tspeaker strobs. 6 ceiling speakers and reloacate devices as shown. ref# 2018-0921-0984 | $15,000 |
| Dec 20, 2018 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | ref pa# 201811196252; fire alarm t.i. on 18th fl. add 4 speakrs only | $1,600 |
| Dec 19, 2018 | Completed | 201 Mission St | Acco Engineered Systems Inc. Dba Acco En | demo & replace tenant condenser water supply and return risers form the mech penthouse down to floor l2 of th ebuilding (28 stories). maher na | $982,000 |
| Dec 14, 2018 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 18th fl - fire sprinklers; relocate 2 upright sprinklers; add 3 pendent sprinklers. ref pa 2018-1119-6252 | $2,625 |
| Dec 14, 2018 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | 24th flr fire alarm ti - remove 6 speaker/strobes, 2 strobe only, 15 speaker only, relocate 1 fire alarm terminal cabinet, 2 control relay, 1 smk det add 10 new speaker/strobes 1 relay for heat pump ref 201810153199 | $8,000 |
| Dec 6, 2018 | Completed | 201 Mission St | Richlen Construction | barrier removal, adding automatic door operator activator at bld main entry | $30,000 |
| Nov 19, 2018 | Completed | 201 Mission St | Richlen Construction | suite 1800, 18th flr. t.i, multi-tenant floor. build-out 3 phone rooms, assciated (n) ceilings, power / data work, some new finishes. mep, sprinkler system and life saftey mods under separate permit | $75,000 |
| Nov 16, 2018 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 16th fl: add 1 control relay for card readers, 36 ceiling speakers strobes, relocate 4 existing smoke detectors, rleocate 10 existing spekaer strobes & removal of 6 existing smoke detectors as showm. add 5 duct detectors w/control for heat pumps. | $18,000 |
| Nov 2, 2018 | Completed | 201 Mission St | Ayoob & Peery Plumbing Co Inc | 27th flr - add 1 relocate 3 change out 1 and plug 1 sprinkler to conform with new wall/ceiling layout of ti ref 201810153199 maher na | $1,425 |
| Oct 23, 2018 | Completed | 201 Mission St | Pioneer Fire Inc. | 26th floor - relocate 68 pendents, relocate 8 uprights, relocate 47 concealers, remove 8 pendents. ref 201809210984 | $37,311 |
| Oct 17, 2018 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti - 13th fl corridor - add (4) duct detectors for fsds with control function. ref #201808248281. | $5,000 |
| Oct 15, 2018 | Completed | 201 Mission St | A M A Design Build Incorporated | suite #2750: t.i. includes demolition of extg non-structural partitions, lighting, electrical, plumbing, mechanical, casework and finishes. n/a for maher. | $600,000 |
| Sep 26, 2018 | Completed | 201 Mission St | R L H Fire Protection Inc | 16th flr - fire sprinklers relocate 84, add 47 and delete 16 ref 201809049003 maher na new bracing calc's , hydro required. n/a for maher. | $41,000 |
| Sep 21, 2018 | Completed | 201 Mission St | Skyline Construction | 26th fl.: non structural demo (n) non-structural partitions doors, glazing, ceiling, lights, millork, finishes, no change in occupancy, use or area | $1,730,936 |
| Sep 19, 2018 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | 8th flr - fire alarm ti add 2 speaker strobes and add 1 speaker. ref 201806121638 maher na | $1,000 |
| Sep 17, 2018 | Never finaled | 201 Mission St | Field Construction Inc. | 8th flr, suite 800 mech/ele ref pa 201806121638 maher na | $50,698 |
| Sep 7, 2018 | Completed | 201 Mission St | Ayoob & Peery Plumbing Co Inc | 13th flr - reloate 3 sprinkler to conform with the new wall/ceiling layout of the ti ref 201808248281 job#18-706. maher n/a | $675 |
| Sep 4, 2018 | Completed | 201 Mission St | Novo Construction Inc | 16th flr - construction of full height partitions, partial height partitions doors, frames, and interior glazing, restroom upgrades, finishes. millwork, ceiling grids, mep included maher na | $3,000,000 |
| Aug 24, 2018 | Completed | 201 Mission St | Ayoob & Peery Plumbing Co Inc | 8th flr. relocate and add fire sprinklers per tenant improvements, 11 relocates. ref pa # 201806121638 job # 18-679. maher n/a | $2,475 |
| Aug 24, 2018 | Completed | 201 Mission St | Ayoob & Peery Plumbing Co Inc | 13th flr. relocate and add fire sprinklers per tenant improvement, 18 relocates, 1 add. ref # 201805098615, job # 18-706. maher n/a | $4,575 |
| Aug 17, 2018 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. on 19th and 21st floor: 19th floor add 4 duct detectors with relays for fsd & 2 control relay at elevator lobby for fsd. 21st floor: add 3 speaker strobes, 4 duct detectors with relay for fsd and 2 control relay at elevator lobby for fsd | $7,500 |
| Aug 2, 2018 | Completed | 201 Mission St | Pribuss Engineering Inc | fire sprinkler t.i. on the 21st fl. relocate sprinklers =(18), added sprinklers=(1)total (19) ($514.00) | $9,252 |
| Jul 19, 2018 | Expired or cancelled | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 9th fl. add (1) control relay air security interface | $600 |
| Jul 12, 2018 | Completed | 201 Mission St | Pribuss Engineering Inc | fire sprinkler ti on ste 1350, relocated 1 head, ref pa 2018-0509-8615 | $514 |
| Jul 5, 2018 | Completed | 201 Mission St | Pribuss Engineering Inc | 19th flr fire sprinkler ti relocate 25 hd, add 4 | $14,906 |
| Jun 15, 2018 | Completed | 201 Mission St | demolition of existing non-structural partitions, door frames & interior glazing fire sprinkler demo - remove (e) drops and place fire sprinkler heads at roof level | $75,000 | |
| Jun 15, 2018 | Completed | 201 Mission St | Swinerton Builders | 13th flr - project consists of interior aleration work to the elevator lobby and corridor. does not affect (e) suites, exit access, egress paths, or exit stairs. (e) exiting to remain as is. (e) sprinkler and life-safety systems to be under separate permit | $200,000 |
| Jun 12, 2018 | Completed | 201 Mission St | Field Construction Inc. | suite 800 - selective renovation of (e) office space to create four private offices and an open office area with six work stations maher na | |
| May 18, 2018 | Completed | 201 Mission St | Richlen Construction | 21/f: interior alteration to the restrooms, elevator lobby and corridor. scope does not affect (e) tneant suites, exit access, paths of egress or exit stairs. existing exiting to remain as is. existing sprinkler system, life safety modification to be under sep permit | $420,000 |
| May 18, 2018 | Completed | 201 Mission St | Richlen Construction | project consists of interior alteration to the restrooms, elevator lobby, and corridor on the 19th fl. this scope does not affect existing tenant suites, exit access, paths of egress or exit stairs. existing exiting to remain as is. existing sprinkler system, life safety modification to be under sep | $420,000 |
| May 16, 2018 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | 2nd floor: fire alarm as built for pa 2018-0406-5666 include duct detectors for heat pumps & fan boxes. update notification devices location | $10,000 |
| May 9, 2018 | Expired or cancelled | 201 Mission St | suite #2750: project consists of a t.i. on a multi-tenant floor. build out consits of minor demo of extg walls & millwork & construction of new power/data work, millwork and finishes. mep, and extg sprinkler system and life safty modification is under seperate permit. n/a for maher | $160,000 | |
| May 9, 2018 | Completed | 201 Mission St | Richlen Construction | suite #1350: on a multi-tenant floor. build out consists of minor demo of extg walls and construction of new partitions and glazing, power/data work, millwork and finishes. mep & extg sprinkler system and life safty modification is under seperate permit. n/a for maher | $190,000 |
| Apr 30, 2018 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm - ti suite 2310 remove 3 (e) speaker/strobes. 1 (e) strobe, relocate 4 speaker strobes and 1 smk det. n/a for maher. ref 201802151370 | $2,600 |
| Apr 18, 2018 | Never finaled | 201 Mission St | J B Signs | suite 100. install 1 illuminated & 1 non-illuminated signs | $1,000 |
| Apr 18, 2018 | Completed | 201 Mission St | R L H Fire Protection Inc | fire sprinkler permit - install 24 new pendents and 68 new uprights; relocate 21 and delete pendents on the 2nd floor. ref pa 201801178781 | $25,000 |
| Apr 18, 2018 | Never finaled | 201 Mission St | J B Signs | suite 100. install 1 illuminated & 1 non-illuminated signs | $1,505 |
| Apr 6, 2018 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire t.i. on 2nd fl. add (23) speaker strobes, (5) speakers only & (2) smoke detectors. ref pa # 201801178781 n/a maher | $15,200 |
| Apr 2, 2018 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 23rd floor: fire sprinkler only. relocate 50 pendents for spec suite #2310. n/a for maher ref app#201802151370 | $12,500 |
| Mar 22, 2018 | Completed | 201 Mission St | Richlen Construction | suite 560: project consists of a tenant improvemen on a multi tenant floor. build out consists of minor demo of e walls and construction of new power data work and finishes. mep and existing ls under separate permit | $27,000 |
| Mar 6, 2018 | Never finaled | 201 Mission St | Anderson, Rowe & Buckley, Inc. | 9th flr -(e) fire sprinklers system ti 1 relocated, 6 changeed ref 201802050406 maher na | $3,500 |
| Mar 5, 2018 | Never finaled | 201 Mission St | Golden Gate Sign Company Inc. | #100: revision to 201709137859 sign a1, a2 size locations-installed. revision to 201709137858 sign b1,b2 revised location-installed | |
| Feb 15, 2018 | Completed | 201 Mission St | Novo Construction Inc | 2/f: mechanical and electrical work for ti. ref pa 2018-0117-8781 | $150,000 |
| Feb 15, 2018 | Completed | 201 Mission St | Richlen Construction | suite 2310: ti on a multi-tenant floor. build-out consist of demo of (e) walls & ceiling & construction of new walls & glazing configuration, finishes, ceiling, & power/data work. sprinkler system & fire life safety suite 23190modification is under separate permit. maher na | $564,568 |
| Feb 8, 2018 | Never finaled | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 24th fl add 9 smoke detectors for door holder maher not req | $5,700 |
| Feb 5, 2018 | Completed | 201 Mission St | Principal Builders Inc. | 9th fl: ti to build new partitions, door frames, glazing & millwork/finishes and mep systems. fire alarms & sprinklers under sep permits. maher na | $100,000 |
| Jan 19, 2018 | Completed | 201 Mission St | Principal Builders Inc. | demo of non structural partitions, doors framing, millwork, finishes to prepare for future t.i. to remain vacant under ab 017 adn ada will be issued with future architectural permit. n/a for maher | $42,000 |
| Jan 17, 2018 | Completed | 201 Mission St | Novo Construction Inc | tenant improvement to consist of new non load bearing partitions door frames, interior glazing, finishes and millwork. mep & life safety under separate permit | $300,000 |
| Jan 11, 2018 | Completed | 201 Mission St | R L H Fire Protection Inc | 2nd floor: fire sprinkler demolition of extg fire sprinkler drops raise sprinker protction to roof level. 119 heads. ref app#201801108260. n/a for maher | $10,600 |
| Jan 10, 2018 | Completed | 201 Mission St | Novo Construction Inc | demo of (e) non structural partitions, doors, frames & interior glazing finishes, millwork, ceiling grid soffits and associated mech. ele and lighting maher na sprinkler ref pa 201801118414 | $140,000 |
| Dec 26, 2017 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | 17th floor: fire alarm t.i. to add 1 duct detector with control relay for heat pump. ref app#201707050975. n/a for maher | $1,000 |
| Dec 20, 2017 | Never finaled | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti suite 640, add 2 speaker strobes and 1 smoke detector. ref#2017 1025 2219. n/a for maher. | $1,700 |
| Nov 30, 2017 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | suite 1500: fire alarm ti add 8 speaker strobes, 1 speaker only & relocate (e) devices as shown ref 2017100404276 maher na | $4,500 |
| Nov 29, 2017 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 15th flr: fire sprinkler only, relocate 10 pendents in #1500; maher na ref 201710040427 | $4,000 |
| Nov 29, 2017 | Completed | 201 Mission St | Golden Gate Fire Protection Inc | 6th flr: fire sprinkler only, relocate 3 head, add 1 head for blue crest ref201710252219; maher na | $1,250 |
| Nov 16, 2017 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | 27th floor: t.i. suite 2775: fire alarm to add 2 new speaker strobes and relocate 1 speaker per plan. ref app#201710040421 n/a for maher | $1,500 |
| Nov 8, 2017 | Completed | 201 Mission St | R L H Fire Protection Inc | 5/f #510- fire sprinkler permit, relocate 7 pendent sprinklers. t.i. pa#201706220129. n/a ordinance #155-13 | $2,000 |
| Nov 8, 2017 | Completed | 201 Mission St | R L H Fire Protection Inc | 5/f #560- fire sprinkler permit, relocate 1 pendent sprinkler. t.i. pa#201709087343. n/a ordinance #155-13 | $1,000 |
| Nov 8, 2017 | Never finaled | 201 Mission St | R L H Fire Protection Inc | 14/f- fire sprinkler permit, relocate 15, add 1 and delete 2 sprinklers. t.i. pa#201709087352. n/a ordinance #155-13 | $4,000 |
| Oct 30, 2017 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti on the 14th floor, ste 1450 - add 6 speaker strobes & relocate existing devices as shown on plan. ref pa 2017-0908-7352 | $3,000 |
| Oct 30, 2017 | Completed | 201 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 18th fl - add 14 speaker strobes & relocate existing devices as shown on plans. ref pa 2017-0223-9942 | $7,000 |
| Oct 25, 2017 | Completed | 201 Mission St | Richlen Construction | suite 640: tenant improvment on a multi tenant floor. build out consist of demo of e light fixtures and construction of new wall and glazing configuration, minor ceiling and power data work and finishes. sprinkler system and fire life safety modification under sep permit maher not req | $200,000 |