Claudette Bleijenberg
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Revel Architecture & Design
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Aug 2022
98 permits since 2000 (architect on 92 permits, engineer on 5 permits, authorized agent-others on 1 permit): 77 completed, 10 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2022 | Completed final sign-off Jan 2024 | 88 Kearny St | Skyline Construction | rooftop: install 2 am receive only and 2 fm receive only antennas and gpa only receive antenna and one receive only satelite.Details
rooftop: install 2 am receive only and 2 fm receive only antennas and gpa only receive antenna and one receive only satelite. | $246,924 |
| Aug 14, 2019 | Expired or cancelled withdrawn Aug 2019 | 185 Berry St | wharf side bldg: project consist of selective demo of (e) 6th fl freight elevator shaft/smoke doors and installation of new smoke curtains and associated power as required. electrical, life safety & fire proection modification will be submitted under sep. permit. no changes in occupancy & existing.Details
wharf side bldg: project consist of selective demo of (e) 6th fl freight elevator shaft/smoke doors and installation of new smoke curtains and associated power as required. electrical, life safety & fire proection modification will be submitted under sep. permit. no changes in occupancy & existing. | $60,000 | |
| Jul 26, 2019 | Completed final sign-off Sep 2019 | 580 California St | Richlen Construction | 17th fl: demise of an (e) office & provide new power/data/finishes at new offices, construction of new closet, rpelace (e) office dorrs/sidelites, relocate (2) light fixtures, replace millwork cabinets. space is currently occupied. life safety & sprinkler system modifications are under sep. permitDetails
17th fl: demise of an (e) office & provide new power/data/finishes at new offices, construction of new closet, rpelace (e) office dorrs/sidelites, relocate (2) light fixtures, replace millwork cabinets. space is currently occupied. life safety & sprinkler system modifications are under sep. permit | $104,936 |
| Jul 22, 2019 | Completed final sign-off Jan 2020 | 499 Illinois St | Landmark Builders | suite110:demo of(e)paritions and associated power/data,floor finishes and lighting. construction of new partitionls,doors,power and tele/data, heating,millwork and finishes.all worked to occur on the 1st flr of 6 story low rise bld.tenant suite is currently vacant.structural/life safety/fire underdeDetails
suite110:demo of(e)paritions and associated power/data,floor finishes and lighting. construction of new partitionls,doors,power and tele/data, heating,millwork and finishes.all worked to occur on the 1st flr of 6 story low rise bld.tenant suite is currently vacant.structural/life safety/fire underde | $107,314 |
| Jun 14, 2019 | Completed final sign-off Sep 2021 | 185 Berry St | Hathaway Dinwiddie Co. | barrier removal to incl restroom uprades for finishes w/ fixtures per 2016 cbc. 4 pairs of restrooms total at wharfside building: lobby 5 at flrs 1 & 4 and lobby 3 at floors 1 & 2. no sprinkler work. mep and life safety to be submitted under separate deffered permit. no change to occupancy. maher naDetails
barrier removal to incl restroom uprades for finishes w/ fixtures per 2016 cbc. 4 pairs of restrooms total at wharfside building: lobby 5 at flrs 1 & 4 and lobby 3 at floors 1 & 2. no sprinkler work. mep and life safety to be submitted under separate deffered permit. no change to occupancy. maher na | $990,000 |
| May 31, 2019 | Completed final sign-off May 2020 | 580 California St | Peacock Construction | 5th flr - interior restroom remodel. does not affect (e) tenant suites exit access, path of egress or exit stairs, (e) exiting to remain as is. mep & sprinklers under sep permitDetails
5th flr - interior restroom remodel. does not affect (e) tenant suites exit access, path of egress or exit stairs, (e) exiting to remain as is. mep & sprinklers under sep permit | $200,000 |
| May 31, 2019 | Completed final sign-off Dec 2019 | 555 California St | Peacock Construction | 49th fl, ste 4925 - selective demo of 2 offices & expansion of existing break room including power, ceiling/lighting & finishes. relocation of (e) millwork only. mechanical, electrical, life safety & sprinkler modifications under separate permitDetails
49th fl, ste 4925 - selective demo of 2 offices & expansion of existing break room including power, ceiling/lighting & finishes. relocation of (e) millwork only. mechanical, electrical, life safety & sprinkler modifications under separate permit | $195,000 |
| May 29, 2019 | Expired or cancelled withdrawn Feb 2020 | 270 Brannan St | provide 2 (n) interconnecting openings w/fire rated doors @ 3rd floor between 250 & 270 brannan. per ab010 demo, patching, structural & (n) mep work. maher n/a.Details
provide 2 (n) interconnecting openings w/fire rated doors @ 3rd floor between 250 & 270 brannan. per ab010 demo, patching, structural & (n) mep work. maher n/a. | $150,000 | |
| May 29, 2019 | Expired or cancelled withdrawn Feb 2020 | 250 Brannan St | 3rd fl - provide 2 (n) interconnecting openings w/fire rated doors @ 3rd fl between 250 & 270 brannan. per ab010 demo, patching, structural & mep work. (n) stair, landing, ada lift. demo (e) conference room/work room (e) training room to create (n) training room & storage closet.maher n/a.Details
3rd fl - provide 2 (n) interconnecting openings w/fire rated doors @ 3rd fl between 250 & 270 brannan. per ab010 demo, patching, structural & mep work. (n) stair, landing, ada lift. demo (e) conference room/work room (e) training room to create (n) training room & storage closet.maher n/a. | $150,000 | |
| May 17, 2019 | Completed final sign-off Nov 2019 | 601 California St | Peacock Construction | demo e partitions, power tele data, lighting and ceiling, millwork, new partitions, new power tele data, lighting, ceiling tiles, millwork, finishes throughoutDetails
demo e partitions, power tele data, lighting and ceiling, millwork, new partitions, new power tele data, lighting, ceiling tiles, millwork, finishes throughout | $145,000 |
| May 7, 2019 | Completed final sign-off Dec 2019 | 170 09th St | C C I Commercial Construction & Improv | installation of two flag poles at the roof.Details
installation of two flag poles at the roof. | $12,000 |
| Apr 26, 2019 | Completed final sign-off Oct 2020 | 525 Market St | Peacock Construction | 28th floor: t.i- interior demolition of non-structural elements, including but not limited to , interior partitions, doors, and finishes. no ceiling work in this permit. mech and elec plans will be submitted as a separate permit. scope of work does not affect fixture quantitiesDetails
28th floor: t.i- interior demolition of non-structural elements, including but not limited to , interior partitions, doors, and finishes. no ceiling work in this permit. mech and elec plans will be submitted as a separate permit. scope of work does not affect fixture quantities | $10,000 |
| Apr 26, 2019 | Expired or cancelled cancelled Jan 2026 | 185 Berry St | barrier removal project work includes: restroom upgrades for finishes and fixtures per 2016 cal building code. 1 pair of restroom at the wharfside building, floor 1 lobby 5. no mechanical or sprinklers upgrades. electrical and life safety will be submitted under separate permitDetails
barrier removal project work includes: restroom upgrades for finishes and fixtures per 2016 cal building code. 1 pair of restroom at the wharfside building, floor 1 lobby 5. no mechanical or sprinklers upgrades. electrical and life safety will be submitted under separate permit | $50,000 | |
| Apr 25, 2019 | Completed final sign-off Aug 2019 | 1700 Owens St | Rossi Builders Inc. | ste 535 -project consists of joining two separate tenants suites including - demo of (e) partitions and associated power/data lighting and finishes. all work to occur on the 5th fl of a 5 story building. (e) tenant suite will be unoccupied time of construction. mep, life, safety and sprinkler systemDetails
ste 535 -project consists of joining two separate tenants suites including - demo of (e) partitions and associated power/data lighting and finishes. all work to occur on the 5th fl of a 5 story building. (e) tenant suite will be unoccupied time of construction. mep, life, safety and sprinkler system | $76,581 |
| Apr 24, 2019 | Completed final sign-off Sep 2020 | 101 California St | Peacock Construction | selective demo of (1) office rinishes. relocation of existing millwork only. suite is on 27th floor, is occupied. mep life safety and sprinkler system modifications under separate deferred permits.Details
selective demo of (1) office rinishes. relocation of existing millwork only. suite is on 27th floor, is occupied. mep life safety and sprinkler system modifications under separate deferred permits. | $35,000 |
| Apr 24, 2019 | Completed final sign-off Jun 2019 | 185 Berry St | Hathaway Dinwiddie Co. | project consists of selective demo of power, (2) light fixtures + upper cabinets millwork. construction of new ceiling soffit new and relocated power, (1) new lighting fixture and relocation of millwork, suiteis currently occupied. electrical, life safety+ fire protection under separate permit.Details
project consists of selective demo of power, (2) light fixtures + upper cabinets millwork. construction of new ceiling soffit new and relocated power, (1) new lighting fixture and relocation of millwork, suiteis currently occupied. electrical, life safety+ fire protection under separate permit. | $35,000 |
| Apr 17, 2019 | Completed final sign-off May 2019 | 601 California St | Rylko Builders Inc. | suite 1710: minimal demo of (e) power/tele/data & millwork, construction of minimal (n) power/tele/data, millwork, wing wall at break area & new finishes throughout. no clg demo scope as a part of this project: (e) ceilings, grid, tile. lights, exit signs, sprinklers, etc tp remain.Details
suite 1710: minimal demo of (e) power/tele/data & millwork, construction of minimal (n) power/tele/data, millwork, wing wall at break area & new finishes throughout. no clg demo scope as a part of this project: (e) ceilings, grid, tile. lights, exit signs, sprinklers, etc tp remain. | $100,000 |
| Apr 17, 2019 | Completed final sign-off Oct 2019 | 185 Berry St | Bay Area Builders Inc. | 2/f: t.i. including demo of non-structural partitions and building (n) non-structural partitions. meps included. maher n/a.Details
2/f: t.i. including demo of non-structural partitions and building (n) non-structural partitions. meps included. maher n/a. | $366,000 |
| Mar 6, 2019 | Completed final sign-off Jun 2019 | 1760 Polk St | David Juricic Constructon | work on 1st fl includes barrier removal restroom upgrade. (e) restroom will be upgraded to accomodate (1) unisex accessible restroom and (1) unisex non accessible restroom.Details
work on 1st fl includes barrier removal restroom upgrade. (e) restroom will be upgraded to accomodate (1) unisex accessible restroom and (1) unisex non accessible restroom. | $50,000 |
| Feb 5, 2019 | Completed final sign-off Dec 2019 | 601 California St | Build Group Inc. | minor demo e power , ceiling accessories, tiles. new partitoins, door/frame/hardware, millwork, power data, finihses, lighting, new w hr rated ceiling enclosure assemblies 4th fl. mech transfer ducts, new mech, struct celing framework. renovate restrooms,elevator lobby.space is vacant. mep,sprink,lsDetails
minor demo e power , ceiling accessories, tiles. new partitoins, door/frame/hardware, millwork, power data, finihses, lighting, new w hr rated ceiling enclosure assemblies 4th fl. mech transfer ducts, new mech, struct celing framework. renovate restrooms,elevator lobby.space is vacant. mep,sprink,ls | $400,323 |
| Jan 30, 2019 | Completed final sign-off Sep 2019 | 50 Beale St | 3rd floor: demo of existing partitions, doors, millwork, electrical, plumbing, ceiling light, 4 finishes, new demising partisions, doors & finishes no structural work to be performed - maher n/aDetails
3rd floor: demo of existing partitions, doors, millwork, electrical, plumbing, ceiling light, 4 finishes, new demising partisions, doors & finishes no structural work to be performed - maher n/a | $450,000 | |
| Jan 18, 2019 | Never finaled issued Jan 2019, no final | 332 Pine St | Novo Construction Inc | 7th fl - demo & construction of partitions & associated power/data floor finishes, millwork, plumbing & lighting. all work to occur on the 7th fl of a 8b-story bldg tenant suite is currently vacant. no structural workDetails
7th fl - demo & construction of partitions & associated power/data floor finishes, millwork, plumbing & lighting. all work to occur on the 7th fl of a 8b-story bldg tenant suite is currently vacant. no structural work | $845,000 |
| Jan 8, 2019 | Completed final sign-off Jul 2019 | 1 Bush St | Skyline Construction | project is converting portion of file rm into private offices, including minor demo and construction of new partitions, doors & finishes. (e) ceiling tile and grid to remain, no plumbing work, mech, elec,life safety and sprinkler system modification is under sep permit. 6th flDetails
project is converting portion of file rm into private offices, including minor demo and construction of new partitions, doors & finishes. (e) ceiling tile and grid to remain, no plumbing work, mech, elec,life safety and sprinkler system modification is under sep permit. 6th fl | $55,000 |
| Dec 20, 2018 | Completed final sign-off Sep 2019 | 222 Kearny St | M C S Construction Services | increasing level of safety of (e) roof deck by adding new path to new second exit, upgrading emergency lighting/strobes. new panic bars will be added to egress path out of building. any modification to electrical or fire life safety under separate permit.Details
increasing level of safety of (e) roof deck by adding new path to new second exit, upgrading emergency lighting/strobes. new panic bars will be added to egress path out of building. any modification to electrical or fire life safety under separate permit. | $30,000 |
| Dec 6, 2018 | Completed final sign-off Apr 2019 | 525 Market St | Peacock Construction | suite 1460 - ti- multi tenant floor, new construction fo new partitions, ceiling, lighting, power.data, millwork and finishes throughout. mep/fire/life safety under sep permitDetails
suite 1460 - ti- multi tenant floor, new construction fo new partitions, ceiling, lighting, power.data, millwork and finishes throughout. mep/fire/life safety under sep permit | $855,200 |
| Dec 6, 2018 | Completed final sign-off Apr 2021 | 201 Mission St | Richlen Construction | barrier removal, adding automatic door operator activator at bld main entryDetails
barrier removal, adding automatic door operator activator at bld main entry | $30,000 |
| Nov 29, 2018 | Completed final sign-off Jun 2019 | 44 Montgomery St | Source Planning And Construction Inc | unit #150: demo & construction of partitions & associated power/tele/data, finishes, lighting & millwork. tenant suite currently vacant. mep, life safety & sprinkler modification under sep/deferred permit.Details
unit #150: demo & construction of partitions & associated power/tele/data, finishes, lighting & millwork. tenant suite currently vacant. mep, life safety & sprinkler modification under sep/deferred permit. | $150,000 |
| Nov 29, 2018 | Completed final sign-off Jun 2019 | 44 Montgomery St | Source Planning And Construction Inc | #850: demo & construction of partitions & associated power/tele/data, finishes, lighting & millwork. tenant suite currently vacant. mep, life safety & sprinkler modification under sep/deferred permit.Details
#850: demo & construction of partitions & associated power/tele/data, finishes, lighting & millwork. tenant suite currently vacant. mep, life safety & sprinkler modification under sep/deferred permit. | $250,000 |
| Nov 29, 2018 | Completed final sign-off Jun 2019 | 44 Montgomery St | Source Planning And Construction Inc | #1210: demo & construction of partitions & associated power/tele/data, finishes, lighting & millwork. tenant suite currently vacant. mep, life safety & sprinkler modification under sep/deferred permit.Details
#1210: demo & construction of partitions & associated power/tele/data, finishes, lighting & millwork. tenant suite currently vacant. mep, life safety & sprinkler modification under sep/deferred permit. | $200,000 |
| Nov 7, 2018 | Completed final sign-off Jan 2019 | 44 Montgomery St | Richlen Construction | rev to pa# 201808167490; the proposed revision keeps the (e) exercise/stretching room doors in the same location in lieu of relocationgDetails
rev to pa# 201808167490; the proposed revision keeps the (e) exercise/stretching room doors in the same location in lieu of relocationg | |
| Nov 6, 2018 | Completed final sign-off Dec 2018 | 350 Rhode Island St | Novo Construction Inc | suite #110 at 1st floor: project consisting of demo of an extg portion which includes door, electrical and finishes, first floor n/a for maherDetails
suite #110 at 1st floor: project consisting of demo of an extg portion which includes door, electrical and finishes, first floor n/a for maher | $15,000 |
| Oct 16, 2018 | Never finaled issued Oct 2018, no final | 101 California St | Source Planning And Construction Inc | 22nd flr. selective demo of non-structural partitions (e) ceiling grid & tile, lighting fixtures, frames and side lights. abo.17. maher n/a. ref sprinkler pa#201809271544Details
22nd flr. selective demo of non-structural partitions (e) ceiling grid & tile, lighting fixtures, frames and side lights. abo.17. maher n/a. ref sprinkler pa#201809271544 | |
| Oct 16, 2018 | Never finaled issued Oct 2018, no final | 101 California St | Source Planning And Construction Inc | 44th flr. selective demo of non-structural partitions (e) ceiling grid & tile, lighting fixtures, frames and side lights. abo.17. maher n/a. ref sprinkler pa#201809271544Details
44th flr. selective demo of non-structural partitions (e) ceiling grid & tile, lighting fixtures, frames and side lights. abo.17. maher n/a. ref sprinkler pa#201809271544 | |
| Oct 10, 2018 | Completed final sign-off Jul 2019 | 170 09th St | C C I Commercial Construction & Improv | 1/f -full floor t.i. : currently unoccupied shell space. no change to occupancy. any modifications to mep, fls, and/or sprinkler systems will be under seperate pemit. no changes to the front facade of the bldg, change of use to instituional use, n/a for maherDetails
1/f -full floor t.i. : currently unoccupied shell space. no change to occupancy. any modifications to mep, fls, and/or sprinkler systems will be under seperate pemit. no changes to the front facade of the bldg, change of use to instituional use, n/a for maher | $1,300,000 |
| Oct 9, 2018 | Completed final sign-off Aug 2019 | 170 09th St | C C I Commercial Construction & Improv | 2nd floor: full floor t.i. currently unoccupied shell space. no changes to occupancy. any modifications to mep, fls, and/or sprinkler system will be under seperate permit.no changes to the front facade of hte building change of use to institunional use . n/a for maherDetails
2nd floor: full floor t.i. currently unoccupied shell space. no changes to occupancy. any modifications to mep, fls, and/or sprinkler system will be under seperate permit.no changes to the front facade of hte building change of use to institunional use . n/a for maher | $1,300,000 |
| Oct 9, 2018 | Completed final sign-off Jul 2019 | 170 09th St | C C I Commercial Construction & Improv | 3rd floor: full floor t.i. currently unoccupied shell space. no changes to occupancy. any modifications to mep, fls, and/or sprinkler system will be under seperate permit. no changes to the front facade of hte bldg, change of use to institutional use, n/a for maherDetails
3rd floor: full floor t.i. currently unoccupied shell space. no changes to occupancy. any modifications to mep, fls, and/or sprinkler system will be under seperate permit. no changes to the front facade of hte bldg, change of use to institutional use, n/a for maher | $1,300,000 |
| Sep 13, 2018 | Completed final sign-off Apr 2019 | 50 Beale St | Field Construction Inc. | revision to 201806252791. demolition of concrete pads, curbs, and struc slab infill. new partitions added to electrical room floor current unoccupied ti life safety and sprinkler modification under sep permit per ab-017Details
revision to 201806252791. demolition of concrete pads, curbs, and struc slab infill. new partitions added to electrical room floor current unoccupied ti life safety and sprinkler modification under sep permit per ab-017 | |
| Sep 13, 2018 | Completed final sign-off Apr 2019 | 50 Beale St | Field Construction Inc. | 3/f:revision to 201806252793. demolition of concrete pads, curbs, and struc slab infill. floor is currently partially occupied. sprinkler modification under sep permit ti for new unoccupied suite in future sep permit per ab-017. maher n/a.Details
3/f:revision to 201806252793. demolition of concrete pads, curbs, and struc slab infill. floor is currently partially occupied. sprinkler modification under sep permit ti for new unoccupied suite in future sep permit per ab-017. maher n/a. | |
| Sep 6, 2018 | Never finaled issued Sep 2018, no final | 601 California St | Rylko Builders Inc. | hvac: replace 17 double duct and 7 cooling vavs. replace diffusers. install 1 new cooling vav and change pneumatic controls to ddc. elec. new lighting, outlets, switching. ref. pa# 201806262955. maher n/a.Details
hvac: replace 17 double duct and 7 cooling vavs. replace diffusers. install 1 new cooling vav and change pneumatic controls to ddc. elec. new lighting, outlets, switching. ref. pa# 201806262955. maher n/a. | $460,000 |
| Aug 24, 2018 | Never finaled issued Aug 2018, no final | 44 Montgomery St | Greene Builders Inc | suite 4210: permit revision to pa #201806151973, includes double glass swing doors to conference room in lieu of bi-fold doors.Details
suite 4210: permit revision to pa #201806151973, includes double glass swing doors to conference room in lieu of bi-fold doors. | |
| Aug 16, 2018 | Completed final sign-off Jan 2019 | 44 Montgomery St | Richlen Construction | 4th fl: interior demolition of non-structural elements: interior partitions, doors, finishes, ceiling, lighting, outlets & switches, new work scope to include partitions, doors & frames, millwokr w/sink, finishes & lighting. mep submitted as separate permit. maher naDetails
4th fl: interior demolition of non-structural elements: interior partitions, doors, finishes, ceiling, lighting, outlets & switches, new work scope to include partitions, doors & frames, millwokr w/sink, finishes & lighting. mep submitted as separate permit. maher na | $300,000 |
| Aug 16, 2018 | Completed final sign-off Mar 2019 | 44 Montgomery St | Richlen Construction | lower level: interior demo of non-structural elements: interior partitions, doors, finishes, ceiling, lighting, mechanical & electrical outlets & switches; new scope includes new door & frames, partitions, lighting & finishes. mep submitted as separate permit. maher naDetails
lower level: interior demo of non-structural elements: interior partitions, doors, finishes, ceiling, lighting, mechanical & electrical outlets & switches; new scope includes new door & frames, partitions, lighting & finishes. mep submitted as separate permit. maher na | $700,000 |
| Jun 25, 2018 | Completed final sign-off Nov 2018 | 222 Kearny St | Gci, Inc | 5th flr -minor partition demo, new suite exit door, new finishes throughout, no plumbing, ele or lighting work.Details
5th flr -minor partition demo, new suite exit door, new finishes throughout, no plumbing, ele or lighting work. | $90,000 |
| Jun 25, 2018 | Completed final sign-off Apr 2019 | 50 Beale St | Field Construction Inc. | 2nd flr- demo of (e) partitions, doors, millwork, ele, plm and finishes. floor is currently unoccupied. ti - mep/fire/life safety modification under sep permit. ab-017.Details
2nd flr- demo of (e) partitions, doors, millwork, ele, plm and finishes. floor is currently unoccupied. ti - mep/fire/life safety modification under sep permit. ab-017. | $37,000 |
| Jun 25, 2018 | Completed final sign-off Apr 2019 | 50 Beale St | Field Construction Inc. | 3rd flr - demo of (e) partitions, doors, millwork, ele, plm and finishes. new demising partitions/doors are in scope. floor is currently partiallyu occupied. sprinkler modification under sep permit. ti for new unoccupied suite in future spe permit submittal maher naDetails
3rd flr - demo of (e) partitions, doors, millwork, ele, plm and finishes. new demising partitions/doors are in scope. floor is currently partiallyu occupied. sprinkler modification under sep permit. ti for new unoccupied suite in future spe permit submittal maher na | $35,000 |
| Jun 21, 2018 | Never finaled issued Jun 2018, no final | 44 Montgomery St | Bcci Construction Company | #3200: project consists of a minimal demo and construction of partitions, sidelights and doors. no lighting or plumbing will be affected. mep drawings to be deferred. n/a for maherDetails
#3200: project consists of a minimal demo and construction of partitions, sidelights and doors. no lighting or plumbing will be affected. mep drawings to be deferred. n/a for maher | $117,287 |
| Jun 15, 2018 | Never finaled issued Jul 2018, no final | 44 Montgomery St | Greene Builders Inc | arch ti suite 4210, approx 2100 sq ft selective demo of existing partitions and associated power/data floor finishes and lighting. new apartitons, doors, power, tele data, lighting, finish patching, mep, life safety, sprinkler modifications sep permitDetails
arch ti suite 4210, approx 2100 sq ft selective demo of existing partitions and associated power/data floor finishes and lighting. new apartitons, doors, power, tele data, lighting, finish patching, mep, life safety, sprinkler modifications sep permit | $260,760 |
| May 25, 2018 | Completed final sign-off Jun 2018 | 44 Montgomery St | Greene Builders Inc | 34th floor: revision to app#201804247201. new scope includes addition of partial height wall at open office. electrical under deferred submittal.Details
34th floor: revision to app#201804247201. new scope includes addition of partial height wall at open office. electrical under deferred submittal. | |
| May 24, 2018 | Completed final sign-off Jun 2018 | 180 Sutter St | Gci, Inc | revision to pa 2018-0309-3335: revising ceiling to expose wood floor/beams above. include pre-app letter & updated details. clarify building type as iiib.Details
revision to pa 2018-0309-3335: revising ceiling to expose wood floor/beams above. include pre-app letter & updated details. clarify building type as iiib. | |
| May 21, 2018 | Completed final sign-off Sep 2019 | 350 Rhode Island St | Swinerton Builders | removal of floor tiles on 4th fl, partial on 2nd and 3rd fl. per ab-017. maher naDetails
removal of floor tiles on 4th fl, partial on 2nd and 3rd fl. per ab-017. maher na | $75,000 |
| Apr 24, 2018 | Completed final sign-off Jun 2018 | 44 Montgomery St | Greene Builders Inc | 34th floor: selective demolition of extg partitions and associated power/data, floor finishes & lighting. construction of nw partitions, doors, power & tele/data, relocation of lighting & new finish patching. mep, life safety, & sprinkler system modifications are under seperate permits. n/a maherDetails
34th floor: selective demolition of extg partitions and associated power/data, floor finishes & lighting. construction of nw partitions, doors, power & tele/data, relocation of lighting & new finish patching. mep, life safety, & sprinkler system modifications are under seperate permits. n/a maher | $85,000 |
| Apr 11, 2018 | Completed final sign-off Jun 2018 | 500 Howard St | Richlen Construction | partial remodel of extg retail suite #100 for retail manager. new non-structural walls, finishes, casework, power data, ceiling and lighting. under separate permit: elect, mech, fire life safety. n/a for maherDetails
partial remodel of extg retail suite #100 for retail manager. new non-structural walls, finishes, casework, power data, ceiling and lighting. under separate permit: elect, mech, fire life safety. n/a for maher | $90,000 |
| Mar 14, 2018 | Completed final sign-off Jun 2018 | 601 California St | Rylko Builders Inc. | unit #600:demo extg partitions, doors/frames, power/tele/data, ceiling/lighting, plumbing fixtures & millwork, construction of new partitions, nw ceiling/lighting, nw power/tele/data & finishes. space is currently unoccupied. mep, sprinkler & life safty systems will be under seperate permit.Details
unit #600:demo extg partitions, doors/frames, power/tele/data, ceiling/lighting, plumbing fixtures & millwork, construction of new partitions, nw ceiling/lighting, nw power/tele/data & finishes. space is currently unoccupied. mep, sprinkler & life safty systems will be under seperate permit. | $175,367 |
| Mar 9, 2018 | Completed final sign-off Nov 2018 | 180 Sutter St | Gci, Inc | 4th fl - ti new non structural partitions, doors, glazing, millwork, power & tele/data receptacles finishes throughout. mep & life safety under separate permits. demo of it room, lights in restrooms & ceiling & lights throughout suiteDetails
4th fl - ti new non structural partitions, doors, glazing, millwork, power & tele/data receptacles finishes throughout. mep & life safety under separate permits. demo of it room, lights in restrooms & ceiling & lights throughout suite | $350,000 |
| Feb 22, 2018 | Completed final sign-off Feb 2018 | 300 Clay St | Gci, Inc | 14/f: revised enlarged restroom plans and elevation sheets a301 for shower location. rev to [a #201705267759. maher naDetails
14/f: revised enlarged restroom plans and elevation sheets a301 for shower location. rev to [a #201705267759. maher na | |
| Feb 22, 2018 | Completed final sign-off Jul 2018 | 601 California St | Peacock Construction | suite 1168: demo of extg partitions, doors/frames, power/tele/data, ceiling/lighting, relocation of millwork, construction of new partitions, new ceiling/lighting, nw power/ele/data & finishes, mep, sprinkler & life safty system under seperate permit.Details
suite 1168: demo of extg partitions, doors/frames, power/tele/data, ceiling/lighting, relocation of millwork, construction of new partitions, new ceiling/lighting, nw power/ele/data & finishes, mep, sprinkler & life safty system under seperate permit. | $68,707 |
| Feb 16, 2018 | Completed final sign-off Jun 2018 | 44 Montgomery St | Greene Builders Inc | suite 1110 & 1150: existing single tenant suite demo of (e) partitions & power/data, floor finishes & lighting. construction of two tenant suites including (n) partitions, doors, power & tele/data, lighting, millwork & finishes. mep/life safety & sprinkler system modifications under sep. permit.Details
suite 1110 & 1150: existing single tenant suite demo of (e) partitions & power/data, floor finishes & lighting. construction of two tenant suites including (n) partitions, doors, power & tele/data, lighting, millwork & finishes. mep/life safety & sprinkler system modifications under sep. permit. | $391,132 |
| Feb 16, 2018 | Completed final sign-off Mar 2019 | 185 Berry St | Hathaway Dinwiddie Co. | barrier removal project work includes: restroom upgrades for finishes and fixtures per 2016 cbc. 1 pair of restrooms at the wharfside building. lobby 1 (floor 1) no mechanical or sprinkler upgrades. electrical and life safety upgrades will be submitted under sep. permit. maher naDetails
barrier removal project work includes: restroom upgrades for finishes and fixtures per 2016 cbc. 1 pair of restrooms at the wharfside building. lobby 1 (floor 1) no mechanical or sprinkler upgrades. electrical and life safety upgrades will be submitted under sep. permit. maher na | $70,000 |
| Jan 30, 2018 | Completed final sign-off Oct 2018 | 50 Beale St | 5th floor: demo of partitions and associated electrical and ceiling work construction of new partitions, doors, sink, finishes, electrical within ext full floor tenant suite. mep, sprinkler and life safety system under seperate permit. n/a for maher.Details
5th floor: demo of partitions and associated electrical and ceiling work construction of new partitions, doors, sink, finishes, electrical within ext full floor tenant suite. mep, sprinkler and life safety system under seperate permit. n/a for maher. | $250,000 | |
| Jan 12, 2018 | Completed final sign-off Oct 2018 | 75 Broadway | Peacock Construction | commercial ti - including new offices, electrical & finishes - no structrual work maher naDetails
commercial ti - including new offices, electrical & finishes - no structrual work maher na | $123,000 |
| Oct 27, 2017 | Completed final sign-off Mar 2018 | 185 Berry St | Rossi Builders Inc. | #200 & 210- demo of partitions, doors/frames/hardware,power/data. constrcut new demising partition to create separate suite 200 + 210 w/new exit door & create signle conference room from 2 previous private offices. new partitions, doors/frames/hardward,power/data,relocated light fixtures, patching/Details
#200 & 210- demo of partitions, doors/frames/hardware,power/data. constrcut new demising partition to create separate suite 200 + 210 w/new exit door & create signle conference room from 2 previous private offices. new partitions, doors/frames/hardward,power/data,relocated light fixtures, patching/ | $35,000 |
| Oct 26, 2017 | Completed final sign-off Mar 2018 | 601 California St | Rylko Builders Inc. | #1307 on 13th fl: minor alterations to tenant suite & relocation of exit door at adjacent suite. new and/or alterations to mep, sprinklers & life safety systems will be under separate permits.Details
#1307 on 13th fl: minor alterations to tenant suite & relocation of exit door at adjacent suite. new and/or alterations to mep, sprinklers & life safety systems will be under separate permits. | $165,891 |
| Oct 18, 2017 | Completed final sign-off Jun 2019 | 222 Kearny St | Gci, Inc | project consist of - and limited to millwork, finish, furniture & lighting upgrades to (e) lobby. mech, elec, life safety and sprinkler system modification are under seperate/deferred permits.Details
project consist of - and limited to millwork, finish, furniture & lighting upgrades to (e) lobby. mech, elec, life safety and sprinkler system modification are under seperate/deferred permits. | $60,000 |
| Oct 18, 2017 | Never finaled issued Jan 2018, no final | 180 Sutter St | Gci, Inc | project consist of - and limited to millwork, finish, furniture & lighting upgrades to (e) lobby. mech, elec, life safety and sprinkler system modification are under seperate/deferred permits. ground fl lobby.Details
project consist of - and limited to millwork, finish, furniture & lighting upgrades to (e) lobby. mech, elec, life safety and sprinkler system modification are under seperate/deferred permits. ground fl lobby. | $60,000 |
| Oct 17, 2017 | Completed final sign-off Jan 2018 | 425 California St | Gci, Inc | suite 1700 - revision to pa #201708084229 - project includes providing one additional urinal at mens restroom. n/a maher ordinanceDetails
suite 1700 - revision to pa #201708084229 - project includes providing one additional urinal at mens restroom. n/a maher ordinance | |
| Oct 6, 2017 | Completed final sign-off Mar 2019 | 185 Berry St | Hathaway Dinwiddie Co. | (roof / building) construct an expansion to (e) mechanical penthouse to accomodate the pumps for new cooling towers & part of central plant upgrade for building. new mech penthouse will be same hight as (e) mech penthouse. ** maher: n/a **Details
(roof / building) construct an expansion to (e) mechanical penthouse to accomodate the pumps for new cooling towers & part of central plant upgrade for building. new mech penthouse will be same hight as (e) mech penthouse. ** maher: n/a ** | $4,037,000 |
| Oct 4, 2017 | Completed final sign-off Jan 2018 | 201 Mission St | Richlen Construction | suite #2775, 27th fl: project consist of ti on a multi-tenant floor. build-out consists of construction of new walls and glazing configuration, minor ceiling and power/data work, and finishes. mech, elec & sprinkler modification under seperate permit. maher naDetails
suite #2775, 27th fl: project consist of ti on a multi-tenant floor. build-out consists of construction of new walls and glazing configuration, minor ceiling and power/data work, and finishes. mech, elec & sprinkler modification under seperate permit. maher na | $80,000 |
| Oct 4, 2017 | Completed final sign-off Dec 2018 | 201 Mission St | Richlen Construction | suite 1500: t.i. - build-out consists of demo of (e) walls & finishes & construction of new wall and glazing configuration, minor ceiling and power/data work & finishes. f/s mods under sep permit. maher n/a.Details
suite 1500: t.i. - build-out consists of demo of (e) walls & finishes & construction of new wall and glazing configuration, minor ceiling and power/data work & finishes. f/s mods under sep permit. maher n/a. | $200,000 |
| Oct 4, 2017 | Completed final sign-off Dec 2017 | 201 Mission St | Richlen Construction | suite 1800: rev to pa#201702239942. additional demo scope with additional ceiling electrivcal scope. maher n/a.Details
suite 1800: rev to pa#201702239942. additional demo scope with additional ceiling electrivcal scope. maher n/a. | $30,000 |
| Oct 4, 2017 | Completed final sign-off Jan 2019 | 222 Kearny St | Gci, Inc | 7th fl: scope includes demo of non-struct int. walls, doors, millwork, power & tele/data, lighting & finishes. fire sprinkler & life safety system to remain operational & in place with connted ceiling tile. fire sprinkler & life safety submitted under sep. permit during construction phase.Details
7th fl: scope includes demo of non-struct int. walls, doors, millwork, power & tele/data, lighting & finishes. fire sprinkler & life safety system to remain operational & in place with connted ceiling tile. fire sprinkler & life safety submitted under sep. permit during construction phase. | $50,000 |
| Sep 26, 2017 | Completed final sign-off Mar 2019 | 601 California St | Peacock Construction | 10/f- replace & upgrade 10 fire smoke dampers per new bldg. smoke management system.Details
10/f- replace & upgrade 10 fire smoke dampers per new bldg. smoke management system. | $25,000 |
| Sep 21, 2017 | Completed final sign-off Jan 2018 | 425 California St | Gci, Inc | 24/f #2400- selective demo of (e) partitions, doors/frames, power/tile/data, lighting & millwork. construct (n) partitions, (n) power, (n) lighting fixtures, (n) millwork & finishes. minor ada upgrades to accessible restrooms. space is unoccupied. life safety & sprinkler modication as req underDetails
24/f #2400- selective demo of (e) partitions, doors/frames, power/tile/data, lighting & millwork. construct (n) partitions, (n) power, (n) lighting fixtures, (n) millwork & finishes. minor ada upgrades to accessible restrooms. space is unoccupied. life safety & sprinkler modication as req under | $200,000 |
| Sep 19, 2017 | Completed final sign-off Dec 2017 | 44 Montgomery St | Rudolph Commercial Interiors Inc, Rci | demo e partitions & associated power data floor finishes and lighting. construction new partitions, doors power data, floor finishes and lighting. new partitions, doors, power data, lighting, millwork,finishes. ti currently vacant. mep, ls, sprklr system modifications sep permitsDetails
demo e partitions & associated power data floor finishes and lighting. construction new partitions, doors power data, floor finishes and lighting. new partitions, doors, power data, lighting, millwork,finishes. ti currently vacant. mep, ls, sprklr system modifications sep permits | $64,159 |
| Sep 19, 2017 | Completed final sign-off Dec 2017 | 44 Montgomery St | Rudolph Commercial Interiors Inc, Rci | demo of existing partitions & associated power data, floor finishes and lighting. new partitions, doors, power and teledata, lighting, millwork, finishes. aoll work to occur on the 12th fl of a 43 stor bldg. suite currently vacant. mep,ls, sprinkler sep permitDetails
demo of existing partitions & associated power data, floor finishes and lighting. new partitions, doors, power and teledata, lighting, millwork, finishes. aoll work to occur on the 12th fl of a 43 stor bldg. suite currently vacant. mep,ls, sprinkler sep permit | $25,172 |
| Sep 15, 2017 | Completed final sign-off Jan 2019 | 222 Kearny St | Gci, Inc | 9th floor: demolition of non-structural interior walls, doors, millwork power & teledata, lighting & finishes. fire sprinklers & life safty system to remain operational & in place with connecting tile. f/s, l/s will be submitted under seperate permit during the construction phase. ab-017 applies.Details
9th floor: demolition of non-structural interior walls, doors, millwork power & teledata, lighting & finishes. fire sprinklers & life safty system to remain operational & in place with connecting tile. f/s, l/s will be submitted under seperate permit during the construction phase. ab-017 applies. | $50,000 |
| Sep 14, 2017 | Completed final sign-off Mar 2018 | 185 Berry St | Dfi Construction Company | elevator lobby no.6 on 3rd floor renovation: project consists of demo of e eoors/frames/hardware finishes. new doors frames hardware finishes elec, ls, fire protection modifications under sep permit maher not rqDetails
elevator lobby no.6 on 3rd floor renovation: project consists of demo of e eoors/frames/hardware finishes. new doors frames hardware finishes elec, ls, fire protection modifications under sep permit maher not rq | $20,000 |
| Sep 1, 2017 | Expired or cancelled cancelled Jan 2026 | 44 Montgomery St | suite 4000, 4050: demo existing partitions, doors, millwork, elec, plumb, finishes. suite is currently unoccupiedDetails
suite 4000, 4050: demo existing partitions, doors, millwork, elec, plumb, finishes. suite is currently unoccupied | $40,000 | |
| Sep 1, 2017 | Expired or cancelled cancelled Jan 2026 | 44 Montgomery St | suite 1750: demo existing paritions, doors, m illwork, elec, plumb, finishes. suite unoccupied, ti, mep, ls sep permit maher not reqDetails
suite 1750: demo existing paritions, doors, m illwork, elec, plumb, finishes. suite unoccupied, ti, mep, ls sep permit maher not req | $40,000 | |
| Aug 24, 2017 | Completed final sign-off Jan 2018 | 185 Berry St | Dfi Construction Company | #1510- revision to pa#201706219952 includes (n) restroom access upgrade sheet g-105. n/a ordinance #155-13Details
#1510- revision to pa#201706219952 includes (n) restroom access upgrade sheet g-105. n/a ordinance #155-13 | |
| Aug 14, 2017 | Never finaled issued Aug 2017, no final | 44 Montgomery St | Rudolph Commercial Interiors Inc, Rci | on 10th floor -demo e partitions assoc power data, floor finishes, lighting. new partitions, doors, power , teledata, lighting millwork, finishes, all work to occur 10th fl of 43 story bldg. tenant suite is vacant. mep, ls, sprinkler system modifications under separate and deferred permitsDetails
on 10th floor -demo e partitions assoc power data, floor finishes, lighting. new partitions, doors, power , teledata, lighting millwork, finishes, all work to occur 10th fl of 43 story bldg. tenant suite is vacant. mep, ls, sprinkler system modifications under separate and deferred permits | $155,000 |
| Aug 11, 2017 | Completed final sign-off Jan 2018 | 601 California St | Rylko Builders Inc. | 5/f- barrier removal, construction of single accomodation unisex (all gender) ada compliant restroom, new ada accessible drinking fountain & associated elevator lobby extension to accomodate accessible upgrades. mep., life safety & sprinklers on seperate permit.Details
5/f- barrier removal, construction of single accomodation unisex (all gender) ada compliant restroom, new ada accessible drinking fountain & associated elevator lobby extension to accomodate accessible upgrades. mep., life safety & sprinklers on seperate permit. | $72,000 |
| Aug 10, 2017 | Completed final sign-off Jan 2018 | 601 California St | Rylko Builders Inc. | 6th floor: upgrade finishes and replacement fixtures in core restrooms.Details
6th floor: upgrade finishes and replacement fixtures in core restrooms. | $140,000 |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 601 California St | Rylko Builders Inc. | 1st floor: demo of extg partitions and associated power/data, floor finishes, lighting, millwork/plumbing. mep, sprinkler, & life safty systems under seperate permits.Details
1st floor: demo of extg partitions and associated power/data, floor finishes, lighting, millwork/plumbing. mep, sprinkler, & life safty systems under seperate permits. | $70,000 |
| Aug 8, 2017 | Completed final sign-off Jan 2018 | 425 California St | Gci, Inc | suite demo partitions, doors/frames, power, ceilng/ltg, plmg fix. millwork & finishes. constctn of partitions power, ceilg/ltg, millwork & fnsh. nw buildout of accessible restrooms to achieve full barrier removal with associated ceiling, elec & finishes work. space is currentrly unoccupied.Details
suite demo partitions, doors/frames, power, ceilng/ltg, plmg fix. millwork & finishes. constctn of partitions power, ceilg/ltg, millwork & fnsh. nw buildout of accessible restrooms to achieve full barrier removal with associated ceiling, elec & finishes work. space is currentrly unoccupied. | $200,000 |
| Jul 31, 2017 | Completed final sign-off Nov 2017 | 101 California St | Source Planning And Construction Inc | 40th fl: removing stairs (communication stair) and infilling floor. maher naDetails
40th fl: removing stairs (communication stair) and infilling floor. maher na | |
| Jul 25, 2017 | Expired or cancelled withdrawn Aug 2017 | 44 Montgomery St | 10th flr ste 1050 -consists of demo of (e) partitions & associated power/data, floor finishes & lighting. construction of new partitions, doors, power & tele/data, lighting, millwork & finishes. mep, life safety & sprinkler modifications under separate permit. n/a maher ordinanceDetails
10th flr ste 1050 -consists of demo of (e) partitions & associated power/data, floor finishes & lighting. construction of new partitions, doors, power & tele/data, lighting, millwork & finishes. mep, life safety & sprinkler modifications under separate permit. n/a maher ordinance | $155,000 | |
| Jul 25, 2017 | Expired or cancelled withdrawn Aug 2017 | 44 Montgomery St | 29th flr ste 2920-consists of demo of (e) partitions & associated power/data, flr finishes & lighting. construct new partitions,doors, power & tele/data,lighting, tenant suite is currently vacant. mep, life safety & sprinkler modifications under separate permit.Details
29th flr ste 2920-consists of demo of (e) partitions & associated power/data, flr finishes & lighting. construct new partitions,doors, power & tele/data,lighting, tenant suite is currently vacant. mep, life safety & sprinkler modifications under separate permit. | $175,000 | |
| Jul 25, 2017 | Expired or cancelled withdrawn Aug 2017 | 44 Montgomery St | 9th flr ste 960 - consists of demo of (e) partitions & associated power/data, floor finishes, & lighting. construct of new partitions, doors, power & tele/data, lighting, millwork & finishes. tenant suite is currently vacant. mep, life safety & sprinkler modifications under separate permit.n/a maherDetails
9th flr ste 960 - consists of demo of (e) partitions & associated power/data, floor finishes, & lighting. construct of new partitions, doors, power & tele/data, lighting, millwork & finishes. tenant suite is currently vacant. mep, life safety & sprinkler modifications under separate permit.n/a maher | $14,000 | |
| Jul 25, 2017 | Expired or cancelled cancelled Jan 2026 | 44 Montgomery St | 4th flr -project consists of an (e) common non-rated hallway, ceiling & lighting. tenant suite is currently unoccupied & unfinished & remain so until future tenant build-out. hallway, t.i., mep, life safety & sprinkler modifications under separate permit.Details
4th flr -project consists of an (e) common non-rated hallway, ceiling & lighting. tenant suite is currently unoccupied & unfinished & remain so until future tenant build-out. hallway, t.i., mep, life safety & sprinkler modifications under separate permit. | $14,000 | |
| Jul 25, 2017 | Expired or cancelled withdrawn Aug 2017 | 44 Montgomery St | 34th flr ste 3450 -consists of demo (e) partitions & associate, power/data, floor finishes & lighting. construct new patitions, doors, power & tele/data, lightingmillwork & finishes. tenant suite is currently vacant. mep, life safety & sprinkler sys modifications are to be under separate permit.Details
34th flr ste 3450 -consists of demo (e) partitions & associate, power/data, floor finishes & lighting. construct new patitions, doors, power & tele/data, lightingmillwork & finishes. tenant suite is currently vacant. mep, life safety & sprinkler sys modifications are to be under separate permit. | $175,000 | |
| Jul 21, 2017 | Completed final sign-off Dec 2017 | 825 Battery St | Source Planning And Construction Inc | 3/f- t.i. on a multi tenant floor to demo (e) partitions, ceiling, millwork & finishes. construct new walls, ceiling work with new lighting, power/data & finishes, full ada compliance restrooms. mep, life safety & sprinkler separate . no structural work in this scope. n/a ordinance #155-13Details
3/f- t.i. on a multi tenant floor to demo (e) partitions, ceiling, millwork & finishes. construct new walls, ceiling work with new lighting, power/data & finishes, full ada compliance restrooms. mep, life safety & sprinkler separate . no structural work in this scope. n/a ordinance #155-13 | $450,000 |
| Jul 21, 2017 | Completed final sign-off Dec 2017 | 825 Battery St | Source Planning And Construction Inc | g/f lobby- project consists of (e) ceiling grid/tile and lighting at g/f elevator lobby, install (n) ceiling grid/tile and lighting. mep., life safety & sprinkler modification to be seperate permit. no structural work in this scope. n/a ordinance #155-13Details
g/f lobby- project consists of (e) ceiling grid/tile and lighting at g/f elevator lobby, install (n) ceiling grid/tile and lighting. mep., life safety & sprinkler modification to be seperate permit. no structural work in this scope. n/a ordinance #155-13 | $20,000 |
| Jun 21, 2017 | Completed final sign-off Jan 2018 | 185 Berry St | Dfi Construction Company | suite #1510: project consists of demo of light fixtures & finishes. construction of interior tenant partitions, doors, frames, power/data, lighting and finishes. mep & life safety & fire protection modifications will be under seperate permit.Details
suite #1510: project consists of demo of light fixtures & finishes. construction of interior tenant partitions, doors, frames, power/data, lighting and finishes. mep & life safety & fire protection modifications will be under seperate permit. | $30,000 |
| Jun 5, 2017 | Completed final sign-off Sep 2017 | 121 Spear St | Peacock Construction | demo of toilet stall prtitions, plumbing fixtures and finiahes. construction of new partitoins, plumb fixtures, light fixtures, finishes for barrier removeal, mep/life safety, sprinkler system modfiications sep permitDetails
demo of toilet stall prtitions, plumbing fixtures and finiahes. construction of new partitoins, plumb fixtures, light fixtures, finishes for barrier removeal, mep/life safety, sprinkler system modfiications sep permit | $104,400 |
| May 17, 2017 | Completed final sign-off May 2020 | 185 Berry St | Hathaway Dinwiddie Co. | wharfside bldg: restroom upgrades for finishes & fixtures per 2016 cbc. 2 pairs of restrooms total, lobby 1 (6th fl) and lobby 3 (6th fl) no mechanical or sprinkler upgrades. electrical and life safety upgrades will be submitted under seperate permit.Details
wharfside bldg: restroom upgrades for finishes & fixtures per 2016 cbc. 2 pairs of restrooms total, lobby 1 (6th fl) and lobby 3 (6th fl) no mechanical or sprinkler upgrades. electrical and life safety upgrades will be submitted under seperate permit. | $325,000 |
| May 17, 2017 | Completed final sign-off May 2020 | 185 Berry St | Hathaway Dinwiddie Co. | berry st bldg: restroom upgrades for finishes and fixtures per 2016 cbc. 7 pairs of restrooms total, lobby 5,6,7 (floors 1,2,3). no mechanical or sprinkler upgrades. electrical and life safety upgrades will be submitted under seperate permit.Details
berry st bldg: restroom upgrades for finishes and fixtures per 2016 cbc. 7 pairs of restrooms total, lobby 5,6,7 (floors 1,2,3). no mechanical or sprinkler upgrades. electrical and life safety upgrades will be submitted under seperate permit. | $325,000 |
| Feb 23, 2017 | Completed final sign-off Jun 2017 | 85 02nd St | 4/f- project scope consists of selective demolition and safe-off in vacant 4/f. no new construction is considered in this scope of work. area of work is currently unoccupied per ab-017. n/a ordinance #155-13 ceilings to remain intactDetails
4/f- project scope consists of selective demolition and safe-off in vacant 4/f. no new construction is considered in this scope of work. area of work is currently unoccupied per ab-017. n/a ordinance #155-13 ceilings to remain intact | $55,000 | |
| Feb 23, 2017 | Completed final sign-off Jun 2017 | 85 02nd St | 5/f- project scope consists of selective demolition and safe-off in vacant 5/f. no new construction is considered in this scope of work. area of work is currently unoccupied per ab-017. n/a ordinance #155-13 ceilings to remain intactDetails
5/f- project scope consists of selective demolition and safe-off in vacant 5/f. no new construction is considered in this scope of work. area of work is currently unoccupied per ab-017. n/a ordinance #155-13 ceilings to remain intact | $55,000 |