Block 3774, lot 025
250 Brannan St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 3
- Rooms
- 7 bathrooms
- Building
- 104,000 sq ft
- Lot
- 37,812 sq ft
- Zoning
- SSO
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
96 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 13, 2020 | Completed final sign-off Dec 2020 | 250 Brannan St | Acco Engineered Systems Inc. Dba Acco En | replace existing parking garage exhaust fans that caused noise violation with new lower sound emitting fan-array. per inspector kevin burmingham's request. mechanical application on file.Details
replace existing parking garage exhaust fans that caused noise violation with new lower sound emitting fan-array. per inspector kevin burmingham's request. mechanical application on file. | $99,140 |
| Jan 7, 2020 | Never finaled issued Feb 2020, no final | 250 Brannan St | Novo Construction Inc | revision to 201907125793 to remove moveable partitons from project including revised structural maher not reqDetails
revision to 201907125793 to remove moveable partitons from project including revised structural maher not req | |
| Dec 18, 2019 | Completed final sign-off May 2020 | 250 Brannan St | Novo Construction Inc | 1st floor: revision to app#201907125792 to move mens and womens ada stall toilet and grab bars for code complianc. ref app#201907125792Details
1st floor: revision to app#201907125792 to move mens and womens ada stall toilet and grab bars for code complianc. ref app#201907125792 | $15,000 |
| Nov 18, 2019 | Completed final sign-off Feb 2020 | 250 Brannan St | Anderson, Rowe & Buckley, Inc. | 1st floor: fire sprinkler only: relocate 16 pendents, 3 uprights and add 1 for sprinkleDetails
1st floor: fire sprinkler only: relocate 16 pendents, 3 uprights and add 1 for sprinkle | $7,500 |
| Nov 18, 2019 | Completed final sign-off Feb 2020 | 250 Brannan St | Anderson, Rowe & Buckley, Inc. | basement: fire sprinkler only: relocate 23 heads for splunk.Details
basement: fire sprinkler only: relocate 23 heads for splunk. | $11,500 |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 250 Brannan St | Novo Construction Inc | electrical work for ti at basement and gr fl. ref 201907125792, 201907125789Details
electrical work for ti at basement and gr fl. ref 201907125792, 201907125789 | $10,000 |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 250 Brannan St | Novo Construction Inc | eletrical work for ti on 2nd fl. ref 201907125793Details
eletrical work for ti on 2nd fl. ref 201907125793 | $150,000 |
| Oct 23, 2019 | Never finaled issued Oct 2019, no final | 250 Brannan St | Novo Construction Inc | mechanical work for ti ref pa 2019-0712-5792 & 2019-0712-5789 at basement and 1st floor.Details
mechanical work for ti ref pa 2019-0712-5792 & 2019-0712-5789 at basement and 1st floor. | $8,000 |
| Oct 18, 2019 | Completed final sign-off Mar 2020 | 250 Brannan St | Anderson, Rowe & Buckley, Inc. | 2/f: relocate 29 pendent add 1 upright fire sprinklers in offices for 2/f t.i. ref pa 201907226459.Details
2/f: relocate 29 pendent add 1 upright fire sprinklers in offices for 2/f t.i. ref pa 201907226459. | $15,000 |
| Sep 30, 2019 | Completed final sign-off May 2020 | 250 Brannan St | Novo Construction Inc | 2/f:mechanical work for ti on the 2nd fl. ref arch #201907125793. maher n/a.Details
2/f:mechanical work for ti on the 2nd fl. ref arch #201907125793. maher n/a. | $400,000 |
| Aug 26, 2019 | Completed final sign-off Sep 2019 | 250 Brannan St | Anderson, Rowe & Buckley, Inc. | 3rd flr. fire sprinkler only. relocate 69 pendents and 10 uprights for splunk on the 3rd floor.Details
3rd flr. fire sprinkler only. relocate 69 pendents and 10 uprights for splunk on the 3rd floor. | $39,500 |
| Aug 5, 2019 | Never finaled issued Sep 2019, no final | 250 Brannan St | Novo Construction Inc | ref pa# 201906214140; mep for t.i. improvement to include demo & installation of new ductwork hhw piping arilles and van boxes to serve new roomsDetails
ref pa# 201906214140; mep for t.i. improvement to include demo & installation of new ductwork hhw piping arilles and van boxes to serve new rooms | $750,000 |
| Aug 5, 2019 | Completed final sign-off Feb 2020 | 250 Brannan St | Pyro-Comm Systems, Inc. | f/a: 30 ceiling strobes, 1 wall strobes, 19 ceiling horn strobes, 6 wall horn strobes to be added to existing facu. ref pa #201801027709Details
f/a: 30 ceiling strobes, 1 wall strobes, 19 ceiling horn strobes, 6 wall horn strobes to be added to existing facu. ref pa #201801027709 | $28,000 |
| Jul 22, 2019 | Completed final sign-off Feb 2020 | 250 Brannan St | Novo Construction Inc | 2nd fl - selective demo of non-load beams partitions, ceiling and finishes ab017Details
2nd fl - selective demo of non-load beams partitions, ceiling and finishes ab017 | $15,000 |
| Jul 22, 2019 | Completed final sign-off Feb 2020 | 250 Brannan St | Novo Construction Inc | 1st fl: selective demo of non-load beams partitions, cieling and finishes ab017Details
1st fl: selective demo of non-load beams partitions, cieling and finishes ab017 | $15,000 |
| Jul 22, 2019 | Never finaled issued Jul 2019, no final | 250 Brannan St | Novo Construction Inc | basement selective demo of non-load beams partitions, ceiling and finishes ab017Details
basement selective demo of non-load beams partitions, ceiling and finishes ab017 | $15,000 |
| Jul 12, 2019 | Completed final sign-off Feb 2020 | 250 Brannan St | level 1/mezzanine - ti work includes new partitions, finishes, lighting & equipment. interior onlyDetails
level 1/mezzanine - ti work includes new partitions, finishes, lighting & equipment. interior only | $900,000 | |
| Jul 12, 2019 | Completed final sign-off Feb 2020 | 250 Brannan St | Novo Construction Inc | basement - no change of use. ti work includes new partitions, finishes, one new all gender restroom. lighting & equipment. interior onlyDetails
basement - no change of use. ti work includes new partitions, finishes, one new all gender restroom. lighting & equipment. interior only | $1,500,000 |
| Jul 12, 2019 | Completed final sign-off May 2020 | 250 Brannan St | Novo Construction Inc | second flr - ti work includes new partitions, finishes, lighting & equipment. interior onlyDetails
second flr - ti work includes new partitions, finishes, lighting & equipment. interior only | $1,000,000 |
| Jun 21, 2019 | Completed final sign-off Dec 2019 | 250 Brannan St | Novo Construction Inc | interior ti at 3rd fl. work includes new partitions, finishes, lighting, equipment maher not reqDetails
interior ti at 3rd fl. work includes new partitions, finishes, lighting, equipment maher not req | $1,638,416 |
| May 30, 2019 | Completed final sign-off Dec 2019 | 250 Brannan St | Novo Construction Inc | selective demolition of non-load bearing partitions ceilings and finishes on the 3rd floor. ab-017.Details
selective demolition of non-load bearing partitions ceilings and finishes on the 3rd floor. ab-017. | $15,000 |
| May 29, 2019 | Expired or cancelled withdrawn Feb 2020 | 250 Brannan St | 3rd fl - provide 2 (n) interconnecting openings w/fire rated doors @ 3rd fl between 250 & 270 brannan. per ab010 demo, patching, structural & mep work. (n) stair, landing, ada lift. demo (e) conference room/work room (e) training room to create (n) training room & storage closet.maher n/a.Details
3rd fl - provide 2 (n) interconnecting openings w/fire rated doors @ 3rd fl between 250 & 270 brannan. per ab010 demo, patching, structural & mep work. (n) stair, landing, ada lift. demo (e) conference room/work room (e) training room to create (n) training room & storage closet.maher n/a. | $150,000 | |
| Feb 27, 2018 | Completed final sign-off Mar 2018 | 250 Brannan St | R L H Fire Protection Inc | basement & 1st flr - fire spsrinklers b- 5 add pendent & 5 upright. 1st - 4 add pendents, 2 relocated uprights, 1 added upright. 17 total ref 201712206979 maher naDetails
basement & 1st flr - fire spsrinklers b- 5 add pendent & 5 upright. 1st - 4 add pendents, 2 relocated uprights, 1 added upright. 17 total ref 201712206979 maher na | $5,310 |
| Feb 27, 2018 | Completed final sign-off Mar 2018 | 250 Brannan St | R L H Fire Protection Inc | 2nd flr - fire spsrinklers 12 added pendent, 8 relocated upright,6 added upright. 26 total ref 201712206981 maher naDetails
2nd flr - fire spsrinklers 12 added pendent, 8 relocated upright,6 added upright. 26 total ref 201712206981 maher na | $8,120 |
| Feb 9, 2018 | Never finaled issued Feb 2018, no final | 250 Brannan St | Pyro-Comm Systems, Inc. | fa t.i. pyro comm will provide 8 new audible and visual devices. ref app#201312113871. n/a for maherDetails
fa t.i. pyro comm will provide 8 new audible and visual devices. ref app#201312113871. n/a for maher | $4,000 |
| Jan 2, 2018 | Completed final sign-off Apr 2018 | 250 Brannan St | Principal Builders Inc. | title 24 mechanical electrical to install new systems and lighting power on basement 1st fl. ref 201712206979Details
title 24 mechanical electrical to install new systems and lighting power on basement 1st fl. ref 201712206979 | $40,000 |
| Jan 2, 2018 | Completed final sign-off Apr 2018 | 250 Brannan St | Principal Builders Inc. | title 24 mechanical elec to install new system and lighting power on d 2nd fl. ref to 201712206981 for ti maher histDetails
title 24 mechanical elec to install new system and lighting power on d 2nd fl. ref to 201712206981 for ti maher hist | $31,000 |
| Dec 20, 2017 | Completed final sign-off Apr 2018 | 250 Brannan St | Principal Builders Inc. | b,1: ti- demo of (e) non bearing partitions, selective light fixture replacement, new office doors/frames, modification of (e) hvac, new construction, new millwork, new ceiling grid in new offices maher naDetails
b,1: ti- demo of (e) non bearing partitions, selective light fixture replacement, new office doors/frames, modification of (e) hvac, new construction, new millwork, new ceiling grid in new offices maher na | $156,162 |
| Dec 20, 2017 | Completed final sign-off Apr 2018 | 250 Brannan St | Principal Builders Inc. | b,1: ti- modification of an (e) ti ste to include selective demo and construction of non-loading bearing partitions, selective light fixtures, and re-switching (n) office doors & frams, salvage & reuse of (e) selected materisls if practicalbe (n) millwork, (n) sink and (n) finishes.Details
b,1: ti- modification of an (e) ti ste to include selective demo and construction of non-loading bearing partitions, selective light fixtures, and re-switching (n) office doors & frams, salvage & reuse of (e) selected materisls if practicalbe (n) millwork, (n) sink and (n) finishes. | $185,000 |
| Aug 2, 2017 | Never finaled issued Aug 2017, no final | 250 Brannan St | Pyro-Comm Systems, Inc. | 3rd fl , fire alarm ti add 7 strobes; 1 relay module to (e) fa system. ref pa 2017-0622-0027. maher naDetails
3rd fl , fire alarm ti add 7 strobes; 1 relay module to (e) fa system. ref pa 2017-0622-0027. maher na | $4,000 |
| Jun 22, 2017 | Never finaled issued Jun 2017, no final | 250 Brannan St | Skyline Construction | tenant improvement include installation of new door on 3rd floorDetails
tenant improvement include installation of new door on 3rd floor | $24,000 |
| Sep 24, 2015 | Never finaled issued Sep 2015, no final | 250 Brannan St | Acco Engineered Systems Inc. Dba Acco En | install dx split system on roof to serve idf room. maher naDetails
install dx split system on roof to serve idf room. maher na | $18,000 |
| May 8, 2014 | Completed final sign-off May 2015 | 250 Brannan St | True North Signs & Graphic Services | 5 evacuation signs for basement. n/a ordinance #155-13.Details
5 evacuation signs for basement. n/a ordinance #155-13. | $2,200 |
| Jan 24, 2014 | Completed final sign-off Feb 2014 | 250 Brannan St | True North Signs & Graphic Services | install evcuation signs - all indoorDetails
install evcuation signs - all indoor | $6,600 |
| Dec 11, 2013 | Completed final sign-off May 2015 | 250 Brannan St | Pyro-Comm Systems, Inc. | basement, 1st & 2nd floor - new fire alarm devices to tenant build-out in an existing building, (15) strobes, (5) horn/strobes, (4) weatherproof horn/strobes, (1) relay module, (1) voltage relay. ref pa #2013.1106.1235Details
basement, 1st & 2nd floor - new fire alarm devices to tenant build-out in an existing building, (15) strobes, (5) horn/strobes, (4) weatherproof horn/strobes, (1) relay module, (1) voltage relay. ref pa #2013.1106.1235 | $12,000 |
| Nov 6, 2013 | Completed final sign-off Jun 2015 | 250 Brannan St | Hathaway Dinwiddie Co. | basement/1st/2nd/3rd floors-mechanical, electrical, plumbing & structural. refer to arch pa# 2013-0814-4246. no roof work under this permit, refer to pa# 2013-1007-8706 submitted separately for roof workDetails
basement/1st/2nd/3rd floors-mechanical, electrical, plumbing & structural. refer to arch pa# 2013-0814-4246. no roof work under this permit, refer to pa# 2013-1007-8706 submitted separately for roof work | $840,000 |
| Oct 23, 2013 | Completed final sign-off May 2015 | 250 Brannan St | Pyro-Comm Systems, Inc. | 3rd floor:this is a t.i. to an extg bldg. 2 monitor modules, 3 relay modules, 3 voltage relays, 3 smoke detectors, 1 duct detector, 35 horn/strobes, 10 strobes.Details
3rd floor:this is a t.i. to an extg bldg. 2 monitor modules, 3 relay modules, 3 voltage relays, 3 smoke detectors, 1 duct detector, 35 horn/strobes, 10 strobes. | $8,000 |
| Oct 7, 2013 | Completed final sign-off Jun 2015 | 250 Brannan St | Hathaway Dinwiddie Co. | (roof) roof work; 2 air handling units, 2 new exhaust fans, 2 new condensing units. 2 new tef. new refrigerent riser pipes from below. all mech. t-24 are being shared by the meps of pa# 2013/08/14/4246. please use structural calcs. mech t-24 for roof project portion only.Details
(roof) roof work; 2 air handling units, 2 new exhaust fans, 2 new condensing units. 2 new tef. new refrigerent riser pipes from below. all mech. t-24 are being shared by the meps of pa# 2013/08/14/4246. please use structural calcs. mech t-24 for roof project portion only. | $50,000 |
| Oct 4, 2013 | Completed final sign-off Jan 2014 | 250 Brannan St | Anderson, Rowe & Buckley, Inc. | basement,1st,2nd, 3rd floors: fire sprinkler system extg t.i. remove 104 sprinkler, add 78 sprinklers. ref app#201308144246Details
basement,1st,2nd, 3rd floors: fire sprinkler system extg t.i. remove 104 sprinkler, add 78 sprinklers. ref app#201308144246 | $45,000 |
| Sep 17, 2013 | Never finaled issued Sep 2013, no final | 250 Brannan St | Pyro-Comm Systems, Inc. | relocate & replace fire alarm control unit to basement form the 1st floor, replace existing led annunicator at main extrance, moving dedicated curcuit. orginal work under 2008/11/05/5893Details
relocate & replace fire alarm control unit to basement form the 1st floor, replace existing led annunicator at main extrance, moving dedicated curcuit. orginal work under 2008/11/05/5893 | $7,000 |
| Aug 14, 2013 | Completed final sign-off Jun 2015 | 250 Brannan St | Hathaway Dinwiddie Co. | basement through 3rd floor. t.i. includes demo of non structural partitions and bldg n non structural partitons and showers. see mep engineering. plans for all new or revised hvac, electrical , plumbing, & life safety. bldg is fully sprinklered. structural plans for solar tube under mep submittal.Details
basement through 3rd floor. t.i. includes demo of non structural partitions and bldg n non structural partitons and showers. see mep engineering. plans for all new or revised hvac, electrical , plumbing, & life safety. bldg is fully sprinklered. structural plans for solar tube under mep submittal. | $1,345,393 |
| Aug 5, 2013 | Never finaled issued Aug 2013, no final | 250 Brannan St | Hathaway Dinwiddie Co. | 3rd floor: t.i. includes demolishing of non- structural partitions and hvac. future work will be submitted under seperate permit. building is fully sprinklered. ab017. unoccupied space.Details
3rd floor: t.i. includes demolishing of non- structural partitions and hvac. future work will be submitted under seperate permit. building is fully sprinklered. ab017. unoccupied space. | $20,000 |
| Dec 23, 2011 | Never finaled issued Jan 2012, no final | 250 Brannan St | Truebeck Construction | architectural finish upgrade to entry lobby/corridor painting of basement/garage area.Details
architectural finish upgrade to entry lobby/corridor painting of basement/garage area. | $176,000 |
| Dec 21, 2011 | Never finaled issued Sep 2012, no final | 250 Brannan St | Truebeck Construction | new light fixtures on the exterior street facade.Details
new light fixtures on the exterior street facade. | $10,000 |
| Dec 5, 2011 | Completed final sign-off Feb 2012 | 250 Brannan St | Rhodes Network Services Inc | basement and 1st flr: provide and install category se network cabling to handwall and modular work stations provide and install 2 post network equipment racks. reference app#201110207250Details
basement and 1st flr: provide and install category se network cabling to handwall and modular work stations provide and install 2 post network equipment racks. reference app#201110207250 | $58,000 |
| Nov 16, 2011 | Completed final sign-off Nov 2011 | 250 Brannan St | Pioneer Fire Inc. | grd & 1st floor-relocate 27 pendent fire sprinklers, relocate 12 upright fire sprinklers, add 1 upright fire sprinklerDetails
grd & 1st floor-relocate 27 pendent fire sprinklers, relocate 12 upright fire sprinklers, add 1 upright fire sprinkler | $8,900 |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 250 Brannan St | Sabah International Incorporated | provide and test program notification appliances for existing fire alarm system for ti in space on gr and 1st fl tenant space. 2 strobes, 25 horn strobesDetails
provide and test program notification appliances for existing fire alarm system for ti in space on gr and 1st fl tenant space. 2 strobes, 25 horn strobes | $10,841 |
| Oct 20, 2011 | Expired or cancelled cancelled Jan 2026 | 250 Brannan St | 1st floor-revision to pa# 2011-0901-3706-new entry doors to suite (interior)Details
1st floor-revision to pa# 2011-0901-3706-new entry doors to suite (interior) | $8,200 | |
| Sep 1, 2011 | Completed final sign-off Dec 2011 | 250 Brannan St | Team Commercial Construction Inc. | office ti on ground and 1st floor. interior demo non struc. partitions and bldg new npn struc, partitions. see mep engineered plans for all new or revised hvac, elec. plbg and life safety work. building is fully sprinkleredDetails
office ti on ground and 1st floor. interior demo non struc. partitions and bldg new npn struc, partitions. see mep engineered plans for all new or revised hvac, elec. plbg and life safety work. building is fully sprinklered | $415,237 |
| May 11, 2010 | Completed final sign-off Oct 2010 | 250 Brannan St | to obtain final inspection for work approved under pa 200803066506; all work is complete (1st flr)Details
to obtain final inspection for work approved under pa 200803066506; all work is complete (1st flr) | ||
| Nov 13, 2008 | Completed final sign-off Apr 2010 | 250 Brannan St | 1st fl. basement- t.i. including 2 conference rooms, millwrok @ bracing 2 pantries and additional communication stair. (mep under separate permit), building is fully sprinklered, structural drawing included.Details
1st fl. basement- t.i. including 2 conference rooms, millwrok @ bracing 2 pantries and additional communication stair. (mep under separate permit), building is fully sprinklered, structural drawing included. | $97,486 | |
| Nov 5, 2008 | Completed final sign-off Jan 2009 | 250 Brannan St | Bay Alarm Company | 2nd floor-as builts for fire alarm system-revise calculations to reflect correct amperage of the weatherproof horn/strobe devicesDetails
2nd floor-as builts for fire alarm system-revise calculations to reflect correct amperage of the weatherproof horn/strobe devices | $9,254 |
| Aug 18, 2008 | Completed final sign-off Dec 2008 | 250 Brannan St | A-1 Sign Company Inc | erect a wall non-electric single faced sign.Details
erect a wall non-electric single faced sign. | $1,000 |
| Aug 18, 2008 | Completed final sign-off Dec 2008 | 250 Brannan St | A-1 Sign Company Inc | erect a wall electric, single faced sign.Details
erect a wall electric, single faced sign. | $5,001 |
| Jul 22, 2008 | Never finaled issued Jul 2008, no final | 250 Brannan St | Shaughnessy Roofing Inc | reroofingDetails
reroofing | $15,400 |
| Jul 16, 2008 | Completed final sign-off Jan 2009 | 250 Brannan St | Bay Alarm Company | 2nd floor-fire alarm system tenant improvement throughout the 2nd floor that will connect to the (e) fire alarm system. 39 horn strobes, 46 strobes, 3 control modules, 2 relays, 6 manual pull, 7 duct smokes and 7 smoke detectors.nov 200858998-bid.Details
2nd floor-fire alarm system tenant improvement throughout the 2nd floor that will connect to the (e) fire alarm system. 39 horn strobes, 46 strobes, 3 control modules, 2 relays, 6 manual pull, 7 duct smokes and 7 smoke detectors.nov 200858998-bid. | $9,254 |
| Jun 26, 2008 | Completed final sign-off Jan 2009 | 250 Brannan St | R L H Fire Protection Inc | upgrade fire sprinkler system. relocate 37, add 3 and delete 3 heads.Details
upgrade fire sprinkler system. relocate 37, add 3 and delete 3 heads. | $6,750 |
| Jun 6, 2008 | Completed final sign-off Jan 2009 | 250 Brannan St | Field Construction Inc. | 2nd floor-tenant improvement,new partitions, some new ceiling, new mens & womens restrooms on the north side of the building. mechanical, plumbing, electrical. building is fully sprinklered. plumbing & electrical on separate permit.Details
2nd floor-tenant improvement,new partitions, some new ceiling, new mens & womens restrooms on the north side of the building. mechanical, plumbing, electrical. building is fully sprinklered. plumbing & electrical on separate permit. | $490,000 |
| Jun 5, 2008 | Completed final sign-off Jun 2008 | 250 Brannan St | C B F Inc | 3rd floor-life safety system modifications, fire alarm upgrade, 33 devicesDetails
3rd floor-life safety system modifications, fire alarm upgrade, 33 devices | $20,000 |
| May 15, 2008 | Completed final sign-off Jun 2008 | 250 Brannan St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinkler heads per tenant improvement (104 add) (12 relocated) at 3rd fl.Details
add & relocate fire sprinkler heads per tenant improvement (104 add) (12 relocated) at 3rd fl. | $20,800 |
| Apr 11, 2008 | Completed final sign-off Jul 2008 | 250 Brannan St | Bcci Construction Company | 3rd floor-mechancial & electrical work associated with approved pa# 2008-0325-7969-work include installation of vav boxes, ductwork, outlets & thermostats & exhaust fansDetails
3rd floor-mechancial & electrical work associated with approved pa# 2008-0325-7969-work include installation of vav boxes, ductwork, outlets & thermostats & exhaust fans | $50,000 |
| Mar 25, 2008 | Completed final sign-off Jul 2008 | 250 Brannan St | Bcci Construction Company | full floor tenant improvement on the 3rd floor including new partitions, electrical, ceiling, and finishes. life safety under sep permit. mech/elec separate permitDetails
full floor tenant improvement on the 3rd floor including new partitions, electrical, ceiling, and finishes. life safety under sep permit. mech/elec separate permit | $989,750 |
| Mar 6, 2008 | Expired or cancelled expired Oct 2010 | 250 Brannan St | new glass canopy for main floor entrance and new entry door. new striping in parking area for accessible parking stalls included. building number sign on separate permit.Details
new glass canopy for main floor entrance and new entry door. new striping in parking area for accessible parking stalls included. building number sign on separate permit. | $74,000 | |
| Jan 28, 2008 | Completed final sign-off Mar 2008 | 250 Brannan St | revision to 200710195912 and 200801041845, these permits were taken out to do work on the exist path of the building. is a revision to those permit to shown existing condition to the passageway.Details
revision to 200710195912 and 200801041845, these permits were taken out to do work on the exist path of the building. is a revision to those permit to shown existing condition to the passageway. | ||
| Jan 22, 2008 | Completed final sign-off Mar 2008 | 250 Brannan St | Ayoob & Peery Plumbing Co Inc | 1st floor : relocate fire sprinkler pre tenant improvement ( 7 heads total).Details
1st floor : relocate fire sprinkler pre tenant improvement ( 7 heads total). | $1,400 |
| Jan 4, 2008 | Completed final sign-off Mar 2008 | 250 Brannan St | 1st floor - revision to pa# 2007/10/19/5912 - new 2-hr wall & door. ceiling work.Details
1st floor - revision to pa# 2007/10/19/5912 - new 2-hr wall & door. ceiling work. | $1,000 | |
| Oct 19, 2007 | Completed final sign-off Mar 2008 | 250 Brannan St | first floor - corridor work to elevators. ada upgrade of ramp at entry ($24000). mechanical and electrical work under separate permit as needed.Details
first floor - corridor work to elevators. ada upgrade of ramp at entry ($24000). mechanical and electrical work under separate permit as needed. | $64,000 | |
| Jul 26, 2007 | Never finaled issued Jul 2007, no final | 250 Brannan St | street space permit only.Details
street space permit only. | ||
| Jan 30, 2007 | Expired or cancelled withdrawn May 2007 | 250 Brannan St | renovate (e) 3 story brick and timber bldg converting it to residential. demo (e) penthouse & replace with two (n) penthouses. two story parking garage to remain.Details
renovate (e) 3 story brick and timber bldg converting it to residential. demo (e) penthouse & replace with two (n) penthouses. two story parking garage to remain. | $12,000,000 | |
| Dec 26, 2001 | Completed final sign-off Jan 2002 | 250 Brannan St | chg of use only fr business service to office. no tenant improvement work under this permit.Details
chg of use only fr business service to office. no tenant improvement work under this permit. | ||
| Aug 10, 2001 | Expired or cancelled expired Mar 2005 | 250 Brannan St | Alight Electric | install conduit & devise for fire alarm (rev to 2001-03-15-4382)Details
install conduit & devise for fire alarm (rev to 2001-03-15-4382) | $2,400 |
| Jul 25, 2001 | Expired or cancelled expired Mar 2005 | 250 Brannan St | Mc Millan Electric | alteration bldgn, fire alarm system at 2nd & 3rd floor onlyDetails
alteration bldgn, fire alarm system at 2nd & 3rd floor only | $28,000 |
| Jul 9, 2001 | Expired or cancelled expired Mar 2005 | 250 Brannan St | Pribuss Engineering Inc | fire sprinkler t.i. office lite hazard. 2nd & 3rd floors.Details
fire sprinkler t.i. office lite hazard. 2nd & 3rd floors. | $22,500 |
| Jun 1, 2001 | Expired or cancelled expired Mar 2005 | 250 Brannan St | revi ap#200010112703/#200010112695/200010112712/200010112702/200010112697/200010112707/200110112698Details
revi ap#200010112703/#200010112695/200010112712/200010112702/200010112697/200010112707/200110112698 | ||
| Mar 15, 2001 | Expired or cancelled expired Mar 2005 | 250 Brannan St | Alight Electric | install fire alarm systemDetails
install fire alarm system | $60,000 |
| Mar 2, 2001 | Expired or cancelled expired Nov 2004 | 250 Brannan St | revise to appln #200005139925s install 2-hr rated exit enclosureDetails
revise to appln #200005139925s install 2-hr rated exit enclosure | $25,000 | |
| Jan 4, 2001 | Expired or cancelled cancelled Nov 2001 | 250 Brannan St | oti-1 1st floor, el, meDetails
oti-1 1st floor, el, me | ||
| Jan 4, 2001 | Expired or cancelled cancelled Feb 2003 | 250 Brannan St | oti-1 basement to 3rd floor el, meDetails
oti-1 basement to 3rd floor el, me | $100,000 | |
| Jan 4, 2001 | Expired or cancelled cancelled Nov 2001 | 250 Brannan St | oti-2 2nd flr,el meDetails
oti-2 2nd flr,el me | ||
| Jan 4, 2001 | Expired or cancelled cancelled Nov 2001 | 250 Brannan St | oti-2 basement lsDetails
oti-2 basement ls | ||
| Jan 4, 2001 | Never finaled filed Jan 2001, never issued | 250 Brannan St | oti-2 3rd floor el,meDetails
oti-2 3rd floor el,me | ||
| Oct 11, 2000 | Expired or cancelled expired Mar 2005 | 250 Brannan St | oti-1 1/f el & me onlyDetails
oti-1 1/f el & me only | $230,000 | |
| Oct 11, 2000 | Expired or cancelled expired Mar 2005 | 250 Brannan St | oti-1 basement me el ls spDetails
oti-1 basement me el ls sp | $600,000 | |
| Oct 11, 2000 | Expired or cancelled expired Mar 2005 | 250 Brannan St | oti-2 3/f el & meDetails
oti-2 3/f el & me | $626,000 | |
| Oct 11, 2000 | Expired or cancelled expired Mar 2005 | 250 Brannan St | oti-1 3/f el me ls spDetails
oti-1 3/f el me ls sp | $1,252,000 | |
| Oct 11, 2000 | Expired or cancelled expired Mar 2005 | 250 Brannan St | oti-1 2/f el me l/s sp.Details
oti-1 2/f el me l/s sp. | $1,252,000 | |
| Oct 11, 2000 | Expired or cancelled expired Mar 2005 | 250 Brannan St | oti-2 el meDetails
oti-2 el me | $300,000 | |
| Oct 11, 2000 | Expired or cancelled expired Mar 2005 | 250 Brannan St | oti-2 2nd floor el & meDetails
oti-2 2nd floor el & me | $626,000 | |
| Oct 11, 2000 | Expired or cancelled expired Mar 2005 | 250 Brannan St | oti-1 1/f el me ls spDetails
oti-1 1/f el me ls sp | $460,000 | |
| Sep 6, 2000 | Expired or cancelled expired Dec 2004 | 250 Brannan St | revise to app #200005139925s provide sprinklers per plansDetails
revise to app #200005139925s provide sprinklers per plans | ||
| Aug 26, 2000 | Expired or cancelled expired Dec 2000 | 250 Brannan St | street spaceDetails
street space | ||
| Aug 16, 2000 | Expired or cancelled expired Mar 2005 | 250 Brannan St | Scott Co Of California | add new fire sprinkler system w/ new fire pumpDetails
add new fire sprinkler system w/ new fire pump | $285,000 |
| May 13, 2000 | Completed final sign-off Dec 2001 | 250 Brannan St | seismic upgrade of umb new bldg lobby new bldg restrms new elevators hvac plantDetails
seismic upgrade of umb new bldg lobby new bldg restrms new elevators hvac plant | $2,500,000 | |
| Apr 3, 2000 | Expired or cancelled expired Aug 2000 | 230 Brannan St | sidewalk repairDetails
sidewalk repair | ||
| Apr 3, 2000 | Expired or cancelled cancelled Jan 2026 | 230 Brannan St | sidewalk repairDetails
sidewalk repair | ||
| Mar 7, 2000 | Expired or cancelled withdrawn May 2000 | 250 Brannan St | change of use renvoate shell & core area of (e)bldg demo performed in interior new handicapped accesDetails
change of use renvoate shell & core area of (e)bldg demo performed in interior new handicapped acces | $250,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Novo Construction Inc (14), Pyro-Comm Systems, Inc. (6), Anderson, Rowe & Buckley, Inc. (5), Hathaway Dinwiddie Co. (4), Principal Builders Inc. (4), R L H Fire Protection Inc (3), A-1 Sign Company Inc (2), Acco Engineered Systems Inc. Dba Acco En (2), Alight Electric (2), Ayoob & Peery Plumbing Co Inc (2), Bay Alarm Company (2), Bcci Construction Company (2), True North Signs & Graphic Services (2), Truebeck Construction (2), C B F Inc, Field Construction Inc., Mc Millan Electric, Pioneer Fire Inc., Pribuss Engineering Inc, Rhodes Network Services Inc, Sabah International Incorporated, Scott Co Of California, Shaughnessy Roofing Inc, Skyline Construction, Team Commercial Construction Inc.
- Architects
- Joelle Kristina Rosander (6), Melissa Pesci (5), Doug Zucker (2), Bloszies, Claudette Bleijenberg, Joseph Remling, Paul Bosman
- Engineers
- Sherry Chaumpluke (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.