Block 0167, lot 063
190 Pacific Ave
- City’s use
- Commercial Office
- Built
- 1986
- Stories
- 2
- Building
- 98,027 sq ft
- Lot
- 89,134 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
151 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 75 Broadway | Mcclure Electric Inc | 2/f: title 24 for lighting and electrical engineered drawings. ref arch pa# 202607134920.Details
2/f: title 24 for lighting and electrical engineered drawings. ref arch pa# 202607134920. | $850,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 75 Broadway | Marchetti Group | 2nd fl/ ste# 201: t.i. included building new non-structural partitions, ceiling, lights, & millwork, all new or revised meps & life safety work will be design-build & submitted separately (bldg fully sprinklered)Details
2nd fl/ ste# 201: t.i. included building new non-structural partitions, ceiling, lights, & millwork, all new or revised meps & life safety work will be design-build & submitted separately (bldg fully sprinklered) | $1,400,000 |
| Feb 9, 2026 | Completed final sign-off Mar 2026 | 75 Broadway | Golden Gate Fire Protection Inc | 2flr: fire sprinkler t.i.; relocate 28 concealed pendants on the 2nd flr. ref t.i.#: 202512302986.Details
2flr: fire sprinkler t.i.; relocate 28 concealed pendants on the 2nd flr. ref t.i.#: 202512302986. | $7,000 |
| Jan 22, 2026 | Completed final sign-off May 2026 | 75 Broadway | Marchetti Group | ste 206-ref 202512302986- rework low side air distribution and air balance area of work.Details
ste 206-ref 202512302986- rework low side air distribution and air balance area of work. | $175,000 |
| Dec 30, 2025 | Completed final sign-off May 2026 | 75 Broadway | Marchetti Group | 2nd fl suite 206: office tenant improvement. new non structural partitions, ceilings, lights & millwork. new or revised hvac, plumbing, electrical & life safety work to be design build & permitted separately. electrical t-24 added to this permit.Details
2nd fl suite 206: office tenant improvement. new non structural partitions, ceilings, lights & millwork. new or revised hvac, plumbing, electrical & life safety work to be design build & permitted separately. electrical t-24 added to this permit. | $490,000 |
| Dec 23, 2025 | Completed final sign-off May 2026 | 75 Broadway | Marchetti Group | deferred me scope, ref bpa#202502261108. mechanical hvac ti includes remove (4) existing sidewall suuply griles. install (2) new t-bar supply diffusers. install(1) 16x12 transfer duct for return, provide air balance report. electrical scope to include(n) power & signal devices throughout the space.Details
deferred me scope, ref bpa#202502261108. mechanical hvac ti includes remove (4) existing sidewall suuply griles. install (2) new t-bar supply diffusers. install(1) 16x12 transfer duct for return, provide air balance report. electrical scope to include(n) power & signal devices throughout the space. | $75,000 |
| Apr 10, 2025 | Completed final sign-off May 2025 | 75 Broadway | Pioneer Fire Inc. | 1st fl ref: 2025-0226-1108 relocate (2) pendents, (2) uprights, add (2) uprightsDetails
1st fl ref: 2025-0226-1108 relocate (2) pendents, (2) uprights, add (2) uprights | $1,500 |
| Mar 27, 2025 | Completed final sign-off Jul 2025 | 75 Broadway | Siemens Industry, Inc. | 1st fl - fire only work for the clubhouse remodel on floor 1 done under pa 202502261108. additions are 1 power supply, 1 module, 2 speaker/strobes, and 2 strobesDetails
1st fl - fire only work for the clubhouse remodel on floor 1 done under pa 202502261108. additions are 1 power supply, 1 module, 2 speaker/strobes, and 2 strobes | $9,945 |
| Feb 26, 2025 | Completed final sign-off May 2026 | 75 Broadway | Marchetti Group | 1st flr: commercial interior improvment. partial non-strucutural demo, new conference room with non-structural partitions, doors/frames, lighting, interior finishes or new millwork.Details
1st flr: commercial interior improvment. partial non-strucutural demo, new conference room with non-structural partitions, doors/frames, lighting, interior finishes or new millwork. | $165,000 |
| Oct 8, 2024 | In progress filed Oct 2024, not yet issued | 75 Broadway | g/f commercial t.i.:partial non-structural demo of (e) ramp to be replacement. new shower room amenity with new non-structural partiions, 1 plumbing lighting and interior finishes. mep, fire l/s & f/s work to be design building & filed sep. bldg is already fully sprinkled.Details
g/f commercial t.i.:partial non-structural demo of (e) ramp to be replacement. new shower room amenity with new non-structural partiions, 1 plumbing lighting and interior finishes. mep, fire l/s & f/s work to be design building & filed sep. bldg is already fully sprinkled. | $130,595 | |
| May 21, 2024 | Completed final sign-off Sep 2024 | 75 Broadway | Marchetti Group | 2nd fl: 206: tenant improvement include the demo of non- structural partitions, building is fully sprinklered per ab-017 tenant suite 206: is to remain vacant and disable review/ compliance to be deferred. sprinkler permit app # 2024-0517-2331.Details
2nd fl: 206: tenant improvement include the demo of non- structural partitions, building is fully sprinklered per ab-017 tenant suite 206: is to remain vacant and disable review/ compliance to be deferred. sprinkler permit app # 2024-0517-2331. | $15,000 |
| May 17, 2024 | Completed final sign-off Jul 2024 | 75 Broadway | Pioneer Fire Inc. | convert (78) pendents to uprights, remove (58) pendentsDetails
convert (78) pendents to uprights, remove (58) pendents | $17,500 |
| Jul 19, 2023 | Completed final sign-off Jun 2024 | 75 Broadway | Siemens Industry, Inc. | 1st fl: fire only work for the voluntary replacement of the fire alarm panel motherboard and associated modules within it. the work includes the replacement of the engineer's office annunciator for compatibility and the cellular dialer. there is no record plan or ul certficate for the existing systeDetails
1st fl: fire only work for the voluntary replacement of the fire alarm panel motherboard and associated modules within it. the work includes the replacement of the engineer's office annunciator for compatibility and the cellular dialer. there is no record plan or ul certficate for the existing syste | $12,915 |
| Aug 26, 2022 | Completed final sign-off Sep 2022 | 75 Broadway | Bilcor Inc | install (12) ceiling mount speaker strobes, install (1) control relay module.Details
install (12) ceiling mount speaker strobes, install (1) control relay module. | $8,580 |
| Jul 7, 2022 | Completed final sign-off Oct 2022 | 75 Broadway | Field Construction Inc. | ste 140: mechanical, electrical, plumbing portion of ti reference 202206065683Details
ste 140: mechanical, electrical, plumbing portion of ti reference 202206065683 | |
| Jul 6, 2022 | Completed final sign-off Aug 2022 | 75 Broadway | Golden Gate Fire Protection Inc | fire sprinklers, relocate 12 pendents, 2 uprights and 7 concealed pendent heads in suite 140. ref pa 202206065683Details
fire sprinklers, relocate 12 pendents, 2 uprights and 7 concealed pendent heads in suite 140. ref pa 202206065683 | $11,550 |
| Jun 6, 2022 | Completed final sign-off Oct 2022 | 75 Broadway | Field Construction Inc. | suite# 140. selective demo of non-load bearing partitions, plumbing & lighting. new ada compliant single use shower room. restrooms, plumbing fixtures accessories, finighes. to comply with cbc guidelines. moveable furniture partitions, new 2 x 2 grid ceiling & led lighting throughout. * meher: n/a *Details
suite# 140. selective demo of non-load bearing partitions, plumbing & lighting. new ada compliant single use shower room. restrooms, plumbing fixtures accessories, finighes. to comply with cbc guidelines. moveable furniture partitions, new 2 x 2 grid ceiling & led lighting throughout. * meher: n/a * | $305,130 |
| Apr 22, 2022 | Completed final sign-off Jun 2022 | 75 Broadway | Golden Gate Fire Protection Inc | 1st fl ste 140: : fire sprinkler - relocate 2 pendent sprinklers & relocate 12 uprights.Details
1st fl ste 140: : fire sprinkler - relocate 2 pendent sprinklers & relocate 12 uprights. | $7,350 |
| Mar 7, 2022 | Completed final sign-off Mar 2022 | 160 Pacific Av | Siemens Industry, Inc. | 2/f: fire only work for the removal of a relay module on the "allstate" remodel. initial fire alarm permit 202112174603.Details
2/f: fire only work for the removal of a relay module on the "allstate" remodel. initial fire alarm permit 202112174603. | |
| Dec 17, 2021 | Completed final sign-off Mar 2022 | 160 Pacific Av | Siemens Industry, Inc. | fire only work for the "all state" remodel on floor 2; additions are 1 speaker/strobe, 2 strobes, and 1 module ref permit 2021-1028-1355Details
fire only work for the "all state" remodel on floor 2; additions are 1 speaker/strobe, 2 strobes, and 1 module ref permit 2021-1028-1355 | $2,235 |
| Dec 14, 2021 | Completed final sign-off Jan 2022 | 160 Pacific Av | Pribuss Engineering Inc | modify sprinkler head location to accomodate new ceiling and partition layout for new office space on the 2nd fl. 1 sprinkler head added, 1 sprinkler relocated. ref 202110281355.Details
modify sprinkler head location to accomodate new ceiling and partition layout for new office space on the 2nd fl. 1 sprinkler head added, 1 sprinkler relocated. ref 202110281355. | $1,028 |
| Oct 28, 2021 | Completed final sign-off Mar 2022 | 160 Pacific Av | Field Construction Inc. | interior build out and construction of (e) t.i space as shown.Details
interior build out and construction of (e) t.i space as shown. | $149,900 |
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 75 Broadway | Alpha Architectural Signs & Lighting | replace, paint, re-brand & re-install 4 existing building id signs in same location. 17" x 17"Details
replace, paint, re-brand & re-install 4 existing building id signs in same location. 17" x 17" | $3,200 |
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 75 Broadway | Alpha Architectural Signs & Lighting | replace, paint, re-brand & re-install 4 existing map signs in same location. 17" x 17"Details
replace, paint, re-brand & re-install 4 existing map signs in same location. 17" x 17" | $3,200 |
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 75 Broadway | Alpha Architectural Signs & Lighting | replace, paint, re-brand & re-install 4 existing street signs in same location. 25" x 25"Details
replace, paint, re-brand & re-install 4 existing street signs in same location. 25" x 25" | $3,200 |
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 75 Broadway | Alpha Architectural Signs & Lighting | replace, paint, re-brand & re-install 7 existing tenant signs in same location. 25" x 25"Details
replace, paint, re-brand & re-install 7 existing tenant signs in same location. 25" x 25" | $5,600 |
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 75 Broadway | Alpha Architectural Signs & Lighting | replace, paint, re-brand & re-install 2 directory signs in same location. 50" x 19"Details
replace, paint, re-brand & re-install 2 directory signs in same location. 50" x 19" | $1,600 |
| Jul 16, 2020 | Completed final sign-off Jan 2021 | 160 Pacific Av | Arrow Sign Company | install 1 set of led halo lit aluminium tubing in stairwell as an art installation.Details
install 1 set of led halo lit aluminium tubing in stairwell as an art installation. | $3,250 |
| Jul 16, 2020 | Completed final sign-off Dec 2020 | 75 Broadway | Arrow Sign Company | install 1 set of led halo lit aluminium tubing in stairwell as an art installation.Details
install 1 set of led halo lit aluminium tubing in stairwell as an art installation. | $3,250 |
| Jan 17, 2020 | Completed final sign-off Oct 2020 | 150 Pacific Av | Field Construction Inc. | modify (e) hvac system dict work and reuse (e) heat pumps for new layout, new power for clubhouse & conference room, new lighting and controlsDetails
modify (e) hvac system dict work and reuse (e) heat pumps for new layout, new power for clubhouse & conference room, new lighting and controls | $150,000 |
| Nov 19, 2019 | Completed final sign-off Feb 2020 | 150 Pacific Av | Pioneer Fire Inc. | 150 pacific ave aka 170 pacific ave: relocate (4) pendents. ref t.i. pa201911137121. maher n/a.Details
150 pacific ave aka 170 pacific ave: relocate (4) pendents. ref t.i. pa201911137121. maher n/a. | $7,300 |
| Nov 13, 2019 | Completed final sign-off Oct 2020 | 150 Pacific Av | Field Construction Inc. | interior t.i. on a single floor, work includes demo of (e) partitons, act ceiling installation of new partitons per plans,lighting, finishes, electricalDetails
interior t.i. on a single floor, work includes demo of (e) partitons, act ceiling installation of new partitons per plans,lighting, finishes, electrical | $250,000 |
| Oct 2, 2019 | Completed final sign-off Mar 2020 | 75 Broadway | Red Hawk Fire & Security Ca Llc | as builts for pa 2019-0805-7833Details
as builts for pa 2019-0805-7833 | |
| Aug 5, 2019 | Completed final sign-off Oct 2019 | 75 Broadway | Red Hawk Fire & Security Ca Llc | 1st fl - add 4 horn/strobe ref pa 2019-0530-1982Details
1st fl - add 4 horn/strobe ref pa 2019-0530-1982 | $6,000 |
| Jul 9, 2019 | Expired or cancelled expired Nov 2019 | 75 Broadway | Field Construction Inc. | suite 2002. mechanical and electrical in spec suite build-out in 2,925 sq ft of total floor space. maher n/a.Details
suite 2002. mechanical and electrical in spec suite build-out in 2,925 sq ft of total floor space. maher n/a. | $60,000 |
| May 30, 2019 | Completed final sign-off Nov 2019 | 75 Broadway | Field Construction Inc. | spec suite build out on 3583 sq ft of total floor area. new wall, power, lighting, and finishes. ste 3016Details
spec suite build out on 3583 sq ft of total floor area. new wall, power, lighting, and finishes. ste 3016 | $225,000 |
| Feb 22, 2019 | Never finaled issued Feb 2019, no final | 190 Pacific Av | street spaceDetails
street space | ||
| Jul 18, 2018 | Completed final sign-off Oct 2018 | 75 Broadway | Marchetti Group | 2/f: extent of mechanical work, modify (e) hvac to modification architectural layout, add (1) heat pump with controler. add of exhaust fan with controls and air balance. no detector required for new equipmentDetails
2/f: extent of mechanical work, modify (e) hvac to modification architectural layout, add (1) heat pump with controler. add of exhaust fan with controls and air balance. no detector required for new equipment | $1,000 |
| Jul 13, 2018 | Completed final sign-off Jul 2018 | 75 Broadway | Siemens Industry, Inc. | fire alarm work for the "atomic fiction" remodel on fl 2; additions are 10 speaker/strobes. ref#201804206910. n/a for maher.Details
fire alarm work for the "atomic fiction" remodel on fl 2; additions are 10 speaker/strobes. ref#201804206910. n/a for maher. | $6,350 |
| Jun 25, 2018 | Never finaled issued Jun 2018, no final | 75 Broadway | street space w/mtaDetails
street space w/mta | ||
| May 15, 2018 | Completed final sign-off Aug 2018 | 75 Broadway | Pioneer Fire Inc. | rleocate (13) concealers, add (1) upright. ref ti #201804206910. maher naDetails
rleocate (13) concealers, add (1) upright. ref ti #201804206910. maher na | $7,850 |
| Apr 20, 2018 | Completed final sign-off Oct 2018 | 75 Broadway | Marchetti Group | commercial t.i. on a single floor. work includes new partitions, doors and frames, ceiling, lighting, finishes, casework, electrical and mechanical. no structural work required. n/a for maherDetails
commercial t.i. on a single floor. work includes new partitions, doors and frames, ceiling, lighting, finishes, casework, electrical and mechanical. no structural work required. n/a for maher | $727,620 |
| Apr 17, 2018 | Never finaled issued Apr 2018, no final | 75 Broadway | street space w/mtaDetails
street space w/mta | ||
| Jan 30, 2018 | Completed final sign-off Mar 2018 | 75 Broadway | Golden Gate Fire Protection Inc | fire sprinkler only: relocate 15 pendents, pliug off 6 outlets for cbf at 1st floor. n/a for maher ref 201801128566Details
fire sprinkler only: relocate 15 pendents, pliug off 6 outlets for cbf at 1st floor. n/a for maher ref 201801128566 | $3,750 |
| Jan 12, 2018 | Completed final sign-off Oct 2018 | 75 Broadway | Peacock Construction | commercial ti - including new offices, electrical & finishes - no structrual work maher naDetails
commercial ti - including new offices, electrical & finishes - no structrual work maher na | $123,000 |
| Jun 26, 2017 | Completed final sign-off Jul 2017 | 75 Broadway | Siemens Industry, Inc. | fire alarm work for the "suite 2001" remodel on floor2; additions are 6 speaker/strobes and 2 speakers. ref pa 2017-0531-8040Details
fire alarm work for the "suite 2001" remodel on floor2; additions are 6 speaker/strobes and 2 speakers. ref pa 2017-0531-8040 | $4,080 |
| Jun 23, 2017 | Completed final sign-off Oct 2017 | 160 Pacific Av | Siemens Industry, Inc. | fire alarm work for the "suite 3008" remodel on floor 1; additions are 5 speaker/strobes. ref pa 2017-0310-1189. maher naDetails
fire alarm work for the "suite 3008" remodel on floor 1; additions are 5 speaker/strobes. ref pa 2017-0310-1189. maher na | $2,550 |
| Jun 21, 2017 | Completed final sign-off Oct 2017 | 160 Pacific Av | C B F Inc | suite #3008: provide new lighting & branch circuits to existing panel. maintained some of the existing power and signal outlets and provide additional new power branch circuiting and raceway systems as required to new power and signal outlets. provide t-24 compliance forms. ref. arch #201703101189.Details
suite #3008: provide new lighting & branch circuits to existing panel. maintained some of the existing power and signal outlets and provide additional new power branch circuiting and raceway systems as required to new power and signal outlets. provide t-24 compliance forms. ref. arch #201703101189. | $45,000 |
| Jun 16, 2017 | Completed final sign-off Jul 2017 | 75 Broadway | R L H Fire Protection Inc | fire sprinkler permit relocate 3 pendent sprinklers at 2nd fl ref 201705318040Details
fire sprinkler permit relocate 3 pendent sprinklers at 2nd fl ref 201705318040 | $1,000 |
| Jun 1, 2017 | Completed final sign-off Jul 2017 | 160 Pacific Av | Walschon Fire Protection Inc | suite 3008 - demo (e) branch lines & (e) sr uprights due to new wall & ceiling layout. install (n) branch lines & (n) qr upright & pendent sprinklers due to new wall & ceiling layout. ref pa #201703101189.Details
suite 3008 - demo (e) branch lines & (e) sr uprights due to new wall & ceiling layout. install (n) branch lines & (n) qr upright & pendent sprinklers due to new wall & ceiling layout. ref pa #201703101189. | $2,500 |
| May 31, 2017 | Completed final sign-off Jul 2017 | 75 Broadway | Rudolph Commercial Interiors Inc, Rci | commercial tenant improvement on a single floor. new partitons, door, frames, finishes, casework, relocation of light fixtures, electrical and mech. no structuralDetails
commercial tenant improvement on a single floor. new partitons, door, frames, finishes, casework, relocation of light fixtures, electrical and mech. no structural | $100,000 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 75 Broadway | Alpha Architectural Signs & Lighting | 2 non illuminated signs dbl faced, projecting.Details
2 non illuminated signs dbl faced, projecting. | $1,500 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 75 Broadway | Alpha Architectural Signs & Lighting | 4 non illuminated projecting signs.Details
4 non illuminated projecting signs. | $3,000 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 75 Broadway | Alpha Architectural Signs & Lighting | 4 non illuminated signs, wall mount.Details
4 non illuminated signs, wall mount. | $2,000 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 75 Broadway | Alpha Architectural Signs & Lighting | 5 non illuminated signs, projecting, double faced.Details
5 non illuminated signs, projecting, double faced. | $3,750 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 75 Broadway | Alpha Architectural Signs & Lighting | 2 non illuminated signs single faced, wall mounted.Details
2 non illuminated signs single faced, wall mounted. | $1,000 |
| Mar 10, 2017 | Completed final sign-off Oct 2017 | 160 Pacific Av | City Building Inc. | 1st flr suite 3008: commerical ti for office space about 1900 sq ft - new partitions, finishes, casework, electrical & plumbing. 1 hr corridor with 20 min door. mech/elec, fire under separate permit. maher naDetails
1st flr suite 3008: commerical ti for office space about 1900 sq ft - new partitions, finishes, casework, electrical & plumbing. 1 hr corridor with 20 min door. mech/elec, fire under separate permit. maher na | $260,250 |
| Jan 23, 2017 | Never finaled issued Jan 2017, no final | 75 Broadway | Marchetti Group | title 24 only. ref app#2016-1117-2969. n/a for maherDetails
title 24 only. ref app#2016-1117-2969. n/a for maher | |
| Dec 5, 2016 | Expired or cancelled cancelled Jan 2026 | 160 Pacific Av | City Building Inc. | add shower area in gr fl parking garage bldg 3. work includes new walls, doors, frame. finishes, plumbing, elec. no structural workDetails
add shower area in gr fl parking garage bldg 3. work includes new walls, doors, frame. finishes, plumbing, elec. no structural work | $175,000 |
| Nov 17, 2016 | Completed final sign-off Feb 2017 | 75 Broadway | Marchetti Group | ground floor, suite 3004: commercial ti on a single floor. work includes new glass partitions a door and frame, lighting finishes and ele maher naDetails
ground floor, suite 3004: commercial ti on a single floor. work includes new glass partitions a door and frame, lighting finishes and ele maher na | $175,000 |
| Aug 31, 2016 | Completed final sign-off Sep 2016 | 75 Broadway | City Building Inc. | 1st floor: revision to ref pa 201606099520 expansion at break room areaDetails
1st floor: revision to ref pa 201606099520 expansion at break room area | $15,000 |
| Aug 30, 2016 | Completed final sign-off Sep 2016 | 160 Pacific Av | C B F Inc | provided new lighting & branch circuiting to existing panel. maintained some of the (e) power and signal outlets and provided additional new power branch circuiting and raceway systems as req to new power and signal outlets; provided title 24 compliance forms. ref pa 2016-0609-9520Details
provided new lighting & branch circuiting to existing panel. maintained some of the (e) power and signal outlets and provided additional new power branch circuiting and raceway systems as req to new power and signal outlets; provided title 24 compliance forms. ref pa 2016-0609-9520 | $40,000 |
| Aug 29, 2016 | Completed final sign-off Oct 2016 | 150 Pacific Av | Ayoob & Peery Plumbing Co Inc | suite 2003, relocate 19 fire sprinklers and plug 11 outlets to conform with new wall ceiling layout. reference 2016.0610.9650Details
suite 2003, relocate 19 fire sprinklers and plug 11 outlets to conform with new wall ceiling layout. reference 2016.0610.9650 | $3,861 |
| Aug 12, 2016 | Completed final sign-off Sep 2016 | 160 Pacific Av | City Building Inc. | revision to pa 2016-0609-9520 - addition of structural detail for a suspended soffit. maher naDetails
revision to pa 2016-0609-9520 - addition of structural detail for a suspended soffit. maher na | $1,000 |
| Jun 9, 2016 | Completed final sign-off Sep 2016 | 160 Pacific Av | City Building Inc. | suite #3015 - commercial tenant improvement work includes new partitions, finishes, casework, electrical & plumbing. this is not a medicla office space. n/a maher ordinanceDetails
suite #3015 - commercial tenant improvement work includes new partitions, finishes, casework, electrical & plumbing. this is not a medicla office space. n/a maher ordinance | $300,000 |
| Nov 12, 2015 | Never finaled issued Nov 2015, no final | 75 Broadway | street space permitDetails
street space permit | ||
| Nov 4, 2015 | Never finaled issued Mar 2016, no final | 75 Broadway | Marchetti Group | demolition of extg vinyl paneled soffit and framing to exterior "colonnades" provision of new exterior gyp board soffit with integral l.e.d. lighting and replacement l.e.d. column lighting intergrated space heaters. n/a for maher.Details
demolition of extg vinyl paneled soffit and framing to exterior "colonnades" provision of new exterior gyp board soffit with integral l.e.d. lighting and replacement l.e.d. column lighting intergrated space heaters. n/a for maher. | $112,000 |
| Aug 10, 2015 | Completed final sign-off Oct 2015 | 160 Pacific Av | Novo Construction Inc | revision to pa 2014 0611 8090: (e) breakroom to remain the same. remove (e) suite entry door construction of non load bearing partitions, door & finishes/ maher naDetails
revision to pa 2014 0611 8090: (e) breakroom to remain the same. remove (e) suite entry door construction of non load bearing partitions, door & finishes/ maher na | |
| May 20, 2015 | Completed final sign-off Jun 2015 | 160 Pacific Av | Peacock Construction | 1st floor: title 24 electrical for work done under appl. #2014.1010.8595. maher n/a.Details
1st floor: title 24 electrical for work done under appl. #2014.1010.8595. maher n/a. | $12,700 |
| Jan 16, 2015 | Completed final sign-off Feb 2015 | 160 Pacific Av | Matrix Hg Inc | as built for 201409116093, new locations for dsds. indentification of parking garage, closed, location of fsd for bathroom exhaust, identificaion of existing heat pumps. maher not reqDetails
as built for 201409116093, new locations for dsds. indentification of parking garage, closed, location of fsd for bathroom exhaust, identificaion of existing heat pumps. maher not req | |
| Dec 17, 2014 | Never finaled issued Dec 2014, no final | 160 Pacific Av | Novo Construction Inc | revision to pa#2014-06-11-8090 to request equivalent facilitation addition to two single occupant accessible restrooms.Details
revision to pa#2014-06-11-8090 to request equivalent facilitation addition to two single occupant accessible restrooms. | $50,000 |
| Dec 5, 2014 | Completed final sign-off Feb 2015 | 160 Pacific Av | Siemens Industry, Inc. | 2nd floor: fire alarm work for esurance t.i. additions are 1 smoke detector, 4 duct detectors, 5 modules, 2 strobe power supplies, 15 speakers, 48 speaker/strobes, and 6 strobes. ref app#201406118090. mechanical 2014.0911.6093 n/a for the maher.Details
2nd floor: fire alarm work for esurance t.i. additions are 1 smoke detector, 4 duct detectors, 5 modules, 2 strobe power supplies, 15 speakers, 48 speaker/strobes, and 6 strobes. ref app#201406118090. mechanical 2014.0911.6093 n/a for the maher. | $41,500 |
| Oct 21, 2014 | Completed final sign-off Oct 2015 | 160 Pacific Av | Pioneer Fire Inc. | 2nd flr: relocate 57 pendants/ ti 201406118090; maher n/aDetails
2nd flr: relocate 57 pendants/ ti 201406118090; maher n/a | $29,965 |
| Oct 10, 2014 | Completed final sign-off Jun 2015 | 160 Pacific Av | Peacock Construction | bldg 3, 1st flr: tenant improvements, new lighting, new elec/tele/data, new finishes; maher n/a.Details
bldg 3, 1st flr: tenant improvements, new lighting, new elec/tele/data, new finishes; maher n/a. | $35,000 |
| Sep 11, 2014 | Completed final sign-off Feb 2015 | 160 Pacific Av | Matrix Hg Inc | new ductwork, air outlets, thermostats for tenant improvement. reuse existing heat pumps. provide new supplemental cooling units. new fsd and 16 new dsd's. ref #201406118090. compliance with ord 155-13 not requiredDetails
new ductwork, air outlets, thermostats for tenant improvement. reuse existing heat pumps. provide new supplemental cooling units. new fsd and 16 new dsd's. ref #201406118090. compliance with ord 155-13 not required | $250,000 |
| Jul 16, 2014 | Never finaled issued Jul 2014, no final | 75 Broadway | Peacock Construction | replace existing sump pumps with new sump pumps. n/a ordinance #155-13Details
replace existing sump pumps with new sump pumps. n/a ordinance #155-13 | $82,500 |
| Jun 27, 2014 | Completed final sign-off Sep 2014 | 75 Broadway | Peacock Construction | demo only under ab-017, selective demo of non-structural, non-rated partitions. n/a ordinance #155-13Details
demo only under ab-017, selective demo of non-structural, non-rated partitions. n/a ordinance #155-13 | $16,000 |
| Jun 11, 2014 | Never finaled issued Jul 2014, no final | 160 Pacific Av | Novo Construction Inc | t.i. on 2nd floor. work include construcito of non-load bearing partitions, doors and finishes. mep under separate permit. maher n/a.Details
t.i. on 2nd floor. work include construcito of non-load bearing partitions, doors and finishes. mep under separate permit. maher n/a. | $650,000 |
| Mar 18, 2014 | Completed final sign-off Mar 2015 | 75 Broadway | All American Waterproof Inc. | suite 202 - rain water leaking into the bldg near th ecorner of the 2nd floor window. repair/remove brick veneer to expose crack in concrete panel & seal crack & replace brick veneer. compliance with ordinance #155-13 not required.Details
suite 202 - rain water leaking into the bldg near th ecorner of the 2nd floor window. repair/remove brick veneer to expose crack in concrete panel & seal crack & replace brick veneer. compliance with ordinance #155-13 not required. | $5,000 |
| Jan 6, 2014 | Completed final sign-off Jan 2014 | 160 Pacific Av | Siemens Industry, Inc. | addition of 4 speaker/strobes for the esurance remodel on floor 2. all new devices connect onto fire alarm systemDetails
addition of 4 speaker/strobes for the esurance remodel on floor 2. all new devices connect onto fire alarm system | $2,000 |
| Dec 11, 2013 | Never finaled issued Dec 2013, no final | 160 Pacific Av | Novo Construction Inc | bldg c- demolition and construction of interior non-load bearing partition, doors and finsihes. mep, life safety and fire sprinkler under seperate permit.Details
bldg c- demolition and construction of interior non-load bearing partition, doors and finsihes. mep, life safety and fire sprinkler under seperate permit. | $12,000 |
| Aug 9, 2013 | Never finaled issued Aug 2013, no final | 75 Broadway | street space permitDetails
street space permit | ||
| Mar 20, 2013 | Completed final sign-off Jun 2013 | 160 Pacific Av | 2nd floor: t.i. include bldg new non structural partition and new break room millwork. all new or revised hvac, electrical, plumbing, & life safety work will be designed build & submitted seperately. bldg fully sprinklered.Details
2nd floor: t.i. include bldg new non structural partition and new break room millwork. all new or revised hvac, electrical, plumbing, & life safety work will be designed build & submitted seperately. bldg fully sprinklered. | $45,328 | |
| Feb 14, 2013 | Completed final sign-off Mar 2013 | 75 Broadway | Siemens Industry, Inc. | 2nd floor:addition of 3 smoke detectors and 2 speaker/strobes, per the direction of the sffd inpector, for the regus remodel on floor 2. these drawings reflect the as built conditions of the new devices. ref app#201210182399Details
2nd floor:addition of 3 smoke detectors and 2 speaker/strobes, per the direction of the sffd inpector, for the regus remodel on floor 2. these drawings reflect the as built conditions of the new devices. ref app#201210182399 | $2,500 |
| Feb 12, 2013 | Never finaled issued Feb 2013, no final | 75 Broadway | Siemens Industry, Inc. | 2nd floor:addition of 5 speakers and 2 speaker/strobe for the goldman fund remodel on floor 2. all devices connect onto the fire alarm system. ref app#201210011023Details
2nd floor:addition of 5 speakers and 2 speaker/strobe for the goldman fund remodel on floor 2. all devices connect onto the fire alarm system. ref app#201210011023 | $3,500 |
| Feb 12, 2013 | Completed final sign-off Feb 2013 | 160 Pacific Av | Golden Gate Fire Protection Inc | fire sprinkler system upgrade; relocate 8 pendent sprinkler on the 2nd floors.Details
fire sprinkler system upgrade; relocate 8 pendent sprinkler on the 2nd floors. | $4,120 |
| Jan 15, 2013 | Never finaled issued Jan 2013, no final | 160 Pacific Av | Peacock Construction Inc | mechanical only for app#201212115906Details
mechanical only for app#201212115906 | $1,500 |
| Dec 11, 2012 | Completed final sign-off Mar 2013 | 160 Pacific Av | Peacock Construction Inc | 16th floor. t.i includes building new 2 door set of doors. revised electrical and life safety work will be design build and submitted for permit separately. bldg is fully sprinkled.Details
16th floor. t.i includes building new 2 door set of doors. revised electrical and life safety work will be design build and submitted for permit separately. bldg is fully sprinkled. | $124,380 |
| Nov 29, 2012 | Completed final sign-off Jan 2013 | 75 Broadway | Golden Gate Fire Protection Inc | 2nd floor-fire sprinkler system upgrade, relocate 102 pendent sprinkler heads, upgrade branchline restraints. ti pa# 2012-1001-1022Details
2nd floor-fire sprinkler system upgrade, relocate 102 pendent sprinkler heads, upgrade branchline restraints. ti pa# 2012-1001-1022 | $52,530 |
| Oct 18, 2012 | Completed final sign-off Mar 2013 | 75 Broadway | Siemens Industry, Inc. | addition of 8 speaker, 23 speaker/strobes, and 1 strobe for the "regus" remodel on floor 2. all devices connect onto the fire alarm system. t.i ref pa# 201210011023.Details
addition of 8 speaker, 23 speaker/strobes, and 1 strobe for the "regus" remodel on floor 2. all devices connect onto the fire alarm system. t.i ref pa# 201210011023. | $15,000 |
| Oct 1, 2012 | Completed final sign-off Apr 2013 | 75 Broadway | Peacock Construction Inc | 2nd floor-demolition of non structural partitions, non complaint restrooms, build back complaint restrooms to meet ada restrooms to meet ada. mechanical, electrical, life safety & sprinklers under seperate permitDetails
2nd floor-demolition of non structural partitions, non complaint restrooms, build back complaint restrooms to meet ada restrooms to meet ada. mechanical, electrical, life safety & sprinklers under seperate permit | $93,000 |
| Oct 1, 2012 | Completed final sign-off Mar 2013 | 75 Broadway | Peacock Construction Inc | suite 202, 2nd floor-demolition of non structural partitions, non complaint restrooms, build back complaint restrooms to meet ada restrooms to meet ada. mechanical, electrical, life safety & sprinklers under seperate permitDetails
suite 202, 2nd floor-demolition of non structural partitions, non complaint restrooms, build back complaint restrooms to meet ada restrooms to meet ada. mechanical, electrical, life safety & sprinklers under seperate permit | $750,000 |
| Nov 14, 2011 | Completed final sign-off Dec 2011 | 75 Broadway | Peacock Construction Inc | revision to appl #201012156760 - barrier removal - path of travel to parking, upgrade (e) mid-block curb cuts to comply w/accessiblity code.Details
revision to appl #201012156760 - barrier removal - path of travel to parking, upgrade (e) mid-block curb cuts to comply w/accessiblity code. | $60,000 |
| Oct 5, 2011 | Never finaled issued Oct 2011, no final | 75 Broadway | Novo Construction Inc | 1st floor-t.i. include demolishing of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build, if determined necessary & submitted for permit seperatelyDetails
1st floor-t.i. include demolishing of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing, life safety work will be design build, if determined necessary & submitted for permit seperately | $25,000 |
| May 18, 2011 | Expired or cancelled cancelled Jan 2026 | 75 Broadway | 1st floor-revision to pa# 2010-1215-6760-inspector reviewed in the field the d.a. parking. the parking we had is not acceptable, directly outside is a compliant d.a parking. documenting for permit only, no work being doneDetails
1st floor-revision to pa# 2010-1215-6760-inspector reviewed in the field the d.a. parking. the parking we had is not acceptable, directly outside is a compliant d.a parking. documenting for permit only, no work being done | ||
| May 9, 2011 | Completed final sign-off May 2011 | 75 Broadway | Peacock Construction Inc | g/f- rev. pa#201105045355, change wording on application form: removal of power door opener, move door to center of opening to removal of power door opener, remove latch, add push-pull hardware.Details
g/f- rev. pa#201105045355, change wording on application form: removal of power door opener, move door to center of opening to removal of power door opener, remove latch, add push-pull hardware. | |
| May 9, 2011 | Completed final sign-off May 2011 | 75 Broadway | Peacock Construction Inc | 2/f- rev. pa#201105045357, change wording on application form: removal of power door openers, move door to center opening to removal of power door openers, remove latch, install push-pull hardware.Details
2/f- rev. pa#201105045357, change wording on application form: removal of power door openers, move door to center opening to removal of power door openers, remove latch, install push-pull hardware. | |
| May 4, 2011 | Completed final sign-off May 2011 | 75 Broadway | Peacock Construction Inc | revision #2 to p.a.#201012207019, 201101279103. removal of power door opener, move door to center of opening.Details
revision #2 to p.a.#201012207019, 201101279103. removal of power door opener, move door to center of opening. | |
| May 4, 2011 | Completed final sign-off May 2011 | 75 Broadway | Peacock Construction Inc | revision to p.a.#201101067968, #201101279110. removal of power door opener, move door to center of opening.Details
revision to p.a.#201101067968, #201101279110. removal of power door opener, move door to center of opening. | |
| Apr 29, 2011 | Completed final sign-off Oct 2018 | 75 Broadway | Peacock Construction Inc | mech and electrical work for work under pa# 2011.04.07.3656Details
mech and electrical work for work under pa# 2011.04.07.3656 | $53,000 |
| Apr 28, 2011 | Completed final sign-off Jun 2011 | 75 Broadway | Anderson, Rowe & Buckley, Inc. | tenant improvements in office on 1st floor :extg fire sprinkler system. 73 relocated penedent sprinklers and 3 pendent removed due to removal of lowered ceiling. all sprinklers and pipe will be exposed in the open office space.Details
tenant improvements in office on 1st floor :extg fire sprinkler system. 73 relocated penedent sprinklers and 3 pendent removed due to removal of lowered ceiling. all sprinklers and pipe will be exposed in the open office space. | $36,500 |
| Apr 7, 2011 | Completed final sign-off Jun 2011 | 75 Broadway | Peacock Construction Inc | ground floor - demo of extg cieling grid, selected non structural partitions and flooring construct new non structural paertitions, new cieling in selectred areas, new lighting.hvac-lighting under seperate permit.Details
ground floor - demo of extg cieling grid, selected non structural partitions and flooring construct new non structural paertitions, new cieling in selectred areas, new lighting.hvac-lighting under seperate permit. | $252,000 |
| Mar 17, 2011 | Completed final sign-off Dec 2011 | 75 Broadway | Peacock Construction Inc | mechanical and electrical t-24 for work donw under pa# 2010.12.15.6760Details
mechanical and electrical t-24 for work donw under pa# 2010.12.15.6760 | $150,000 |
| Feb 23, 2011 | Completed final sign-off May 2011 | 75 Broadway | Peacock Construction Inc | structural calculations for movable partition work under 201012156760Details
structural calculations for movable partition work under 201012156760 | |
| Jan 27, 2011 | Completed final sign-off May 2011 | 75 Broadway | Peacock Construction Inc | building 3: revision to 201012207019. remodel 2 accomodate 2 sinks and still comply with ada codeDetails
building 3: revision to 201012207019. remodel 2 accomodate 2 sinks and still comply with ada code | $10,000 |
| Jan 27, 2011 | Completed final sign-off May 2011 | 75 Broadway | Peacock Construction Inc | revision to 201101067968 adding one sink per bathroom still maintaining ada compliance.Details
revision to 201101067968 adding one sink per bathroom still maintaining ada compliance. | $5,000 |
| Jan 24, 2011 | Completed final sign-off Apr 2011 | 75 Broadway | R L H Fire Protection Inc | 1st floor fire sprinkler system upgrade, relocate 92 pendents, add 4 pendents, delete 17 pendents.Details
1st floor fire sprinkler system upgrade, relocate 92 pendents, add 4 pendents, delete 17 pendents. | $48,000 |
| Jan 19, 2011 | Completed final sign-off Apr 2011 | 75 Broadway | Siemens Industry, Inc. | 1st floor-addition of 15 speakers/strobes, 1 speaker, 4 strobes & a strobe power supply for the landmark edcuation remodel. all new devices connect onto the (e) fire alarm systemDetails
1st floor-addition of 15 speakers/strobes, 1 speaker, 4 strobes & a strobe power supply for the landmark edcuation remodel. all new devices connect onto the (e) fire alarm system | $9,200 |
| Jan 6, 2011 | Completed final sign-off May 2011 | 75 Broadway | Peacock Construction Inc | building #3: remodel of (e) restrooms, including finishes & fixtures to meet ada code compliance @ 2nd. flr.Details
building #3: remodel of (e) restrooms, including finishes & fixtures to meet ada code compliance @ 2nd. flr. | $70,000 |
| Dec 20, 2010 | Completed final sign-off May 2011 | 75 Broadway | Peacock Construction Inc | building 3. remodel of existing restrooms incl. finishes and fixtures to meet ada code compliance at ground floorDetails
building 3. remodel of existing restrooms incl. finishes and fixtures to meet ada code compliance at ground floor | $140,000 |
| Dec 15, 2010 | Completed final sign-off Dec 2011 | 75 Broadway | Peacock Construction Inc | this is a fully sprinklered bldg; 1st fl: ti includes demo on non structural partitons and bldg new non structural, paritions; construct demising walls to create 2nd tenant space; change of use b/r2 to b/r2 and new a3; & occup load verification; mep, life safety on sep permitDetails
this is a fully sprinklered bldg; 1st fl: ti includes demo on non structural partitons and bldg new non structural, paritions; construct demising walls to create 2nd tenant space; change of use b/r2 to b/r2 and new a3; & occup load verification; mep, life safety on sep permit | $678,615 |
| Dec 1, 2010 | Completed final sign-off Feb 2011 | 160 Pacific Av | Siemens Industry, Inc. | floor 2nd - addition of 6 speaker/strobes for the "corridor" remodel. all new devices connect onto the existing fire alarm system.Details
floor 2nd - addition of 6 speaker/strobes for the "corridor" remodel. all new devices connect onto the existing fire alarm system. | $2,700 |
| Oct 26, 2010 | Completed final sign-off Feb 2011 | 160 Pacific Av | Anderson, Rowe & Buckley, Inc. | 2nd floor-tenant improvements to (e) fire sprinkler system-14 removed sprinklers & 11 new pendent sprinklersDetails
2nd floor-tenant improvements to (e) fire sprinkler system-14 removed sprinklers & 11 new pendent sprinklers | $2,200 |
| Oct 19, 2010 | Completed final sign-off Feb 2011 | 160 Pacific Av | Anderson, Rowe & Buckley, Inc. | 2nd floor - 95 removed sprinklers, 84 added sprinklersDetails
2nd floor - 95 removed sprinklers, 84 added sprinklers | $16,000 |
| Oct 8, 2010 | Completed final sign-off Mar 2011 | 160 Pacific Av | Peacock Construction Inc | remodel existing restrooms to comply with ada new finishes in 2nd fl officeDetails
remodel existing restrooms to comply with ada new finishes in 2nd fl office | $60,000 |
| Oct 6, 2010 | Completed final sign-off Feb 2011 | 160 Pacific Av | Bcci Construction Company | mechanical & electrical work associated with approved permit #201009160999Details
mechanical & electrical work associated with approved permit #201009160999 | $300,000 |
| Oct 1, 2010 | Completed final sign-off Feb 2011 | 160 Pacific Av | Siemens Industry, Inc. | addition of 2 smoke detectors,12 speakers/strobes,3 strobes, & a strobe power supply for the goldman fund tenant remodel on floor 2. all new devices connect onto the extg fire alarm system.Details
addition of 2 smoke detectors,12 speakers/strobes,3 strobes, & a strobe power supply for the goldman fund tenant remodel on floor 2. all new devices connect onto the extg fire alarm system. | $6,800 |
| Sep 20, 2010 | Completed final sign-off Feb 2011 | 160 Pacific Av | Bcci Construction Company | creation of common corridor on 2nd floor. new ada compliant stair hand and guard railsDetails
creation of common corridor on 2nd floor. new ada compliant stair hand and guard rails | $80,000 |
| Sep 16, 2010 | Completed final sign-off Feb 2011 | 160 Pacific Av | Bcci Construction Company | 2nd floor-demo of non structural partitions, build back of non structural partitions. all new or revised hvac, electrical, plumbing, sprinkler & life safety will be design build & submitted under seperate permit. building is fully sprinkleredDetails
2nd floor-demo of non structural partitions, build back of non structural partitions. all new or revised hvac, electrical, plumbing, sprinkler & life safety will be design build & submitted under seperate permit. building is fully sprinklered | $650,235 |
| Aug 26, 2009 | Never finaled issued Aug 2009, no final | 75 Broadway | Red Hawk Fire & Security Ca Llc | speaker/strobes added to lobby, conference room and open office smoke detector installed in server room @ 2nd. floor. suite# 205.Details
speaker/strobes added to lobby, conference room and open office smoke detector installed in server room @ 2nd. floor. suite# 205. | $7,000 |
| Aug 11, 2009 | Completed final sign-off Feb 2010 | 75 Broadway | Bcci Construction Company | replace single entry interior door with new entrance door with sidelights. add 6 pendant lights for mockup to show space to potential tenants. mep and fire sprinkler under separate permit.Details
replace single entry interior door with new entrance door with sidelights. add 6 pendant lights for mockup to show space to potential tenants. mep and fire sprinkler under separate permit. | $4,500 |
| Aug 7, 2009 | Completed final sign-off Feb 2011 | 160 Pacific Av | Bcci Construction Company | pre-construction demolition under ab017. demo interior partitions only. fire sprinklers & life safety to remain operational. no fire rated construction to be removed.Details
pre-construction demolition under ab017. demo interior partitions only. fire sprinklers & life safety to remain operational. no fire rated construction to be removed. | $22,500 |
| May 13, 2009 | Completed final sign-off Nov 2009 | 55 Broadway | 153 Cornerstone Construction | replace dry cleaning machine and add new handicap counter in existing drycleanersDetails
replace dry cleaning machine and add new handicap counter in existing drycleaners | $4,000 |
| Sep 29, 2008 | Completed final sign-off Feb 2009 | 160 Pacific Av | Red Hawk Fire & Security Ca Llc | 2nd floor-as built revision to pa# 2008-0910-1234-added to scope: 4 speaker/strobes, 1 smoke detectorDetails
2nd floor-as built revision to pa# 2008-0910-1234-added to scope: 4 speaker/strobes, 1 smoke detector | $100 |
| Sep 10, 2008 | Completed final sign-off Feb 2009 | 160 Pacific Av | Red Hawk Fire & Security Ca Llc | 2nd floor-addition of new fire alarm devices to (e) fire alarm panel. 3 smoke detectors, 1 control module, 1 power supply, 7 strobes, 14 speaker strobesDetails
2nd floor-addition of new fire alarm devices to (e) fire alarm panel. 3 smoke detectors, 1 control module, 1 power supply, 7 strobes, 14 speaker strobes | $10,000 |
| Sep 4, 2008 | Completed final sign-off Feb 2009 | 160 Pacific Av | Bcci Construction Company | 2nd floor revision to appl #200808128997 to remove automatic door opener o stall door in disabled access bathroom.Details
2nd floor revision to appl #200808128997 to remove automatic door opener o stall door in disabled access bathroom. | |
| Aug 12, 2008 | Completed final sign-off Feb 2009 | 160 Pacific Av | Bcci Construction Company | 2nd floor-tenant improvements to include minor demolition, new walls and upgrades to meet ada requirements. mep, fire safety & sprinkler under seperate permit. no increase in office space. interior work only.Details
2nd floor-tenant improvements to include minor demolition, new walls and upgrades to meet ada requirements. mep, fire safety & sprinkler under seperate permit. no increase in office space. interior work only. | $200,000 |
| Apr 23, 2008 | Completed final sign-off Jun 2008 | 75 Broadway | demo existing walls, doors, gyp soffits, ceiling tile & carpet on 1st floor per ab-17.Details
demo existing walls, doors, gyp soffits, ceiling tile & carpet on 1st floor per ab-17. | $15,000 | |
| Apr 23, 2008 | Completed final sign-off May 2008 | 160 Pacific Av | demo existing walls, door, carpet on 1st floor (per ab-17), tenant improvement under separate permit.Details
demo existing walls, door, carpet on 1st floor (per ab-17), tenant improvement under separate permit. | $12,000 | |
| Mar 21, 2008 | Completed final sign-off Apr 2008 | 75 Broadway | Siemens Industry, Inc. | renew pa 200705100918 for final inspection.Details
renew pa 200705100918 for final inspection. | |
| Feb 14, 2008 | Never finaled issued Feb 2008, no final | 75 Broadway | street space permitDetails
street space permit | ||
| May 10, 2007 | Expired or cancelled expired Apr 2008 | 75 Broadway | Siemens Industry, Inc. | renew pa# 2004/06/14/6355 for final inspection.Details
renew pa# 2004/06/14/6355 for final inspection. | |
| Mar 10, 2005 | Completed final sign-off Jun 2005 | 190 Pacific Av | Peacock Construction Inc | mechanical & sprinklers @ 1st floor only.Details
mechanical & sprinklers @ 1st floor only. | $4,500 |
| Feb 8, 2005 | Completed final sign-off Jun 2005 | 190 Pacific Av | interior alt to existing space (minor) demo & const. of non structural partitions, ceilings & finishDetails
interior alt to existing space (minor) demo & const. of non structural partitions, ceilings & finish | $70,000 | |
| Feb 4, 2005 | Never finaled issued Feb 2005, no final | 190 Pacific Av | Peacock Construction Inc | demo of interior partitions,ceiling grid & finishes.area to remain unoccupied per sfab 017Details
demo of interior partitions,ceiling grid & finishes.area to remain unoccupied per sfab 017 | $3,000 |
| Nov 13, 2004 | Never finaled issued Nov 2004, no final | 190 Pacific Av | house number permitDetails
house number permit | ||
| Nov 10, 2004 | Expired or cancelled expired Aug 2006 | 55 Broadway | R L H Fire Protection Inc | fire spinkler tenant improvements to abm suite on ground (1st fl). total 35 heads.Details
fire spinkler tenant improvements to abm suite on ground (1st fl). total 35 heads. | $7,000 |
| Nov 8, 2004 | Expired or cancelled expired Jan 2006 | 75 Broadway | Mc Millan Electric | install 10 control modules, 11 strobes in waterproof enclosure, all wiring to be in conduit and surfDetails
install 10 control modules, 11 strobes in waterproof enclosure, all wiring to be in conduit and surf | $17,700 |
| Oct 15, 2004 | Completed final sign-off Feb 2005 | 55 Broadway | minor, non structural, alterations to (e) office space. hvac ,electrical, and sprinkler alterationsDetails
minor, non structural, alterations to (e) office space. hvac ,electrical, and sprinkler alterations | $25,000 | |
| Sep 20, 2004 | Completed final sign-off Oct 2004 | 75 Broadway | minor alteration ro existing office spaceDetails
minor alteration ro existing office space | $25,000 | |
| Jul 14, 2004 | Completed final sign-off Aug 2004 | 75 Broadway | access alteration to existing restroom. provide accessable urinalDetails
access alteration to existing restroom. provide accessable urinal | $15,000 | |
| Jun 14, 2004 | Expired or cancelled expired Aug 2006 | 75 Broadway | Siemens Bldg Technologies | upgrade fire alarm system for bldg in accordance w/5 year plan. emergency replacement permitDetails
upgrade fire alarm system for bldg in accordance w/5 year plan. emergency replacement permit | $30,000 |
| Aug 29, 2003 | Never finaled issued Aug 2003, no final | 75 Broadway | Siemens Bldg Technologies | upgrade fire alarm system for entire bldg. 5 year plan will submit as plan of action within 30 daysDetails
upgrade fire alarm system for entire bldg. 5 year plan will submit as plan of action within 30 days | $30,000 |
| Jun 9, 2003 | Expired or cancelled expired Oct 2004 | 75 Broadway | handicap accessibility requirements. market ready project, demo exist walls and clean up space. 20%Details
handicap accessibility requirements. market ready project, demo exist walls and clean up space. 20% | $30,000 | |
| May 14, 2003 | Completed final sign-off Sep 2003 | 75 Broadway | Giampolini & Co., Inc | renew p.a. 200208214543 for completion of work and final inspectionDetails
renew p.a. 200208214543 for completion of work and final inspection | $15,000 |
| Dec 24, 2002 | Completed final sign-off Apr 2003 | 160 Pacific Av | install handrails & striping at (e) exterior stairs, install railing for visually impaired personsDetails
install handrails & striping at (e) exterior stairs, install railing for visually impaired persons | $8,823 | |
| Aug 21, 2002 | Expired or cancelled expired Sep 2003 | 75 Broadway | repair & replace damaged brick veneer. maintenance repairs.Details
repair & replace damaged brick veneer. maintenance repairs. | $15,000 | |
| May 15, 2001 | Completed final sign-off Sep 2001 | 160 Pacific Av | Peacock Construction Inc | remodel ceilings, for our walls, replace ceilingsDetails
remodel ceilings, for our walls, replace ceilings | $45,000 |
| Apr 30, 2001 | Expired or cancelled expired Oct 2001 | 75 Broadway | Premier Fire Protection Inc | remove all central omega sprinkler and install new viking model in quick respons fire sprinklersDetails
remove all central omega sprinkler and install new viking model in quick respons fire sprinklers | $14,000 |
| Apr 23, 2001 | Expired or cancelled cancelled Dec 2001 | 55 Broadway | Richlen Construction | oti-1 ground floor, ltg, lsDetails
oti-1 ground floor, ltg, ls | $5,000 |
| Apr 9, 2001 | Completed final sign-off Oct 2001 | 160 Pacific Av | barrier removal work to restrms on 1st fl of bldng, lighting, mech & fire under sep permitDetails
barrier removal work to restrms on 1st fl of bldng, lighting, mech & fire under sep permit | $85,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.