Permit GraphShortlistSan Francisco building permits since 2000

Bikash Vaidya

License
M35849
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M35849 at the Board for Professional Engineers
Listed as
engineer
Firm
Bv Engineering
Based in
San Francisco
On San Francisco permits
Aug 2022 to Dec 2025

4 permits since 2000 (engineer on 4 permits): 2 completed, 1 in progress, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Arch Plumbing Inc, Cal C A D E Construction Inc, Marchetti Group, Mitchell Engineering
Architects
Alex Yao Chen
Engineers
Roman Perkis, Stephen Shaffer
Authorized agents
Mairead Mcgreevy

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 23, 2025Completed
final sign-off May 2026
75 BroadwayMarchetti Groupdeferred me scope, ref bpa#202502261108. mechanical hvac ti includes remove (4) existing sidewall suuply griles. install (2) new t-bar supply diffusers. install(1) 16x12 transfer duct for return, provide air balance report. electrical scope to include(n) power & signal devices throughout the space.
Details
Permit
202512232519
Permit issued
Dec 23, 2025
Final sign-off
May 7, 2026

deferred me scope, ref bpa#202502261108. mechanical hvac ti includes remove (4) existing sidewall suuply griles. install (2) new t-bar supply diffusers. install(1) 16x12 transfer duct for return, provide air balance report. electrical scope to include(n) power & signal devices throughout the space.

Open the permit page

$75,000
Oct 20, 2025In progress
issued Oct 2025
3501 California StArch Plumbing Incste #200: installation of new ducting to existing mechanical system per new wall layout. ref ti pa# 202509104966
Details
Permit
202510207684
Permit issued
Oct 20, 2025

ste #200: installation of new ducting to existing mechanical system per new wall layout. ref ti pa# 202509104966

Open the permit page

$6,000
Aug 25, 2022Never finaled
issued Sep 2022, no final
1395 Evans AvMitchell Engineeringextend f/s system to 2/f & penthouse. addition of ddcv on (e) 6" riser
Details
Permit
202208251241
Permit issued
Sep 1, 2022

extend f/s system to 2/f & penthouse. addition of ddcv on (e) 6" riser

Open the permit page

$28,000
Aug 4, 2022Completed
final sign-off May 2024
60 Clipper Cove WyCal C A D E Construction Increnovate (e) storage room by adding a 2-hour fire rated wall to divide a room space of about 1500 sf into (2) rooms, server (716 sf) & storage rooms (770 sf).
Details
Permit
202208049949
Permit issued
Jan 12, 2023
Final sign-off
May 2, 2024

renovate (e) storage room by adding a 2-hour fire rated wall to divide a room space of about 1500 sf into (2) rooms, server (716 sf) & storage rooms (770 sf).

Open the permit page

$20,000