All American Waterproof Inc.
- Based in
- Palomar Park
- On San Francisco permits
- Oct 2002 to Mar 2022
- Last 24 months
- 0 permits filed
22 permits since 2000: 18 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2022 | Never finaled issued Mar 2022, no final | 550 Davis St | unit 4: remove the bricks and tile and stucco around the living room, two large windows and around the base of the dining room walls. and install new flashing and thin bricks. and water test for leaks.Details
unit 4: remove the bricks and tile and stucco around the living room, two large windows and around the base of the dining room walls. and install new flashing and thin bricks. and water test for leaks. | $12,000 |
| May 4, 2021 | Completed final sign-off Mar 2022 | 550 Davis St | at the north facing wall has 2 windos that are leaking-remove the bricks and stucco around both windos and install new flashing at both windows and replace finishes and rewater test leaking areas. apt 19Details
at the north facing wall has 2 windos that are leaking-remove the bricks and stucco around both windos and install new flashing at both windows and replace finishes and rewater test leaking areas. apt 19 | $5,500 |
| Aug 2, 2019 | Completed final sign-off Jul 2020 | 550 Davis St | waterproof membrane newa units 20&21 is leaking when its raining. remove the topping slap and repair the leaking membrane on the structural slap that was leaking into the office ceiling below and water test and replace topping slab. no street facing. all work in kind.Details
waterproof membrane newa units 20&21 is leaking when its raining. remove the topping slap and repair the leaking membrane on the structural slap that was leaking into the office ceiling below and water test and replace topping slab. no street facing. all work in kind. | $10,000 |
| Jul 3, 2019 | Completed final sign-off Jul 2020 | 550 Davis St | work near unit 1 & 2 walkway. waterproof membrane is leaking at the structural slab. remove 22' inch wide strip of cement topping slab to determine if strip repair is leaking or the entire deck is leaking.Details
work near unit 1 & 2 walkway. waterproof membrane is leaking at the structural slab. remove 22' inch wide strip of cement topping slab to determine if strip repair is leaking or the entire deck is leaking. | $10,000 |
| Sep 7, 2018 | Completed final sign-off Sep 2019 | 640 Davis St | at master bedroom half round window remove old flashing and install new flashing. repair flashing around half round window frame. finished finishes to match existing.Details
at master bedroom half round window remove old flashing and install new flashing. repair flashing around half round window frame. finished finishes to match existing. | $5,000 |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 550 Davis St | 4 leaking windows, 2 on first floor, 2 on second floor. will remove brick veneer and stucco around windows and install new flashing and install new stucco and bick veneer to match existing.Details
4 leaking windows, 2 on first floor, 2 on second floor. will remove brick veneer and stucco around windows and install new flashing and install new stucco and bick veneer to match existing. | $7,000 |
| May 17, 2016 | Completed final sign-off May 2017 | 170 Pacific Av | unit 9: 1st floor: remove brick veneer & stucco around 2 leaking windows and install new flashing and install new stucco and brick. veneer to match existing. not facing street.Details
unit 9: 1st floor: remove brick veneer & stucco around 2 leaking windows and install new flashing and install new stucco and brick. veneer to match existing. not facing street. | $6,000 |
| May 17, 2016 | Completed final sign-off May 2017 | 170 Pacific Av | unit 10: at entry door, install new door pan and new base flashing between entry door and garbage room door and install a new door pan at the garbage room door.Details
unit 10: at entry door, install new door pan and new base flashing between entry door and garbage room door and install a new door pan at the garbage room door. | $5,000 |
| Sep 4, 2015 | Completed final sign-off Mar 2016 | 170 Pacific Av | two leaking saddle flashings at the parapet wall above. remove brick veneer and stucco at both locations and remove the metal wall cap counter flashing and insall new metal saddle flashings and tie into (e) paper and replace stucco and brick veneer.Details
two leaking saddle flashings at the parapet wall above. remove brick veneer and stucco at both locations and remove the metal wall cap counter flashing and insall new metal saddle flashings and tie into (e) paper and replace stucco and brick veneer. | $5,200 |
| Jul 24, 2015 | Completed final sign-off Mar 2016 | 550 Davis St | at the arch wall above the guest bedroom, remove brick veneer and stucco at both ends of the wall, remove wall cap flashing, install new metal saddle flashings and tie into existing flashing paper. install new stucco and brick veneer to match existing.Details
at the arch wall above the guest bedroom, remove brick veneer and stucco at both ends of the wall, remove wall cap flashing, install new metal saddle flashings and tie into existing flashing paper. install new stucco and brick veneer to match existing. | $5,100 |
| Jul 16, 2014 | Completed final sign-off Mar 2015 | 550 Davis St | remove brick veneer and stucco around window and install new flashing and install new stucco and brick veneer to match existing. 1 window facing the tennis courts.Details
remove brick veneer and stucco around window and install new flashing and install new stucco and brick veneer to match existing. 1 window facing the tennis courts. | $4,500 |
| Mar 18, 2014 | Completed final sign-off Mar 2015 | 75 Broadway | suite 202 - rain water leaking into the bldg near th ecorner of the 2nd floor window. repair/remove brick veneer to expose crack in concrete panel & seal crack & replace brick veneer. compliance with ordinance #155-13 not required.Details
suite 202 - rain water leaking into the bldg near th ecorner of the 2nd floor window. repair/remove brick veneer to expose crack in concrete panel & seal crack & replace brick veneer. compliance with ordinance #155-13 not required. | $5,000 |
| Aug 26, 2013 | Completed final sign-off Apr 2014 | 640 Davis St | unit 23. remove brick veneer and stucco around round shape bathroom window. install new flashing and re-install stucco and brick veneer to match existing finishes.Details
unit 23. remove brick veneer and stucco around round shape bathroom window. install new flashing and re-install stucco and brick veneer to match existing finishes. | $4,500 |
| May 31, 2013 | Completed final sign-off Apr 2014 | 550 Davis St | remove brick and stucco(brick veneer) around 2 windows and installtion new flashes and stucco and brick veneer. 1 window faced the street.Details
remove brick and stucco(brick veneer) around 2 windows and installtion new flashes and stucco and brick veneer. 1 window faced the street. | $9,000 |
| Apr 18, 2012 | Completed final sign-off Apr 2013 | 550 Davis St | reflashing of master bedroom window - leaking. remove brick veneer and stucco about 12" at jambs & head of window, install new flashing, lath, stucco & brick veneer, visable from outside.Details
reflashing of master bedroom window - leaking. remove brick veneer and stucco about 12" at jambs & head of window, install new flashing, lath, stucco & brick veneer, visable from outside. | $5,500 |
| May 24, 2011 | Completed final sign-off Nov 2011 | 170 Pacific Av | we will be waterproofing 2 leaking windows that are attached. we will be removing the brick veneer and stucco around the windows and installing new flashing and replacing the stucco and the brick veneerDetails
we will be waterproofing 2 leaking windows that are attached. we will be removing the brick veneer and stucco around the windows and installing new flashing and replacing the stucco and the brick veneer | $7,500 |
| Jun 2, 2009 | Completed final sign-off Jul 2009 | 170 Pacific Av | work @ unit# 7 only. reflashing of 2 living room windows & 1 kitchen window. remove brick vemeer & stucco about 6" to 12" wide at jambs & sills of windows. install new flashing at jambs & sills of windows & reinstall lath & stucco & brick veneer.Details
work @ unit# 7 only. reflashing of 2 living room windows & 1 kitchen window. remove brick vemeer & stucco about 6" to 12" wide at jambs & sills of windows. install new flashing at jambs & sills of windows & reinstall lath & stucco & brick veneer. | $5,000 |
| Nov 6, 2007 | Expired or cancelled expired Dec 2009 | 850 Powell St | new bathroom shower membrane. remove old tile from shower area floor and walls and remove old membrane. install new shower drain hube and float out walls floor and install new laticrete 9235 waterproof system membrane. rum a water test. and install new tile. shower above 30"x42" 8 feet high.Details
new bathroom shower membrane. remove old tile from shower area floor and walls and remove old membrane. install new shower drain hube and float out walls floor and install new laticrete 9235 waterproof system membrane. rum a water test. and install new tile. shower above 30"x42" 8 feet high. | $10,000 |
| Oct 23, 2007 | Completed final sign-off Apr 2008 | 550 Davis St | remove brick veneer & stucco around 2 windows & 2 sliding glass doors & deck railing, and re-flash windows & doors & coat deck 10' x 12' & re-stucco & brick vemeer. no structural work.Details
remove brick veneer & stucco around 2 windows & 2 sliding glass doors & deck railing, and re-flash windows & doors & coat deck 10' x 12' & re-stucco & brick vemeer. no structural work. | $42,000 |
| Aug 23, 2007 | Completed final sign-off Oct 2007 | 2999 Pacific Av | 10 foot by 25 foot existing patio deck. remove and install new urethane deck coating system by iso-flex and permitier flashing.Details
10 foot by 25 foot existing patio deck. remove and install new urethane deck coating system by iso-flex and permitier flashing. | $11,000 |
| Apr 14, 2004 | Expired or cancelled expired May 2006 | 170 Pacific Av | tapping for loose brick veneer & replace on the street sides of the bldng.Details
tapping for loose brick veneer & replace on the street sides of the bldng. | $40,000 |
| Oct 3, 2002 | Completed final sign-off May 2003 | 550 Davis St | water leaks into unit: remove brick venver+ stucco. repair metal flashing and holes in 30 lb felt atDetails
water leaks into unit: remove brick venver+ stucco. repair metal flashing and holes in 30 lb felt at | $70,000 |