Permit GraphShortlistSan Francisco building permits since 2000

All American Waterproof Inc.

Contractor license
538040
State license record
Based in
Palomar Park
On San Francisco permits
Oct 2002 to Mar 2022
Last 24 months
0 permits filed

22 permits since 2000: 18 completed, 2 never finaled, 2 expired or cancelled.

Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllDeck 3Kitchen remodel 1Bathroom remodel 2

3 deck permits: 3 completed. Typically 0 days from filing to permit and 174 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 3, 2019Completed
final sign-off Jul 2020
550 Davis Stwork near unit 1 & 2 walkway. waterproof membrane is leaking at the structural slab. remove 22' inch wide strip of cement topping slab to determine if strip repair is leaking or the entire deck is leaking.
Details
Permit
201907035055
Status
complete
Filed
Jul 3, 2019
Permit issued
Jul 3, 2019
Final sign-off
Jul 6, 2020
Declared cost
$10,000
Address
550 Davis St

work near unit 1 & 2 walkway. waterproof membrane is leaking at the structural slab. remove 22' inch wide strip of cement topping slab to determine if strip repair is leaking or the entire deck is leaking.

Open the permit page

$10,000
Oct 23, 2007Completed
final sign-off Apr 2008
550 Davis Stremove brick veneer & stucco around 2 windows & 2 sliding glass doors & deck railing, and re-flash windows & doors & coat deck 10' x 12' & re-stucco & brick vemeer. no structural work.
Details
Permit
200710236201
Status
complete
Filed
Oct 23, 2007
Permit issued
Oct 23, 2007
Final sign-off
Apr 14, 2008
Declared cost
$42,000
Address
550 Davis St

remove brick veneer & stucco around 2 windows & 2 sliding glass doors & deck railing, and re-flash windows & doors & coat deck 10' x 12' & re-stucco & brick vemeer. no structural work.

Open the permit page

$42,000
Aug 23, 2007Completed
final sign-off Oct 2007
2999 Pacific Av10 foot by 25 foot existing patio deck. remove and install new urethane deck coating system by iso-flex and permitier flashing.
Details
Permit
200708230755
Status
complete
Filed
Aug 23, 2007
Permit issued
Aug 23, 2007
Final sign-off
Oct 30, 2007
Declared cost
$11,000
Address
2999 Pacific Av

10 foot by 25 foot existing patio deck. remove and install new urethane deck coating system by iso-flex and permitier flashing.

Open the permit page

$11,000