Kevin Christensen
- License
- E19020
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E19020 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Environmental System Design
- On San Francisco permits
- Nov 2019 to Oct 2021
7 permits since 2000 (engineer on 7 permits): 7 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bcci Construction Company (2), Field Construction Inc., Paul Melish Builder, Related California Construction Llc, Skyline Capital Builders Llc, Skyline Construction
- Architects
- David De Valeria, Joelle Rosander, Joseph Remling, Marcus A. Hopper, Sarah Rege, William Kevin Harden
- Engineers
- Kylie Lo (7), Kirk A. Johnston
- Authorized agents
- Brady Holcomb
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 6
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 28, 2021 | Completed final sign-off Mar 2022 | 160 Pacific Av | Field Construction Inc. | interior build out and construction of (e) t.i space as shown.Details
interior build out and construction of (e) t.i space as shown. | $149,900 |
| Apr 9, 2021 | Completed final sign-off Jan 2023 | 101 Utah St | Skyline Capital Builders Llc | revision to arch/structural pa 201905312103 and mep pa 201906254344. elimanate large roof skylights; rr (new) removed from shell scope: electrical scope changed; adjust stair #2 layout; see page ao.01r for more specifics.Details
revision to arch/structural pa 201905312103 and mep pa 201906254344. elimanate large roof skylights; rr (new) removed from shell scope: electrical scope changed; adjust stair #2 layout; see page ao.01r for more specifics. | |
| Dec 3, 2020 | Completed final sign-off Aug 2022 | 1500 Mission St | Related California Construction Llc | deferred submittal for mep, fire alarms & fire sprinklers only. all arch & strl, planning, dbi, bsm, puc, & dfcu scopes submitted under pa#2020-0911-4000 & 2021-0824-7070.Details
deferred submittal for mep, fire alarms & fire sprinklers only. all arch & strl, planning, dbi, bsm, puc, & dfcu scopes submitted under pa#2020-0911-4000 & 2021-0824-7070. | $250,000 |
| Oct 10, 2020 | Completed final sign-off Sep 2021 | 575 Market St | Bcci Construction Company | suite 3000:ti work includes interior non-structural demo, new partitions, doors, sidelites, casework, finishes, & light fixtures. maher n/aDetails
suite 3000:ti work includes interior non-structural demo, new partitions, doors, sidelites, casework, finishes, & light fixtures. maher n/a | $900,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2022 | 334 Mason St | Paul Melish Builder | interior renovation at ground floor. legalize work done without permit along w/ proposed interior renovation. no structural work, no changes to egress, no changes to exterior or core/shell. no demolition, no debris disposed.Details
interior renovation at ground floor. legalize work done without permit along w/ proposed interior renovation. no structural work, no changes to egress, no changes to exterior or core/shell. no demolition, no debris disposed. | $182,000 |
| Jul 22, 2020 | Completed final sign-off Oct 2021 | 101 Mission St | Skyline Construction | office t.i.; minor structural, small kitchen, removal of non structural partitions, acoustical ceilings, architectural finishes and caseworkDetails
office t.i.; minor structural, small kitchen, removal of non structural partitions, acoustical ceilings, architectural finishes and casework | $2,500,000 |
| Nov 26, 2019 | Completed final sign-off May 2021 | 650 California St | Bcci Construction Company | 33rd fl - ti work includes demo of existing tenant walls, ceiling. new drywall and demountable galss partitions, furn and finishes for offices. break room for employee use onlyDetails
33rd fl - ti work includes demo of existing tenant walls, ceiling. new drywall and demountable galss partitions, furn and finishes for offices. break room for employee use only | $4,678,605 |