Block 3918, lot 009
101 Utah St
- City’s use
- Industrial
- Built
- 1957
- Stories
- 2
- Rooms
- 1 bathroom
- Building
- 56,479 sq ft
- Lot
- 39,350 sq ft
- Zoning
- PDR1D
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
31 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 23, 2026 | In progress filed Jun 2026, not yet issued | 101 Utah St | Ewsf Inc. | removal of 8358 sqft on 2nd floor, relocation of brace frames. no change of use, interior work only.Details
removal of 8358 sqft on 2nd floor, relocation of brace frames. no change of use, interior work only. | $20,000 |
| Jan 9, 2025 | In progress issued Jan 2025 | 101 Utah St | Ewsf Inc. | vacant, no tenants currently. we will perform exploratory work to determine footing size, and depth. all holes to be filled back w/ slurry. no structural work.Details
vacant, no tenants currently. we will perform exploratory work to determine footing size, and depth. all holes to be filled back w/ slurry. no structural work. | $3,000 |
| Oct 24, 2022 | Never finaled filed Oct 2022, never issued | 101 Utah St | converting existing planning use of wholesale showroom to proposed use of laboratory.bike parking,restrooms,showers & lockers,non-load bearing partitions,floor wall/ceiling finishes.scope of work on this permit includes architectural scope only.mep deferred.Details
converting existing planning use of wholesale showroom to proposed use of laboratory.bike parking,restrooms,showers & lockers,non-load bearing partitions,floor wall/ceiling finishes.scope of work on this permit includes architectural scope only.mep deferred. | $650,000 | |
| Sep 30, 2022 | Completed final sign-off Nov 2022 | 101 Utah St | United Systems Fire And Security Llc | revision to pa# 2022-0607-5783Details
revision to pa# 2022-0607-5783 | |
| Jun 27, 2022 | Completed final sign-off Oct 2022 | 101 Utah St | 1st-2nd fl: shop drawings, stair #1 structural drawings. ref pa# 201905312103 & 202104098253.Details
1st-2nd fl: shop drawings, stair #1 structural drawings. ref pa# 201905312103 & 202104098253. | ||
| Jun 27, 2022 | Completed final sign-off Sep 2022 | 101 Utah St | Skyline Capital Builders Llc | 1st-2nd fl: shop drawings, stair #2 structural drawings. ref pa# 201905312103 & 202104098253.Details
1st-2nd fl: shop drawings, stair #2 structural drawings. ref pa# 201905312103 & 202104098253. | |
| Jun 22, 2022 | Completed final sign-off Oct 2022 | 101 Utah St | Skyline Capital Builders Llc | 2nd fl show drawings frp (strengthing of roof) ref drawings 201905312103Details
2nd fl show drawings frp (strengthing of roof) ref drawings 201905312103 | |
| Jun 7, 2022 | Completed final sign-off Nov 2022 | 101 Utah St | United Systems Fire And Security Llc | provide new fire alarm system and a new elevator landing emergency 2-way communication system for core and shell. ref bpa 201905312103Details
provide new fire alarm system and a new elevator landing emergency 2-way communication system for core and shell. ref bpa 201905312103 | $20,000 |
| Jun 1, 2022 | Completed final sign-off Sep 2022 | 101 Utah St | Skyline Capital Builders Llc | interior stair #3 deferred submittal for 2019-0531-2103Details
interior stair #3 deferred submittal for 2019-0531-2103 | |
| May 26, 2022 | Completed final sign-off Jan 2023 | 101 Utah St | Maguire Inc Dba Lahue And Associates | install 1 single faced wall sign. non-electric. "101 utah".Details
install 1 single faced wall sign. non-electric. "101 utah". | $2,500 |
| May 26, 2022 | Completed final sign-off Oct 2022 | 101 Utah St | Maguire Inc Dba Lahue And Associates | evacuation signs for 101 utah st. (13 signs)Details
evacuation signs for 101 utah st. (13 signs) | $5,492 |
| May 4, 2022 | Completed final sign-off Oct 2022 | 101 Utah St | Skyline Capital Builders Llc | 1st floor through 4th floor: revision to 201905312103, 202104098253. building type of tower revised to 3b. tower occupancy is b use (3rd & 4th floors. t-24 upgrade, door from roof to be proposed locked. add 48" wide elevator control room door.Details
1st floor through 4th floor: revision to 201905312103, 202104098253. building type of tower revised to 3b. tower occupancy is b use (3rd & 4th floors. t-24 upgrade, door from roof to be proposed locked. add 48" wide elevator control room door. | |
| Mar 28, 2022 | Completed final sign-off Sep 2022 | 101 Utah St | Skyline Capital Builders Llc | shop drawings (structural) for project related to pa #201905312103, 201906254344, & 202104098253.Details
shop drawings (structural) for project related to pa #201905312103, 201906254344, & 202104098253. | |
| Oct 12, 2021 | Completed final sign-off Nov 2022 | 101 Utah St | Westates Mechanical Corporation Inc | t.i. demo, relocate and add fire sprinkler piping and sprinkler heads. total of 65 sprinklers at 4 story area.Details
t.i. demo, relocate and add fire sprinkler piping and sprinkler heads. total of 65 sprinklers at 4 story area. | $8,000 |
| Sep 28, 2021 | Completed final sign-off Apr 2022 | 101 Utah St | Skyline Capital Builders Llc | submittal with holms structure response to rf#20 for micropile design lifespan and corrision protection. (shop drawings)Details
submittal with holms structure response to rf#20 for micropile design lifespan and corrision protection. (shop drawings) | |
| Apr 9, 2021 | Completed final sign-off Jan 2023 | 101 Utah St | Skyline Capital Builders Llc | revision to arch/structural pa 201905312103 and mep pa 201906254344. elimanate large roof skylights; rr (new) removed from shell scope: electrical scope changed; adjust stair #2 layout; see page ao.01r for more specifics.Details
revision to arch/structural pa 201905312103 and mep pa 201906254344. elimanate large roof skylights; rr (new) removed from shell scope: electrical scope changed; adjust stair #2 layout; see page ao.01r for more specifics. | |
| Jun 25, 2019 | Completed final sign-off Jan 2023 | 101 Utah St | Level 10 Construction Lp | mep for tenant improvement ref pa 2019-0531-2103Details
mep for tenant improvement ref pa 2019-0531-2103 | |
| May 31, 2019 | Completed final sign-off Jan 2023 | 101 Utah St | Skyline Capital Builders Llc, Level 10 Construction Lp | ada upgrade entrance / rrs / parking / ramp. ti include structural seismic upgrade in conformances with attached pre application letter. alterations include modifying exterior wall openings, add skylights & floor openings. new non structural partitions. mep & fire life safety under separate permitDetails
ada upgrade entrance / rrs / parking / ramp. ti include structural seismic upgrade in conformances with attached pre application letter. alterations include modifying exterior wall openings, add skylights & floor openings. new non structural partitions. mep & fire life safety under separate permit | $6,000,000 |
| Mar 14, 2019 | Expired or cancelled cancelled Jan 2026 | 101 Utah St | Level 10 Construction Lp | install a 10' high security fence around the entrance to the buildingDetails
install a 10' high security fence around the entrance to the building | $18,900 |
| Feb 5, 2019 | Expired or cancelled cancelled Jan 2026 | 101 Utah St | ref sprinkler pa # 201901311732; demo of non structural partitions on 1st, 2nd & 3rd floors; ab-017.Details
ref sprinkler pa # 201901311732; demo of non structural partitions on 1st, 2nd & 3rd floors; ab-017. | $25,000 | |
| Jan 31, 2019 | Completed final sign-off Apr 2019 | 101 Utah St | Allied Fire Protection | fire sprinklers, level 2 ti. remove 14 existing pendent headsDetails
fire sprinklers, level 2 ti. remove 14 existing pendent heads | $7,000 |
| Apr 15, 2013 | Completed final sign-off Aug 2013 | 101 Utah St | Woltke & Argueta Construction | #201: demolish selected non-load bearing partitions. install one new 90 minute rated door in 2 hour rated wall. construct new stair and landing.Details
#201: demolish selected non-load bearing partitions. install one new 90 minute rated door in 2 hour rated wall. construct new stair and landing. | $6,000 |
| Oct 12, 2011 | Expired or cancelled withdrawn Apr 2013 | 101 Utah St | Woltke & Argueta Construction | demolish selected non-load bearing partitions.Details
demolish selected non-load bearing partitions. | $4,000 |
| Jan 21, 2011 | Completed final sign-off Apr 2011 | 101 Utah St | San Francisco Fire Protection | install 8 smoke detectors and 8 door holders and tie into existing fire alarm systemDetails
install 8 smoke detectors and 8 door holders and tie into existing fire alarm system | $2,670 |
| Oct 12, 2010 | Never finaled issued Oct 2010, no final | 101 Utah St | Universal Fire Equipment Co | install fire suppression system to protect hood, duct, plenum & cooking equipments under the hoodDetails
install fire suppression system to protect hood, duct, plenum & cooking equipments under the hood | $4,500 |
| Nov 23, 2009 | Completed final sign-off Mar 2011 | 101 Utah St | Narrowback Construction Co. | reclassify corridors from 1 hour to 0- hour per table 1017.1Details
reclassify corridors from 1 hour to 0- hour per table 1017.1 | |
| Sep 14, 2009 | Expired or cancelled cancelled Jan 2026 | 101 Utah St | corrections to corridor doors & windows. ti flor 1 &2. provide missing clovers. upgrade non-conforming glass. add kickplates at entryDetails
corrections to corridor doors & windows. ti flor 1 &2. provide missing clovers. upgrade non-conforming glass. add kickplates at entry | $4,850 | |
| Nov 13, 2007 | Expired or cancelled expired Jul 2009 | 101 Utah St | Tyco Integrated Security | replace old panel w/new unimode 5 ud control panel. install new sprinkler monitoring devices connect existing waterflow & valve tamper to new panel & monitor per nfpa 72 remote system monitoring.Details
replace old panel w/new unimode 5 ud control panel. install new sprinkler monitoring devices connect existing waterflow & valve tamper to new panel & monitor per nfpa 72 remote system monitoring. | $3,731 |
| Mar 14, 2005 | Expired or cancelled expired Apr 2006 | 101 Utah St | E B Gilmore & Sons Mech Svcs Inc | supply & install steel support frames to accomodate (e) hvac equipmentDetails
supply & install steel support frames to accomodate (e) hvac equipment | $20,000 |
| Dec 22, 2003 | Completed final sign-off Jan 2004 | 101 Utah St | at building interior stor front window repair, replace in kind a windows. not visible from streetDetails
at building interior stor front window repair, replace in kind a windows. not visible from street | $1,000 | |
| May 12, 2001 | Completed final sign-off Aug 2001 | 101 Utah St | Best Roofing Const. | reroofingDetails
reroofing | $60,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Skyline Capital Builders Llc (8), Level 10 Construction Lp (3), Ewsf Inc. (2), Maguire Inc Dba Lahue And Associates (2), United Systems Fire And Security Llc (2), Woltke & Argueta Construction (2), Allied Fire Protection, Best Roofing Const., E B Gilmore & Sons Mech Svcs Inc, Narrowback Construction Co., San Francisco Fire Protection, Tyco Integrated Security, Universal Fire Equipment Co, Westates Mechanical Corporation Inc
- Architects
- Joseph Remling (2), Harvey J Hacker
- Engineers
- John Reese Leavitt (3), Bennett Hasseldeck, Erwin O'toole, Kevin Christensen, Kylie Lo, Mehdi Khrim, Mohammed Jalalapour
- Authorized agent-otherss
- Craig Horton
- Designers
- Lahue And Associates (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.