Block 3708, lot 175
575 Market St
- City’s use
- Commercial Office
- Built
- 1975
- Stories
- 40
- Building
- 505,120 sq ft
- Lot
- 17,930 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 30, 2026 | In progress filed Oct 2026, not yet issued | 575 Market St | 15th floor: interior t.i. demolition of non structural partitions, finishes, ceiling + light fixture. new non-structural partitions, finishes, ceiling and light fixtures, & millwork. mep & fire/life safety to be submitted as deferred permit.Details
15th floor: interior t.i. demolition of non structural partitions, finishes, ceiling + light fixture. new non-structural partitions, finishes, ceiling and light fixtures, & millwork. mep & fire/life safety to be submitted as deferred permit. | $300,000 | |
| Oct 9, 2026 | In progress issued Oct 2026 | 575 Market St | Field Construction Inc. | 21/fl- suite 2100- install of 4 (n) phonebooths to include (n) power (2) and anchoring detailsDetails
21/fl- suite 2100- install of 4 (n) phonebooths to include (n) power (2) and anchoring details | $10,000 |
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 575 Market St | revision to 202602186122. interior tenant improvement. changes to plumbing plans. relocate floor drain at 3 compartment sink. relocation of bakery hand sink water connections. plumbing design for waste and vent piping adjustments. water piping extended for new sink locationDetails
revision to 202602186122. interior tenant improvement. changes to plumbing plans. relocate floor drain at 3 compartment sink. relocation of bakery hand sink water connections. plumbing design for waste and vent piping adjustments. water piping extended for new sink location | $60,000 | |
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 575 Market St | suite 1400: interior tenant improvement, demolition of non-structural partitions, finishes, ceiling and light fixtures. new non structrual patitions, finishes, ceiling & light fixtures, & millwork. mep & fire/life safety to be submitted under seperate permit.Details
suite 1400: interior tenant improvement, demolition of non-structural partitions, finishes, ceiling and light fixtures. new non structrual patitions, finishes, ceiling & light fixtures, & millwork. mep & fire/life safety to be submitted under seperate permit. | $300,000 | |
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 575 Market St | 39/fl- interior ti to include soft demo of non structrual partitions, finishes, ceilings. lighting, and millwork. new non partitions, finishes, celilings, light fixtures, and millwork. mep and fire deferred.Details
39/fl- interior ti to include soft demo of non structrual partitions, finishes, ceilings. lighting, and millwork. new non partitions, finishes, celilings, light fixtures, and millwork. mep and fire deferred. | $150,000 | |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 575 Market St | suite 3400: interior tenant improvement, demo of non stuctual parititions, finishes, ceiling, light fixtures, millwork. new non stuctural partitions, finishes, ceiling light fixtures and millwork. mep and fire life safety to be submitted as deferred permit.Details
suite 3400: interior tenant improvement, demo of non stuctual parititions, finishes, ceiling, light fixtures, millwork. new non stuctural partitions, finishes, ceiling light fixtures and millwork. mep and fire life safety to be submitted as deferred permit. | $300,000 | |
| Sep 2, 2026 | In progress issued Sep 2026 | 575 Market St | Field Construction Inc. | 40th floor. revision to 202608196849, anchoring of 2 single occupant phone booths including structural plans and calculations. new signage to be dedicated to accessible phone room.Details
40th floor. revision to 202608196849, anchoring of 2 single occupant phone booths including structural plans and calculations. new signage to be dedicated to accessible phone room. | |
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 575 Market St | Field Construction Inc. | deferred mep for pa 202608196849 | $450,000 |
| Aug 19, 2026 | In progress issued Aug 2026 | 575 Market St | Field Construction Inc. | revision to 202512172010. convert open office areas to private office areas to private offices, conference room reconfiguration and additional private offices to previous tenant improvement permit.Details
revision to 202512172010. convert open office areas to private office areas to private offices, conference room reconfiguration and additional private offices to previous tenant improvement permit. | |
| Jul 6, 2026 | Completed final sign-off Sep 2026 | 575 Market St | Field Construction Inc. | 21st flr/suite 2100 + 2150. ref#: 202606032424. mechanicalDetails
21st flr/suite 2100 + 2150. ref#: 202606032424. mechanical | $40,000 |
| Jun 26, 2026 | Completed final sign-off Sep 2026 | 575 Market St | Field Construction Inc. | 21st fl suite 2100 and 2150: electrical only. ref drawings 202606032424Details
21st fl suite 2100 and 2150: electrical only. ref drawings 202606032424 | $168,564 |
| Jun 10, 2026 | In progress issued Jun 2026 | 575 Market St | Golden Gate Sign Company Inc. | installation of (1) illuminated wall sign (a): 'panera bread"Details
installation of (1) illuminated wall sign (a): 'panera bread" | $15,000 |
| Jun 10, 2026 | In progress issued Jun 2026 | 575 Market St | Golden Gate Sign Company Inc. | installation of (1) illuminated interior hanging window sign (c): 'panera bread"Details
installation of (1) illuminated interior hanging window sign (c): 'panera bread" | $5,000 |
| Jun 10, 2026 | In progress issued Jun 2026 | 575 Market St | Golden Gate Sign Company Inc. | installation of (1) illuminated projecting sign(b): 'panera bread"Details
installation of (1) illuminated projecting sign(b): 'panera bread" | $8,000 |
| Jun 4, 2026 | Completed final sign-off Oct 2026 | 575 Market St | Richlen Construction | 3rd floor. ref: 202605070841. new lighting fixtures, controls in 2 new enclosed office. new power/teledata feeds for new work stations, new receptacles and associated wiring in existing conference rooms and enclosed office.Details
3rd floor. ref: 202605070841. new lighting fixtures, controls in 2 new enclosed office. new power/teledata feeds for new work stations, new receptacles and associated wiring in existing conference rooms and enclosed office. | $20,125 |
| Jun 3, 2026 | Completed final sign-off Sep 2026 | 575 Market St | Field Construction Inc. | level 21:modification of (e) t.i. to include demolition & construction of new non-load bearing partitions. a new demising partition, new doors, frames, & hardware, glazing, modification of (e) ceiling tile & grid system, new light fixtures & switching, new power/data, new millwork & plumbing fixtureDetails
level 21:modification of (e) t.i. to include demolition & construction of new non-load bearing partitions. a new demising partition, new doors, frames, & hardware, glazing, modification of (e) ceiling tile & grid system, new light fixtures & switching, new power/data, new millwork & plumbing fixture | $500,000 |
| Jun 2, 2026 | Completed final sign-off Nov 2026 | 575 Market St | Field Construction Inc. | 35th floor: revision to 202512232517. convert 1 library lounge room to 3 phone rooms and adding 1 additional private office to previous tenant improvement permitDetails
35th floor: revision to 202512232517. convert 1 library lounge room to 3 phone rooms and adding 1 additional private office to previous tenant improvement permit | |
| May 7, 2026 | Completed final sign-off Oct 2026 | 575 Market St | Richlen Construction | 3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new light fixtures & switching new power/ data and finishesDetails
3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new light fixtures & switching new power/ data and finishes | $200,000 |
| Apr 23, 2026 | Completed final sign-off Nov 2026 | 575 Market St | Field Construction Inc. | suite 3500. mech-furnish and install supply and return duct work, variable air volume boxes. furnish and transfer fan in the it room. elec- power lighting t-24. 202202512232517Details
suite 3500. mech-furnish and install supply and return duct work, variable air volume boxes. furnish and transfer fan in the it room. elec- power lighting t-24. 202202512232517 | $250,000 |
| Apr 23, 2026 | Completed final sign-off Aug 2026 | 575 Market St | Field Construction Inc. | 38/f - ste 3800- mechanical: install ductwork (8) variable. electrical: lighting and controls. ref bpa 202512172042.Details
38/f - ste 3800- mechanical: install ductwork (8) variable. electrical: lighting and controls. ref bpa 202512172042. | $179,000 |
| Mar 19, 2026 | Completed final sign-off Jul 2026 | 575 Market St | Richlen Construction | 30/f: mechanical and electrical permit to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref pa# 202601274610.Details
30/f: mechanical and electrical permit to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref pa# 202601274610. | $30,000 |
| Feb 18, 2026 | In progress issued Jun 2026 | 575 Market St | Construct & Maintain Corp | interior ti for change of use from retail to cafe to include soft demo to remove non structural partitions, construction of (n) interior partitions, restrooms, kitchen build out, mep, fire protection coordination, accessiblity upgrades, finishes per approved drawings. no change in occupancy.Details
interior ti for change of use from retail to cafe to include soft demo to remove non structural partitions, construction of (n) interior partitions, restrooms, kitchen build out, mep, fire protection coordination, accessiblity upgrades, finishes per approved drawings. no change in occupancy. | $2,500,000 |
| Jan 27, 2026 | Completed final sign-off Jul 2026 | 575 Market St | Richlen Construction | 30th fl. partial floor demo and construction of interior partitons, doors, finishes and ceilings. mep deferred.Details
30th fl. partial floor demo and construction of interior partitons, doors, finishes and ceilings. mep deferred. | $194,288 |
| Dec 23, 2025 | Completed final sign-off Nov 2026 | 575 Market St | Field Construction Inc. | 35/fl- suite 3500 interior ti , soft demo of non structural partitions, finishes, ceiling, light fixtures and millwork. new non structrual partitions, finishes, ceiling, light fixtures and millwork. mep and fire/life safety under separte permitsDetails
35/fl- suite 3500 interior ti , soft demo of non structural partitions, finishes, ceiling, light fixtures and millwork. new non structrual partitions, finishes, ceiling, light fixtures and millwork. mep and fire/life safety under separte permits | $300,000 |
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 575 Market St | Field Construction Inc. | 38/f suite 3800: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. mep fire/life safety under separate permit.Details
38/f suite 3800: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. mep fire/life safety under separate permit. | $150,000 |
| Dec 17, 2025 | In progress issued Jan 2026 | 575 Market St | Field Construction Inc. | 40/f suite 4000: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. fire and mep/life safety under separate permit.Details
40/f suite 4000: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. fire and mep/life safety under separate permit. | $300,000 |
| Dec 4, 2025 | Completed final sign-off Mar 2026 | 575 Market St | Capitol Electric Const | 25th floor - ste 2550: provide new lights and associated circuiting/controls for ti pa# 202510157452.Details
25th floor - ste 2550: provide new lights and associated circuiting/controls for ti pa# 202510157452. | $38,530 |
| Dec 3, 2025 | In progress issued Oct 2026 | 575 Market St | Bcci Construction Company | updates to path of travel to make code compliant. scope includes parking area detectable warning stripe and new striping for accessible vehicle charging stations, in the lobby of 575 market st. install new elevator jamb "star" signs.Details
updates to path of travel to make code compliant. scope includes parking area detectable warning stripe and new striping for accessible vehicle charging stations, in the lobby of 575 market st. install new elevator jamb "star" signs. | $7,400 |
| Nov 19, 2025 | Completed final sign-off Jan 2026 | 575 Market St | Richlen Construction | 39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modification, construction of new full height demising partition, and new wall finishes to match existing.Details
39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modification, construction of new full height demising partition, and new wall finishes to match existing. | $10,000 |
| Nov 17, 2025 | Completed final sign-off Mar 2026 | 575 Market St | M C S Construction Services | 12th fl - office interior improvement. new non-structural partitions, new glazing, new doors, new electrical, new finishes, new ceiling. existing mechanical to remainDetails
12th fl - office interior improvement. new non-structural partitions, new glazing, new doors, new electrical, new finishes, new ceiling. existing mechanical to remain | $200,000 |
| Nov 13, 2025 | Completed final sign-off Mar 2026 | 575 Market St | Acco Engineered Systems Inc. Dba Acco En | 25/fl-room 2564- ref 202510157452- relocate (e) vav boxes and (e) supply and return diffusers and add (n) low pressure ductwork as needed, install water source heat pump and associated piping as needed for serverDetails
25/fl-room 2564- ref 202510157452- relocate (e) vav boxes and (e) supply and return diffusers and add (n) low pressure ductwork as needed, install water source heat pump and associated piping as needed for server | $113,610 |
| Oct 28, 2025 | Completed final sign-off Nov 2025 | 575 Market St | Pioneer Fire Inc. | add 6 sprinklers heads ref pa 202510157452Details
add 6 sprinklers heads ref pa 202510157452 | $1,500 |
| Oct 15, 2025 | Completed final sign-off Mar 2026 | 575 Market St | Richlen Construction | suite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n) power & data, (n) millwork & plumbing fixturesDetails
suite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n) power & data, (n) millwork & plumbing fixtures | $426,300 |
| Apr 17, 2025 | Completed final sign-off May 2025 | 575 Market St | Siemens Industry, Inc. | 1st fl - fire only work to add a cellular dialer onto the existing life safety system no ref pa (fire alarm work only)Details
1st fl - fire only work to add a cellular dialer onto the existing life safety system no ref pa (fire alarm work only) | $7,318 |
| Nov 13, 2024 | In progress issued Nov 2024 | 575 Market St | Bilcor Inc | 28/f: install 1 new call station, 1 new power supply, 1 expansion switch. ref pa# 202406144458 & 202411014181.Details
28/f: install 1 new call station, 1 new power supply, 1 expansion switch. ref pa# 202406144458 & 202411014181. | $2,664 |
| Nov 1, 2024 | Completed final sign-off Nov 2024 | 575 Market St | Siemens Industry, Inc. | fire only workto add a door lock release module on floor 28 for elevator lobby door replacement. ref pa 20240614458Details
fire only workto add a door lock release module on floor 28 for elevator lobby door replacement. ref pa 20240614458 | $600 |
| Jul 2, 2024 | Completed final sign-off Jul 2024 | 575 Market St | Gci, Inc | 20/f suite 2080: revision to permit 202308154413. combine storage and idf rooms into one large idf room.Details
20/f suite 2080: revision to permit 202308154413. combine storage and idf rooms into one large idf room. | |
| Jun 14, 2024 | Completed final sign-off Dec 2024 | 575 Market St | Gci, Inc | replacing 2 elevator lobby doors with new on the 28th fl (unoccupied)Details
replacing 2 elevator lobby doors with new on the 28th fl (unoccupied) | $18,000 |
| Nov 3, 2023 | Never finaled issued Nov 2023, no final | 575 Market St | Siemens Industry, Inc. | 20th fl - fire work only for the "suite 2080" remodel. 3 existing speaker/strobes are relocated. no new devices. ref pa 2023-0815-4413Details
20th fl - fire work only for the "suite 2080" remodel. 3 existing speaker/strobes are relocated. no new devices. ref pa 2023-0815-4413 | $2,885 |
| Oct 24, 2023 | Completed final sign-off Sep 2024 | 575 Market St | Peacock Construction | 20/f: mechanical - relocate 1 transfer fan, add a relocated ceiling diffusers, new ductwork, relocate thermastats, air balancing,; lighting fixtures & associcated circuiting/ controls, power & signal & wiring. ref pa# 202308154413.Details
20/f: mechanical - relocate 1 transfer fan, add a relocated ceiling diffusers, new ductwork, relocate thermastats, air balancing,; lighting fixtures & associcated circuiting/ controls, power & signal & wiring. ref pa# 202308154413. | $75,000 |
| Oct 20, 2023 | Completed final sign-off Oct 2023 | 575 Market St | Golden Gate Fire Protection Inc | 20th floor: fire sprinklers; as built to 2023-1010-8287. delete 1 head in the storage closetDetails
20th floor: fire sprinklers; as built to 2023-1010-8287. delete 1 head in the storage closet | $1,000 |
| Oct 10, 2023 | Never finaled issued Oct 2023, no final | 575 Market St | Golden Gate Fire Protection Inc | 20/f: fire sprinklers, relocate 5 pendent, delete 3 pendents and add 1 pendents. ref ti 202308154413Details
20/f: fire sprinklers, relocate 5 pendent, delete 3 pendents and add 1 pendents. ref ti 202308154413 | $3,720 |
| Aug 17, 2023 | Completed final sign-off Aug 2023 | 575 Market St | Ayoob & Peery Plumbing Co Inc | as-built for bpa# 202306140083. capture removal of 16th fl corridor scope. job# 23-63. ref pa# 202303234219, 9th & 16th fl.Details
as-built for bpa# 202306140083. capture removal of 16th fl corridor scope. job# 23-63. ref pa# 202303234219, 9th & 16th fl. | |
| Aug 15, 2023 | Completed final sign-off Sep 2024 | 575 Market St | Peacock Construction | 20th fl - ti including demo and construction of non-structural partitions, glazing, ceiling, lighting, millwork and finishesDetails
20th fl - ti including demo and construction of non-structural partitions, glazing, ceiling, lighting, millwork and finishes | $324,039 |
| Jul 10, 2023 | Completed final sign-off Oct 2023 | 575 Market St | M C S Construction Services | deferred elec permit provide new lijghting and branch dircuiting to e panel. ref 202303234219Details
deferred elec permit provide new lijghting and branch dircuiting to e panel. ref 202303234219 | $25,000 |
| Jun 14, 2023 | Never finaled issued Jun 2023, no final | 575 Market St | Ayoob & Peery Plumbing Co Inc | 9th & 16th fl: ref pa# 202303234219. 9th fl: relocate 6 fire sprinkler per ti. 16th fl: add 3, relocate 16 fire sprinkler per ti.Details
9th & 16th fl: ref pa# 202303234219. 9th fl: relocate 6 fire sprinkler per ti. 16th fl: add 3, relocate 16 fire sprinkler per ti. | $15,528 |
| Mar 23, 2023 | Completed final sign-off Oct 2023 | 575 Market St | M C S Construction Services | 9/f and 16/f: restroom, corridor, and elevator lobby upgrade. demolition and construction of non-structural partitions, gyp-bd, headers, light fixutres, ceiling, millwork, plumbing fixtures and finishes. mep deferred.Details
9/f and 16/f: restroom, corridor, and elevator lobby upgrade. demolition and construction of non-structural partitions, gyp-bd, headers, light fixutres, ceiling, millwork, plumbing fixtures and finishes. mep deferred. | $343,480 |
| Feb 17, 2023 | Completed final sign-off Jun 2023 | 575 Market St | Peacock Construction | electrical new power & lighting. ref pa# 202212158382.Details
electrical new power & lighting. ref pa# 202212158382. | $100,000 |
| Feb 2, 2023 | Completed final sign-off Mar 2023 | 575 Market St | Golden Gate Fire Protection Inc | 9th fl - fire sprinklers; relocate 75 uprights ref pa 2022-1215-8382Details
9th fl - fire sprinklers; relocate 75 uprights ref pa 2022-1215-8382 | $1,638 |
| Dec 15, 2022 | Completed final sign-off Jun 2023 | 575 Market St | Peacock Construction | 9th/flr: non-structural demo throughout. no build back. no accessibility drawings per ab-017 mep, l/s, sprinklers under separate permit. no change in occupancy use or areaDetails
9th/flr: non-structural demo throughout. no build back. no accessibility drawings per ab-017 mep, l/s, sprinklers under separate permit. no change in occupancy use or area | $75,000 |
| Sep 30, 2022 | Completed final sign-off Oct 2022 | 575 Market St | Siemens Industry, Inc. | fire only work for the common corridor/restroom on fl 39 additions are 8 speakaer/strobes, ref pa# 2022-0504-3507Details
fire only work for the common corridor/restroom on fl 39 additions are 8 speakaer/strobes, ref pa# 2022-0504-3507 | $5,075 |
| Sep 30, 2022 | Completed final sign-off Oct 2022 | 575 Market St | Siemens Industry, Inc. | fire only work for the common corridor/restroom on fl 36 additions are 1 duct detector, 1 module,1 speaker, and 8 speaker/strobes, ref pa# 2022-0504-3507Details
fire only work for the common corridor/restroom on fl 36 additions are 1 duct detector, 1 module,1 speaker, and 8 speaker/strobes, ref pa# 2022-0504-3507 | $7,800 |
| Sep 30, 2022 | Completed final sign-off Oct 2022 | 575 Market St | Siemens Industry, Inc. | fire only work for the common corridor/restroom on fl 21 additions are 2 speakers and 9 speaker/strobes, ref pa# 2022-0504-3507Details
fire only work for the common corridor/restroom on fl 21 additions are 2 speakers and 9 speaker/strobes, ref pa# 2022-0504-3507 | $6,975 |
| Sep 13, 2022 | Completed final sign-off Dec 2022 | 575 Market St | Source Planning And Construction Inc | 18/f-suite 1800: mechanical & electrical for bpa#202204192484Details
18/f-suite 1800: mechanical & electrical for bpa#202204192484 | $140,000 |
| Aug 19, 2022 | Completed final sign-off Dec 2022 | 575 Market St | Source Planning And Construction Inc | 18th fl suite 1800 operable partition. structural for 202204192484Details
18th fl suite 1800 operable partition. structural for 202204192484 | |
| Aug 8, 2022 | Completed final sign-off Sep 2022 | 575 Market St | floors 21, 36, 39: fire sprinklers: relocate 14 pendent sprinklers. t.i. pa202205043507. maher n/aDetails
floors 21, 36, 39: fire sprinklers: relocate 14 pendent sprinklers. t.i. pa202205043507. maher n/a | $1,000 | |
| Jul 8, 2022 | Completed final sign-off Jan 2023 | 575 Market St | Field Construction Inc. | floors 21, 36 & 39: mechanical and electrical portion of restroom and corridor upgrades t.i. project reference 202205043507. 24 compliant lighting & controlsDetails
floors 21, 36 & 39: mechanical and electrical portion of restroom and corridor upgrades t.i. project reference 202205043507. 24 compliant lighting & controls | |
| Jul 1, 2022 | Completed final sign-off Aug 2022 | 575 Market St | Anderson, Rowe & Buckley, Inc. | 18th fl: fire sprinkler only. relocate 27 pendents, add 1 pendent and relocate 1 upright. delete 2 heads for australian consulate. ref pa #202204192484Details
18th fl: fire sprinkler only. relocate 27 pendents, add 1 pendent and relocate 1 upright. delete 2 heads for australian consulate. ref pa #202204192484 | $14,500 |
| Jun 30, 2022 | Completed final sign-off Nov 2022 | 575 Market St | Siemens Industry, Inc. | fire only work the suite 1800 remodel on floor 18, 8 speaker/strobes and 2 modules added, 2 duct detectors being replaced. ref 202204192484Details
fire only work the suite 1800 remodel on floor 18, 8 speaker/strobes and 2 modules added, 2 duct detectors being replaced. ref 202204192484 | $8,250 |
| May 4, 2022 | Completed final sign-off May 2023 | 575 Market St | Field Construction Inc. | fl 21, 36, 39: restroom & corridor upgrade. demo & construction of gyp bd, headers and soffits, light fixtures, ceilings, millwork, plumbing fixtures and finishes.Details
fl 21, 36, 39: restroom & corridor upgrade. demo & construction of gyp bd, headers and soffits, light fixtures, ceilings, millwork, plumbing fixtures and finishes. | $343,480 |
| Apr 19, 2022 | Completed final sign-off Dec 2022 | 575 Market St | Source Planning And Construction Inc | ste 1800 18th flr: t.i. demo & buildout of non-load bearing partitions. modification to (e) ceiling grid & tile. (n) light fixtures. (n) & salvaged office doors & frames. (n) millwork & finishes. structural work provided for operable partitions. mep, fire safety to be deferred.Details
ste 1800 18th flr: t.i. demo & buildout of non-load bearing partitions. modification to (e) ceiling grid & tile. (n) light fixtures. (n) & salvaged office doors & frames. (n) millwork & finishes. structural work provided for operable partitions. mep, fire safety to be deferred. | $875,000 |
| Jan 20, 2022 | Never finaled issued Jan 2022, no final | 575 Market St | Field Construction Inc. | 10/f: adding 2-way communication system and card readers at elevator lobby and freight elevator lobby.Details
10/f: adding 2-way communication system and card readers at elevator lobby and freight elevator lobby. | $2,640 |
| Oct 20, 2021 | Completed final sign-off Mar 2022 | 575 Market St | Siemens Industry, Inc. | fire work only to obtain an as built permit for the "ste 2750" remodel on 27/f; 1 speaker/strobe was added into a mother's room per the sffd. initial life safety pa# 202105281271Details
fire work only to obtain an as built permit for the "ste 2750" remodel on 27/f; 1 speaker/strobe was added into a mother's room per the sffd. initial life safety pa# 202105281271 | $635 |
| Jun 24, 2021 | Completed final sign-off Sep 2021 | 575 Market St | Siemens Industry, Inc. | fire only work to add or replace 1 speaker, 15 speaker/strobes, and 4 strobes for corridor area remodels on floors 24, 28 and 38. ref. permit app # 2020-1210-0777Details
fire only work to add or replace 1 speaker, 15 speaker/strobes, and 4 strobes for corridor area remodels on floors 24, 28 and 38. ref. permit app # 2020-1210-0777 | $10,700 |
| May 28, 2021 | Completed final sign-off Oct 2021 | 575 Market St | Siemens Industry, Inc. | fire only work for the "suite 2900" remodel on floor 29; additions are 3 speaker/strobes, 4 strobes, and the relocation of 3 speaker/strobes. ref. permit app # 2020-1215-0979Details
fire only work for the "suite 2900" remodel on floor 29; additions are 3 speaker/strobes, 4 strobes, and the relocation of 3 speaker/strobes. ref. permit app # 2020-1215-0979 | $4,500 |
| May 28, 2021 | Completed final sign-off Mar 2022 | 575 Market St | Siemens Industry, Inc. | fire only work for the "suite 2750" remodel on floor 27; 3 speaker/strobes are added and 5 speaker/strobes are being relocated. ref. permit app # 2020-1210-0759Details
fire only work for the "suite 2750" remodel on floor 27; 3 speaker/strobes are added and 5 speaker/strobes are being relocated. ref. permit app # 2020-1210-0759 | $2,600 |
| May 28, 2021 | Completed final sign-off Sep 2021 | 575 Market St | Siemens Industry, Inc. | fire only work for the "suite 2800" remodel on floor 28; additions are 17 speaker/strobes. ref. permit app # 2020-1215-0972Details
fire only work for the "suite 2800" remodel on floor 28; additions are 17 speaker/strobes. ref. permit app # 2020-1215-0972 | $10,795 |
| May 20, 2021 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | mechanical - install new restroom exhaust terminals including ductwork & grilles. install new grilles serving elevator lobbies. install new fire smoke dampers. electrical - power, lighting & signal.Details
mechanical - install new restroom exhaust terminals including ductwork & grilles. install new grilles serving elevator lobbies. install new fire smoke dampers. electrical - power, lighting & signal. | $115,000 |
| May 5, 2021 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | ste 2900: ref pa# 202012150979. mechanical: demo ductwork & piping, install new fire smoke detectors at shaft, install new supply air duct, install new lighting & vav terminal. electrical: lighting, power & signal.Details
ste 2900: ref pa# 202012150979. mechanical: demo ductwork & piping, install new fire smoke detectors at shaft, install new supply air duct, install new lighting & vav terminal. electrical: lighting, power & signal. | $190,000 |
| May 5, 2021 | Completed final sign-off Apr 2022 | 575 Market St | Field Construction Inc. | ste 2750: mechanical: install new fan powered terminal units including ductwork, grilles, thermostats & piping, relocate existing grilles & thermostats to accomodate arch layout. electrical: lighting, power & signal. ref pa# 202012100759Details
ste 2750: mechanical: install new fan powered terminal units including ductwork, grilles, thermostats & piping, relocate existing grilles & thermostats to accomodate arch layout. electrical: lighting, power & signal. ref pa# 202012100759 | $140,000 |
| May 3, 2021 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | ste 2800: electrical - lighting, power & signal. ref pa# 202012150972. mechanical - install 4 (n) fsd, (n) supply air ducts, heater hot water, vav term units.Details
ste 2800: electrical - lighting, power & signal. ref pa# 202012150972. mechanical - install 4 (n) fsd, (n) supply air ducts, heater hot water, vav term units. | $10,000 |
| Apr 28, 2021 | Expired or cancelled withdrawn Jun 2021 | 575 Market St | replacement of 4 (e) cooling towers at penthouse level. towers shall be replaced in situ and connected to (e) mechanical, electrical & plumbing.Details
replacement of 4 (e) cooling towers at penthouse level. towers shall be replaced in situ and connected to (e) mechanical, electrical & plumbing. | $1,100,000 | |
| Apr 1, 2021 | Completed final sign-off Jun 2021 | 575 Market St | Siemens Industry, Inc. | fire only work for the "suite 2050" remodel on floor 20; additions are 1 smoke detector, 1 module, 2 speaker/strobes, and 3 strobes. 2 existing speaker/strobes are relocated. permit app # 2019-1122-7959Details
fire only work for the "suite 2050" remodel on floor 20; additions are 1 smoke detector, 1 module, 2 speaker/strobes, and 3 strobes. 2 existing speaker/strobes are relocated. permit app # 2019-1122-7959 | $4,200 |
| Mar 16, 2021 | Completed final sign-off Jun 2021 | 575 Market St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 7 pendents on the 24th floor. relocate 26 pendents on the 27th floor. relocate 61 pendents and 45 uprights on the 28th floor. relocate 32 pendents and 1 upright on the 29th floor. relocated 7 pendents on the 38th floor. t.i. ref# 2020-12-10-0777Details
fire sprinklers; relocate 7 pendents on the 24th floor. relocate 26 pendents on the 27th floor. relocate 61 pendents and 45 uprights on the 28th floor. relocate 32 pendents and 1 upright on the 29th floor. relocated 7 pendents on the 38th floor. t.i. ref# 2020-12-10-0777 | $89,500 |
| Feb 23, 2021 | Completed final sign-off May 2021 | 575 Market St | Siemens Industry, Inc. | fire only work for the "suite 3000" remodel on floor 30; additions are 1 smoke detector, 1 duct detector, 4 modules, 3 speaker/strobes, and 2 strobes. ref. permit app # 2020-1010-6308Details
fire only work for the "suite 3000" remodel on floor 30; additions are 1 smoke detector, 1 duct detector, 4 modules, 3 speaker/strobes, and 2 strobes. ref. permit app # 2020-1010-6308 | $7,225 |
| Feb 11, 2021 | Never finaled issued Mar 2021, no final | 575 Market St | Intelligent Technologies & Services Inc | provide detection & audible for 30th floor str room (pre-action system provided by others); includes heat detection & audible/visual devices.Details
provide detection & audible for 30th floor str room (pre-action system provided by others); includes heat detection & audible/visual devices. | |
| Jan 26, 2021 | Completed final sign-off Aug 2021 | 575 Market St | Ayoob & Peery Plumbing Co Inc | 30th floor: relocate eleven (11) sprinkler heads, add eight (8) sprinkler heads, and single interlock pre-action system. ref #: 2020-10106308 job #: 20-696Details
30th floor: relocate eleven (11) sprinkler heads, add eight (8) sprinkler heads, and single interlock pre-action system. ref #: 2020-10106308 job #: 20-696 | $14,675 |
| Jan 8, 2021 | Completed final sign-off Mar 2021 | 575 Market St | Siemens Industry, Inc. | fire alarm work for the "medallia" remodel on floor 23; additions are 4 duct detectors, 10 madules, 1 speaker, 14 speaker/strobes, and 1 strobe. ref. permit app # 2020-0924-4909Details
fire alarm work for the "medallia" remodel on floor 23; additions are 4 duct detectors, 10 madules, 1 speaker, 14 speaker/strobes, and 1 strobe. ref. permit app # 2020-0924-4909 | $17,000 |
| Dec 15, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | ti on 28th floor, suite 2800: demo & construction of non-structural paritions, glazing, ceilings, lighting, millwork & finishes. no change in occupancy, use or area. mep deferred.Details
ti on 28th floor, suite 2800: demo & construction of non-structural paritions, glazing, ceilings, lighting, millwork & finishes. no change in occupancy, use or area. mep deferred. | $747,493 |
| Dec 15, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | ti on 29th floor, suite 2900: demo & construction of non-structural paritions, glazing, ceilings, lighting, millwork & finishes. no change in occupancy, use or area. mep deferred.Details
ti on 29th floor, suite 2900: demo & construction of non-structural paritions, glazing, ceilings, lighting, millwork & finishes. no change in occupancy, use or area. mep deferred. | $324,039 |
| Dec 10, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | 24th/28th/38th floor: restroom & corridor upgrades. demo and construction of non-structural partitions, lighting, ceilings, millwork, plumbing and finishes. no change in occupancy, use, or areaDetails
24th/28th/38th floor: restroom & corridor upgrades. demo and construction of non-structural partitions, lighting, ceilings, millwork, plumbing and finishes. no change in occupancy, use, or area | $343,480 |
| Dec 10, 2020 | Completed final sign-off Apr 2022 | 575 Market St | Field Construction Inc. | 27/f: suite 2750: interior t.i. including demo and construction of non-structural partitions, glazing, lighting, millwork, and finishes. no change in occupancy, use, or areaDetails
27/f: suite 2750: interior t.i. including demo and construction of non-structural partitions, glazing, lighting, millwork, and finishes. no change in occupancy, use, or area | $293,300 |
| Dec 2, 2020 | Never finaled issued Jan 2021, no final | 575 Market St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 7 pendents and relocate 86 uprights on the 23rd floor. t.i. ref # 2020-09-24-4909Details
fire sprinklers; relocate 7 pendents and relocate 86 uprights on the 23rd floor. t.i. ref # 2020-09-24-4909 | $46,500 |
| Nov 30, 2020 | Completed final sign-off Mar 2021 | 575 Market St | Gci, Inc | 23rd fl: mechanical - fire smoke dampers, supply air, relocating hot water, vav terminals, restroom exhaust. electrical - power, lighting. plumbing. reference ti pa# 202009244909.Details
23rd fl: mechanical - fire smoke dampers, supply air, relocating hot water, vav terminals, restroom exhaust. electrical - power, lighting. plumbing. reference ti pa# 202009244909. | |
| Nov 30, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | suite 1700 on 17th fl: mechanical - relocate ductwork & thermostats, demo transfer air, install new exhaust fan. electrical - power, lighting & signal. ref ti pa# 202006259172Details
suite 1700 on 17th fl: mechanical - relocate ductwork & thermostats, demo transfer air, install new exhaust fan. electrical - power, lighting & signal. ref ti pa# 202006259172 | |
| Nov 30, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | 27/f: mechanical: demo low pressure duckwork, install new hvac equipment, new ductwork, new hot water piping. electrical: power, lighting and signal. ref pa# 202006259175Details
27/f: mechanical: demo low pressure duckwork, install new hvac equipment, new ductwork, new hot water piping. electrical: power, lighting and signal. ref pa# 202006259175 | |
| Nov 19, 2020 | Completed final sign-off Apr 2022 | 575 Market St | Field Construction Inc. | 3rd fl. mechanical- relocate grilles and thermostats. electrical- lighting power and signal, corridor and restroom uprades (me deferred) ref pa# 202006259178Details
3rd fl. mechanical- relocate grilles and thermostats. electrical- lighting power and signal, corridor and restroom uprades (me deferred) ref pa# 202006259178 | |
| Nov 18, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | 17th fl corridor & restrooms: mechanical, install new grilles to accomodate new ceiling installation (m.e.p. deferred). electrical, lighting, power & signal. ref pa# 202006259173Details
17th fl corridor & restrooms: mechanical, install new grilles to accomodate new ceiling installation (m.e.p. deferred). electrical, lighting, power & signal. ref pa# 202006259173 | |
| Nov 13, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | suite #850: mechanical - demo ductwork, relocate grills & thermostats. install new exhaust fan & associated ductwork, re-balance vav to valves shown. electrical - lighting, power, & signal. reference pa #2020-0625-9174.Details
suite #850: mechanical - demo ductwork, relocate grills & thermostats. install new exhaust fan & associated ductwork, re-balance vav to valves shown. electrical - lighting, power, & signal. reference pa #2020-0625-9174. | |
| Nov 13, 2020 | Completed final sign-off Apr 2022 | 575 Market St | Field Construction Inc. | suite #375: mechanical - relocate grilles & thermostats. install new exhaust fan & associated ductwork. electrical - lighting. reference pa #2020-0625-9179.Details
suite #375: mechanical - relocate grilles & thermostats. install new exhaust fan & associated ductwork. electrical - lighting. reference pa #2020-0625-9179. | |
| Nov 9, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | 30/f: mech: replace grills in bathroom to accomodate new ceiling installation. new electrical lighting. rev pa 202006259177. maher n/a.Details
30/f: mech: replace grills in bathroom to accomodate new ceiling installation. new electrical lighting. rev pa 202006259177. maher n/a. | |
| Nov 6, 2020 | Completed final sign-off Feb 2021 | 575 Market St | Siemens Industry, Inc. | fire only work for the restroom/corridor remodel on floor 30; additions are 3 speakers, 7 speaker/strobes and 1 strobe. ref. permit app #2020-0625-9177.Details
fire only work for the restroom/corridor remodel on floor 30; additions are 3 speakers, 7 speaker/strobes and 1 strobe. ref. permit app #2020-0625-9177. | $6,900 |
| Nov 5, 2020 | Completed final sign-off Feb 2021 | 575 Market St | Siemens Industry, Inc. | fire only work for the restroom/corridor remodel on floor 3; additions are 4 speakers, 7 speaker/strobes, and 2 strobes. ref app # 2020-0625-9173Details
fire only work for the restroom/corridor remodel on floor 3; additions are 4 speakers, 7 speaker/strobes, and 2 strobes. ref app # 2020-0625-9173 | $8,075 |
| Nov 5, 2020 | Completed final sign-off Feb 2021 | 575 Market St | Siemens Industry, Inc. | fire only work for the restroom/corridor remodel on floor 17; additions are 3 speakers, 7 speakers/strobes, and 1 strobe. ref # 2020-0625-9172Details
fire only work for the restroom/corridor remodel on floor 17; additions are 3 speakers, 7 speakers/strobes, and 1 strobe. ref # 2020-0625-9172 | $6,900 |
| Oct 10, 2020 | Completed final sign-off Sep 2021 | 575 Market St | Bcci Construction Company | suite 3000:ti work includes interior non-structural demo, new partitions, doors, sidelites, casework, finishes, & light fixtures. maher n/aDetails
suite 3000:ti work includes interior non-structural demo, new partitions, doors, sidelites, casework, finishes, & light fixtures. maher n/a | $900,000 |
| Sep 24, 2020 | Completed final sign-off Mar 2021 | 575 Market St | Gci, Inc | 23/f: non-structural demo: new construction - warm sheel conditions with limited finishes construction. expansion of (e) restrooms break room, new walls, new millwork.Details
23/f: non-structural demo: new construction - warm sheel conditions with limited finishes construction. expansion of (e) restrooms break room, new walls, new millwork. | $190,000 |
| Sep 18, 2020 | Completed final sign-off Oct 2020 | 575 Market St | Siemens Industry, Inc. | fire only "as built" permit for the common corridors remodels on floors 8, 25 and 27; no devices are added. the revisions reflect correct designations of replaced and new devices from initial f.a. permit app# 202003035939.Details
fire only "as built" permit for the common corridors remodels on floors 8, 25 and 27; no devices are added. the revisions reflect correct designations of replaced and new devices from initial f.a. permit app# 202003035939. | |
| Sep 11, 2020 | Completed final sign-off Feb 2021 | 575 Market St | Siemens Industry, Inc. | fire only additions of 6 speakers/strobes for the ste 850 remodel on fl 8. ref pa#202006259174Details
fire only additions of 6 speakers/strobes for the ste 850 remodel on fl 8. ref pa#202006259174 | $3,800 |
| Aug 31, 2020 | Completed final sign-off Nov 2020 | 575 Market St | Golden Gate Fire Protection Inc | fire sprinklers;relocate 8 pendant 3rd fl. relocate pendant & 2 upright on 8th fl. relocate 8 pendant and 18 uprights on the 27th fl. relocate 4 pendants 30th fl. ti ref 202006259173 3rd 202006259174 8th, 202006259172 17th fl. 202006259175 27th flDetails
fire sprinklers;relocate 8 pendant 3rd fl. relocate pendant & 2 upright on 8th fl. relocate 8 pendant and 18 uprights on the 27th fl. relocate 4 pendants 30th fl. ti ref 202006259173 3rd 202006259174 8th, 202006259172 17th fl. 202006259175 27th fl | $32,000 |
| Aug 25, 2020 | Completed final sign-off Feb 2021 | 575 Market St | Siemens Industry, Inc. | suite #2700: fire only permit on floor 27 - additions are 10 speakers/strobes. reference pa #2020-0625-9175.Details
suite #2700: fire only permit on floor 27 - additions are 10 speakers/strobes. reference pa #2020-0625-9175. | $6,350 |
| Aug 25, 2020 | Never finaled issued Aug 2020, no final | 575 Market St | Siemens Industry, Inc. | suite #375: fire only permit on floor 3 - additions are 2 speakers, 5 speakers/strobes & 1 strobe. reference pa #2020-0625-9179.Details
suite #375: fire only permit on floor 3 - additions are 2 speakers, 5 speakers/strobes & 1 strobe. reference pa #2020-0625-9179. | $4,995 |
| Aug 25, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Siemens Industry, Inc. | suite #1700: fire only permit on floor 17 - additions are 1 speaker & 8 speakers/strobes. reference pa #2020-0625-9172.Details
suite #1700: fire only permit on floor 17 - additions are 1 speaker & 8 speakers/strobes. reference pa #2020-0625-9172. | $5,715 |
| Jun 25, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | demo of non-structural partitions, gyp bd headers,light fixtures, millwork, rr plumbing & finishes. construct furred wall, soffit, lighting, poewr/data, rr plumbing and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals.Details
demo of non-structural partitions, gyp bd headers,light fixtures, millwork, rr plumbing & finishes. construct furred wall, soffit, lighting, poewr/data, rr plumbing and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals. | $213,564 |
| Jun 25, 2020 | Completed final sign-off Apr 2022 | 575 Market St | demo of non-structural partitions, gyp bd headers,light fixtures, millwork, rr plumbing & finishes. construct furred wall, soffit, lighting, poewr/data, rr plumbing and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals.Details
demo of non-structural partitions, gyp bd headers,light fixtures, millwork, rr plumbing & finishes. construct furred wall, soffit, lighting, poewr/data, rr plumbing and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals. | $276,796 | |
| Jun 25, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | suite #1700: demolition of non-structural partitions, light fixtures, millwork, & finishes. construction of non-structural partitions, lighting, poewr/data, millwork and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals.Details
suite #1700: demolition of non-structural partitions, light fixtures, millwork, & finishes. construction of non-structural partitions, lighting, poewr/data, millwork and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals. | $309,911 |
| Jun 25, 2020 | Completed final sign-off Apr 2022 | 575 Market St | suite #375: demolition of non-structural partitions, light fixtures, millwork, & finishes. construction of non-structural partitions, lighting, poewr/data, millwork and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals.Details
suite #375: demolition of non-structural partitions, light fixtures, millwork, & finishes. construction of non-structural partitions, lighting, poewr/data, millwork and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals. | $177,441 | |
| Jun 25, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | demo of non-structural partitions, gyp bd headers,light fixtures, millwork, rr plumbing & finishes. construct furred wall, soffit, lighting, poewr/data, rr plumbing and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals.Details
demo of non-structural partitions, gyp bd headers,light fixtures, millwork, rr plumbing & finishes. construct furred wall, soffit, lighting, poewr/data, rr plumbing and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals. | $194,228 |
| Jun 25, 2020 | Completed final sign-off Dec 2021 | 575 Market St | suite #2700: demolition of non-structural partitions, light fixtures, millwork, & finishes. construction of non-structural partitions, lighting, poewr/data, millwork and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals.Details
suite #2700: demolition of non-structural partitions, light fixtures, millwork, & finishes. construction of non-structural partitions, lighting, poewr/data, millwork and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals. | $319,181 | |
| Jun 25, 2020 | Completed final sign-off Dec 2021 | 575 Market St | Field Construction Inc. | suite #850: demolition of non-structural partitions, light fixtures, millwork, & finishes. construction of non-structural partitions, lighting, poewr/data, millwork and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals.Details
suite #850: demolition of non-structural partitions, light fixtures, millwork, & finishes. construction of non-structural partitions, lighting, poewr/data, millwork and finishes. no change in area or occupancy. mech., electrical, plumbing, fire life safety and sprinklers to be deferred submittals. | $178,597 |
| Jun 12, 2020 | Completed final sign-off Aug 2020 | 575 Market St | Pioneer Fire Inc. | 1/f: fire sprinklers - relocate 4 pendents, 1 dry pendent to accomodate new build out. ref t.i. 202003066373. maher n/a.Details
1/f: fire sprinklers - relocate 4 pendents, 1 dry pendent to accomodate new build out. ref t.i. 202003066373. maher n/a. | $2,500 |
| May 14, 2020 | Completed final sign-off Aug 2020 | 575 Market St | Siemens Industry, Inc. | "fire only" floor 1 - additions of (2) speakers/strobes and the relocation of (4) existing speakers/strobes for the "amazon" remodelDetails
"fire only" floor 1 - additions of (2) speakers/strobes and the relocation of (4) existing speakers/strobes for the "amazon" remodel | $1,270 |
| Mar 6, 2020 | Completed final sign-off Aug 2020 | 575 Market St | ti renovation with new interior partitions, finishes, fixtures, equipment & restroom. revision to pa #201912058718. maher naDetails
ti renovation with new interior partitions, finishes, fixtures, equipment & restroom. revision to pa #201912058718. maher na | ||
| Mar 4, 2020 | Completed final sign-off Mar 2022 | 575 Market St | Bilcor Inc | 10/f: f/a - install 2 two-way communication call stations, install 1 two-way comm expansion switch, install 1 two-way communcation power supply.Details
10/f: f/a - install 2 two-way communication call stations, install 1 two-way comm expansion switch, install 1 two-way communcation power supply. | $2,640 |
| Mar 3, 2020 | Completed final sign-off Oct 2020 | 575 Market St | Siemens Industry, Inc. | fire alarm work for the "corridor/restroom" areas on floors 8, 25 and 27; additions are 3 speakers, 17 speaker/strobes, and 3 strobes. ref pa 2019-1210-9158Details
fire alarm work for the "corridor/restroom" areas on floors 8, 25 and 27; additions are 3 speakers, 17 speaker/strobes, and 3 strobes. ref pa 2019-1210-9158 | $14,350 |
| Feb 24, 2020 | Never finaled filed Feb 2020, never issued | 575 Market St | Pioneer Fire Inc. | 29/f: suite 2950: install fire sprinklers: replace 1 pendent with upright. ref pa202001071316. maher n/a.Details
29/f: suite 2950: install fire sprinklers: replace 1 pendent with upright. ref pa202001071316. maher n/a. | $500 |
| Feb 10, 2020 | Completed final sign-off Apr 2020 | 575 Market St | Siemens Industry, Inc. | 20th fl - fire alarm work for suite 2050 remodel. additions are 5 speaker/strobes. ref pa 2019-1122-7959Details
20th fl - fire alarm work for suite 2050 remodel. additions are 5 speaker/strobes. ref pa 2019-1122-7959 | $3,170 |
| Feb 6, 2020 | Completed final sign-off Mar 2021 | 575 Market St | Gci, Inc | minimal interior t.i. of (e) built out office space, demo and construct 2 doors, relocate power and data, replace light fixtures n/a maherDetails
minimal interior t.i. of (e) built out office space, demo and construct 2 doors, relocate power and data, replace light fixtures n/a maher | $40,000 |
| Jan 30, 2020 | Completed final sign-off Mar 2021 | 575 Market St | M C S Construction Services | scope of work includes new electrical & lighting within hallways and restrooms of the 8th, 25th & 27th floors. ref pa 2019-1210-9158Details
scope of work includes new electrical & lighting within hallways and restrooms of the 8th, 25th & 27th floors. ref pa 2019-1210-9158 | $166,157 |
| Jan 30, 2020 | Never finaled issued Feb 2020, no final | 575 Market St | M C S Construction Services | 20th fl - new light & electrical work. no structural partrition (n). no change in occupancy or use. ref pa 2019-1122-7959Details
20th fl - new light & electrical work. no structural partrition (n). no change in occupancy or use. ref pa 2019-1122-7959 | $11,716,080 |
| Jan 30, 2020 | Completed final sign-off Aug 2020 | 575 Market St | Siemens Industry, Inc. | ref pa# 201911227967: fire alarm work for the suite 2500 remodel on floor 25; additons are 2 speakers and 14 speakr strobesDetails
ref pa# 201911227967: fire alarm work for the suite 2500 remodel on floor 25; additons are 2 speakers and 14 speakr strobes | $9,950 |
| Jan 30, 2020 | Completed final sign-off Apr 2020 | 575 Market St | Siemens Industry, Inc. | ref pa# 201911227966: fire alarm work for the suite 2500 remodel on floor 25; additon are 12 speaker strobesDetails
ref pa# 201911227966: fire alarm work for the suite 2500 remodel on floor 25; additon are 12 speaker strobes | $7,620 |
| Jan 16, 2020 | Never finaled issued Jan 2020, no final | 575 Market St | M C S Construction Services | ste 2550 - ref pa 2019-1122-7966 demo new lighting controls and overhead mechanical. no change in occupancy use or areaDetails
ste 2550 - ref pa 2019-1122-7966 demo new lighting controls and overhead mechanical. no change in occupancy use or area | $258,141 |
| Jan 16, 2020 | Never finaled issued Jan 2020, no final | 575 Market St | M C S Construction Services | ste 2500 - ref pa 2019-1122-7968 (n) non structural partitions. lighting and mech. no change in occupancy use or areaDetails
ste 2500 - ref pa 2019-1122-7968 (n) non structural partitions. lighting and mech. no change in occupancy use or area | $387,537 |
| Jan 14, 2020 | Completed final sign-off Apr 2020 | 575 Market St | Pioneer Fire Inc. | suite #2500 (25th fl) - relocate 6 pendents, add 5 pendents ref 201911227967Details
suite #2500 (25th fl) - relocate 6 pendents, add 5 pendents ref 201911227967 | $4,683 |
| Jan 14, 2020 | Completed final sign-off Jul 2020 | 575 Market St | Pioneer Fire Inc. | corridor/8th fl - relocate 6 pendents, remove 1 pendent maher not req. refer to pa 2019 1210 9158Details
corridor/8th fl - relocate 6 pendents, remove 1 pendent maher not req. refer to pa 2019 1210 9158 | $3,000 |
| Jan 14, 2020 | Completed final sign-off Jul 2020 | 575 Market St | Pioneer Fire Inc. | 27th fl / corridor - relocate 3 pendents refer to ti 201912109158Details
27th fl / corridor - relocate 3 pendents refer to ti 201912109158 | $1,500 |
| Jan 14, 2020 | Completed final sign-off Apr 2020 | 575 Market St | Pioneer Fire Inc. | suite 2050 - relocate 13 pendents, remove 1. refer to ti 2019 1122 7959Details
suite 2050 - relocate 13 pendents, remove 1. refer to ti 2019 1122 7959 | $5,946 |
| Jan 14, 2020 | Completed final sign-off Apr 2020 | 575 Market St | Pioneer Fire Inc. | suite 2550 (25th fl): relocate 3 pendents, add 1 pendent, relocate 2 uprights, 4 pendents. ref 201911227966Details
suite 2550 (25th fl): relocate 3 pendents, add 1 pendent, relocate 2 uprights, 4 pendents. ref 201911227966 | $5,000 |
| Jan 14, 2020 | Completed final sign-off Apr 2020 | 575 Market St | Pioneer Fire Inc. | 25th fl/cottidor - relocate 3 pendents ref 201912109158Details
25th fl/cottidor - relocate 3 pendents ref 201912109158 | $1,500 |
| Jan 7, 2020 | Expired or cancelled cancelled Jan 2026 | 575 Market St | ste 2950 - selective demoltion of one conference room, non-load bearing partitions, ceiling grid & tile lighting & finishes. construction of new wall, lighting & power & data & finishesDetails
ste 2950 - selective demoltion of one conference room, non-load bearing partitions, ceiling grid & tile lighting & finishes. construction of new wall, lighting & power & data & finishes | $5,000 | |
| Dec 10, 2019 | Completed final sign-off Mar 2021 | 575 Market St | M C S Construction Services | common areas and restrooms which includes removing and adding new finishes to the common areas and upgrading the restrooms to comple with codeDetails
common areas and restrooms which includes removing and adding new finishes to the common areas and upgrading the restrooms to comple with code | $16,157 |
| Dec 5, 2019 | Completed final sign-off Aug 2020 | 575 Market St | Build Group Inc. | remodel of retail space, new layout and egress drawings. new dining area, new restroom. refer to original pa #201805239949. maher naDetails
remodel of retail space, new layout and egress drawings. new dining area, new restroom. refer to original pa #201805239949. maher na | $100,000 |
| Nov 26, 2019 | Never finaled issued Jun 2020, no final | 575 Market St | Thomas Swan Sign Co Inc | install one illuminated double-face projecting sign for "amazon go"Details
install one illuminated double-face projecting sign for "amazon go" | $5,000 |
| Nov 22, 2019 | Completed final sign-off Sep 2020 | 575 Market St | M C S Construction Services | suite #2500: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.Details
suite #2500: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit. | $387,537 |
| Nov 22, 2019 | Completed final sign-off Sep 2020 | 575 Market St | M C S Construction Services | suite #2550: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.Details
suite #2550: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit. | $258,141 |
| Nov 22, 2019 | Completed final sign-off Sep 2020 | 575 Market St | M C S Construction Services | suite #2050: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.Details
suite #2050: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit. | $117,101 |
| Oct 15, 2019 | Completed final sign-off Oct 2019 | 575 Market St | Bilcor Inc | 6/f: installa 2 call stations in lobby. voluntary installation. maher n/a.Details
6/f: installa 2 call stations in lobby. voluntary installation. maher n/a. | $1,320 |
| Sep 27, 2019 | Completed final sign-off Apr 2020 | 575 Market St | Ayoob & Peery Plumbing Co Inc | fire sprinklers: relocate & remove sprinkler per ti. relocate 15 and remove 5 on 6th fl. ref pa #201908209246.Details
fire sprinklers: relocate & remove sprinkler per ti. relocate 15 and remove 5 on 6th fl. ref pa #201908209246. | $3,375 |
| Sep 26, 2019 | Completed final sign-off Jul 2020 | 575 Market St | Gci, Inc | 18th fl - mep for pa 2019-0816-9077Details
18th fl - mep for pa 2019-0816-9077 | $400,000 |
| Sep 24, 2019 | Completed final sign-off Nov 2019 | 575 Market St | Siemens Industry, Inc. | 18th fl - fire alarm work for the "medallia" remodel; 10 existing speaker/strobes will be replace at their current locations with new devices. ref pa 2019-0816-9077Details
18th fl - fire alarm work for the "medallia" remodel; 10 existing speaker/strobes will be replace at their current locations with new devices. ref pa 2019-0816-9077 | $3,175 |
| Sep 12, 2019 | Completed final sign-off Oct 2019 | 575 Market St | Siemens Industry, Inc. | 6th fl - fire alarm work for the "baker" remodel; addition of 1 speaker/strobe and teh removal of 2 speakers at former phone rooms (now a private office) ref pa 2019-0820-9246Details
6th fl - fire alarm work for the "baker" remodel; addition of 1 speaker/strobe and teh removal of 2 speakers at former phone rooms (now a private office) ref pa 2019-0820-9246 | $650 |
| Sep 11, 2019 | Completed final sign-off Jan 2020 | 575 Market St | Field Construction Inc. | 6th fl. t.i. elec connect power to new (e) lights, ower outlets & equipment, connect to base building panels, no work on (e) bus riser system, no no new taps, no changes to the main service board, hvac: revise (e) cooling only zones to conform with new layout,modify duct distribution & reprogram (e)Details
6th fl. t.i. elec connect power to new (e) lights, ower outlets & equipment, connect to base building panels, no work on (e) bus riser system, no no new taps, no changes to the main service board, hvac: revise (e) cooling only zones to conform with new layout,modify duct distribution & reprogram (e) | $70,000 |
| Sep 4, 2019 | Completed final sign-off Nov 2019 | 575 Market St | Pioneer Fire Inc. | 18th floor: relocate 9 uprights, 6 pendents, 2 concealers, 9 upright concealers add 2 up and 2 pend.. ref app#201908169077Details
18th floor: relocate 9 uprights, 6 pendents, 2 concealers, 9 upright concealers add 2 up and 2 pend.. ref app#201908169077 | $13,000 |
| Aug 20, 2019 | Completed final sign-off Jan 2020 | 575 Market St | Field Construction Inc. | demo of 3 phone rooms (non loade bearing partitions), miner ceiling, light fixtures and finishes. 6 new offices (non load bearing, non rted partitions) new cewiling/grid tile, lighting fixtures, power signal and finishesDetails
demo of 3 phone rooms (non loade bearing partitions), miner ceiling, light fixtures and finishes. 6 new offices (non load bearing, non rted partitions) new cewiling/grid tile, lighting fixtures, power signal and finishes | $150,000 |
| Aug 16, 2019 | Completed final sign-off Jul 2020 | 575 Market St | Gci, Inc | ubterior ti of (e) office space. partition, finishes, lighting, pantry f/ls system to remain intact & operational mep under sep permitDetails
ubterior ti of (e) office space. partition, finishes, lighting, pantry f/ls system to remain intact & operational mep under sep permit | $300,000 |
| Jul 23, 2019 | Never finaled filed Jul 2019, never issued | 575 Market St | the project scope to renovate portions of the ground floor of the existing building & the exterior plaza.Details
the project scope to renovate portions of the ground floor of the existing building & the exterior plaza. | $1,958,796 | |
| Jul 23, 2019 | Never finaled filed Jul 2019, never issued | 575 Market St | selective demo in plaza per ab-017. improvement under separate permit.Details
selective demo in plaza per ab-017. improvement under separate permit. | $175,083 | |
| Jun 27, 2019 | Completed final sign-off Jul 2019 | 575 Market St | Bilcor Inc | 22nd floor: life safety ti: install 2 call stations, 1 power supply and 1 expansion module.Details
22nd floor: life safety ti: install 2 call stations, 1 power supply and 1 expansion module. | $2,640 |
| May 14, 2019 | Completed final sign-off Jun 2019 | 575 Market St | Pioneer Fire Inc. | 1st fl - relocate 12 pendents and remove 14 pendentsDetails
1st fl - relocate 12 pendents and remove 14 pendents | $9,500 |
| Apr 3, 2019 | Never finaled issued Apr 2019, no final | 575 Market St | Siemens Industry, Inc. | fire alarm for common area on floors 18,19,20 & 29 add 4 duct det and 4 relay modules ref 201811155926 maher naDetails
fire alarm for common area on floors 18,19,20 & 29 add 4 duct det and 4 relay modules ref 201811155926 maher na | $8,340 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 575 Market St | Discount Signs & Neon Inc | amazon go sign - install 1 illuminate wall signDetails
amazon go sign - install 1 illuminate wall sign | $4,000 |
| Mar 19, 2019 | Completed final sign-off Aug 2019 | 575 Market St | Field Construction Inc. | revision to pa #201901099889. suite 2135Details
revision to pa #201901099889. suite 2135 | |
| Mar 19, 2019 | Never finaled issued Mar 2019, no final | 575 Market St | Field Construction Inc. | revision to pa #201901099892. suite 2145.Details
revision to pa #201901099892. suite 2145. | |
| Mar 15, 2019 | Never finaled issued Jun 2019, no final | 575 Market St | Source Planning And Construction Inc | revision to pa 201805250169. 4th flr t.i. addition of card readers and 9 push to exit button. maher n/a.Details
revision to pa 201805250169. 4th flr t.i. addition of card readers and 9 push to exit button. maher n/a. | $2,000 |
| Mar 13, 2019 | Completed final sign-off Apr 2019 | 575 Market St | Siemens Industry, Inc. | 21st fl, ste 2135 fire alarm work - additions are 1 smoke detector and 5 speaker/strobes ref pa 2019-0109-9889Details
21st fl, ste 2135 fire alarm work - additions are 1 smoke detector and 5 speaker/strobes ref pa 2019-0109-9889 | $3,800 |
| Mar 13, 2019 | Completed final sign-off Apr 2019 | 575 Market St | Siemens Industry, Inc. | 21st fl, ste 2145 fire alarm work - additions are 1 smoke detector and 5 speaker/strobes ref pa 2019-0109-9892Details
21st fl, ste 2145 fire alarm work - additions are 1 smoke detector and 5 speaker/strobes ref pa 2019-0109-9892 | $3,800 |
| Mar 12, 2019 | Never finaled issued Mar 2019, no final | 575 Market St | Siemens Industry, Inc. | fire alarm - 18th flr suite 1850 - add 2 duct det and 13 speaker/strobes ref 201812138188 maher naDetails
fire alarm - 18th flr suite 1850 - add 2 duct det and 13 speaker/strobes ref 201812138188 maher na | $11,400 |
| Mar 12, 2019 | Completed final sign-off Mar 2019 | 575 Market St | Siemens Industry, Inc. | fire alarm - 22nd flr suite 2200 - add 5 duct det and 21 speaker/strobes and 1 relay module. ref 201811307182 maher naDetails
fire alarm - 22nd flr suite 2200 - add 5 duct det and 21 speaker/strobes and 1 relay module. ref 201811307182 maher na | $21,730 |
| Mar 11, 2019 | Completed final sign-off Aug 2019 | 575 Market St | Field Construction Inc. | suite 2145. mep for tenant improvement. new power, lighting & controls. (n) supply & return grilles install transfer fan ref pa# 201901099892 % 201908195611Details
suite 2145. mep for tenant improvement. new power, lighting & controls. (n) supply & return grilles install transfer fan ref pa# 201901099892 % 201908195611 | $10,000 |
| Mar 11, 2019 | Completed final sign-off Aug 2019 | 575 Market St | Field Construction Inc. | suite 2135. mep for tenant improvement. new power, lighting & controls. (n) supply & return grilles install transfer fanDetails
suite 2135. mep for tenant improvement. new power, lighting & controls. (n) supply & return grilles install transfer fan | $10,000 |
| Feb 28, 2019 | Completed final sign-off Mar 2019 | 575 Market St | Anderson, Rowe & Buckley, Inc. | 18/f suite 1850: fire sprinkler ti - 48 relocate, 6 add. total 54 ref pa 2018-1213-8188. maher n/a.Details
18/f suite 1850: fire sprinkler ti - 48 relocate, 6 add. total 54 ref pa 2018-1213-8188. maher n/a. | $15,000 |
| Feb 21, 2019 | Completed final sign-off Aug 2019 | 575 Market St | Source Planning And Construction Inc | 16th fl. suite 1650 (e) t.i. construct non-load bearing partitions, (n) doors, frames, (n) millwork & (n) finsishes sprinklers referred onlyDetails
16th fl. suite 1650 (e) t.i. construct non-load bearing partitions, (n) doors, frames, (n) millwork & (n) finsishes sprinklers referred only | $52,000 |
| Feb 21, 2019 | Never finaled issued Feb 2019, no final | 575 Market St | Siemens Industry, Inc. | 1st fl - fire alarm work for permit #2 on the "store front" remodel; the additions to initial permit 2018-1217-8451 are 1 smoke detector, 1 pull station, 7 modules and 1 strobe power supply. changes reflect "as-builts" installation. ref pa 2018-0523-9849Details
1st fl - fire alarm work for permit #2 on the "store front" remodel; the additions to initial permit 2018-1217-8451 are 1 smoke detector, 1 pull station, 7 modules and 1 strobe power supply. changes reflect "as-builts" installation. ref pa 2018-0523-9849 | $6,200 |
| Jan 28, 2019 | Completed final sign-off Apr 2019 | 575 Market St | Anderson, Rowe & Buckley, Inc. | 21st fl, ste 2145 - existing fire sprinkler ti. ref pa 2019-0109-9892. relocate 11 sprinklers and add 1 sprinklerDetails
21st fl, ste 2145 - existing fire sprinkler ti. ref pa 2019-0109-9892. relocate 11 sprinklers and add 1 sprinkler | $8,000 |
| Jan 28, 2019 | Completed final sign-off Apr 2019 | 575 Market St | Anderson, Rowe & Buckley, Inc. | 21st fl, ste 2135 - existing fire sprinkler ti. ref pa 2019-0109-9889. relocate 10 sprinklers, change out 3 sprinklers.Details
21st fl, ste 2135 - existing fire sprinkler ti. ref pa 2019-0109-9889. relocate 10 sprinklers, change out 3 sprinklers. | $7,000 |
| Jan 28, 2019 | Completed final sign-off Jun 2019 | 575 Market St | Field Construction Inc. | 18/f: suite 1850: mechanical and electrical - title 24 compliance for 201812138188. maher n/a.Details
18/f: suite 1850: mechanical and electrical - title 24 compliance for 201812138188. maher n/a. | $210,000 |
| Jan 22, 2019 | Completed final sign-off Jun 2019 | 575 Market St | Field Construction Inc. | mep for t.i. improvement ref pa 201811155926Details
mep for t.i. improvement ref pa 201811155926 | $300,000 |
| Jan 22, 2019 | Never finaled issued Jan 2019, no final | 575 Market St | Field Construction Inc. | mep for t.i. improvement ref pa 201811307182Details
mep for t.i. improvement ref pa 201811307182 | $300,000 |
| Jan 9, 2019 | Completed final sign-off Aug 2019 | 575 Market St | Field Construction Inc. | suite 2135 - ti demo of non struct partitions, etc. construct new non str partitions, etc. mep/fire/life safety under sep permit. bldg fully sprinklered maher n/a.Details
suite 2135 - ti demo of non struct partitions, etc. construct new non str partitions, etc. mep/fire/life safety under sep permit. bldg fully sprinklered maher n/a. | $107,000 |
| Jan 9, 2019 | Never finaled issued Jan 2019, no final | 575 Market St | Field Construction Inc. | suite 2145 - ti demo of non struct partitions, etc. construct new non str partitions, etc. mep/fire/life safety under sep permit. bld fully sprinklered maher n/a.Details
suite 2145 - ti demo of non struct partitions, etc. construct new non str partitions, etc. mep/fire/life safety under sep permit. bld fully sprinklered maher n/a. | $102,000 |
| Dec 28, 2018 | Never finaled issued Dec 2018, no final | 575 Market St | Siemens Industry, Inc. | fire alarm, 30th flr, suite 3050 - 2 speaker/strobes were added as well as another being relocated. a speaker was also removed, sffd testing inspector requested this permit ref 201809241138Details
fire alarm, 30th flr, suite 3050 - 2 speaker/strobes were added as well as another being relocated. a speaker was also removed, sffd testing inspector requested this permit ref 201809241138 | $634 |
| Dec 21, 2018 | Completed final sign-off Feb 2019 | 575 Market St | Pioneer Fire Inc. | 22/f: relocate 17 pendents ref 201811307182Details
22/f: relocate 17 pendents ref 201811307182 | $24,868 |
| Dec 21, 2018 | Completed final sign-off Mar 2019 | 575 Market St | Pioneer Fire Inc. | floors 18/19/20/29: relocate 8 pendants,ref ti 201811155926.Details
floors 18/19/20/29: relocate 8 pendants,ref ti 201811155926. | $36,400 |
| Dec 20, 2018 | Never finaled issued Dec 2018, no final | 575 Market St | Bilcor Inc | 12th fl - fire alarm ti install 2 call stations, install 1 power supply, install 1 expansion moduleDetails
12th fl - fire alarm ti install 2 call stations, install 1 power supply, install 1 expansion module | $2,400 |
| Dec 17, 2018 | Completed final sign-off Feb 2019 | 575 Market St | Siemens Industry, Inc. | fire alarm for "stire front" remodel on floor 1 add 6 duct dets, and 10 speaker/strobes. ref 201805239949Details
fire alarm for "stire front" remodel on floor 1 add 6 duct dets, and 10 speaker/strobes. ref 201805239949 | $15,840 |
| Dec 13, 2018 | Completed final sign-off Jun 2019 | 575 Market St | Field Construction Inc. | 18th fl, ste 1850 ti demo of (e) non-structural partitions, doors, glazing & ceiling etc. mep, life safety and sprinklers under separate permitDetails
18th fl, ste 1850 ti demo of (e) non-structural partitions, doors, glazing & ceiling etc. mep, life safety and sprinklers under separate permit | $416,000 |
| Dec 12, 2018 | Completed final sign-off Dec 2018 | 575 Market St | Eco Fire Sprinklers Inc | ref pa# 201805239949; add (4) new cold box heads & relocate (6) penant sprinklers heads to accomadate new ceiling & walls after demo of (e) suiteDetails
ref pa# 201805239949; add (4) new cold box heads & relocate (6) penant sprinklers heads to accomadate new ceiling & walls after demo of (e) suite | $5,000 |
| Nov 30, 2018 | Completed final sign-off Jan 2019 | 575 Market St | Field Construction Inc. | 22nd floor:suite 2200 t.i. including demo bldg back. deferred submittals for meps,life safety and sprinklers. n/a for maherDetails
22nd floor:suite 2200 t.i. including demo bldg back. deferred submittals for meps,life safety and sprinklers. n/a for maher | $830,000 |
| Nov 16, 2018 | Completed final sign-off Dec 2018 | 575 Market St | Siemens Industry, Inc. | 36/f: f/a work for "softbank" remodel. additions are 4 speaker/strobes. ref pa#201809261451. maher n/a.Details
36/f: f/a work for "softbank" remodel. additions are 4 speaker/strobes. ref pa#201809261451. maher n/a. | $3,170 |
| Nov 16, 2018 | Never finaled issued Nov 2018, no final | 575 Market St | Siemens Industry, Inc. | 30/f: f/a work for spec suite 3050 remodel. additions are 1 speaker and 4 speaker/strobes. ref pa#201809241138. maher n/a.Details
30/f: f/a work for spec suite 3050 remodel. additions are 1 speaker and 4 speaker/strobes. ref pa#201809241138. maher n/a. | $3,170 |
| Nov 15, 2018 | Completed final sign-off Jun 2019 | 575 Market St | Field Construction Inc. | 18/19/20/29th floors: renovation of common areas, corridors and restrooms. n/a for maher.Details
18/19/20/29th floors: renovation of common areas, corridors and restrooms. n/a for maher. | $850,000 |
| Nov 5, 2018 | Completed final sign-off Jan 2019 | 575 Market St | Novo Construction Inc | 36/f: new lighting and branch circuitry to (e) panel. title-24 compliance. ref t.i. 201809261451. maher n/a.Details
36/f: new lighting and branch circuitry to (e) panel. title-24 compliance. ref t.i. 201809261451. maher n/a. | $10,000 |
| Nov 5, 2018 | Completed final sign-off Dec 2018 | 575 Market St | Ayoob & Peery Plumbing Co Inc | 36th flr - add 3 relocate zero(0) and plug zero(0), to conform with the new wall and ceiling layout of tiDetails
36th flr - add 3 relocate zero(0) and plug zero(0), to conform with the new wall and ceiling layout of ti | $1,575 |
| Nov 1, 2018 | Completed final sign-off Mar 2019 | 575 Market St | Build Group Inc. | revision to pa #201505239949. divide storage room to add trash room, updates to plumbing, electrical & refridgeration, update finishes.Details
revision to pa #201505239949. divide storage room to add trash room, updates to plumbing, electrical & refridgeration, update finishes. | |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 575 Market St | Siemens Industry, Inc. | 5th fl - fire alarm work to acquire an as-built permit for additions on the "mindspace" remodel. 2 smoke detectors and 1 module that were installed now shown on the drawings. ref pa 2018-0419-6755Details
5th fl - fire alarm work to acquire an as-built permit for additions on the "mindspace" remodel. 2 smoke detectors and 1 module that were installed now shown on the drawings. ref pa 2018-0419-6755 | $1,770 |
| Oct 1, 2018 | Completed final sign-off Mar 2019 | 575 Market St | Field Construction Inc. | 30th fl suite 3050 electrical only. ref 201802090894, 201809241138Details
30th fl suite 3050 electrical only. ref 201802090894, 201809241138 | $67,000 |
| Sep 27, 2018 | Completed final sign-off Nov 2018 | 575 Market St | Pioneer Fire Inc. | ste #3050: relocate 33 pendents and remove 3 pendents ref 201802090894Details
ste #3050: relocate 33 pendents and remove 3 pendents ref 201802090894 | $5,412 |
| Sep 26, 2018 | Completed final sign-off Jan 2019 | 575 Market St | Novo Construction Inc | demo of ceiling height partitions construction of new partitions, construction of new partttions, doors hardware finishes and millworkDetails
demo of ceiling height partitions construction of new partitions, construction of new partttions, doors hardware finishes and millwork | $120,000 |
| Sep 24, 2018 | Completed final sign-off Mar 2019 | 575 Market St | Field Construction Inc. | 30th fl: rev to pa# 201802090894 was a spec. suite, client now has a tenant, revising original sets, adding arch/mech, under this permit all other permits defferred under seperate permitDetails
30th fl: rev to pa# 201802090894 was a spec. suite, client now has a tenant, revising original sets, adding arch/mech, under this permit all other permits defferred under seperate permit | $86,000 |
| Sep 20, 2018 | Completed final sign-off Oct 2018 | 575 Market St | Siemens Industry, Inc. | fire alarm work for the "suite 1900" remodel on floor 19; additions are 1 duct detector, 2 speakers, 7 speaker/strobe, and 1 strobe. ref pa #201807315973. maher naDetails
fire alarm work for the "suite 1900" remodel on floor 19; additions are 1 duct detector, 2 speakers, 7 speaker/strobe, and 1 strobe. ref pa #201807315973. maher na | $7,840 |
| Sep 20, 2018 | Completed final sign-off Oct 2018 | 575 Market St | Siemens Industry, Inc. | fire alarm work for the "suite 2950" remodel on floor 29; additions are 2 duct detector, 13 speaker/strobe, and 1 strobe. ref pa #201807315971. maher na.Details
fire alarm work for the "suite 2950" remodel on floor 29; additions are 2 duct detector, 13 speaker/strobe, and 1 strobe. ref pa #201807315971. maher na. | $11,960 |
| Sep 18, 2018 | Completed final sign-off Dec 2018 | 575 Market St | Bilcor Inc | install (2) call stations, install (1) power supply, install (1) expansion moduleDetails
install (2) call stations, install (1) power supply, install (1) expansion module | $4,000 |
| Sep 13, 2018 | Completed final sign-off Feb 2019 | 575 Market St | Field Construction Inc. | 29th floor/suite #2950: meps for 201807315971Details
29th floor/suite #2950: meps for 201807315971 | $180,000 |
| Sep 12, 2018 | Completed final sign-off Oct 2018 | 575 Market St | Pribuss Engineering Inc | fire sprinkler tenant on 33rd fl relocate 33, add 33, total 66Details
fire sprinkler tenant on 33rd fl relocate 33, add 33, total 66 | $33,924 |
| Sep 11, 2018 | Completed final sign-off Oct 2018 | 575 Market St | Pioneer Fire Inc. | suite 1900 relocate 12 pendent and remove 14 pendents gc 201807315973 maher naDetails
suite 1900 relocate 12 pendent and remove 14 pendents gc 201807315973 maher na | $9,132 |
| Sep 11, 2018 | Completed final sign-off Oct 2018 | 575 Market St | Pioneer Fire Inc. | suite 2950 - relocate 13 pendents and remove 14 pendents gc 201807315973Details
suite 2950 - relocate 13 pendents and remove 14 pendents gc 201807315973 | $3,352 |
| Sep 10, 2018 | Completed final sign-off Feb 2019 | 575 Market St | Field Construction Inc. | 19th flr suoite 1900 - mech & ele for 201807315973 maher naDetails
19th flr suoite 1900 - mech & ele for 201807315973 maher na | $95,000 |
| Sep 4, 2018 | Completed final sign-off Nov 2018 | 575 Market St | Siemens Industry, Inc. | 33rd flr - fire alarm for crone horwarth add 1 duct det, 11 speakers and 30 speaker/strobes ref 201807194923 maher naDetails
33rd flr - fire alarm for crone horwarth add 1 duct det, 11 speakers and 30 speaker/strobes ref 201807194923 maher na | $27,570 |
| Aug 16, 2018 | Completed final sign-off Aug 2018 | 575 Market St | Siemens Industry, Inc. | fire alarm work for the "equity office" remodel on floor 12; additions are 5 speakers, 8 speaker/strobes, and 2 strobes ref pa 2018-0615-1994. n/a for maher.Details
fire alarm work for the "equity office" remodel on floor 12; additions are 5 speakers, 8 speaker/strobes, and 2 strobes ref pa 2018-0615-1994. n/a for maher. | $9,340 |
| Jul 31, 2018 | Completed final sign-off Feb 2019 | 575 Market St | Field Construction Inc. | suite 1900 - t.i. demolition of non-structural partitions, doors, glazing, ceilings, light fixtures, plmg fixtures,casework and finishes. construction of new non structural partitions, doors, glazing, ceilings, light fixtures, casework and finishes.Details
suite 1900 - t.i. demolition of non-structural partitions, doors, glazing, ceilings, light fixtures, plmg fixtures,casework and finishes. construction of new non structural partitions, doors, glazing, ceilings, light fixtures, casework and finishes. | $225,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Field Construction Inc. (54), Siemens Industry, Inc. (45), Pioneer Fire Inc. (16), M C S Construction Services (11), Gci, Inc (7), Bilcor Inc (6), Golden Gate Fire Protection Inc (6), Richlen Construction (6), Ayoob & Peery Plumbing Co Inc (5), Source Planning And Construction Inc (5), Anderson, Rowe & Buckley, Inc. (4), Peacock Construction (4), Golden Gate Sign Company Inc. (3), Bcci Construction Company (2), Build Group Inc. (2), Novo Construction Inc (2), Acco Engineered Systems Inc. Dba Acco En, Capitol Electric Const, Construct & Maintain Corp, Discount Signs & Neon Inc, Eco Fire Sprinklers Inc, Intelligent Technologies & Services Inc, Pribuss Engineering Inc, Thomas Swan Sign Co Inc
- Architects
- Lawrence Smith (9), Stanley Lew (9), Katharine Dwyer (7), Ashley Miller (6), Douglas Tom (4), Dominique Price (3), George Soskin (3), Blake Olson (2), David De Valeria (2), Douglas Tom (2), Marian Meyer (2), Nicolas S. Detorres (2), Rollie Childers (2), James Terry, Koichi Tamaoki, Sophia Tyra, Teresa Emery
- Engineers
- Stephen Shaffer (11), Rodolfo Bustos (7), Jesus B Cabellon Jr (5), Lars P. Mortensen (5), Alexander Joseph Pacheco (4), Carlo Biscocho (4), Xuong Quach (3), Dean Way Chandler (2), Joshua N. Hover (2), Peter Kogan (2), Alex Habliston, Alexander Pacheco, Alicia Thorpe, Amit Wadhwa, Courtney O Wassom, Craig Ristow, Darrell Stein Ii, Douglas Tom, Douglas W. Mehl, Edward Rivera, George Dimic, Gregory Bruce, Jillian P. Moritz, John Harvey, Katharine Dwyer, Kevin Christensen, Kyle J Linenfelser, Kylie Lo, Levi G. Abarte, Levi Malabuyo, Mozart Faizi, Stephen Glatt, Todd M. See
- Authorized agents
- Loren Sheffield (2), Ashley Miller, Brady Holcomb, Chris Detijem, Christina Nguyen
- Designers
- Golden Gate Sign Company Inc. (3), Joseph Tarantino, Pioneer Fire Inc.
- Pmt consultant/expediters
- Donald Dammen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.