Dominique Price
- Listed as
- architect
- Firm
- As::::Is
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Jun 2025
20 permits since 2000 (architect on 20 permits): 15 completed, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 11, 2025 | Completed final sign-off Dec 2025 | 760 Market St | Gci, Inc | tenant improvement including installation of 6 existing prefabricated phone booths with new power, fire sprinklers, and seismic at each booth, to meet current code.Details
tenant improvement including installation of 6 existing prefabricated phone booths with new power, fire sprinklers, and seismic at each booth, to meet current code. | $40,000 |
| Apr 9, 2025 | Completed final sign-off Dec 2025 | 760 Market St | Gci, Inc | 7th and 10th floors:tenant improvement including intallation of 22 prefabricated phone booths with new power and fire sprinklers at each booth. existing accessible phone rooms indicated. new updated room signage with braille for disabled access upgrades. electrical under separate permit.Details
7th and 10th floors:tenant improvement including intallation of 22 prefabricated phone booths with new power and fire sprinklers at each booth. existing accessible phone rooms indicated. new updated room signage with braille for disabled access upgrades. electrical under separate permit. | $160,000 |
| Mar 5, 2025 | Completed final sign-off Jul 2025 | 85 02nd St | Anderson Construction Group Inc | 4/f: reposition of (4) phone booth to comply with code required placement. fire and life safety system to remain intact and operational.Details
4/f: reposition of (4) phone booth to comply with code required placement. fire and life safety system to remain intact and operational. | $9,344 |
| Dec 14, 2023 | Expired or cancelled cancelled Feb 2025 | 634 Mangels Av | (e) windows and doors at rear of house to be replaced. new skylight in (e) roof. new deck platform (55 sq ft ) to be constructed at rear of house.Details
(e) windows and doors at rear of house to be replaced. new skylight in (e) roof. new deck platform (55 sq ft ) to be constructed at rear of house. | $8,000 | |
| Nov 8, 2023 | Completed final sign-off Jun 2024 | 634 Mangels Av | interior renovation of (e) kitchen, eating nook and bathroom renovation, includes new casework, new plumbing fixtues (replace existing), and new appliancesDetails
interior renovation of (e) kitchen, eating nook and bathroom renovation, includes new casework, new plumbing fixtues (replace existing), and new appliances | $80,000 | |
| Aug 31, 2023 | Completed final sign-off Oct 2024 | 601 California St | Golden Gate Fire Protection Inc | 4/f: addition of 2 fire sprinkler to 2 phone booths.Details
4/f: addition of 2 fire sprinkler to 2 phone booths. | $3,000 |
| Apr 17, 2023 | Never finaled issued Oct 2023, no final | 601 California St | Peacock Construction | 4/f: addition of 1 new tekbooth & 1 tek room to existing office space.Details
4/f: addition of 1 new tekbooth & 1 tek room to existing office space. | $2,497 |
| Jun 17, 2021 | Completed final sign-off Sep 2021 | 660 Lombard St | Capetti Construction | repair of (e) fence at northeast side of property with additional wood supports and footings. fence does not touch neighboring bldgs. to comply with complaint 202178604Details
repair of (e) fence at northeast side of property with additional wood supports and footings. fence does not touch neighboring bldgs. to comply with complaint 202178604 | $10,000 |
| Mar 22, 2021 | Expired or cancelled cancelled May 2025 | 660 Lombard St | Capetti Construction | construction of new fence, trash enclosure, and entry gate at chestnut st. all fences and structure less than 10' above sidewalk.Details
construction of new fence, trash enclosure, and entry gate at chestnut st. all fences and structure less than 10' above sidewalk. | $75,000 |
| Sep 24, 2020 | Completed final sign-off Mar 2021 | 575 Market St | Gci, Inc | 23/f: non-structural demo: new construction - warm sheel conditions with limited finishes construction. expansion of (e) restrooms break room, new walls, new millwork.Details
23/f: non-structural demo: new construction - warm sheel conditions with limited finishes construction. expansion of (e) restrooms break room, new walls, new millwork. | $190,000 |
| Aug 5, 2020 | Completed final sign-off Mar 2021 | 699 08th St | Novo Construction Inc | 6/f: t.i. of (e) office: add single door and glazing to storage room and double door to replace (e) door on exit pathway. replace solid door with full lite door at receptaion. fire and life safety system to remain intact and operation.Details
6/f: t.i. of (e) office: add single door and glazing to storage room and double door to replace (e) door on exit pathway. replace solid door with full lite door at receptaion. fire and life safety system to remain intact and operation. | $70,000 |
| Mar 11, 2020 | Never finaled issued Mar 2020, no final | 601 California St | Build Group Inc. | 4th fl - revision to pa 2019-1126-8198 reduction of lighting, removal of doors, additional millworkDetails
4th fl - revision to pa 2019-1126-8198 reduction of lighting, removal of doors, additional millwork | |
| Feb 6, 2020 | Completed final sign-off Mar 2021 | 575 Market St | Gci, Inc | minimal interior t.i. of (e) built out office space, demo and construct 2 doors, relocate power and data, replace light fixtures n/a maherDetails
minimal interior t.i. of (e) built out office space, demo and construct 2 doors, relocate power and data, replace light fixtures n/a maher | $40,000 |
| Jan 21, 2020 | Completed final sign-off Mar 2021 | 699 08th St | Novo Construction Inc | 6/f: ref pa# 201908128489: interior t.i. of (e) reception area, demo of door and partion of wall, construction includes new gas related glazing, deluge sprinklers (deferred submittal, hav) new stroage room/closet, and miner finish changesDetails
6/f: ref pa# 201908128489: interior t.i. of (e) reception area, demo of door and partion of wall, construction includes new gas related glazing, deluge sprinklers (deferred submittal, hav) new stroage room/closet, and miner finish changes | $156,000 |
| Aug 16, 2019 | Completed final sign-off Jan 2020 | 425 Market St | Gci, Inc | 25th floor ti - non structural partitions, ceiling, casework, mepsDetails
25th floor ti - non structural partitions, ceiling, casework, meps | $520,000 |
| Aug 16, 2019 | Completed final sign-off Jul 2020 | 575 Market St | Gci, Inc | ubterior ti of (e) office space. partition, finishes, lighting, pantry f/ls system to remain intact & operational mep under sep permitDetails
ubterior ti of (e) office space. partition, finishes, lighting, pantry f/ls system to remain intact & operational mep under sep permit | $300,000 |
| Aug 12, 2019 | Completed final sign-off Mar 2021 | 699 08th St | Novo Construction Inc | 6th floor: interior tenant improvement of existing built out office space ont he 6th floor. construction to include new partitions, finishes, lighting and pantry.Details
6th floor: interior tenant improvement of existing built out office space ont he 6th floor. construction to include new partitions, finishes, lighting and pantry. | $3,150,000 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 699 08th St | Novo Construction Inc | 5th and 6th flr, demo. demo non-structural partions millwork, finishes, plumbing fixtures, lighting and ceilingsDetails
5th and 6th flr, demo. demo non-structural partions millwork, finishes, plumbing fixtures, lighting and ceilings | $70,000 |
| Dec 13, 2018 | Completed final sign-off Dec 2019 | 188 Spear St | Principal Builders Inc. | 9th floor:t.i. to construct new partitions glazing doors, millwork, finishes, and mep systems. fire sprinklers/life safety on seperate permit. n/a for maherDetails
9th floor:t.i. to construct new partitions glazing doors, millwork, finishes, and mep systems. fire sprinklers/life safety on seperate permit. n/a for maher | $1,950,000 |
| Jul 10, 2018 | Completed final sign-off Mar 2019 | 188 Spear St | Principal Builders Inc. | 11th fl: interior tenant improvement to demo & construct new partitions, doors, glazing, millwork, finishes, lighting/power and mechanical system. fire sprinklers and alarms on separte permit. maher naDetails
11th fl: interior tenant improvement to demo & construct new partitions, doors, glazing, millwork, finishes, lighting/power and mechanical system. fire sprinklers and alarms on separte permit. maher na | $1,955,000 |