Block 3717, lot 019

188 Spear St

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 29, 2025Completed
final sign-off Oct 2025
188 Spear StGolden Gate Fire Protection Inc6th fl - add 1 upright & 3 pendents. ref 202507281710$1,000
Sep 18, 2025Completed
final sign-off Oct 2025
188 Spear StJohnson Controls Fire6/fl- provide (1) new speaker strobe. ref#: 202501228817$750
Aug 13, 2025Completed
final sign-off Oct 2025
188 Spear StSkyline Constructionmechanical and electrical work for tenant improvement on the 6th floor. ref: 202507281710. no plumbing fixtures.$4,000
Jul 28, 2025Completed
final sign-off Oct 2025
188 Spear StSkyline Construction6th floor: new non-structural partitions ceiling work and new finishes to create 3 private offices. mep deferred$80,000
Feb 18, 2025Completed
final sign-off Jul 2025
188 Spear StAnderson, Rowe & Buckley, Inc.existing fire sprinklers system tenant improvements. add 16 sprinkles in the basement$10,000
Feb 14, 2025Completed
final sign-off Feb 2025
188 Spear StJohnson Controls Fire6th floor: provide and install 2 new speaker strobes as shown on the drawings.$1,000
Jan 22, 2025Completed
final sign-off Mar 2025
188 Spear StSkyline Constructionrevision for pa # 2023-1219-2741 proposed relocation of one phone booth & adding one phone booth on the 6th fl
Jan 2, 2025Completed
final sign-off Jan 2025
188 Spear StGolden Gate Fire Protection Incfire sprinkler t.i; relocate 1 concealed pendent on the 5/f and relocate 3 concealed pendents on the 6/f. ref#202312192741$1,000
Nov 14, 2024Completed
final sign-off Apr 2025
188 Spear StGolden Gate Fire Protection Inc5th & 6th fl fire sprinklers ti ref pa #2023-1219-2741: relocate 3 concealed pendents on 5th fl & 2 concealed pendents on the 6th fl$1,750
Nov 7, 2024Completed
final sign-off Dec 2024
188 Spear StJohnson Controls Fire5th and 6th floor. provide and install 10 new speaker strobesx to phone booths on 5th and 6th floors as shown on drawings. ref. 202312192741$10,000
Sep 23, 2024Completed
final sign-off Oct 2024
188 Spear StAyoob & Peery Plumbing Co Inc9/f: add 2, relocate 2 fire sprinkler per ti. ref permit 202408158787.$2,484
Aug 15, 2024Completed
final sign-off Oct 2024
188 Spear StNovo Construction Inc9/fl- office ti to include construction of non sturctural partitions, finishes, lights, millwork and appliances$64,000
Dec 19, 2023Completed
final sign-off Mar 2025
188 Spear StSkyline Constructioninstalling and anchoring furniture phone booths on office fl. 5 & 6. no change of use, interior only$102,000
Oct 13, 2023Completed
final sign-off Nov 2024
188 Spear StJohnson Controls Fireref 202308083954. 1/f fa modification: demo (e) device in the suite not including core device. spkr/strbs shall be maintained for shell space notification tenant space to remain unoccupied after the demo. any new ti will be submitted on a separted permit.$1,500
Oct 5, 2023Completed
final sign-off Nov 2023
188 Spear StAnderson, Rowe & Buckley, Inc.7/f: existing fire sprinkler system tenant improvement add - 1 sprinkler.$650
Aug 31, 2023Completed
final sign-off Sep 2023
188 Spear StGolden Gate Fire Protection Inc1/f: replace 20 pendents with 20 uprights and delete 2 pendents, ref pa# 202308083954.$225,000
Aug 8, 2023Completed
final sign-off Feb 2024
188 Spear StRichlen Constructionselective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017.$225,000
Aug 3, 2023Completed
final sign-off Nov 2023
188 Spear StG Swanson Constr. Inc.7/f: install interior partitions, door and card reader to enclose secure storage room, project area is approx 698 sqft.$30,000
Jun 13, 2023Never finaled
filed Jun 2023, never issued
188 Spear StJohnson Controls Firefire as built to pa# 202305258655. as-built requested by sffd inspector for job card signoff.
Jun 1, 2023Completed
final sign-off Jun 2023
188 Spear StAaa Restaurant Fire Control/Dba Aaa Fireas built drawing 202111303263, ansul$5
May 25, 2023Completed
final sign-off Jul 2023
188 Spear StJohnson Controls Fire4/f,6/f,8/f: as built record drawings for f/a permit 202208231100 as requested by sffd inspector for inspection and sign off.
Jan 17, 2023Completed
final sign-off Jan 2023
188 Spear StGolden Gate Fire Protection Incfire sprinklers; add 3 concealed pendents on the 4th fl, 2 concealers on the 6th fl, 2 concealers on the 7th fl, and 4 concealers on the 8th fl. ref t.i.# 202209222945.$6,006
Sep 22, 2022Completed
final sign-off Jul 2023
188 Spear StSkyline Construction4th, 6th, 7th & 8th fl - furniture modifications to include seismic anchoring of 11 existing furniture phone booths. fire alarm and sprinkler under separate permit$176,000
Aug 23, 2022Completed
final sign-off Oct 2023
188 Spear StJohnson Controls Fire4th, 6th, 8th flrs: provide 11 new strobe devices in phone booths.$1,500
Nov 30, 2021Completed
final sign-off Jun 2023
188 Spear StAaa Restaurant Fire Control/Dba Aaa Firerework (1) (e) ansul r-102 fire suppression system in the main kitchen area on the gound floor.$4,500
Aug 5, 2021Completed
final sign-off Jan 2022
188 Spear StSkyline Construction7th flr: addition of a glazed addition barrier with frosted film along the (e) hallway to serve as a visual barrier to open space 07.940.$22,000
Jun 24, 2021Completed
final sign-off Mar 2022
188 Spear StSkyline Construction2nd, 3rd, 5th and 6th floors - mechanical electric and plumbing work for ti at the ref pa 2020-0919-4548$30,000
Apr 13, 2021Completed
final sign-off Jun 2021
188 Spear StGolden Gate Fire Protection Incfire sprinklers; relocate 2 pendents and relocate 1 upright on the 2nd floor. relocate 5 pendents on the 3rd floor. relocate 5 pendents on the 5th floor. reloate 8 pendents on the 6th floor. t.i. ref # 2020-0919-4548.$10,500
Mar 25, 2021Completed
final sign-off Jun 2021
188 Spear StJohnson Controls Firemodify existing fire alarm system. partial floor fire alarm tenant improvement to floors 2, 3, 5, 6. (9) new speaker/strobes, (1) new call box. ref to ti # 2020-0919-4548$8,000
Mar 24, 2021Completed
final sign-off Mar 2022
188 Spear StSkyline Constructionrevision to pa# 202009194548. to demo & relocate pendants, extend partition, revise soffit alignment at 6th fl. added scope at 4th & 8th floor. m.e.p. under separate permit.$20,000
Dec 28, 2020Completed
final sign-off Jun 2021
188 Spear StJohnson Controls Fireas built record drawings for permit application 2018-1051-3147. drawing submitted for re-approval per request of field inspector.
Nov 23, 2020Completed
final sign-off Mar 2021
188 Spear StJohnson Controls Fireexisting fire alarm. submit for review per inspector kathy harold * for approved/extended fire permit/2018-1015-3147 * ref to ti permit # 2018-0907-9405
Nov 9, 2020Completed
final sign-off Feb 2021
188 Spear StSkyline Construction7/f: revision to pa# 2019.1205.8727 to provide structural plans for modular partitions for tenant improvement.
Sep 29, 2020Completed
final sign-off Oct 2022
188 Spear StSkyline Construction7/f: mechanical & electrical for t.i. demo (e) duct, install low press duct, (n) heat pump, (n) cooling only vav's, condensor water piping. no new fsd's. ref pa.201912058727, maher n/a.$45,000
Sep 28, 2020Never finaled
issued Mar 2021, no final
188 Spear StSkyline Construction7/f: revision to pa#201912058721 to add banquette seating near kitchenette, addition of power @ alternate workspaces & phone booth locations.
Sep 19, 2020Completed
final sign-off Mar 2022
188 Spear StSkyline Constructionpartial ti to floors 2, 3, 5, & 6, to include selective demo, new partitions, ceiling modifications, lighting replacement & finishes. mep under separate permit.$500,000
Sep 1, 2020Completed
final sign-off Nov 2020
188 Spear StGolden Gate Fire Protection Incfire sprinkler only. relocate 10 uprights & 4 pendents on the 7th floor. ref#201912058727$7,000
Dec 17, 2019Never finaled
issued Jan 2020, no final
188 Spear StSkyline Constructionfloor finishes (approx 400sf), power work in room 402 elec to be design /build$7,800
Dec 12, 2019Expired or cancelled
cancelled Aug 2023
188 Spear StJohnson Controls Fireadd 1 relay module in fire alarm system in order to report alarm to tenants security system in order to repaort alarm to tenant security system$528
Dec 5, 2019Completed
final sign-off Mar 2021
188 Spear StSkyline Construction7th floor: selective demolition, minor modifications to partitions, ceilings, and lighting. new finishes throughout new all gender restrooms. new product demostration area$190,000
Jun 6, 2019Completed
final sign-off Dec 2019
188 Spear StPrincipal Builders Inc.10th floor: revision to app#201902263813 to remove operable partition from scope of work. n/a for maher
May 15, 2019Completed
final sign-off Jul 2019
188 Spear StJohnson Controls Fire9th fl: modify (e) fire alarm, provide, relocate and demo (e) devices as shown as showing drawing, all new wireing to be class a modify 2 way communication to add call box$37,196
May 15, 2019Completed
final sign-off Aug 2019
188 Spear StJohnson Controls Fire10th fl: modify (e) fire alarm system, provide new device, relocate and demo existing as shown, this system shall be class a, 2 way communication system, add call box on the 10th floor elvater lobby. adding: 3 smoke detectors, 1 control module, 19 strobes, 35 speaker strobes and 1 nac.$42,500
Apr 29, 2019Completed
final sign-off May 2019
188 Spear StSkyline Construction4th & 8th flr mechanical work for tenant improvement. ref pa's 201901099897 & 201811156050.
Apr 25, 2019Completed
final sign-off Jul 2019
188 Spear StAnderson, Rowe & Buckley, Inc.10th fl: existing fire sprinkler system t1. 5 added sprinklers. 94 relocated sprinklers. ref arch #201903074652$50,000
Apr 25, 2019Completed
final sign-off Jun 2019
188 Spear StAnderson, Rowe & Buckley, Inc.9th fl: existing fire sprinkler system t1.12 added sprinklers. 60 relocated sprinklers. 7 changed out sprinklers. ref arch #201812138242$39,500
Apr 16, 2019Completed
final sign-off Mar 2023
188 Spear StJohnson Controls Fireas built fire alarm ref 201902011830
Apr 16, 2019Completed
final sign-off Mar 2023
188 Spear StJohnson Controls Fireas built fire alarm ref 201902011829
Apr 3, 2019Completed
final sign-off Sep 2022
188 Spear StAnderson Burton Construction Incremove electronic gates on floors 2,3,4,5,7,8 and bldg security vestibules on floors 2,3,4,5,7,8. revision to app#201806202382 to remove all references to work on floor 6. (no work on floor 6). n/a for maher
Mar 18, 2019Never finaled
issued Mar 2019, no final
188 Spear St4th & 8th floor evacuation maps. (3 each floor)$3,300
Mar 14, 2019Completed
final sign-off Dec 2019
188 Spear StPrincipal Builders Inc.structural details for installation of an operable partitions on the 10th fl. please refer to pa #201902263813 for arch permit. 10th fl.$30,000
Mar 7, 2019Completed
final sign-off Dec 2019
188 Spear StPrincipal Builders Inc.revision to app#201902263813 to convert partrial break room area to coffee bar with full service and storage area to kitchen prep. & title 24 mep to construct mechanical, electrical and plmg system on 10th floor. n/a for maher$720,995
Feb 26, 2019Completed
final sign-off Dec 2019
188 Spear StPrincipal Builders Inc.ti on 10th fl - to construct new partitions, doors, finishes, glazing, millwork, and ceilings. mep, fire alarms, and sprinklers on separate permits. determine occupancy load for assembly area. maher n/a.$1,240,191
Feb 19, 2019Completed
final sign-off Nov 2023
188 Spear StPrincipal Builders Inc.10th fl: demo of existing non structural partitions, doors, glazing, millwork finishes 10th fl. space remain vacant per ab-17. ada will be adressed under future ti permit$107,000
Feb 13, 2019Completed
final sign-off Mar 2023
188 Spear StJohnson Controls Fireas-built. record drawings for pa 201809079405. 6th flr scope removed from plans: sheets fa-105 removed, 1 smoke sensor removed, 1 relay removed, 1 2-way call box removed
Feb 8, 2019Completed
final sign-off May 2019
188 Spear StSkyline Construction4th * 8th floors - electrical for ti. ref pa 2018-1115-6050$30,000
Feb 1, 2019Completed
final sign-off Mar 2023
188 Spear StJohnson Controls Fireref pa# 201811156050; remove and relocate notificaton per owner requested. add new device as need for compliance$7,393
Feb 1, 2019Completed
final sign-off Mar 2019
188 Spear StJohnson Controls Fire12/f: fire alarm: t.i.install 1 new power supply, 1 new relay,4 smoke sensors, 30 speaker/strobes,19 strobes. install 1 call box in elevator lobby for (e) emergency comm system. ref pa201810112919. maher n/a.$30,600
Feb 1, 2019Completed
final sign-off Mar 2023
188 Spear StJohnson Controls Fireref pa# 201811156050; remove and relocate notificaton as per owner requested. add new device as need for compliance$3,766
Jan 11, 2019Completed
final sign-off Feb 2019
188 Spear StGolden Gate Fire Protection Inc4th & 8th flr. fire sprinklers. relocate 29 pendents at 4th flr. relocate 116 pendant sprinklers at 8th flr. relocate 6 upright sprinklers$26,775
Jan 9, 2019Completed
final sign-off May 2019
188 Spear StSkyline Constructionrevision to pa 2018-1115-6050 to relocate new unisex restroom
Dec 18, 2018Completed
final sign-off Sep 2021
188 Spear StAnderson, Rowe & Buckley, Inc.ref pa# 201812188581; (e) sprinker system t.i. 80 relocated sprinklers, 15 added sprinklers$47,500
Dec 13, 2018Completed
final sign-off Dec 2019
188 Spear StPrincipal Builders Inc.9th floor:t.i. to construct new partitions glazing doors, millwork, finishes, and mep systems. fire sprinklers/life safety on seperate permit. n/a for maher$1,950,000
Dec 4, 2018Completed
final sign-off Mar 2023
188 Spear StJohnson Controls Fire11th fl: as-built record drawing for pa #201809190729 fire alarm tenant improvement. ref pa #201807104076.
Nov 15, 2018Completed
final sign-off May 2019
188 Spear StSkyline Constructionpartial fl ti on the 4th & 8th fl to include selective demo, new partitions, ceiling, lighting, finishes and new unisex restroom. mep under sep permit.$2,000,000
Nov 7, 2018Never finaled
issued Nov 2018, no final
188 Spear StMetropolitan Electrical Constructionprovide new lighting & branch circuiting to (e) panel. provide ca t-24 compliance. ref. p.a.#2018 0620 2382$39,822
Oct 26, 2018Completed
final sign-off Sep 2022
188 Spear StAnderson Burton Construction Incfloors 2-8. revision to pa #201806202382. relocation of 24hr comm intercoms (coord. w/201809079405) minor increase in demo, minor decrease in other scopes.
Oct 15, 2018Completed
final sign-off Mar 2023
188 Spear StJohnson Controls Firef/a: new 2-way communication system, 1 main control, 2 master stations, 7 call stations, 4 fire alarm modules. associated permit #201809079405. maher na$34,790
Oct 11, 2018Completed
final sign-off May 2019
188 Spear StPrincipal Builders Inc.12th floor: t.i. to construct new partitions, doors, millwork, finishes, and mep systems. life safety and sprinklers on separate permit.$1,960,000
Oct 2, 2018Completed
final sign-off Nov 2018
188 Spear StAnderson, Rowe & Buckley, Inc.existing fire sprinkler system ti 70 relocated sprinkler 19 added sprinklers$40,000
Sep 19, 2018Completed
final sign-off Mar 2023
188 Spear StJohnson Controls Firefire alarm ti - install 36 new speaker/strobe appliances and 12 new strobe appliances$25,500
Sep 7, 2018Completed
final sign-off May 2019
188 Spear StJohnson Controls Fire2-8 floors. modify (e) fire alarm system. install 15 new addressable smoke detectors and 7 new addressable relays for tenant access control integration. ref pa 201806202382. install (n) ecs call boxes at elevator landings. maher n/a$14,000
Jul 10, 2018Completed
final sign-off Mar 2019
188 Spear StPrincipal Builders Inc.11th fl: interior tenant improvement to demo & construct new partitions, doors, glazing, millwork, finishes, lighting/power and mechanical system. fire sprinklers and alarms on separte permit. maher na$1,955,000
Jun 20, 2018Completed
final sign-off May 2019
188 Spear StAnderson Burton Construction Incremove security turnstiles in suites, replace w/door. flrs 2-8$313,000
Dec 8, 2015Completed
final sign-off Jan 2016
188 Spear StGolden Gate Fire Protection Inc8th floor: fire sprinkler only - relocate 8 pendents & add 3 uprights for marvin stein associates = 11 total. ref pa 2015-1118-2933. maher na$5,500
Dec 4, 2015Completed
final sign-off Jan 2016
188 Spear StJohnson Controls Fire8th floor ti consists of adding 92) new speakers as shown on drawings. ref pa 2015-1118-2933$1,500
Nov 18, 2015Completed
final sign-off Feb 2016
188 Spear StNovo Construction Inc8th flr: partial floor tenant improvement, selective demolition of ceiling,lighting, floor finishes ,mechanical and electrical.$20,000
May 22, 2015Completed
final sign-off Aug 2015
188 Spear StBcci Construction Companyshower room in 10th floor.$50,000
May 11, 2015Completed
final sign-off Jul 2015
188 Spear StHathaway Dinwiddie Co.2nd floor - revision to pa #201406239080: storage room changed to green screen room, control, & recording rooms (new architectrual, mechanical & electrical sheets). n/a maher ordinance$54,770
Mar 31, 2015Never finaled
issued Mar 2015, no final
188 Spear Ststreet space
Mar 27, 2015Completed
final sign-off Jun 2015
188 Spear StGolden Gate Fire Protection Inc2nd floor fire spirnkler only - relocate 56 pendents, add 4 pendents, relocate 8 upright, add 2 uprights for "amazon". total 70 heads. ref pa #2014.0623.9080. n/a maher ordinance$35,000
Oct 14, 2014Completed
final sign-off Oct 2014
188 Spear StJohnson Controls Firefire alarm as-builts for permit application #2014-0806-3173. 5th/6th floor only. 2nd floor to be done under separate permit. (remove 2nd floor work from original permit.)
Oct 14, 2014Completed
final sign-off Jul 2015
188 Spear StJohnson Controls Firefire alarm t.i. to 2nd floor. (1) smoke detector, (1) dual relay iam, relay, (10) speak strobes and (4) speakers. 2nd floor scope is being removed from original application #2014-0806-3173 for phasing purposes.$8,500
Sep 19, 2014Completed
final sign-off Nov 2014
188 Spear StJohnson Controls Firemodify existing fire alarm system: provide (14) new appliances, (1) one expansion power supply & demo & relocate existing appliances. t.i. pa#2014-0611-8142. n/a maher ordinance.$9,500
Sep 12, 2014Never finaled
issued Sep 2014, no final
188 Spear StThomas Swan Sign Co Inc6 evacuation plan maps 5th and 6th floors$1,800
Aug 6, 2014Never finaled
issued Aug 2014, no final
188 Spear StJohnson Controls Firemodify (e) fire alarm system on 2/f, 5/f & 6/f: add 2 power supplies, 2 duct sensors, 3 smoke sensors, 3 relays, 36 ceiling mount speaker/strobes, 26 wall mount speaker/strobes & 4 speakers. t.i. pa# 201406168429, 201406168430, 201406239080, n/a ordinance #155-13$28,000
Jul 25, 2014Completed
final sign-off Sep 2014
188 Spear StPribuss Engineering Incmodify sprinkler head locations at 9th floor, relocate 44 heads and add 28 heads$38,082
Jul 14, 2014Completed
final sign-off Aug 2014
188 Spear StGolden Gate Fire Protection Increlocate 97 upright sprinklers heads on the 5th fl and relocate 68 pendent sprinklers. relocate 93 upgright sprinklers on the 6th fl and 62 pendent sprinklers. update earthquake bracing.maher not req$164,000
Jun 23, 2014Completed
final sign-off Jul 2015
188 Spear StHathaway Dinwiddie Co.commercial tenant improvement including selective demolition, interior partitions, ceilings, lighting, finishes, furniture, mechanical, plumbing & electrical. f/a and sprinklers under separate permit. n/a ordinance #155-13.$1,040,000
Jun 16, 2014Completed
final sign-off Oct 2014
188 Spear StHathaway Dinwiddie Co.commercial tenant improvement including slective demo, interior partitions, ceilings, lighting, casework, floor finishes, glazing, furniture, mechanical, plumbing, electrical$2,080,000
Jun 16, 2014Completed
final sign-off Oct 2014
188 Spear StHathaway Dinwiddie Co.commercial tenant improvement including selective demo, interior partitions, ceilings, lighting, casework, floor finishes, glazing, furniture, mechanical, plumbing, and electric$2,080,000
Jun 11, 2014Completed
final sign-off Aug 2015
188 Spear StBcci Construction Company9th flr: interior tenant improvement on the 9th flr, partial area including (n) private offices, (n) conference rooms and new mep systems, life safety and sprinklers under separate permit; compliance with ord 155-13 not required. skyfold doors under deferred submittal$825,000
Feb 3, 2014Never finaled
issued Feb 2014, no final
188 Spear Ststreet space and mta parking
Dec 20, 2013Completed
final sign-off Feb 2014
188 Spear StJohnson Controls Firemodify existing fire alarm system on ground floor, adding (4) duct smoke sensors, (5) ceiling mount speaker/strobes and removing (1) duct smoke sensor, (3) ceiling mount speakers. t.i. pa# 201309045892$6,700
Dec 10, 2013Completed
final sign-off Jan 2014
188 Spear StHathaway Dinwiddie Co.change team room occupancy to office. revision to app#201310250247
Nov 15, 2013Completed
final sign-off Dec 2013
188 Spear StGolden Gate Fire Protection Increlocate 8 upright sprinkler heads on the 3rd floor.$4,120
Nov 12, 2013Completed
final sign-off Dec 2013
188 Spear StGolden Gate Sign Company Inc.to erect non-illuminated sign. channel letters.$3,000
Nov 12, 2013Completed
final sign-off Jan 2014
188 Spear StJohnson Controls Firemodify extg fire alarm system: adding one wall mount strobe only. relocating one speaker and one speaker/strobes. t.i. bldg app#201310250247$3,500
Nov 12, 2013Never finaled
issued Nov 2013, no final
188 Spear StSimplexgrinnell Lp.fire alarm as-built drawings to permit application 2013-0702-1007.
Nov 8, 2013Completed
final sign-off Feb 2014
188 Spear StPotter Fire Protectionrelocate 30 fire sprinklers & plug 6 on the street level only. ref pa# 201309045892$14,000
Oct 30, 2013Never finaled
issued Oct 2013, no final
188 Spear Ststreet space and mta parking
Oct 25, 2013Completed
final sign-off Jan 2014
188 Spear StHathaway Dinwiddie Co.3rd fl partial, convert oppen office space to private conference room. (a-3 occupancy). life safety to be under sep permit. 1 hvac upsized box to free new conference room$63,000
Oct 15, 2013Completed
final sign-off Aug 2015
188 Spear StBcci Construction Company9th floor:revision to 201305207356: as built drawing to update smoke control report all changed pages bubbled. pages without bubbles are referenced only. fire alarm under seperate permit.
Sep 12, 2013Completed
final sign-off Apr 2014
188 Spear StSigntech Electrical Advertising Inc.install 2 illuminated exterior wall signs.$6,000
Sep 12, 2013Completed
final sign-off Apr 2014
188 Spear StSigntech Electrical Advertising Inc.install 6 non branded window signs (illuminated).$12,000
Sep 12, 2013Completed
final sign-off Apr 2014
188 Spear StSigntech Electrical Advertising Inc.install 2 illuminated window signs$4,000
Sep 4, 2013Completed
final sign-off Mar 2014
188 Spear StDeb Construction Llc1st floor #190: tenant improvement of existing retail space for new branch bank including exterior storefront, interior partitions, restroom, finishes.$300,906
Sep 4, 2013Completed
final sign-off Jan 2014
188 Spear StEagle Bay Enterprises, Inc (Dba Garnett9th floor - install (3) evacuation signs. spear & howard.$900
Jul 25, 2013Completed
final sign-off Sep 2013
188 Spear StSimplexgrinnell Lp.10th floor-modify (e) fire alarm system-adding five wall mount speaker/strobes, 1 ceiling mount speaker/strobe, 1 wall mount strobes, 1 ceiling mount speaker & relocating 4 wall mount speaker/strobes.$7,500
Jul 2, 2013Completed
final sign-off Jan 2014
188 Spear StSimplexgrinnell Lp.9th floor - modify (e) fire alarm system: adding one (1) in-duct smoke sensor w/relay, six(6) photo smoke sensors, two (2) door holders, thirteen (13) wall mount speaker/strobes, & two (2) ceiling mount speakers. ref t.i. #2013.05.20.7356$12,000
Jul 1, 2013Completed
final sign-off Sep 2013
188 Spear StPribuss Engineering Incfire sprinkler t.i. add 43 heads, relocate 7 heads, total 50 heads. ref. to t.i.# 201305207356$25,730
Jun 26, 2013Completed
final sign-off Feb 2014
188 Spear StBcci Construction Company10th flr: tenant improvement on the 10th flr including open offices, private offices, conference rooms, and associated mechanical & elec inlcuding new vav boxes & (3) new fire dampers and new lighting, life safety & sprinklers under separate permit.$720,000
Jun 20, 2013Completed
final sign-off Sep 2013
188 Spear StPribuss Engineering Inc10th floor-fire sprinkler ti-relocate 13 (e) sprinklers & add 42 fire sprinklers, ref pa #2013.01.22.8414$28,304
May 20, 2013Completed
final sign-off Aug 2015
188 Spear StBcci Construction Companyinterior tenant improvement for partial area of 9th floor including new open office, private office, conference rooms, idf closet. new mep system. life safety and sprinkler work under sepparate permit. no structural work is to be excuted under this permit.$1,500,000
Apr 8, 2013Completed
final sign-off Jun 2013
188 Spear StEagle Bay Enterprises, Inc (Dba Garnettfloors 10, 11 & 12 - install (3) evacuation signs (total)$1,000
Mar 6, 2013Completed
final sign-off Mar 2013
180 Spear StCertified Fire & Safety Coinstall ansul fire system into kitchen hood at ground floor, ref #2012.1113.4001$3,000
Feb 11, 2013Completed
final sign-off Mar 2013
188 Spear StSimplexgrinnell Lp.modify existing fa system on 1st floor. suite 150. add one monitor module (iam) for ansul system and three ceiling mount speaker/strobes$2,000
Jan 22, 2013Completed
final sign-off Aug 2015
188 Spear StBcci Construction Company10th floor-revision to pa# 2012-1128-4997 & 2012-1011-1820-work covers venting for the fireplace$15,000
Jan 11, 2013Completed
final sign-off Mar 2013
180 Spear StPotter Fire Protectionground floor:relocate 10 fire sprinklers, add 1 fire sprinkler, and plug 2. ti app#201211134001$4,500
Jan 10, 2013Completed
final sign-off Feb 2013
188 Spear StGolden Gate Fire Protection Incfire sprinkler system upgrade, relocate 162 pendant sprinkler heads on the 4th floor. relocate 1 uprights. ti app #201212186468$83,945
Jan 7, 2013Completed
final sign-off Feb 2013
188 Spear StSimplexgrinnell Lp.4th floor:modify extg fire alarm system on 4th floor:adding one nac panel, 6 photo smoke sensors, 2 relay iam, 32 wall mount speaker strobes, 4 wall mont strobes, and 3 ceiling mount speakers. t. i. app#201208167529.$19,200
Dec 26, 2012Never finaled
issued Dec 2012, no final
188 Spear Ststreet space permit.
Dec 26, 2012Expired or cancelled
cancelled Jan 2026
188 Spear StHathaway Dinwiddie Co.revision 201211013272. remove access controlled egress from exiting scheme
Dec 20, 2012Completed
final sign-off Mar 2013
188 Spear StPribuss Engineering Inc10th,11th, & 12th floor:fire sprinkler t.i./ 10th floor add 63, 11th floor add 73, 12th floor add 82. ref app#201211284997,201210111822,201210111820$129,684
Dec 20, 2012Completed
final sign-off Aug 2015
188 Spear StSimplexgrinnell Lp.ti pa#2012-11-28-4997. modify (e) fire alarm system on 10th fl. adding one nac panel, four duct smoke sensors, five photo smoke sensors, one wall mount strobe, two w.p. strobes, sixteen wall mnt strobes, one ceil mnt speaker/strobe, two w.p. ceil mnt speakers.$20,000
Dec 18, 2012Never finaled
issued Jan 2013, no final
188 Spear StHathaway Dinwiddie Co.4th floor mechanical electrical full floor tenant imrpovement in multi tenant building including selective demo, partitions, new kitchenette, ceiling and finishes, plumbing and life safety to be design build under separate permit. deferred submittal for 201208167529$175,000
Dec 13, 2012Completed
final sign-off Feb 2013
188 Spear StHathaway Dinwiddie Co.evacuation signage only, total of 12 signs. ti pa#2012-0726-5875, 2012-0809-6968, 2012-0816-7529 & 2012-0816-7530.
Nov 28, 2012Completed
final sign-off Aug 2015
188 Spear StBcci Construction Companyti in partial area of the 10th floor including open offices, lounges, pantries, meeting room, server room & associated mech & elect work. ls & sprinklers under separate permit. new horizontal exit- panic harware reired on assembly exit doors- new a-3 occupnacy$1,280,000
Nov 21, 2012Completed
final sign-off Feb 2013
188 Spear StIntelligent Technologies & Services Inc7th floor-provide pre-action detection & controls in server room. fire alarm connection & pre-action system under separate permit.$9,800
Nov 19, 2012Never finaled
issued Nov 2012, no final
188 Spear StHathaway Dinwiddie Co.mechanical and electrical plans for 2nd floor t.i. in multi-tenant bldg, including select demo, partitions, ceilings and finishes life safety alarm and sprinkler to be design build under seperate permit. ref pa #201210152027$330,000
Nov 16, 2012Completed
final sign-off Feb 2013
188 Spear StGolden Gate Fire Protection Incfire sprinkler system upgrade; relocate 65 pendent sprinkler heads on the 2nd floor. ti pa# 201210152027$33,475
Nov 13, 2012Completed
final sign-off Mar 2013
180 Spear Stinterior improvements to a 1045 sq ft ground floor space, to be used as a fast casual restaurant with a type b occupancy less than 50. it includes the construction of partial height partitions, counters, and a suspended act ceiling.$80,000
Nov 1, 2012Expired or cancelled
cancelled Jan 2026
188 Spear StHathaway Dinwiddie Co.revision to 201208167530. remove delayed egress at bypass doors. turnstile enclosures changed to full height drywall partition at specific locations, revised unisex restroom layout
Nov 1, 2012Expired or cancelled
cancelled Jan 2026
188 Spear StHathaway Dinwiddie Co.revision to 201208167529.. remove delayed egress at bypass doors. turnstile enclosures changed to full height drywall partition at specific locations, revised unisex restroom layout. reconfigure layout to add team room. 2 med conf rooms converted to rf labs. 2x2 susp clg grid throughout$150,000
Oct 30, 2012Completed
final sign-off Aug 2015
188 Spear StSimplexgrinnell Lp.11th floor-modify (e) fire alarm system-adding 1 nac panel, 1 duct sensor, 3 photo sensors, 25 wall mounts speaker strobes, 2 ceiling mount speakers$11,200
Oct 30, 2012Completed
final sign-off Feb 2013
188 Spear StSimplexgrinnell Lp.12th floor-modify (e) fire alarm system-adding 1 nac panel, 1 duct sensor, 3 photo sensors, 24 wall mounts speaker strobes, 1 ceiling mount speakers strobe & 2 ceiling mount speakers$12,500
Oct 26, 2012Never finaled
issued Oct 2012, no final
188 Spear StSimplexgrinnell Lp.2nd floor - modify (e) fire alarm system. adding (4) photo sensors, (6) duct sensors, (6) encapsulaed relays, (6) remote test switches, (1) relay iam, (1) relay spdt, (2) w.p. wall mount strobes, (2) w.p. ceiling speakers, (12) wall mount speaker strobes.$10,600
Oct 15, 2012Completed
final sign-off Jan 2013
188 Spear StHathaway Dinwiddie Co.2nd floor: partial floor t. i. in multi tenant building including selective demolition, patitions, ceiling, and finishes. 1 hour rated won door. public assembly permit required from sffd 698 second st. electrical, mechanical, plmg and life safety to be design/build on separate permit.$890,000
Oct 11, 2012Expired or cancelled
cancelled Jan 2026
188 Spear St7th floor-revision to pa# 2012-0809-6968-changed decaped egress doors to access controlled doors, re-used bathroom layout, removed 2 team rooms
Oct 11, 2012Expired or cancelled
cancelled Jan 2026
188 Spear St8th floor-revision to pa# 2012-0726-5875. changed delayed egress doors to access controlled doors, re-used bathroom layout.
Oct 11, 2012Completed
final sign-off Jul 2013
188 Spear StBcci Construction Companyt.i. on the 12th floor including new offices and associated mechanical and electrical work. fire and life safty under seperate permit.$1,280,000
Oct 11, 2012Completed
final sign-off May 2013
188 Spear StBcci Construction Companyt.i. on the 11th floor including new offices and associated mechanical and electrical work. fire and life safty under seperate permit.$1,280,000
Oct 9, 2012Completed
final sign-off Feb 2013
188 Spear StGolden Gate Fire Protection Inc3rd floor:fire sprinkler system upgrade. relocate 83 pendent sprinkler heads on the 3rd floor. relocate 88 upright heads. app#201208167530$88,065
Sep 27, 2012Completed
final sign-off Jan 2013
188 Spear StGolden Gate Fire Protection Incfire sprinkler system upgrade, relocate 83 pendant prinkler heads on the 7th flr, relocate 80 upright heads, add 4 new upright head and pre-action valve, ti 201208096968$88,065
Sep 14, 2012Never finaled
issued Sep 2012, no final
188 Spear StSimplexgrinnell Lp.modify existig fire alarm system o the 7th fl. add 4 photo sensors. 1 relay iam, 28 wall mount speaker strobes, 2 wall mount strobes, 5 ceiling mount speakers$18,900
Sep 14, 2012Never finaled
issued Sep 2012, no final
188 Spear StHathaway Dinwiddie Co.mechanical & electrical plabs for 7th floor tenant improvement in multi tenant bldg. including selected demo, partitions, ceilings, and finishes. fire safety alarm & sprinkler under separate permit. (defer sumittal for pa# 2012 0809 6968)$275,000
Sep 14, 2012Completed
final sign-off Jan 2013
188 Spear StGolden Gate Fire Protection Incfire sprinker system upgrade. relocate 86 pendent sprinkler heads on the 8th fl. relocate 85 upgright heads$88,065
Sep 14, 2012Never finaled
issued Sep 2012, no final
188 Spear StSimplexgrinnell Lp.modify existing fire alarm system o 3rd fl. add 1 mac panel. 3 photo sensors, 1 relay, iam 23 wal mount speaker strobes, 9 wall mount strobes, 6 ceiling mount speakers$19,350
Sep 14, 2012Never finaled
issued Sep 2012, no final
188 Spear StSimplexgrinnell Lp.modify existing fire alarm system on the 8th fl. add four photo sensors. 1 relay iam, 27 wall mount speaker strobes, 6 wall mount strobes, 6 ceiling mount speakers$19,800
Sep 14, 2012Never finaled
issued Sep 2012, no final
188 Spear StHathaway Dinwiddie Co.mechanical & electrical plabs for 3rd floor tenant improvement in multi tenant bldg. including selected demo, partitions, ceilings, and finishes. fire safety alarm & sprinkler under separate permit. (defer sumittal for pa# 2012 0816 7530)$275,000
Sep 10, 2012Never finaled
issued Sep 2012, no final
188 Spear StHathaway Dinwiddie Co.mechanical plans for 8th fl tenant improvement in multi tenant building including selective demolition, partitions, ceilings, and finishes. life safety design build under separate permit$275,000
Aug 22, 2012Never finaled
issued Aug 2012, no final
188 Spear Ststreet space
Aug 16, 2012Completed
final sign-off Feb 2013
188 Spear StHathaway Dinwiddie Co.4th floor: full floor t.i. in multi tenant bldg including selective demolition, partitions, new kitchenette, ceiling and finishes. electrical, mech, plmg, and life safety to be design/build under seperate permit.$1,163,000
Aug 16, 2012Completed
final sign-off Feb 2013
188 Spear StHathaway Dinwiddie Co.3rd floor: full floor t.i. in multi tenant bldg including selective demolition, partitions, new kitchenette, ceiling and finishes. electrical, mech, plmg, and life safety to be design/build under seperate permit.$1,163,000
Aug 9, 2012Completed
final sign-off Jan 2013
188 Spear StHathaway Dinwiddie Co.7th floor:full floor t.i. in multi tenant bldg including selective demolition,partitions, new kitchenette, ceiling and finishes. electrical,mech, plmg, and life safety to be design/build under seperate permit.provide full area detection for delayed egress per cbc-2010 sec. 907.3.2.1$3,489,000
Jul 26, 2012Completed
final sign-off Jan 2013
188 Spear StHathaway Dinwiddie Co.8th floor phase 1-full floor tenant improvement in multi-tenant building including selective demoition, partitions, ceiling & finishes. electrical, mechanical, plumbing & life safety to be design build under separate permit.$1,163,000
Apr 17, 2012Never finaled
issued Apr 2012, no final
188 Spear Stto add address to block 3717, lot 019 per pa #200611178045s.
Apr 11, 2012Completed
final sign-off Jul 2012
120 Howard Strevision to 200611178045 for additional interior non structural demo and modifications to vacant 2nd fl space$15,000
Mar 29, 2012Completed
final sign-off Jul 2012
120 Howard Strevision to 200611178045 for modifications to ground floor lobby layout.$60,000
Feb 7, 2012Expired or cancelled
expired Jun 2014
120 Howard StEagle Bay Enterprises, Inc (Dba Garnettfabricate & install evacuation plans on floors - basement to 12th.$4,000
Dec 14, 2011Never finaled
issued Dec 2011, no final
120 Howard Ststreetspace
Sep 26, 2011Completed
final sign-off Jun 2012
120 Howard Stminor revision to pa# 2006.11.17.8045s5 to show fire pump attatchment details
Jun 29, 2011Never finaled
issued Jun 2011, no final
120 Howard Ststreet space & mta parking meter
Jun 29, 2011Completed
final sign-off Jul 2012
120 Howard Strevision to garage level mechanical approved 200611178045 s3$16,500
Jan 26, 2011Completed
final sign-off Jun 2012
120 Howard Ststructural revision to approved app# 200611178045 s2$17,500
Jan 6, 2010Completed
final sign-off Feb 2010
120 Howard StRichlen Construction2nd floor-electrical and mechanical ti for 2nd fl$60,000
Dec 23, 2009Completed
final sign-off Feb 2010
120 Howard StSimplex Grinnelladd one nac panel, 13 strobes, six speakers$8,000
Dec 11, 2009Completed
final sign-off Feb 2010
120 Howard StAyoob & Peery Plumbing Co Inc2nd floor relocate fire sprinkler heads per tenant improvements , total 28.$4,200
Nov 19, 2009Never finaled
issued Nov 2009, no final
120 Howard Ststreet space permit
Oct 29, 2009Completed
final sign-off Feb 2010
120 Howard StRichlen Constructiontenant improvements 2nd floor. new classrooms$120,000
Jun 30, 2009Completed
final sign-off Jul 2009
120 Howard Stumbrella permit. compliance with highrise sprinkler ordinance 377-93. no work
Jun 3, 2009Never finaled
issued Jun 2009, no final
120 Howard StTyco Integrated Securityremove old communicator & install new dialer panel in basement, install pull station next to panel & horn above. connect dialer panel to (e) fire control panel located on 1st floor to monitor alarm & trouble condition$3,177
May 14, 2009Completed
final sign-off Jun 2009
120 Howard StPribuss Engineering Incas built high rise compliance work for app #200904236933. add 12 speaker and relocate 3 speakers at ground floor. add one sprklr at 8th floor. add 2 on ground level.
Apr 23, 2009Completed
final sign-off Jun 2009
120 Howard StPribuss Engineering Inc1st & 8th floors-high rise compliance work-add 14 sprinklers & relocate 3 sprinkler at ground floor. add one sprinkler at 8th floor. umbrella permit separte application..$6,100
Mar 13, 2009Never finaled
issued Mar 2009, no final
120 Howard Ststreet space only.
Jun 20, 2008Completed
final sign-off Apr 2010
120 Howard StPribuss Engineering Incti for sprinkler system on the basement level, 1st, 4th, 5th and 6th floors. add 3 heads in basement, 1 on the 1st, 5 on the 4th, 2 on the 5th and 4 on the 6th floors$3,500
May 9, 2008Expired or cancelled
cancelled Jan 2020
120 Howard Stbase building, building lobby renovation and common area upgrades$5,000,000
Apr 24, 2008Completed
final sign-off Jun 2008
120 Howard StDpr Construction Incadd and relocate ductwork for existing hvac on 6th floor$9,000
Apr 23, 2008Never finaled
issued Apr 2008, no final
120 Howard StR L H Fire Protection Incti upgrade to sprinkler system. relocate 19 sprinkler heads on the 6th floor. 19 - relocates.$6,300
Apr 22, 2008Completed
final sign-off Jun 2008
120 Howard StDpr Construction Incdemo some ex. non bearing partition wall and reconstruct new ones to creat a new storage room. (1st flr)$40,550
Mar 31, 2008Never finaled
issued Apr 2008, no final
120 Howard StDpr Construction Incdemolition of non-load bearing interior partitions & door assemblie & interior finishes, suite 600 -ab017 used.$12,000
Mar 26, 2008Completed
final sign-off Jun 2008
120 Howard StDpr Construction Inct.i. fl. 6, demolition to existing interior partitions and door assemblies, construct new interior partitions with new door and glazing assemblies. provide new interior finishes. mep under separate permit.$250,000
Oct 23, 2007Completed
final sign-off Dec 2007
120 Howard StR L H Fire Protection Incsystem buil-out. new branchlines and mains. add 134 new upright 3rd floor.$32,000
Aug 8, 2007Completed
final sign-off Oct 2007
120 Howard StCannon Constructors North Incmechanical work on 6th floor. install 3 new cofrenacne rooms on 6th floor, ref 200706214653$20,000
Aug 7, 2007Completed
final sign-off Oct 2007
120 Howard StSimplex Grinnellsuite #640-fire devices: 10ea. wall strobes, remove/replace 1 ceiling speaker strobe, remove/replace 1 wall strobe.$3,800
Jul 31, 2007Completed
final sign-off Oct 2007
120 Howard StR L H Fire Protection Inct.i. upgrade on (e) fire sprinkler system for securitas 6th floor (#3541) 7 hd. relocated, delete 2 hd.$1,400
Jun 21, 2007Completed
final sign-off Oct 2007
120 Howard St6th floor - demolition, construction of non load bearing partitions. minor electrical work w/ separate permit. no structural work.$64,341
Jun 21, 2007Completed
final sign-off Dec 2007
120 Howard St3rd floor - demolition all partitions except rated corridor. demolition of ceiling and grid/lighting on 3rd floor.$56,000
Feb 12, 2007Completed
final sign-off Jun 2007
120 Howard StSkyline Constructionheffernan- oti-2 5th floor me$24,000
Jan 29, 2007Completed
final sign-off Jun 2007
120 Howard StSkyline Constructionsprinkler work. 36 relocates$16,500
Jan 23, 2007Completed
final sign-off Jun 2007
120 Howard StSimplex Grinnellfire alarm t.i. on 5/f. add 5 speaker strobes, 2 smoke detectors & 2 door holders. fire alarm certification required.$5,000
Jan 22, 2007Completed
final sign-off Jun 2007
120 Howard StSkyline Constructionoti-2, cac real estate, 5th fl, el.$65,000
Nov 17, 2006Never finaled
issued Jul 2011, no final
120 Howard Stproposed vertical addition removing extg penthouse and constructing 4 new stories with full floor plates, new structure will be steel moment frame and mechanical will be variable air volume-replace 3 extg elevators$8,300,000
Nov 9, 2006Completed
final sign-off Jun 2007
120 Howard Stoti-1 5th floor el, me, l/s, sp$304,500
Nov 4, 2005Completed
final sign-off Dec 2005
120 Howard Stinterior tenant improvement-mionr demolition constuction of non bearing partitions new finishes$10,000
Mar 30, 2005Completed
final sign-off Sep 2005
120 Howard StAyoob & Peery Plumbing Co Inc3/fl - install fire sprinklers at core area & calc. for future floor layout sprinkler system.$18,000
Mar 24, 2005Never finaled
issued Mar 2005, no final
120 Howard Ststreet space permit
Mar 3, 2005Completed
final sign-off Sep 2005
120 Howard StAyoob & Peery Plumbing Co Incadd & relocate fire sprinkler heads per tenant improvement.$85,000
Jan 18, 2005Expired or cancelled
expired Sep 2005
120 Howard Stdemo existing drywall partitions construct new dry wall partitions for new offices relocate existing$24,000
Aug 13, 2004Completed
final sign-off Apr 2005
120 Howard StDome Construction Corpsprinkler only at 1st floor & basement only.$5,500