Block 3717, lot 019
188 Spear St
- City’s use
- Commercial Office
- Built
- 1973
- Stories
- 12
- Rooms
- 18 bathrooms
- Building
- 220,000 sq ft
- Lot
- 25,208 sq ft
- Zoning
- C3OSD
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2025 | Completed final sign-off Oct 2025 | 188 Spear St | Golden Gate Fire Protection Inc | 6th fl - add 1 upright & 3 pendents. ref 202507281710Details
6th fl - add 1 upright & 3 pendents. ref 202507281710 | $1,000 |
| Sep 18, 2025 | Completed final sign-off Oct 2025 | 188 Spear St | Johnson Controls Fire | 6/fl- provide (1) new speaker strobe. ref#: 202501228817Details
6/fl- provide (1) new speaker strobe. ref#: 202501228817 | $750 |
| Aug 13, 2025 | Completed final sign-off Oct 2025 | 188 Spear St | Skyline Construction | mechanical and electrical work for tenant improvement on the 6th floor. ref: 202507281710. no plumbing fixtures.Details
mechanical and electrical work for tenant improvement on the 6th floor. ref: 202507281710. no plumbing fixtures. | $4,000 |
| Jul 28, 2025 | Completed final sign-off Oct 2025 | 188 Spear St | Skyline Construction | 6th floor: new non-structural partitions ceiling work and new finishes to create 3 private offices. mep deferredDetails
6th floor: new non-structural partitions ceiling work and new finishes to create 3 private offices. mep deferred | $80,000 |
| Feb 18, 2025 | Completed final sign-off Jul 2025 | 188 Spear St | Anderson, Rowe & Buckley, Inc. | existing fire sprinklers system tenant improvements. add 16 sprinkles in the basementDetails
existing fire sprinklers system tenant improvements. add 16 sprinkles in the basement | $10,000 |
| Feb 14, 2025 | Completed final sign-off Feb 2025 | 188 Spear St | Johnson Controls Fire | 6th floor: provide and install 2 new speaker strobes as shown on the drawings.Details
6th floor: provide and install 2 new speaker strobes as shown on the drawings. | $1,000 |
| Jan 22, 2025 | Completed final sign-off Mar 2025 | 188 Spear St | Skyline Construction | revision for pa # 2023-1219-2741 proposed relocation of one phone booth & adding one phone booth on the 6th flDetails
revision for pa # 2023-1219-2741 proposed relocation of one phone booth & adding one phone booth on the 6th fl | |
| Jan 2, 2025 | Completed final sign-off Jan 2025 | 188 Spear St | Golden Gate Fire Protection Inc | fire sprinkler t.i; relocate 1 concealed pendent on the 5/f and relocate 3 concealed pendents on the 6/f. ref#202312192741Details
fire sprinkler t.i; relocate 1 concealed pendent on the 5/f and relocate 3 concealed pendents on the 6/f. ref#202312192741 | $1,000 |
| Nov 14, 2024 | Completed final sign-off Apr 2025 | 188 Spear St | Golden Gate Fire Protection Inc | 5th & 6th fl fire sprinklers ti ref pa #2023-1219-2741: relocate 3 concealed pendents on 5th fl & 2 concealed pendents on the 6th flDetails
5th & 6th fl fire sprinklers ti ref pa #2023-1219-2741: relocate 3 concealed pendents on 5th fl & 2 concealed pendents on the 6th fl | $1,750 |
| Nov 7, 2024 | Completed final sign-off Dec 2024 | 188 Spear St | Johnson Controls Fire | 5th and 6th floor. provide and install 10 new speaker strobesx to phone booths on 5th and 6th floors as shown on drawings. ref. 202312192741Details
5th and 6th floor. provide and install 10 new speaker strobesx to phone booths on 5th and 6th floors as shown on drawings. ref. 202312192741 | $10,000 |
| Sep 23, 2024 | Completed final sign-off Oct 2024 | 188 Spear St | Ayoob & Peery Plumbing Co Inc | 9/f: add 2, relocate 2 fire sprinkler per ti. ref permit 202408158787.Details
9/f: add 2, relocate 2 fire sprinkler per ti. ref permit 202408158787. | $2,484 |
| Aug 15, 2024 | Completed final sign-off Oct 2024 | 188 Spear St | Novo Construction Inc | 9/fl- office ti to include construction of non sturctural partitions, finishes, lights, millwork and appliancesDetails
9/fl- office ti to include construction of non sturctural partitions, finishes, lights, millwork and appliances | $64,000 |
| Dec 19, 2023 | Completed final sign-off Mar 2025 | 188 Spear St | Skyline Construction | installing and anchoring furniture phone booths on office fl. 5 & 6. no change of use, interior onlyDetails
installing and anchoring furniture phone booths on office fl. 5 & 6. no change of use, interior only | $102,000 |
| Oct 13, 2023 | Completed final sign-off Nov 2024 | 188 Spear St | Johnson Controls Fire | ref 202308083954. 1/f fa modification: demo (e) device in the suite not including core device. spkr/strbs shall be maintained for shell space notification tenant space to remain unoccupied after the demo. any new ti will be submitted on a separted permit.Details
ref 202308083954. 1/f fa modification: demo (e) device in the suite not including core device. spkr/strbs shall be maintained for shell space notification tenant space to remain unoccupied after the demo. any new ti will be submitted on a separted permit. | $1,500 |
| Oct 5, 2023 | Completed final sign-off Nov 2023 | 188 Spear St | Anderson, Rowe & Buckley, Inc. | 7/f: existing fire sprinkler system tenant improvement add - 1 sprinkler.Details
7/f: existing fire sprinkler system tenant improvement add - 1 sprinkler. | $650 |
| Aug 31, 2023 | Completed final sign-off Sep 2023 | 188 Spear St | Golden Gate Fire Protection Inc | 1/f: replace 20 pendents with 20 uprights and delete 2 pendents, ref pa# 202308083954.Details
1/f: replace 20 pendents with 20 uprights and delete 2 pendents, ref pa# 202308083954. | $225,000 |
| Aug 8, 2023 | Completed final sign-off Feb 2024 | 188 Spear St | Richlen Construction | selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017.Details
selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017. | $225,000 |
| Aug 3, 2023 | Completed final sign-off Nov 2023 | 188 Spear St | G Swanson Constr. Inc. | 7/f: install interior partitions, door and card reader to enclose secure storage room, project area is approx 698 sqft.Details
7/f: install interior partitions, door and card reader to enclose secure storage room, project area is approx 698 sqft. | $30,000 |
| Jun 13, 2023 | Never finaled filed Jun 2023, never issued | 188 Spear St | Johnson Controls Fire | fire as built to pa# 202305258655. as-built requested by sffd inspector for job card signoff.Details
fire as built to pa# 202305258655. as-built requested by sffd inspector for job card signoff. | |
| Jun 1, 2023 | Completed final sign-off Jun 2023 | 188 Spear St | Aaa Restaurant Fire Control/Dba Aaa Fire | as built drawing 202111303263, ansulDetails
as built drawing 202111303263, ansul | $5 |
| May 25, 2023 | Completed final sign-off Jul 2023 | 188 Spear St | Johnson Controls Fire | 4/f,6/f,8/f: as built record drawings for f/a permit 202208231100 as requested by sffd inspector for inspection and sign off.Details
4/f,6/f,8/f: as built record drawings for f/a permit 202208231100 as requested by sffd inspector for inspection and sign off. | |
| Jan 17, 2023 | Completed final sign-off Jan 2023 | 188 Spear St | Golden Gate Fire Protection Inc | fire sprinklers; add 3 concealed pendents on the 4th fl, 2 concealers on the 6th fl, 2 concealers on the 7th fl, and 4 concealers on the 8th fl. ref t.i.# 202209222945.Details
fire sprinklers; add 3 concealed pendents on the 4th fl, 2 concealers on the 6th fl, 2 concealers on the 7th fl, and 4 concealers on the 8th fl. ref t.i.# 202209222945. | $6,006 |
| Sep 22, 2022 | Completed final sign-off Jul 2023 | 188 Spear St | Skyline Construction | 4th, 6th, 7th & 8th fl - furniture modifications to include seismic anchoring of 11 existing furniture phone booths. fire alarm and sprinkler under separate permitDetails
4th, 6th, 7th & 8th fl - furniture modifications to include seismic anchoring of 11 existing furniture phone booths. fire alarm and sprinkler under separate permit | $176,000 |
| Aug 23, 2022 | Completed final sign-off Oct 2023 | 188 Spear St | Johnson Controls Fire | 4th, 6th, 8th flrs: provide 11 new strobe devices in phone booths.Details
4th, 6th, 8th flrs: provide 11 new strobe devices in phone booths. | $1,500 |
| Nov 30, 2021 | Completed final sign-off Jun 2023 | 188 Spear St | Aaa Restaurant Fire Control/Dba Aaa Fire | rework (1) (e) ansul r-102 fire suppression system in the main kitchen area on the gound floor.Details
rework (1) (e) ansul r-102 fire suppression system in the main kitchen area on the gound floor. | $4,500 |
| Aug 5, 2021 | Completed final sign-off Jan 2022 | 188 Spear St | Skyline Construction | 7th flr: addition of a glazed addition barrier with frosted film along the (e) hallway to serve as a visual barrier to open space 07.940.Details
7th flr: addition of a glazed addition barrier with frosted film along the (e) hallway to serve as a visual barrier to open space 07.940. | $22,000 |
| Jun 24, 2021 | Completed final sign-off Mar 2022 | 188 Spear St | Skyline Construction | 2nd, 3rd, 5th and 6th floors - mechanical electric and plumbing work for ti at the ref pa 2020-0919-4548Details
2nd, 3rd, 5th and 6th floors - mechanical electric and plumbing work for ti at the ref pa 2020-0919-4548 | $30,000 |
| Apr 13, 2021 | Completed final sign-off Jun 2021 | 188 Spear St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 2 pendents and relocate 1 upright on the 2nd floor. relocate 5 pendents on the 3rd floor. relocate 5 pendents on the 5th floor. reloate 8 pendents on the 6th floor. t.i. ref # 2020-0919-4548.Details
fire sprinklers; relocate 2 pendents and relocate 1 upright on the 2nd floor. relocate 5 pendents on the 3rd floor. relocate 5 pendents on the 5th floor. reloate 8 pendents on the 6th floor. t.i. ref # 2020-0919-4548. | $10,500 |
| Mar 25, 2021 | Completed final sign-off Jun 2021 | 188 Spear St | Johnson Controls Fire | modify existing fire alarm system. partial floor fire alarm tenant improvement to floors 2, 3, 5, 6. (9) new speaker/strobes, (1) new call box. ref to ti # 2020-0919-4548Details
modify existing fire alarm system. partial floor fire alarm tenant improvement to floors 2, 3, 5, 6. (9) new speaker/strobes, (1) new call box. ref to ti # 2020-0919-4548 | $8,000 |
| Mar 24, 2021 | Completed final sign-off Mar 2022 | 188 Spear St | Skyline Construction | revision to pa# 202009194548. to demo & relocate pendants, extend partition, revise soffit alignment at 6th fl. added scope at 4th & 8th floor. m.e.p. under separate permit.Details
revision to pa# 202009194548. to demo & relocate pendants, extend partition, revise soffit alignment at 6th fl. added scope at 4th & 8th floor. m.e.p. under separate permit. | $20,000 |
| Dec 28, 2020 | Completed final sign-off Jun 2021 | 188 Spear St | Johnson Controls Fire | as built record drawings for permit application 2018-1051-3147. drawing submitted for re-approval per request of field inspector.Details
as built record drawings for permit application 2018-1051-3147. drawing submitted for re-approval per request of field inspector. | |
| Nov 23, 2020 | Completed final sign-off Mar 2021 | 188 Spear St | Johnson Controls Fire | existing fire alarm. submit for review per inspector kathy harold * for approved/extended fire permit/2018-1015-3147 * ref to ti permit # 2018-0907-9405Details
existing fire alarm. submit for review per inspector kathy harold * for approved/extended fire permit/2018-1015-3147 * ref to ti permit # 2018-0907-9405 | |
| Nov 9, 2020 | Completed final sign-off Feb 2021 | 188 Spear St | Skyline Construction | 7/f: revision to pa# 2019.1205.8727 to provide structural plans for modular partitions for tenant improvement.Details
7/f: revision to pa# 2019.1205.8727 to provide structural plans for modular partitions for tenant improvement. | |
| Sep 29, 2020 | Completed final sign-off Oct 2022 | 188 Spear St | Skyline Construction | 7/f: mechanical & electrical for t.i. demo (e) duct, install low press duct, (n) heat pump, (n) cooling only vav's, condensor water piping. no new fsd's. ref pa.201912058727, maher n/a.Details
7/f: mechanical & electrical for t.i. demo (e) duct, install low press duct, (n) heat pump, (n) cooling only vav's, condensor water piping. no new fsd's. ref pa.201912058727, maher n/a. | $45,000 |
| Sep 28, 2020 | Never finaled issued Mar 2021, no final | 188 Spear St | Skyline Construction | 7/f: revision to pa#201912058721 to add banquette seating near kitchenette, addition of power @ alternate workspaces & phone booth locations.Details
7/f: revision to pa#201912058721 to add banquette seating near kitchenette, addition of power @ alternate workspaces & phone booth locations. | |
| Sep 19, 2020 | Completed final sign-off Mar 2022 | 188 Spear St | Skyline Construction | partial ti to floors 2, 3, 5, & 6, to include selective demo, new partitions, ceiling modifications, lighting replacement & finishes. mep under separate permit.Details
partial ti to floors 2, 3, 5, & 6, to include selective demo, new partitions, ceiling modifications, lighting replacement & finishes. mep under separate permit. | $500,000 |
| Sep 1, 2020 | Completed final sign-off Nov 2020 | 188 Spear St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 10 uprights & 4 pendents on the 7th floor. ref#201912058727Details
fire sprinkler only. relocate 10 uprights & 4 pendents on the 7th floor. ref#201912058727 | $7,000 |
| Dec 17, 2019 | Never finaled issued Jan 2020, no final | 188 Spear St | Skyline Construction | floor finishes (approx 400sf), power work in room 402 elec to be design /buildDetails
floor finishes (approx 400sf), power work in room 402 elec to be design /build | $7,800 |
| Dec 12, 2019 | Expired or cancelled cancelled Aug 2023 | 188 Spear St | Johnson Controls Fire | add 1 relay module in fire alarm system in order to report alarm to tenants security system in order to repaort alarm to tenant security systemDetails
add 1 relay module in fire alarm system in order to report alarm to tenants security system in order to repaort alarm to tenant security system | $528 |
| Dec 5, 2019 | Completed final sign-off Mar 2021 | 188 Spear St | Skyline Construction | 7th floor: selective demolition, minor modifications to partitions, ceilings, and lighting. new finishes throughout new all gender restrooms. new product demostration areaDetails
7th floor: selective demolition, minor modifications to partitions, ceilings, and lighting. new finishes throughout new all gender restrooms. new product demostration area | $190,000 |
| Jun 6, 2019 | Completed final sign-off Dec 2019 | 188 Spear St | Principal Builders Inc. | 10th floor: revision to app#201902263813 to remove operable partition from scope of work. n/a for maherDetails
10th floor: revision to app#201902263813 to remove operable partition from scope of work. n/a for maher | |
| May 15, 2019 | Completed final sign-off Aug 2019 | 188 Spear St | Johnson Controls Fire | 10th fl: modify (e) fire alarm system, provide new device, relocate and demo existing as shown, this system shall be class a, 2 way communication system, add call box on the 10th floor elvater lobby. adding: 3 smoke detectors, 1 control module, 19 strobes, 35 speaker strobes and 1 nac.Details
10th fl: modify (e) fire alarm system, provide new device, relocate and demo existing as shown, this system shall be class a, 2 way communication system, add call box on the 10th floor elvater lobby. adding: 3 smoke detectors, 1 control module, 19 strobes, 35 speaker strobes and 1 nac. | $42,500 |
| May 15, 2019 | Completed final sign-off Jul 2019 | 188 Spear St | Johnson Controls Fire | 9th fl: modify (e) fire alarm, provide, relocate and demo (e) devices as shown as showing drawing, all new wireing to be class a modify 2 way communication to add call boxDetails
9th fl: modify (e) fire alarm, provide, relocate and demo (e) devices as shown as showing drawing, all new wireing to be class a modify 2 way communication to add call box | $37,196 |
| Apr 29, 2019 | Completed final sign-off May 2019 | 188 Spear St | Skyline Construction | 4th & 8th flr mechanical work for tenant improvement. ref pa's 201901099897 & 201811156050.Details
4th & 8th flr mechanical work for tenant improvement. ref pa's 201901099897 & 201811156050. | |
| Apr 25, 2019 | Completed final sign-off Jul 2019 | 188 Spear St | Anderson, Rowe & Buckley, Inc. | 10th fl: existing fire sprinkler system t1. 5 added sprinklers. 94 relocated sprinklers. ref arch #201903074652Details
10th fl: existing fire sprinkler system t1. 5 added sprinklers. 94 relocated sprinklers. ref arch #201903074652 | $50,000 |
| Apr 25, 2019 | Completed final sign-off Jun 2019 | 188 Spear St | Anderson, Rowe & Buckley, Inc. | 9th fl: existing fire sprinkler system t1.12 added sprinklers. 60 relocated sprinklers. 7 changed out sprinklers. ref arch #201812138242Details
9th fl: existing fire sprinkler system t1.12 added sprinklers. 60 relocated sprinklers. 7 changed out sprinklers. ref arch #201812138242 | $39,500 |
| Apr 16, 2019 | Completed final sign-off Mar 2023 | 188 Spear St | Johnson Controls Fire | as built fire alarm ref 201902011829Details
as built fire alarm ref 201902011829 | |
| Apr 16, 2019 | Completed final sign-off Mar 2023 | 188 Spear St | Johnson Controls Fire | as built fire alarm ref 201902011830Details
as built fire alarm ref 201902011830 | |
| Apr 3, 2019 | Completed final sign-off Sep 2022 | 188 Spear St | Anderson Burton Construction Inc | remove electronic gates on floors 2,3,4,5,7,8 and bldg security vestibules on floors 2,3,4,5,7,8. revision to app#201806202382 to remove all references to work on floor 6. (no work on floor 6). n/a for maherDetails
remove electronic gates on floors 2,3,4,5,7,8 and bldg security vestibules on floors 2,3,4,5,7,8. revision to app#201806202382 to remove all references to work on floor 6. (no work on floor 6). n/a for maher | |
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 188 Spear St | 4th & 8th floor evacuation maps. (3 each floor)Details
4th & 8th floor evacuation maps. (3 each floor) | $3,300 | |
| Mar 14, 2019 | Completed final sign-off Dec 2019 | 188 Spear St | Principal Builders Inc. | structural details for installation of an operable partitions on the 10th fl. please refer to pa #201902263813 for arch permit. 10th fl.Details
structural details for installation of an operable partitions on the 10th fl. please refer to pa #201902263813 for arch permit. 10th fl. | $30,000 |
| Mar 7, 2019 | Completed final sign-off Dec 2019 | 188 Spear St | Principal Builders Inc. | revision to app#201902263813 to convert partrial break room area to coffee bar with full service and storage area to kitchen prep. & title 24 mep to construct mechanical, electrical and plmg system on 10th floor. n/a for maherDetails
revision to app#201902263813 to convert partrial break room area to coffee bar with full service and storage area to kitchen prep. & title 24 mep to construct mechanical, electrical and plmg system on 10th floor. n/a for maher | $720,995 |
| Feb 26, 2019 | Completed final sign-off Dec 2019 | 188 Spear St | Principal Builders Inc. | ti on 10th fl - to construct new partitions, doors, finishes, glazing, millwork, and ceilings. mep, fire alarms, and sprinklers on separate permits. determine occupancy load for assembly area. maher n/a.Details
ti on 10th fl - to construct new partitions, doors, finishes, glazing, millwork, and ceilings. mep, fire alarms, and sprinklers on separate permits. determine occupancy load for assembly area. maher n/a. | $1,240,191 |
| Feb 19, 2019 | Completed final sign-off Nov 2023 | 188 Spear St | Principal Builders Inc. | 10th fl: demo of existing non structural partitions, doors, glazing, millwork finishes 10th fl. space remain vacant per ab-17. ada will be adressed under future ti permitDetails
10th fl: demo of existing non structural partitions, doors, glazing, millwork finishes 10th fl. space remain vacant per ab-17. ada will be adressed under future ti permit | $107,000 |
| Feb 13, 2019 | Completed final sign-off Mar 2023 | 188 Spear St | Johnson Controls Fire | as-built. record drawings for pa 201809079405. 6th flr scope removed from plans: sheets fa-105 removed, 1 smoke sensor removed, 1 relay removed, 1 2-way call box removedDetails
as-built. record drawings for pa 201809079405. 6th flr scope removed from plans: sheets fa-105 removed, 1 smoke sensor removed, 1 relay removed, 1 2-way call box removed | |
| Feb 8, 2019 | Completed final sign-off May 2019 | 188 Spear St | Skyline Construction | 4th * 8th floors - electrical for ti. ref pa 2018-1115-6050Details
4th * 8th floors - electrical for ti. ref pa 2018-1115-6050 | $30,000 |
| Feb 1, 2019 | Completed final sign-off Mar 2019 | 188 Spear St | Johnson Controls Fire | 12/f: fire alarm: t.i.install 1 new power supply, 1 new relay,4 smoke sensors, 30 speaker/strobes,19 strobes. install 1 call box in elevator lobby for (e) emergency comm system. ref pa201810112919. maher n/a.Details
12/f: fire alarm: t.i.install 1 new power supply, 1 new relay,4 smoke sensors, 30 speaker/strobes,19 strobes. install 1 call box in elevator lobby for (e) emergency comm system. ref pa201810112919. maher n/a. | $30,600 |
| Feb 1, 2019 | Completed final sign-off Mar 2023 | 188 Spear St | Johnson Controls Fire | ref pa# 201811156050; remove and relocate notificaton per owner requested. add new device as need for complianceDetails
ref pa# 201811156050; remove and relocate notificaton per owner requested. add new device as need for compliance | $7,393 |
| Feb 1, 2019 | Completed final sign-off Mar 2023 | 188 Spear St | Johnson Controls Fire | ref pa# 201811156050; remove and relocate notificaton as per owner requested. add new device as need for complianceDetails
ref pa# 201811156050; remove and relocate notificaton as per owner requested. add new device as need for compliance | $3,766 |
| Jan 11, 2019 | Completed final sign-off Feb 2019 | 188 Spear St | Golden Gate Fire Protection Inc | 4th & 8th flr. fire sprinklers. relocate 29 pendents at 4th flr. relocate 116 pendant sprinklers at 8th flr. relocate 6 upright sprinklersDetails
4th & 8th flr. fire sprinklers. relocate 29 pendents at 4th flr. relocate 116 pendant sprinklers at 8th flr. relocate 6 upright sprinklers | $26,775 |
| Jan 9, 2019 | Completed final sign-off May 2019 | 188 Spear St | Skyline Construction | revision to pa 2018-1115-6050 to relocate new unisex restroomDetails
revision to pa 2018-1115-6050 to relocate new unisex restroom | |
| Dec 18, 2018 | Completed final sign-off Sep 2021 | 188 Spear St | Anderson, Rowe & Buckley, Inc. | ref pa# 201812188581; (e) sprinker system t.i. 80 relocated sprinklers, 15 added sprinklersDetails
ref pa# 201812188581; (e) sprinker system t.i. 80 relocated sprinklers, 15 added sprinklers | $47,500 |
| Dec 13, 2018 | Completed final sign-off Dec 2019 | 188 Spear St | Principal Builders Inc. | 9th floor:t.i. to construct new partitions glazing doors, millwork, finishes, and mep systems. fire sprinklers/life safety on seperate permit. n/a for maherDetails
9th floor:t.i. to construct new partitions glazing doors, millwork, finishes, and mep systems. fire sprinklers/life safety on seperate permit. n/a for maher | $1,950,000 |
| Dec 4, 2018 | Completed final sign-off Mar 2023 | 188 Spear St | Johnson Controls Fire | 11th fl: as-built record drawing for pa #201809190729 fire alarm tenant improvement. ref pa #201807104076.Details
11th fl: as-built record drawing for pa #201809190729 fire alarm tenant improvement. ref pa #201807104076. | |
| Nov 15, 2018 | Completed final sign-off May 2019 | 188 Spear St | Skyline Construction | partial fl ti on the 4th & 8th fl to include selective demo, new partitions, ceiling, lighting, finishes and new unisex restroom. mep under sep permit.Details
partial fl ti on the 4th & 8th fl to include selective demo, new partitions, ceiling, lighting, finishes and new unisex restroom. mep under sep permit. | $2,000,000 |
| Nov 7, 2018 | Never finaled issued Nov 2018, no final | 188 Spear St | Metropolitan Electrical Construction | provide new lighting & branch circuiting to (e) panel. provide ca t-24 compliance. ref. p.a.#2018 0620 2382Details
provide new lighting & branch circuiting to (e) panel. provide ca t-24 compliance. ref. p.a.#2018 0620 2382 | $39,822 |
| Oct 26, 2018 | Completed final sign-off Sep 2022 | 188 Spear St | Anderson Burton Construction Inc | floors 2-8. revision to pa #201806202382. relocation of 24hr comm intercoms (coord. w/201809079405) minor increase in demo, minor decrease in other scopes.Details
floors 2-8. revision to pa #201806202382. relocation of 24hr comm intercoms (coord. w/201809079405) minor increase in demo, minor decrease in other scopes. | |
| Oct 15, 2018 | Completed final sign-off Mar 2023 | 188 Spear St | Johnson Controls Fire | f/a: new 2-way communication system, 1 main control, 2 master stations, 7 call stations, 4 fire alarm modules. associated permit #201809079405. maher naDetails
f/a: new 2-way communication system, 1 main control, 2 master stations, 7 call stations, 4 fire alarm modules. associated permit #201809079405. maher na | $34,790 |
| Oct 11, 2018 | Completed final sign-off May 2019 | 188 Spear St | Principal Builders Inc. | 12th floor: t.i. to construct new partitions, doors, millwork, finishes, and mep systems. life safety and sprinklers on separate permit.Details
12th floor: t.i. to construct new partitions, doors, millwork, finishes, and mep systems. life safety and sprinklers on separate permit. | $1,960,000 |
| Oct 2, 2018 | Completed final sign-off Nov 2018 | 188 Spear St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti 70 relocated sprinkler 19 added sprinklersDetails
existing fire sprinkler system ti 70 relocated sprinkler 19 added sprinklers | $40,000 |
| Sep 19, 2018 | Completed final sign-off Mar 2023 | 188 Spear St | Johnson Controls Fire | fire alarm ti - install 36 new speaker/strobe appliances and 12 new strobe appliancesDetails
fire alarm ti - install 36 new speaker/strobe appliances and 12 new strobe appliances | $25,500 |
| Sep 7, 2018 | Completed final sign-off May 2019 | 188 Spear St | Johnson Controls Fire | 2-8 floors. modify (e) fire alarm system. install 15 new addressable smoke detectors and 7 new addressable relays for tenant access control integration. ref pa 201806202382. install (n) ecs call boxes at elevator landings. maher n/aDetails
2-8 floors. modify (e) fire alarm system. install 15 new addressable smoke detectors and 7 new addressable relays for tenant access control integration. ref pa 201806202382. install (n) ecs call boxes at elevator landings. maher n/a | $14,000 |
| Jul 10, 2018 | Completed final sign-off Mar 2019 | 188 Spear St | Principal Builders Inc. | 11th fl: interior tenant improvement to demo & construct new partitions, doors, glazing, millwork, finishes, lighting/power and mechanical system. fire sprinklers and alarms on separte permit. maher naDetails
11th fl: interior tenant improvement to demo & construct new partitions, doors, glazing, millwork, finishes, lighting/power and mechanical system. fire sprinklers and alarms on separte permit. maher na | $1,955,000 |
| Jun 20, 2018 | Completed final sign-off May 2019 | 188 Spear St | Anderson Burton Construction Inc | remove security turnstiles in suites, replace w/door. flrs 2-8Details
remove security turnstiles in suites, replace w/door. flrs 2-8 | $313,000 |
| Dec 8, 2015 | Completed final sign-off Jan 2016 | 188 Spear St | Golden Gate Fire Protection Inc | 8th floor: fire sprinkler only - relocate 8 pendents & add 3 uprights for marvin stein associates = 11 total. ref pa 2015-1118-2933. maher naDetails
8th floor: fire sprinkler only - relocate 8 pendents & add 3 uprights for marvin stein associates = 11 total. ref pa 2015-1118-2933. maher na | $5,500 |
| Dec 4, 2015 | Completed final sign-off Jan 2016 | 188 Spear St | Johnson Controls Fire | 8th floor ti consists of adding 92) new speakers as shown on drawings. ref pa 2015-1118-2933Details
8th floor ti consists of adding 92) new speakers as shown on drawings. ref pa 2015-1118-2933 | $1,500 |
| Nov 18, 2015 | Completed final sign-off Feb 2016 | 188 Spear St | Novo Construction Inc | 8th flr: partial floor tenant improvement, selective demolition of ceiling,lighting, floor finishes ,mechanical and electrical.Details
8th flr: partial floor tenant improvement, selective demolition of ceiling,lighting, floor finishes ,mechanical and electrical. | $20,000 |
| May 22, 2015 | Completed final sign-off Aug 2015 | 188 Spear St | Bcci Construction Company | shower room in 10th floor.Details
shower room in 10th floor. | $50,000 |
| May 11, 2015 | Completed final sign-off Jul 2015 | 188 Spear St | Hathaway Dinwiddie Co. | 2nd floor - revision to pa #201406239080: storage room changed to green screen room, control, & recording rooms (new architectrual, mechanical & electrical sheets). n/a maher ordinanceDetails
2nd floor - revision to pa #201406239080: storage room changed to green screen room, control, & recording rooms (new architectrual, mechanical & electrical sheets). n/a maher ordinance | $54,770 |
| Mar 31, 2015 | Never finaled issued Mar 2015, no final | 188 Spear St | street space | ||
| Mar 27, 2015 | Completed final sign-off Jun 2015 | 188 Spear St | Golden Gate Fire Protection Inc | 2nd floor fire spirnkler only - relocate 56 pendents, add 4 pendents, relocate 8 upright, add 2 uprights for "amazon". total 70 heads. ref pa #2014.0623.9080. n/a maher ordinanceDetails
2nd floor fire spirnkler only - relocate 56 pendents, add 4 pendents, relocate 8 upright, add 2 uprights for "amazon". total 70 heads. ref pa #2014.0623.9080. n/a maher ordinance | $35,000 |
| Oct 14, 2014 | Completed final sign-off Jul 2015 | 188 Spear St | Johnson Controls Fire | fire alarm t.i. to 2nd floor. (1) smoke detector, (1) dual relay iam, relay, (10) speak strobes and (4) speakers. 2nd floor scope is being removed from original application #2014-0806-3173 for phasing purposes.Details
fire alarm t.i. to 2nd floor. (1) smoke detector, (1) dual relay iam, relay, (10) speak strobes and (4) speakers. 2nd floor scope is being removed from original application #2014-0806-3173 for phasing purposes. | $8,500 |
| Oct 14, 2014 | Completed final sign-off Oct 2014 | 188 Spear St | Johnson Controls Fire | fire alarm as-builts for permit application #2014-0806-3173. 5th/6th floor only. 2nd floor to be done under separate permit. (remove 2nd floor work from original permit.)Details
fire alarm as-builts for permit application #2014-0806-3173. 5th/6th floor only. 2nd floor to be done under separate permit. (remove 2nd floor work from original permit.) | |
| Sep 19, 2014 | Completed final sign-off Nov 2014 | 188 Spear St | Johnson Controls Fire | modify existing fire alarm system: provide (14) new appliances, (1) one expansion power supply & demo & relocate existing appliances. t.i. pa#2014-0611-8142. n/a maher ordinance.Details
modify existing fire alarm system: provide (14) new appliances, (1) one expansion power supply & demo & relocate existing appliances. t.i. pa#2014-0611-8142. n/a maher ordinance. | $9,500 |
| Sep 12, 2014 | Never finaled issued Sep 2014, no final | 188 Spear St | Thomas Swan Sign Co Inc | 6 evacuation plan maps 5th and 6th floorsDetails
6 evacuation plan maps 5th and 6th floors | $1,800 |
| Aug 6, 2014 | Never finaled issued Aug 2014, no final | 188 Spear St | Johnson Controls Fire | modify (e) fire alarm system on 2/f, 5/f & 6/f: add 2 power supplies, 2 duct sensors, 3 smoke sensors, 3 relays, 36 ceiling mount speaker/strobes, 26 wall mount speaker/strobes & 4 speakers. t.i. pa# 201406168429, 201406168430, 201406239080, n/a ordinance #155-13Details
modify (e) fire alarm system on 2/f, 5/f & 6/f: add 2 power supplies, 2 duct sensors, 3 smoke sensors, 3 relays, 36 ceiling mount speaker/strobes, 26 wall mount speaker/strobes & 4 speakers. t.i. pa# 201406168429, 201406168430, 201406239080, n/a ordinance #155-13 | $28,000 |
| Jul 25, 2014 | Completed final sign-off Sep 2014 | 188 Spear St | Pribuss Engineering Inc | modify sprinkler head locations at 9th floor, relocate 44 heads and add 28 headsDetails
modify sprinkler head locations at 9th floor, relocate 44 heads and add 28 heads | $38,082 |
| Jul 14, 2014 | Completed final sign-off Aug 2014 | 188 Spear St | Golden Gate Fire Protection Inc | relocate 97 upright sprinklers heads on the 5th fl and relocate 68 pendent sprinklers. relocate 93 upgright sprinklers on the 6th fl and 62 pendent sprinklers. update earthquake bracing.maher not reqDetails
relocate 97 upright sprinklers heads on the 5th fl and relocate 68 pendent sprinklers. relocate 93 upgright sprinklers on the 6th fl and 62 pendent sprinklers. update earthquake bracing.maher not req | $164,000 |
| Jun 23, 2014 | Completed final sign-off Jul 2015 | 188 Spear St | Hathaway Dinwiddie Co. | commercial tenant improvement including selective demolition, interior partitions, ceilings, lighting, finishes, furniture, mechanical, plumbing & electrical. f/a and sprinklers under separate permit. n/a ordinance #155-13.Details
commercial tenant improvement including selective demolition, interior partitions, ceilings, lighting, finishes, furniture, mechanical, plumbing & electrical. f/a and sprinklers under separate permit. n/a ordinance #155-13. | $1,040,000 |
| Jun 16, 2014 | Completed final sign-off Oct 2014 | 188 Spear St | Hathaway Dinwiddie Co. | commercial tenant improvement including selective demo, interior partitions, ceilings, lighting, casework, floor finishes, glazing, furniture, mechanical, plumbing, and electricDetails
commercial tenant improvement including selective demo, interior partitions, ceilings, lighting, casework, floor finishes, glazing, furniture, mechanical, plumbing, and electric | $2,080,000 |
| Jun 16, 2014 | Completed final sign-off Oct 2014 | 188 Spear St | Hathaway Dinwiddie Co. | commercial tenant improvement including slective demo, interior partitions, ceilings, lighting, casework, floor finishes, glazing, furniture, mechanical, plumbing, electricalDetails
commercial tenant improvement including slective demo, interior partitions, ceilings, lighting, casework, floor finishes, glazing, furniture, mechanical, plumbing, electrical | $2,080,000 |
| Jun 11, 2014 | Completed final sign-off Aug 2015 | 188 Spear St | Bcci Construction Company | 9th flr: interior tenant improvement on the 9th flr, partial area including (n) private offices, (n) conference rooms and new mep systems, life safety and sprinklers under separate permit; compliance with ord 155-13 not required. skyfold doors under deferred submittalDetails
9th flr: interior tenant improvement on the 9th flr, partial area including (n) private offices, (n) conference rooms and new mep systems, life safety and sprinklers under separate permit; compliance with ord 155-13 not required. skyfold doors under deferred submittal | $825,000 |
| Feb 3, 2014 | Never finaled issued Feb 2014, no final | 188 Spear St | street space and mta parking | ||
| Dec 20, 2013 | Completed final sign-off Feb 2014 | 188 Spear St | Johnson Controls Fire | modify existing fire alarm system on ground floor, adding (4) duct smoke sensors, (5) ceiling mount speaker/strobes and removing (1) duct smoke sensor, (3) ceiling mount speakers. t.i. pa# 201309045892Details
modify existing fire alarm system on ground floor, adding (4) duct smoke sensors, (5) ceiling mount speaker/strobes and removing (1) duct smoke sensor, (3) ceiling mount speakers. t.i. pa# 201309045892 | $6,700 |
| Dec 10, 2013 | Completed final sign-off Jan 2014 | 188 Spear St | Hathaway Dinwiddie Co. | change team room occupancy to office. revision to app#201310250247Details
change team room occupancy to office. revision to app#201310250247 | |
| Nov 15, 2013 | Completed final sign-off Dec 2013 | 188 Spear St | Golden Gate Fire Protection Inc | relocate 8 upright sprinkler heads on the 3rd floor.Details
relocate 8 upright sprinkler heads on the 3rd floor. | $4,120 |
| Nov 12, 2013 | Never finaled issued Nov 2013, no final | 188 Spear St | Simplexgrinnell Lp. | fire alarm as-built drawings to permit application 2013-0702-1007.Details
fire alarm as-built drawings to permit application 2013-0702-1007. | |
| Nov 12, 2013 | Completed final sign-off Jan 2014 | 188 Spear St | Johnson Controls Fire | modify extg fire alarm system: adding one wall mount strobe only. relocating one speaker and one speaker/strobes. t.i. bldg app#201310250247Details
modify extg fire alarm system: adding one wall mount strobe only. relocating one speaker and one speaker/strobes. t.i. bldg app#201310250247 | $3,500 |
| Nov 12, 2013 | Completed final sign-off Dec 2013 | 188 Spear St | Golden Gate Sign Company Inc. | to erect non-illuminated sign. channel letters.Details
to erect non-illuminated sign. channel letters. | $3,000 |
| Nov 8, 2013 | Completed final sign-off Feb 2014 | 188 Spear St | Potter Fire Protection | relocate 30 fire sprinklers & plug 6 on the street level only. ref pa# 201309045892Details
relocate 30 fire sprinklers & plug 6 on the street level only. ref pa# 201309045892 | $14,000 |
| Oct 30, 2013 | Never finaled issued Oct 2013, no final | 188 Spear St | street space and mta parking | ||
| Oct 25, 2013 | Completed final sign-off Jan 2014 | 188 Spear St | Hathaway Dinwiddie Co. | 3rd fl partial, convert oppen office space to private conference room. (a-3 occupancy). life safety to be under sep permit. 1 hvac upsized box to free new conference roomDetails
3rd fl partial, convert oppen office space to private conference room. (a-3 occupancy). life safety to be under sep permit. 1 hvac upsized box to free new conference room | $63,000 |
| Oct 15, 2013 | Completed final sign-off Aug 2015 | 188 Spear St | Bcci Construction Company | 9th floor:revision to 201305207356: as built drawing to update smoke control report all changed pages bubbled. pages without bubbles are referenced only. fire alarm under seperate permit.Details
9th floor:revision to 201305207356: as built drawing to update smoke control report all changed pages bubbled. pages without bubbles are referenced only. fire alarm under seperate permit. | |
| Sep 12, 2013 | Completed final sign-off Apr 2014 | 188 Spear St | Signtech Electrical Advertising Inc. | install 2 illuminated exterior wall signs.Details
install 2 illuminated exterior wall signs. | $6,000 |
| Sep 12, 2013 | Completed final sign-off Apr 2014 | 188 Spear St | Signtech Electrical Advertising Inc. | install 2 illuminated window signsDetails
install 2 illuminated window signs | $4,000 |
| Sep 12, 2013 | Completed final sign-off Apr 2014 | 188 Spear St | Signtech Electrical Advertising Inc. | install 6 non branded window signs (illuminated).Details
install 6 non branded window signs (illuminated). | $12,000 |
| Sep 4, 2013 | Completed final sign-off Jan 2014 | 188 Spear St | Eagle Bay Enterprises, Inc (Dba Garnett | 9th floor - install (3) evacuation signs. spear & howard.Details
9th floor - install (3) evacuation signs. spear & howard. | $900 |
| Sep 4, 2013 | Completed final sign-off Mar 2014 | 188 Spear St | Deb Construction Llc | 1st floor #190: tenant improvement of existing retail space for new branch bank including exterior storefront, interior partitions, restroom, finishes.Details
1st floor #190: tenant improvement of existing retail space for new branch bank including exterior storefront, interior partitions, restroom, finishes. | $300,906 |
| Jul 25, 2013 | Completed final sign-off Sep 2013 | 188 Spear St | Simplexgrinnell Lp. | 10th floor-modify (e) fire alarm system-adding five wall mount speaker/strobes, 1 ceiling mount speaker/strobe, 1 wall mount strobes, 1 ceiling mount speaker & relocating 4 wall mount speaker/strobes.Details
10th floor-modify (e) fire alarm system-adding five wall mount speaker/strobes, 1 ceiling mount speaker/strobe, 1 wall mount strobes, 1 ceiling mount speaker & relocating 4 wall mount speaker/strobes. | $7,500 |
| Jul 2, 2013 | Completed final sign-off Jan 2014 | 188 Spear St | Simplexgrinnell Lp. | 9th floor - modify (e) fire alarm system: adding one (1) in-duct smoke sensor w/relay, six(6) photo smoke sensors, two (2) door holders, thirteen (13) wall mount speaker/strobes, & two (2) ceiling mount speakers. ref t.i. #2013.05.20.7356Details
9th floor - modify (e) fire alarm system: adding one (1) in-duct smoke sensor w/relay, six(6) photo smoke sensors, two (2) door holders, thirteen (13) wall mount speaker/strobes, & two (2) ceiling mount speakers. ref t.i. #2013.05.20.7356 | $12,000 |
| Jul 1, 2013 | Completed final sign-off Sep 2013 | 188 Spear St | Pribuss Engineering Inc | fire sprinkler t.i. add 43 heads, relocate 7 heads, total 50 heads. ref. to t.i.# 201305207356Details
fire sprinkler t.i. add 43 heads, relocate 7 heads, total 50 heads. ref. to t.i.# 201305207356 | $25,730 |
| Jun 26, 2013 | Completed final sign-off Feb 2014 | 188 Spear St | Bcci Construction Company | 10th flr: tenant improvement on the 10th flr including open offices, private offices, conference rooms, and associated mechanical & elec inlcuding new vav boxes & (3) new fire dampers and new lighting, life safety & sprinklers under separate permit.Details
10th flr: tenant improvement on the 10th flr including open offices, private offices, conference rooms, and associated mechanical & elec inlcuding new vav boxes & (3) new fire dampers and new lighting, life safety & sprinklers under separate permit. | $720,000 |
| Jun 20, 2013 | Completed final sign-off Sep 2013 | 188 Spear St | Pribuss Engineering Inc | 10th floor-fire sprinkler ti-relocate 13 (e) sprinklers & add 42 fire sprinklers, ref pa #2013.01.22.8414Details
10th floor-fire sprinkler ti-relocate 13 (e) sprinklers & add 42 fire sprinklers, ref pa #2013.01.22.8414 | $28,304 |
| May 20, 2013 | Completed final sign-off Aug 2015 | 188 Spear St | Bcci Construction Company | interior tenant improvement for partial area of 9th floor including new open office, private office, conference rooms, idf closet. new mep system. life safety and sprinkler work under sepparate permit. no structural work is to be excuted under this permit.Details
interior tenant improvement for partial area of 9th floor including new open office, private office, conference rooms, idf closet. new mep system. life safety and sprinkler work under sepparate permit. no structural work is to be excuted under this permit. | $1,500,000 |
| Apr 8, 2013 | Completed final sign-off Jun 2013 | 188 Spear St | Eagle Bay Enterprises, Inc (Dba Garnett | floors 10, 11 & 12 - install (3) evacuation signs (total)Details
floors 10, 11 & 12 - install (3) evacuation signs (total) | $1,000 |
| Mar 6, 2013 | Completed final sign-off Mar 2013 | 180 Spear St | Certified Fire & Safety Co | install ansul fire system into kitchen hood at ground floor, ref #2012.1113.4001Details
install ansul fire system into kitchen hood at ground floor, ref #2012.1113.4001 | $3,000 |
| Feb 11, 2013 | Completed final sign-off Mar 2013 | 188 Spear St | Simplexgrinnell Lp. | modify existing fa system on 1st floor. suite 150. add one monitor module (iam) for ansul system and three ceiling mount speaker/strobesDetails
modify existing fa system on 1st floor. suite 150. add one monitor module (iam) for ansul system and three ceiling mount speaker/strobes | $2,000 |
| Jan 22, 2013 | Completed final sign-off Aug 2015 | 188 Spear St | Bcci Construction Company | 10th floor-revision to pa# 2012-1128-4997 & 2012-1011-1820-work covers venting for the fireplaceDetails
10th floor-revision to pa# 2012-1128-4997 & 2012-1011-1820-work covers venting for the fireplace | $15,000 |
| Jan 11, 2013 | Completed final sign-off Mar 2013 | 180 Spear St | Potter Fire Protection | ground floor:relocate 10 fire sprinklers, add 1 fire sprinkler, and plug 2. ti app#201211134001Details
ground floor:relocate 10 fire sprinklers, add 1 fire sprinkler, and plug 2. ti app#201211134001 | $4,500 |
| Jan 10, 2013 | Completed final sign-off Feb 2013 | 188 Spear St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade, relocate 162 pendant sprinkler heads on the 4th floor. relocate 1 uprights. ti app #201212186468Details
fire sprinkler system upgrade, relocate 162 pendant sprinkler heads on the 4th floor. relocate 1 uprights. ti app #201212186468 | $83,945 |
| Jan 7, 2013 | Completed final sign-off Feb 2013 | 188 Spear St | Simplexgrinnell Lp. | 4th floor:modify extg fire alarm system on 4th floor:adding one nac panel, 6 photo smoke sensors, 2 relay iam, 32 wall mount speaker strobes, 4 wall mont strobes, and 3 ceiling mount speakers. t. i. app#201208167529.Details
4th floor:modify extg fire alarm system on 4th floor:adding one nac panel, 6 photo smoke sensors, 2 relay iam, 32 wall mount speaker strobes, 4 wall mont strobes, and 3 ceiling mount speakers. t. i. app#201208167529. | $19,200 |
| Dec 26, 2012 | Expired or cancelled cancelled Jan 2026 | 188 Spear St | Hathaway Dinwiddie Co. | revision 201211013272. remove access controlled egress from exiting schemeDetails
revision 201211013272. remove access controlled egress from exiting scheme | |
| Dec 26, 2012 | Never finaled issued Dec 2012, no final | 188 Spear St | street space permit. | ||
| Dec 20, 2012 | Completed final sign-off Aug 2015 | 188 Spear St | Simplexgrinnell Lp. | ti pa#2012-11-28-4997. modify (e) fire alarm system on 10th fl. adding one nac panel, four duct smoke sensors, five photo smoke sensors, one wall mount strobe, two w.p. strobes, sixteen wall mnt strobes, one ceil mnt speaker/strobe, two w.p. ceil mnt speakers.Details
ti pa#2012-11-28-4997. modify (e) fire alarm system on 10th fl. adding one nac panel, four duct smoke sensors, five photo smoke sensors, one wall mount strobe, two w.p. strobes, sixteen wall mnt strobes, one ceil mnt speaker/strobe, two w.p. ceil mnt speakers. | $20,000 |
| Dec 20, 2012 | Completed final sign-off Mar 2013 | 188 Spear St | Pribuss Engineering Inc | 10th,11th, & 12th floor:fire sprinkler t.i./ 10th floor add 63, 11th floor add 73, 12th floor add 82. ref app#201211284997,201210111822,201210111820Details
10th,11th, & 12th floor:fire sprinkler t.i./ 10th floor add 63, 11th floor add 73, 12th floor add 82. ref app#201211284997,201210111822,201210111820 | $129,684 |
| Dec 18, 2012 | Never finaled issued Jan 2013, no final | 188 Spear St | Hathaway Dinwiddie Co. | 4th floor mechanical electrical full floor tenant imrpovement in multi tenant building including selective demo, partitions, new kitchenette, ceiling and finishes, plumbing and life safety to be design build under separate permit. deferred submittal for 201208167529Details
4th floor mechanical electrical full floor tenant imrpovement in multi tenant building including selective demo, partitions, new kitchenette, ceiling and finishes, plumbing and life safety to be design build under separate permit. deferred submittal for 201208167529 | $175,000 |
| Dec 13, 2012 | Completed final sign-off Feb 2013 | 188 Spear St | Hathaway Dinwiddie Co. | evacuation signage only, total of 12 signs. ti pa#2012-0726-5875, 2012-0809-6968, 2012-0816-7529 & 2012-0816-7530.Details
evacuation signage only, total of 12 signs. ti pa#2012-0726-5875, 2012-0809-6968, 2012-0816-7529 & 2012-0816-7530. | |
| Nov 28, 2012 | Completed final sign-off Aug 2015 | 188 Spear St | Bcci Construction Company | ti in partial area of the 10th floor including open offices, lounges, pantries, meeting room, server room & associated mech & elect work. ls & sprinklers under separate permit. new horizontal exit- panic harware reired on assembly exit doors- new a-3 occupnacyDetails
ti in partial area of the 10th floor including open offices, lounges, pantries, meeting room, server room & associated mech & elect work. ls & sprinklers under separate permit. new horizontal exit- panic harware reired on assembly exit doors- new a-3 occupnacy | $1,280,000 |
| Nov 21, 2012 | Completed final sign-off Feb 2013 | 188 Spear St | Intelligent Technologies & Services Inc | 7th floor-provide pre-action detection & controls in server room. fire alarm connection & pre-action system under separate permit.Details
7th floor-provide pre-action detection & controls in server room. fire alarm connection & pre-action system under separate permit. | $9,800 |
| Nov 19, 2012 | Never finaled issued Nov 2012, no final | 188 Spear St | Hathaway Dinwiddie Co. | mechanical and electrical plans for 2nd floor t.i. in multi-tenant bldg, including select demo, partitions, ceilings and finishes life safety alarm and sprinkler to be design build under seperate permit. ref pa #201210152027Details
mechanical and electrical plans for 2nd floor t.i. in multi-tenant bldg, including select demo, partitions, ceilings and finishes life safety alarm and sprinkler to be design build under seperate permit. ref pa #201210152027 | $330,000 |
| Nov 16, 2012 | Completed final sign-off Feb 2013 | 188 Spear St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade; relocate 65 pendent sprinkler heads on the 2nd floor. ti pa# 201210152027Details
fire sprinkler system upgrade; relocate 65 pendent sprinkler heads on the 2nd floor. ti pa# 201210152027 | $33,475 |
| Nov 13, 2012 | Completed final sign-off Mar 2013 | 180 Spear St | interior improvements to a 1045 sq ft ground floor space, to be used as a fast casual restaurant with a type b occupancy less than 50. it includes the construction of partial height partitions, counters, and a suspended act ceiling.Details
interior improvements to a 1045 sq ft ground floor space, to be used as a fast casual restaurant with a type b occupancy less than 50. it includes the construction of partial height partitions, counters, and a suspended act ceiling. | $80,000 | |
| Nov 1, 2012 | Expired or cancelled cancelled Jan 2026 | 188 Spear St | Hathaway Dinwiddie Co. | revision to 201208167530. remove delayed egress at bypass doors. turnstile enclosures changed to full height drywall partition at specific locations, revised unisex restroom layoutDetails
revision to 201208167530. remove delayed egress at bypass doors. turnstile enclosures changed to full height drywall partition at specific locations, revised unisex restroom layout | |
| Nov 1, 2012 | Expired or cancelled cancelled Jan 2026 | 188 Spear St | Hathaway Dinwiddie Co. | revision to 201208167529.. remove delayed egress at bypass doors. turnstile enclosures changed to full height drywall partition at specific locations, revised unisex restroom layout. reconfigure layout to add team room. 2 med conf rooms converted to rf labs. 2x2 susp clg grid throughoutDetails
revision to 201208167529.. remove delayed egress at bypass doors. turnstile enclosures changed to full height drywall partition at specific locations, revised unisex restroom layout. reconfigure layout to add team room. 2 med conf rooms converted to rf labs. 2x2 susp clg grid throughout | $150,000 |
| Oct 30, 2012 | Completed final sign-off Feb 2013 | 188 Spear St | Simplexgrinnell Lp. | 12th floor-modify (e) fire alarm system-adding 1 nac panel, 1 duct sensor, 3 photo sensors, 24 wall mounts speaker strobes, 1 ceiling mount speakers strobe & 2 ceiling mount speakersDetails
12th floor-modify (e) fire alarm system-adding 1 nac panel, 1 duct sensor, 3 photo sensors, 24 wall mounts speaker strobes, 1 ceiling mount speakers strobe & 2 ceiling mount speakers | $12,500 |
| Oct 30, 2012 | Completed final sign-off Aug 2015 | 188 Spear St | Simplexgrinnell Lp. | 11th floor-modify (e) fire alarm system-adding 1 nac panel, 1 duct sensor, 3 photo sensors, 25 wall mounts speaker strobes, 2 ceiling mount speakersDetails
11th floor-modify (e) fire alarm system-adding 1 nac panel, 1 duct sensor, 3 photo sensors, 25 wall mounts speaker strobes, 2 ceiling mount speakers | $11,200 |
| Oct 26, 2012 | Never finaled issued Oct 2012, no final | 188 Spear St | Simplexgrinnell Lp. | 2nd floor - modify (e) fire alarm system. adding (4) photo sensors, (6) duct sensors, (6) encapsulaed relays, (6) remote test switches, (1) relay iam, (1) relay spdt, (2) w.p. wall mount strobes, (2) w.p. ceiling speakers, (12) wall mount speaker strobes.Details
2nd floor - modify (e) fire alarm system. adding (4) photo sensors, (6) duct sensors, (6) encapsulaed relays, (6) remote test switches, (1) relay iam, (1) relay spdt, (2) w.p. wall mount strobes, (2) w.p. ceiling speakers, (12) wall mount speaker strobes. | $10,600 |
| Oct 15, 2012 | Completed final sign-off Jan 2013 | 188 Spear St | Hathaway Dinwiddie Co. | 2nd floor: partial floor t. i. in multi tenant building including selective demolition, patitions, ceiling, and finishes. 1 hour rated won door. public assembly permit required from sffd 698 second st. electrical, mechanical, plmg and life safety to be design/build on separate permit.Details
2nd floor: partial floor t. i. in multi tenant building including selective demolition, patitions, ceiling, and finishes. 1 hour rated won door. public assembly permit required from sffd 698 second st. electrical, mechanical, plmg and life safety to be design/build on separate permit. | $890,000 |
| Oct 11, 2012 | Expired or cancelled cancelled Jan 2026 | 188 Spear St | 7th floor-revision to pa# 2012-0809-6968-changed decaped egress doors to access controlled doors, re-used bathroom layout, removed 2 team roomsDetails
7th floor-revision to pa# 2012-0809-6968-changed decaped egress doors to access controlled doors, re-used bathroom layout, removed 2 team rooms | ||
| Oct 11, 2012 | Expired or cancelled cancelled Jan 2026 | 188 Spear St | 8th floor-revision to pa# 2012-0726-5875. changed delayed egress doors to access controlled doors, re-used bathroom layout.Details
8th floor-revision to pa# 2012-0726-5875. changed delayed egress doors to access controlled doors, re-used bathroom layout. | ||
| Oct 11, 2012 | Completed final sign-off May 2013 | 188 Spear St | Bcci Construction Company | t.i. on the 11th floor including new offices and associated mechanical and electrical work. fire and life safty under seperate permit.Details
t.i. on the 11th floor including new offices and associated mechanical and electrical work. fire and life safty under seperate permit. | $1,280,000 |
| Oct 11, 2012 | Completed final sign-off Jul 2013 | 188 Spear St | Bcci Construction Company | t.i. on the 12th floor including new offices and associated mechanical and electrical work. fire and life safty under seperate permit.Details
t.i. on the 12th floor including new offices and associated mechanical and electrical work. fire and life safty under seperate permit. | $1,280,000 |
| Oct 9, 2012 | Completed final sign-off Feb 2013 | 188 Spear St | Golden Gate Fire Protection Inc | 3rd floor:fire sprinkler system upgrade. relocate 83 pendent sprinkler heads on the 3rd floor. relocate 88 upright heads. app#201208167530Details
3rd floor:fire sprinkler system upgrade. relocate 83 pendent sprinkler heads on the 3rd floor. relocate 88 upright heads. app#201208167530 | $88,065 |
| Sep 27, 2012 | Completed final sign-off Jan 2013 | 188 Spear St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade, relocate 83 pendant prinkler heads on the 7th flr, relocate 80 upright heads, add 4 new upright head and pre-action valve, ti 201208096968Details
fire sprinkler system upgrade, relocate 83 pendant prinkler heads on the 7th flr, relocate 80 upright heads, add 4 new upright head and pre-action valve, ti 201208096968 | $88,065 |
| Sep 14, 2012 | Completed final sign-off Jan 2013 | 188 Spear St | Golden Gate Fire Protection Inc | fire sprinker system upgrade. relocate 86 pendent sprinkler heads on the 8th fl. relocate 85 upgright headsDetails
fire sprinker system upgrade. relocate 86 pendent sprinkler heads on the 8th fl. relocate 85 upgright heads | $88,065 |
| Sep 14, 2012 | Never finaled issued Sep 2012, no final | 188 Spear St | Hathaway Dinwiddie Co. | mechanical & electrical plabs for 7th floor tenant improvement in multi tenant bldg. including selected demo, partitions, ceilings, and finishes. fire safety alarm & sprinkler under separate permit. (defer sumittal for pa# 2012 0809 6968)Details
mechanical & electrical plabs for 7th floor tenant improvement in multi tenant bldg. including selected demo, partitions, ceilings, and finishes. fire safety alarm & sprinkler under separate permit. (defer sumittal for pa# 2012 0809 6968) | $275,000 |
| Sep 14, 2012 | Never finaled issued Sep 2012, no final | 188 Spear St | Simplexgrinnell Lp. | modify existing fire alarm system o 3rd fl. add 1 mac panel. 3 photo sensors, 1 relay, iam 23 wal mount speaker strobes, 9 wall mount strobes, 6 ceiling mount speakersDetails
modify existing fire alarm system o 3rd fl. add 1 mac panel. 3 photo sensors, 1 relay, iam 23 wal mount speaker strobes, 9 wall mount strobes, 6 ceiling mount speakers | $19,350 |
| Sep 14, 2012 | Never finaled issued Sep 2012, no final | 188 Spear St | Simplexgrinnell Lp. | modify existig fire alarm system o the 7th fl. add 4 photo sensors. 1 relay iam, 28 wall mount speaker strobes, 2 wall mount strobes, 5 ceiling mount speakersDetails
modify existig fire alarm system o the 7th fl. add 4 photo sensors. 1 relay iam, 28 wall mount speaker strobes, 2 wall mount strobes, 5 ceiling mount speakers | $18,900 |
| Sep 14, 2012 | Never finaled issued Sep 2012, no final | 188 Spear St | Hathaway Dinwiddie Co. | mechanical & electrical plabs for 3rd floor tenant improvement in multi tenant bldg. including selected demo, partitions, ceilings, and finishes. fire safety alarm & sprinkler under separate permit. (defer sumittal for pa# 2012 0816 7530)Details
mechanical & electrical plabs for 3rd floor tenant improvement in multi tenant bldg. including selected demo, partitions, ceilings, and finishes. fire safety alarm & sprinkler under separate permit. (defer sumittal for pa# 2012 0816 7530) | $275,000 |
| Sep 14, 2012 | Never finaled issued Sep 2012, no final | 188 Spear St | Simplexgrinnell Lp. | modify existing fire alarm system on the 8th fl. add four photo sensors. 1 relay iam, 27 wall mount speaker strobes, 6 wall mount strobes, 6 ceiling mount speakersDetails
modify existing fire alarm system on the 8th fl. add four photo sensors. 1 relay iam, 27 wall mount speaker strobes, 6 wall mount strobes, 6 ceiling mount speakers | $19,800 |
| Sep 10, 2012 | Never finaled issued Sep 2012, no final | 188 Spear St | Hathaway Dinwiddie Co. | mechanical plans for 8th fl tenant improvement in multi tenant building including selective demolition, partitions, ceilings, and finishes. life safety design build under separate permitDetails
mechanical plans for 8th fl tenant improvement in multi tenant building including selective demolition, partitions, ceilings, and finishes. life safety design build under separate permit | $275,000 |
| Aug 22, 2012 | Never finaled issued Aug 2012, no final | 188 Spear St | street space | ||
| Aug 16, 2012 | Completed final sign-off Feb 2013 | 188 Spear St | Hathaway Dinwiddie Co. | 3rd floor: full floor t.i. in multi tenant bldg including selective demolition, partitions, new kitchenette, ceiling and finishes. electrical, mech, plmg, and life safety to be design/build under seperate permit.Details
3rd floor: full floor t.i. in multi tenant bldg including selective demolition, partitions, new kitchenette, ceiling and finishes. electrical, mech, plmg, and life safety to be design/build under seperate permit. | $1,163,000 |
| Aug 16, 2012 | Completed final sign-off Feb 2013 | 188 Spear St | Hathaway Dinwiddie Co. | 4th floor: full floor t.i. in multi tenant bldg including selective demolition, partitions, new kitchenette, ceiling and finishes. electrical, mech, plmg, and life safety to be design/build under seperate permit.Details
4th floor: full floor t.i. in multi tenant bldg including selective demolition, partitions, new kitchenette, ceiling and finishes. electrical, mech, plmg, and life safety to be design/build under seperate permit. | $1,163,000 |
| Aug 9, 2012 | Completed final sign-off Jan 2013 | 188 Spear St | Hathaway Dinwiddie Co. | 7th floor:full floor t.i. in multi tenant bldg including selective demolition,partitions, new kitchenette, ceiling and finishes. electrical,mech, plmg, and life safety to be design/build under seperate permit.provide full area detection for delayed egress per cbc-2010 sec. 907.3.2.1Details
7th floor:full floor t.i. in multi tenant bldg including selective demolition,partitions, new kitchenette, ceiling and finishes. electrical,mech, plmg, and life safety to be design/build under seperate permit.provide full area detection for delayed egress per cbc-2010 sec. 907.3.2.1 | $3,489,000 |
| Jul 26, 2012 | Completed final sign-off Jan 2013 | 188 Spear St | Hathaway Dinwiddie Co. | 8th floor phase 1-full floor tenant improvement in multi-tenant building including selective demoition, partitions, ceiling & finishes. electrical, mechanical, plumbing & life safety to be design build under separate permit.Details
8th floor phase 1-full floor tenant improvement in multi-tenant building including selective demoition, partitions, ceiling & finishes. electrical, mechanical, plumbing & life safety to be design build under separate permit. | $1,163,000 |
| Apr 17, 2012 | Never finaled issued Apr 2012, no final | 188 Spear St | to add address to block 3717, lot 019 per pa #200611178045s.Details
to add address to block 3717, lot 019 per pa #200611178045s. | ||
| Apr 11, 2012 | Completed final sign-off Jul 2012 | 120 Howard St | revision to 200611178045 for additional interior non structural demo and modifications to vacant 2nd fl spaceDetails
revision to 200611178045 for additional interior non structural demo and modifications to vacant 2nd fl space | $15,000 | |
| Mar 29, 2012 | Completed final sign-off Jul 2012 | 120 Howard St | revision to 200611178045 for modifications to ground floor lobby layout.Details
revision to 200611178045 for modifications to ground floor lobby layout. | $60,000 | |
| Feb 7, 2012 | Expired or cancelled expired Jun 2014 | 120 Howard St | Eagle Bay Enterprises, Inc (Dba Garnett | fabricate & install evacuation plans on floors - basement to 12th.Details
fabricate & install evacuation plans on floors - basement to 12th. | $4,000 |
| Dec 14, 2011 | Never finaled issued Dec 2011, no final | 120 Howard St | streetspace | ||
| Sep 26, 2011 | Completed final sign-off Jun 2012 | 120 Howard St | minor revision to pa# 2006.11.17.8045s5 to show fire pump attatchment detailsDetails
minor revision to pa# 2006.11.17.8045s5 to show fire pump attatchment details | ||
| Jun 29, 2011 | Completed final sign-off Jul 2012 | 120 Howard St | revision to garage level mechanical approved 200611178045 s3Details
revision to garage level mechanical approved 200611178045 s3 | $16,500 | |
| Jun 29, 2011 | Never finaled issued Jun 2011, no final | 120 Howard St | street space & mta parking meter | ||
| Jan 26, 2011 | Completed final sign-off Jun 2012 | 120 Howard St | structural revision to approved app# 200611178045 s2Details
structural revision to approved app# 200611178045 s2 | $17,500 | |
| Jan 6, 2010 | Completed final sign-off Feb 2010 | 120 Howard St | Richlen Construction | 2nd floor-electrical and mechanical ti for 2nd flDetails
2nd floor-electrical and mechanical ti for 2nd fl | $60,000 |
| Dec 23, 2009 | Completed final sign-off Feb 2010 | 120 Howard St | Simplex Grinnell | add one nac panel, 13 strobes, six speakersDetails
add one nac panel, 13 strobes, six speakers | $8,000 |
| Dec 11, 2009 | Completed final sign-off Feb 2010 | 120 Howard St | Ayoob & Peery Plumbing Co Inc | 2nd floor relocate fire sprinkler heads per tenant improvements , total 28.Details
2nd floor relocate fire sprinkler heads per tenant improvements , total 28. | $4,200 |
| Nov 19, 2009 | Never finaled issued Nov 2009, no final | 120 Howard St | street space permit | ||
| Oct 29, 2009 | Completed final sign-off Feb 2010 | 120 Howard St | Richlen Construction | tenant improvements 2nd floor. new classroomsDetails
tenant improvements 2nd floor. new classrooms | $120,000 |
| Jun 30, 2009 | Completed final sign-off Jul 2009 | 120 Howard St | umbrella permit. compliance with highrise sprinkler ordinance 377-93. no workDetails
umbrella permit. compliance with highrise sprinkler ordinance 377-93. no work | ||
| Jun 3, 2009 | Never finaled issued Jun 2009, no final | 120 Howard St | Tyco Integrated Security | remove old communicator & install new dialer panel in basement, install pull station next to panel & horn above. connect dialer panel to (e) fire control panel located on 1st floor to monitor alarm & trouble conditionDetails
remove old communicator & install new dialer panel in basement, install pull station next to panel & horn above. connect dialer panel to (e) fire control panel located on 1st floor to monitor alarm & trouble condition | $3,177 |
| May 14, 2009 | Completed final sign-off Jun 2009 | 120 Howard St | Pribuss Engineering Inc | as built high rise compliance work for app #200904236933. add 12 speaker and relocate 3 speakers at ground floor. add one sprklr at 8th floor. add 2 on ground level.Details
as built high rise compliance work for app #200904236933. add 12 speaker and relocate 3 speakers at ground floor. add one sprklr at 8th floor. add 2 on ground level. | |
| Apr 23, 2009 | Completed final sign-off Jun 2009 | 120 Howard St | Pribuss Engineering Inc | 1st & 8th floors-high rise compliance work-add 14 sprinklers & relocate 3 sprinkler at ground floor. add one sprinkler at 8th floor. umbrella permit separte application..Details
1st & 8th floors-high rise compliance work-add 14 sprinklers & relocate 3 sprinkler at ground floor. add one sprinkler at 8th floor. umbrella permit separte application.. | $6,100 |
| Mar 13, 2009 | Never finaled issued Mar 2009, no final | 120 Howard St | street space only. | ||
| Jun 20, 2008 | Completed final sign-off Apr 2010 | 120 Howard St | Pribuss Engineering Inc | ti for sprinkler system on the basement level, 1st, 4th, 5th and 6th floors. add 3 heads in basement, 1 on the 1st, 5 on the 4th, 2 on the 5th and 4 on the 6th floorsDetails
ti for sprinkler system on the basement level, 1st, 4th, 5th and 6th floors. add 3 heads in basement, 1 on the 1st, 5 on the 4th, 2 on the 5th and 4 on the 6th floors | $3,500 |
| May 9, 2008 | Expired or cancelled cancelled Jan 2020 | 120 Howard St | base building, building lobby renovation and common area upgradesDetails
base building, building lobby renovation and common area upgrades | $5,000,000 | |
| Apr 24, 2008 | Completed final sign-off Jun 2008 | 120 Howard St | Dpr Construction Inc | add and relocate ductwork for existing hvac on 6th floorDetails
add and relocate ductwork for existing hvac on 6th floor | $9,000 |
| Apr 23, 2008 | Never finaled issued Apr 2008, no final | 120 Howard St | ti upgrade to sprinkler system. relocate 19 sprinkler heads on the 6th floor. 19 - relocates.Details
ti upgrade to sprinkler system. relocate 19 sprinkler heads on the 6th floor. 19 - relocates. | $6,300 | |
| Apr 22, 2008 | Completed final sign-off Jun 2008 | 120 Howard St | Dpr Construction Inc | demo some ex. non bearing partition wall and reconstruct new ones to creat a new storage room. (1st flr)Details
demo some ex. non bearing partition wall and reconstruct new ones to creat a new storage room. (1st flr) | $40,550 |
| Mar 31, 2008 | Never finaled issued Apr 2008, no final | 120 Howard St | Dpr Construction Inc | demolition of non-load bearing interior partitions & door assemblie & interior finishes, suite 600 -ab017 used.Details
demolition of non-load bearing interior partitions & door assemblie & interior finishes, suite 600 -ab017 used. | $12,000 |
| Mar 26, 2008 | Completed final sign-off Jun 2008 | 120 Howard St | Dpr Construction Inc | t.i. fl. 6, demolition to existing interior partitions and door assemblies, construct new interior partitions with new door and glazing assemblies. provide new interior finishes. mep under separate permit.Details
t.i. fl. 6, demolition to existing interior partitions and door assemblies, construct new interior partitions with new door and glazing assemblies. provide new interior finishes. mep under separate permit. | $250,000 |
| Oct 23, 2007 | Completed final sign-off Dec 2007 | 120 Howard St | system buil-out. new branchlines and mains. add 134 new upright 3rd floor.Details
system buil-out. new branchlines and mains. add 134 new upright 3rd floor. | $32,000 | |
| Aug 8, 2007 | Completed final sign-off Oct 2007 | 120 Howard St | Cannon Constructors North Inc | mechanical work on 6th floor. install 3 new cofrenacne rooms on 6th floor, ref 200706214653Details
mechanical work on 6th floor. install 3 new cofrenacne rooms on 6th floor, ref 200706214653 | $20,000 |
| Aug 7, 2007 | Completed final sign-off Oct 2007 | 120 Howard St | Simplex Grinnell | suite #640-fire devices: 10ea. wall strobes, remove/replace 1 ceiling speaker strobe, remove/replace 1 wall strobe.Details
suite #640-fire devices: 10ea. wall strobes, remove/replace 1 ceiling speaker strobe, remove/replace 1 wall strobe. | $3,800 |
| Jul 31, 2007 | Completed final sign-off Oct 2007 | 120 Howard St | t.i. upgrade on (e) fire sprinkler system for securitas 6th floor (#3541) 7 hd. relocated, delete 2 hd.Details
t.i. upgrade on (e) fire sprinkler system for securitas 6th floor (#3541) 7 hd. relocated, delete 2 hd. | $1,400 | |
| Jun 21, 2007 | Completed final sign-off Dec 2007 | 120 Howard St | 3rd floor - demolition all partitions except rated corridor. demolition of ceiling and grid/lighting on 3rd floor.Details
3rd floor - demolition all partitions except rated corridor. demolition of ceiling and grid/lighting on 3rd floor. | $56,000 | |
| Jun 21, 2007 | Completed final sign-off Oct 2007 | 120 Howard St | 6th floor - demolition, construction of non load bearing partitions. minor electrical work w/ separate permit. no structural work.Details
6th floor - demolition, construction of non load bearing partitions. minor electrical work w/ separate permit. no structural work. | $64,341 | |
| Feb 12, 2007 | Completed final sign-off Jun 2007 | 120 Howard St | Skyline Construction | heffernan- oti-2 5th floor meDetails
heffernan- oti-2 5th floor me | $24,000 |
| Jan 29, 2007 | Completed final sign-off Jun 2007 | 120 Howard St | Skyline Construction | sprinkler work. 36 relocatesDetails
sprinkler work. 36 relocates | $16,500 |
| Jan 23, 2007 | Completed final sign-off Jun 2007 | 120 Howard St | Simplex Grinnell | fire alarm t.i. on 5/f. add 5 speaker strobes, 2 smoke detectors & 2 door holders. fire alarm certification required.Details
fire alarm t.i. on 5/f. add 5 speaker strobes, 2 smoke detectors & 2 door holders. fire alarm certification required. | $5,000 |
| Jan 22, 2007 | Completed final sign-off Jun 2007 | 120 Howard St | Skyline Construction | oti-2, cac real estate, 5th fl, el.Details
oti-2, cac real estate, 5th fl, el. | $65,000 |
| Nov 17, 2006 | Never finaled issued Jul 2011, no final | 120 Howard St | proposed vertical addition removing extg penthouse and constructing 4 new stories with full floor plates, new structure will be steel moment frame and mechanical will be variable air volume-replace 3 extg elevatorsDetails
proposed vertical addition removing extg penthouse and constructing 4 new stories with full floor plates, new structure will be steel moment frame and mechanical will be variable air volume-replace 3 extg elevators | $8,300,000 | |
| Nov 9, 2006 | Completed final sign-off Jun 2007 | 120 Howard St | oti-1 5th floor el, me, l/s, spDetails
oti-1 5th floor el, me, l/s, sp | $304,500 | |
| Nov 4, 2005 | Completed final sign-off Dec 2005 | 120 Howard St | interior tenant improvement-mionr demolition constuction of non bearing partitions new finishesDetails
interior tenant improvement-mionr demolition constuction of non bearing partitions new finishes | $10,000 | |
| Mar 30, 2005 | Completed final sign-off Sep 2005 | 120 Howard St | Ayoob & Peery Plumbing Co Inc | 3/fl - install fire sprinklers at core area & calc. for future floor layout sprinkler system.Details
3/fl - install fire sprinklers at core area & calc. for future floor layout sprinkler system. | $18,000 |
| Mar 24, 2005 | Never finaled issued Mar 2005, no final | 120 Howard St | street space permit | ||
| Mar 3, 2005 | Completed final sign-off Sep 2005 | 120 Howard St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinkler heads per tenant improvement.Details
add & relocate fire sprinkler heads per tenant improvement. | $85,000 |
| Jan 18, 2005 | Expired or cancelled expired Sep 2005 | 120 Howard St | demo existing drywall partitions construct new dry wall partitions for new offices relocate existingDetails
demo existing drywall partitions construct new dry wall partitions for new offices relocate existing | $24,000 | |
| Aug 13, 2004 | Completed final sign-off Apr 2005 | 120 Howard St | Dome Construction Corp | sprinkler only at 1st floor & basement only.Details
sprinkler only at 1st floor & basement only. | $5,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Johnson Controls Fire (30), Skyline Construction (21), Hathaway Dinwiddie Co. (20), Golden Gate Fire Protection Inc (17), Simplexgrinnell Lp. (12), Bcci Construction Company (9), Principal Builders Inc. (8), Pribuss Engineering Inc (7), Anderson, Rowe & Buckley, Inc. (6), Ayoob & Peery Plumbing Co Inc (4), Dpr Construction Inc (4), Anderson Burton Construction Inc (3), Eagle Bay Enterprises, Inc (Dba Garnett (3), Richlen Construction (3), Signtech Electrical Advertising Inc. (3), Simplex Grinnell (3), Aaa Restaurant Fire Control/Dba Aaa Fire (2), Novo Construction Inc (2), Potter Fire Protection (2), Cannon Constructors North Inc, Certified Fire & Safety Co, Deb Construction Llc, Dome Construction Corp, G Swanson Constr. Inc., Golden Gate Sign Company Inc., Intelligent Technologies & Services Inc, Metropolitan Electrical Construction, Thomas Swan Sign Co Inc, Tyco Integrated Security
- Architects
- Alan Johansen (7), Donnie Lam (4), Julia Seen (3), Michael Castro (3), David De Valeria (2), Dominique Price (2), Robbin A Mcdonald (2), Alfred Quezada, David Fernando Caneer, Geofe Carmeen, Luda Hoe, Mark E. Levine, Matthew Wei, Sophia Tyra, Stanley Lew, Szto Associates, Victoria Salgado
- Engineers
- Rudolfo P Bustos Iii (3), Donald Dammen (2), Alexander Joseph Pacheco, Jesus Cabellon, Michael Gemmill, Nicholas Brereton, Tom Chuan Xia
- Designers
- Kevin L Herring (2), Anderson, Rowe & Buckley, Inc.