Tom Chuan Xia
- License
- S5319
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S5319 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Dci Engineers
- Based in
- Seattle
- On San Francisco permits
- Aug 2016 to Nov 2020
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- C Stone Construction, Cameron Builders Inc., Greenberry Industrial Llc, Skyline Construction
- Architects
- John Flath, Karoline Derse
- Engineers
- David Cooper, Jack Echols, Stephen M. Glatt
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 9, 2020 | Completed final sign-off Feb 2021 | 188 Spear St | Skyline Construction | 7/f: revision to pa# 2019.1205.8727 to provide structural plans for modular partitions for tenant improvement.Details
7/f: revision to pa# 2019.1205.8727 to provide structural plans for modular partitions for tenant improvement. | |
| Aug 5, 2020 | Completed final sign-off Jul 2021 | 200 Paul Av | Greenberry Industrial Llc, C Stone Construction | seismic upgrade to (e) data center for electric components.Details
seismic upgrade to (e) data center for electric components. | $500,000 |
| Aug 11, 2016 | Completed final sign-off Sep 2017 | 185 Berry St | Cameron Builders Inc. | 1st/3rd flrs: #129 & #325: a/mep 1st flr (#129): modify (e)mri room to accommodate new mri equipment, upgrade mep; 3rd flr(#325) add swiss log station, add pneumatic tube system. fire and life safety under separate permit. maher ord 155-13 naDetails
1st/3rd flrs: #129 & #325: a/mep 1st flr (#129): modify (e)mri room to accommodate new mri equipment, upgrade mep; 3rd flr(#325) add swiss log station, add pneumatic tube system. fire and life safety under separate permit. maher ord 155-13 na | $1,000,000 |