Mark E. Levine
- License
- C30669
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- May 2017 to Sep 2022
2 permits since 2000 (architect on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Retail Construction Services, Skyline Construction
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2022 | Completed final sign-off Jul 2023 | 188 Spear St | Skyline Construction | 4th, 6th, 7th & 8th fl - furniture modifications to include seismic anchoring of 11 existing furniture phone booths. fire alarm and sprinkler under separate permitDetails
4th, 6th, 7th & 8th fl - furniture modifications to include seismic anchoring of 11 existing furniture phone booths. fire alarm and sprinkler under separate permit | $176,000 |
| May 11, 2017 | Completed final sign-off May 2018 | 1 Stockton St | Retail Construction Services | revision to pa #201608296255 (1st & 2nd floor) - relocation of bathrooms from 1st to 2nd floor ; various graphic clarification fo rpackage scope & field verify existing conditions; modifications to entry configuration based on permit comments; stair & handrail updates, hvac update.Details
revision to pa #201608296255 (1st & 2nd floor) - relocation of bathrooms from 1st to 2nd floor ; various graphic clarification fo rpackage scope & field verify existing conditions; modifications to entry configuration based on permit comments; stair & handrail updates, hvac update. |