Block 0327, lot 025
1 Stockton St
- City’s use
- Commercial Retail
- Built
- 1973
- Stories
- 2
- Units
- 1
- Rooms
- 4 bathrooms
- Building
- 15,613 sq ft
- Lot
- 5,280 sq ft
- Zoning
- C3R
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
37 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 12, 2018 | Never finaled issued Jun 2018, no final | 1 Stockton St | temporary installation of 3 phone booth-style listening booths will be instatlled for a 3 month period for the demonstration and consumer interaction with google assistant products. the listening booths are pre-fabricated and will be anchored to existing structures within the store.Details
temporary installation of 3 phone booth-style listening booths will be instatlled for a 3 month period for the demonstration and consumer interaction with google assistant products. the listening booths are pre-fabricated and will be anchored to existing structures within the store. | $100 | |
| May 22, 2018 | Never finaled issued May 2018, no final | 1 Stockton St | Siemens Industry, Inc. | lower level - fire alarm work to add a smoke detector above fire suppression panel on the lower level as pasrt of the t-mobile remodel. ref pa 2016-1220-5430Details
lower level - fire alarm work to add a smoke detector above fire suppression panel on the lower level as pasrt of the t-mobile remodel. ref pa 2016-1220-5430 | $635 |
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 1 Stockton St | Retail Construction Services | health review only - cafe area. sell pre packages goods on 2nd flr ref 201612205430Details
health review only - cafe area. sell pre packages goods on 2nd flr ref 201612205430 | |
| Jan 31, 2018 | Completed final sign-off Mar 2018 | 1 Stockton St | Siemens Industry, Inc. | basement & flrs 1/2. fire alarm work for the t-mobile remodels throughout the bldg. the additions include a new fire alarm panel, a lobby annciator and required initiating/indicating devices. ref app #2016-1220-5430.Details
basement & flrs 1/2. fire alarm work for the t-mobile remodels throughout the bldg. the additions include a new fire alarm panel, a lobby annciator and required initiating/indicating devices. ref app #2016-1220-5430. | $54,000 |
| Jan 25, 2018 | Never finaled issued Jan 2018, no final | 1 Stockton St | street space/mta metersDetails
street space/mta meters | ||
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 1 Stockton St | street space/mta metersDetails
street space/mta meters | ||
| Dec 5, 2017 | Completed final sign-off Mar 2020 | 1 Stockton St | Intelligent Technologies & Services Inc | install clean agent/preaction detection and constrol system in basement server/i.t. room.Details
install clean agent/preaction detection and constrol system in basement server/i.t. room. | $14,750 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 1 Stockton St | Rcm Fire Protection Inc. | relocate and add heads on 3 floors, add 1 preaction system , 1 fm 200 in server rm. ref 201612205430Details
relocate and add heads on 3 floors, add 1 preaction system , 1 fm 200 in server rm. ref 201612205430 | $52,000 |
| Oct 30, 2017 | Never finaled issued Nov 2017, no final | 1 Stockton St | Retail Construction Services | deferred submittal - steel storage racks w/ calculations. ref pa #201608296255.Details
deferred submittal - steel storage racks w/ calculations. ref pa #201608296255. | $50,000 |
| Jul 11, 2017 | Never finaled issued Jul 2017, no final | 1 Stockton St | Retail Construction Services | install 1 illuminated sign, t-mobile, on ellis street side.Details
install 1 illuminated sign, t-mobile, on ellis street side. | $10,000 |
| May 11, 2017 | Completed final sign-off May 2018 | 1 Stockton St | Retail Construction Services | revision to pa #201608296255 (1st & 2nd floor) - relocation of bathrooms from 1st to 2nd floor ; various graphic clarification fo rpackage scope & field verify existing conditions; modifications to entry configuration based on permit comments; stair & handrail updates, hvac update.Details
revision to pa #201608296255 (1st & 2nd floor) - relocation of bathrooms from 1st to 2nd floor ; various graphic clarification fo rpackage scope & field verify existing conditions; modifications to entry configuration based on permit comments; stair & handrail updates, hvac update. | |
| Mar 28, 2017 | Expired or cancelled withdrawn Jul 2017 | 1 Stockton St | electric wall sign single facedDetails
electric wall sign single faced | $4,000 | |
| Mar 28, 2017 | Completed final sign-off Mar 2018 | 1 Stockton St | Golden Gate Sign Company Inc. | to erect electric wall signDetails
to erect electric wall sign | $10,000 |
| Dec 30, 2016 | Never finaled issued May 2017, no final | 1 Stockton St | street spaceDetails
street space | ||
| Dec 20, 2016 | Completed final sign-off May 2018 | 1 Stockton St | Retail Construction Services | tenant improvement of space. improvements occur on the basement level, ground and second floor and includes new finishes, fixtures, lighting and ditigal mediaDetails
tenant improvement of space. improvements occur on the basement level, ground and second floor and includes new finishes, fixtures, lighting and ditigal media | $2,500,000 |
| Oct 11, 2016 | Never finaled issued Oct 2016, no final | 1 Stockton St | street spaceDetails
street space | ||
| Aug 29, 2016 | Completed final sign-off May 2018 | 1 Stockton St | Retail Construction Services | t.i. occur on basement level, 1st floor & 2nd floor. t.i inludes construction of new exterior enclosure with entry-egress doors, interior stair, guardrail, new skylight & restroom alterations. fire protection & exterior signage under seperate permit.Details
t.i. occur on basement level, 1st floor & 2nd floor. t.i inludes construction of new exterior enclosure with entry-egress doors, interior stair, guardrail, new skylight & restroom alterations. fire protection & exterior signage under seperate permit. | $2,500,000 |
| May 25, 2016 | Completed final sign-off Jul 2016 | 1 Stockton St | Golden Gate Fire Protection Inc | 1st & 2nd floor: fire sprinklers. remove 25 pendents. (e) uprights to remain.Details
1st & 2nd floor: fire sprinklers. remove 25 pendents. (e) uprights to remain. | $500 |
| May 16, 2016 | Never finaled issued May 2016, no final | 1 Stockton St | street space permitDetails
street space permit | ||
| Mar 1, 2016 | Completed final sign-off Jun 2016 | 1 Stockton St | Eric F Anderson Incorporated | interior non-structural demolition of stair, suspended ceilings, furniture and fixtures. no external work. per ab-017Details
interior non-structural demolition of stair, suspended ceilings, furniture and fixtures. no external work. per ab-017 | $50,000 |
| Oct 18, 2012 | Completed final sign-off Nov 2012 | 1 Stockton St | Rudolph And Sletten Inc | 1st floor:credenza added. remove access door from storage room and add removal panels to access the extg display. ceiling was modified. revision to app#201206192960Details
1st floor:credenza added. remove access door from storage room and add removal panels to access the extg display. ceiling was modified. revision to app#201206192960 | $9,000 |
| Oct 3, 2012 | Completed final sign-off May 2022 | 1 Stockton St | R L H Fire Protection Inc | 1st & 2nd,basement floors-fire sprinkler only-basement level-relocate 8 pendents, add 2 pendent, remove 3 heads. 1st fl-relocate 7 pendents, add 2 pendent, remove 3 heads. 2nd fl-relocate 2 heads. ti pa# 2012-0619-2960Details
1st & 2nd,basement floors-fire sprinkler only-basement level-relocate 8 pendents, add 2 pendent, remove 3 heads. 1st fl-relocate 7 pendents, add 2 pendent, remove 3 heads. 2nd fl-relocate 2 heads. ti pa# 2012-0619-2960 | $10,000 |
| Aug 28, 2012 | Never finaled issued Aug 2012, no final | 1 Stockton St | Siemens Industry, Inc. | addition of 1 duct detector, 3 horn/strobes for the apple store remodels on the basement, 1st, and 2nd floors. all new devices ointo the exsting fire alarm systemDetails
addition of 1 duct detector, 3 horn/strobes for the apple store remodels on the basement, 1st, and 2nd floors. all new devices ointo the exsting fire alarm system | $4,200 |
| Aug 15, 2012 | Completed final sign-off Nov 2012 | 1 Stockton St | Rudolph And Sletten Inc | revision to approved pa 201206192960 under construction: briefing room remodel: change glass door to metal door, new access to display case thru storage room; mep mechancial diffusers revision, add lights and junction boxes.Details
revision to approved pa 201206192960 under construction: briefing room remodel: change glass door to metal door, new access to display case thru storage room; mep mechancial diffusers revision, add lights and junction boxes. | $9,000 |
| Jun 19, 2012 | Completed final sign-off Nov 2012 | 1 Stockton St | Rudolph And Sletten Inc | 1st/2nd/basement-t.i of (e) retail space. work to include non structural partitions, ceilings, fininshes & m.e.pDetails
1st/2nd/basement-t.i of (e) retail space. work to include non structural partitions, ceilings, fininshes & m.e.p | $1,160,000 |
| Sep 8, 2011 | Expired or cancelled cancelled Jan 2026 | 1 Stockton St | ti. remodel of (e) basement area of retail space partitions, peers, work counters new bathrooms + heat pump - reductions in lights.Details
ti. remodel of (e) basement area of retail space partitions, peers, work counters new bathrooms + heat pump - reductions in lights. | $285,000 | |
| Jan 27, 2011 | Never finaled issued Apr 2011, no final | 1 Stockton St | Skyline Construction | existing foundation wall infill will be constructred on property line at stockton street at basement level to allow for new underground muni line utilitiesDetails
existing foundation wall infill will be constructred on property line at stockton street at basement level to allow for new underground muni line utilities | $35,000 |
| Mar 18, 2009 | Completed final sign-off Mar 2010 | 1 Stockton St | Dpr Construction Inc | barrier removal only for disability access upgrades. remove 3 theater seats and designate 2 companion seats on 2nd fl. install ada compliant handrails at ramp on 1st floor.Details
barrier removal only for disability access upgrades. remove 3 theater seats and designate 2 companion seats on 2nd fl. install ada compliant handrails at ramp on 1st floor. | $20,000 |
| Jun 15, 2007 | Never finaled issued Jun 2007, no final | 18 Ellis St | street space permit only.Details
street space permit only. | ||
| May 5, 2005 | Never finaled issued May 2005, no final | 1 Stockton St | street spaceDetails
street space | ||
| Jan 30, 2004 | Completed final sign-off Dec 2004 | 1 Stockton St | minor revision to approved pa#20033/10/17/7843: sprinkler work at 1st floor only (4 heads)Details
minor revision to approved pa#20033/10/17/7843: sprinkler work at 1st floor only (4 heads) | $500 | |
| Jan 27, 2004 | Completed final sign-off Dec 2004 | 1 Stockton St | minor revision to fire alarm system approved under app #2003/04/081757s-5Details
minor revision to fire alarm system approved under app #2003/04/081757s-5 | $1,000 | |
| Oct 17, 2003 | Completed final sign-off Dec 2004 | 1 Stockton St | install new sprinkler systemDetails
install new sprinkler system | $75,000 | |
| Sep 16, 2003 | Never finaled issued Sep 2003, no final | 18 Ellis St | address assignment-additionalDetails
address assignment-additional | ||
| Jun 2, 2003 | Completed final sign-off Aug 2003 | 1 Stockton St | non-structural interior soft demo of retail space exit stairs to remainDetails
non-structural interior soft demo of retail space exit stairs to remain | $25,000 | |
| Apr 8, 2003 | Completed final sign-off Dec 2004 | 1 Stockton St | remodel (e) retail store: new interior partitions, new facade & structural upgrade, new mech/elecDetails
remodel (e) retail store: new interior partitions, new facade & structural upgrade, new mech/elec | $8,500,000 | |
| Aug 21, 2001 | Expired or cancelled expired Aug 2003 | 1 Stockton St | Fisher Development Inc | on all floors and basement: interior remodel relocate fixtures and cash wrap remove & replace tileDetails
on all floors and basement: interior remodel relocate fixtures and cash wrap remove & replace tile | $50,000 |