Block 3708, lot 019
85 02nd St
- City’s use
- Commercial Office
- Built
- 1898
- Stories
- 8
- Building
- 124,245 sq ft
- Lot
- 20,943 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
127 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 15, 2026 | In progress filed May 2026, not yet issued | 85 02nd St | 2nd and 3rd floor: - revision to bpa: 202604219805. adding structural for the phone booths.Details
2nd and 3rd floor: - revision to bpa: 202604219805. adding structural for the phone booths. | ||
| Apr 21, 2026 | In progress filed Apr 2026, not yet issued | 85 02nd St | 1st fl/level 1 ti includes demo of non-structural partitions and building new non structural partitions. all new or revised meps and life safety work will be design build and submitted for permits separately (bldg is fully sprinklered) ref pa 202603278392Details
1st fl/level 1 ti includes demo of non-structural partitions and building new non structural partitions. all new or revised meps and life safety work will be design build and submitted for permits separately (bldg is fully sprinklered) ref pa 202603278392 | $600,000 | |
| Apr 21, 2026 | In progress issued May 2026 | 85 02nd St | Novo Construction Inc | 2nd & 3rd fl - ti includes demo of non-structural partitions and bldg new non-structural partitions. all new meps and life safety work will be design build and submitted for permit separately (bldg is fully sprinklered) ref pa 202603278389Details
2nd & 3rd fl - ti includes demo of non-structural partitions and bldg new non-structural partitions. all new meps and life safety work will be design build and submitted for permit separately (bldg is fully sprinklered) ref pa 202603278389 | $1,417,190 |
| Mar 27, 2026 | In progress issued Mar 2026 | 85 02nd St | Novo Construction Inc | 2nd & 3rd fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling. ceiling work to remain. no sprinkler work needed (ab017)Details
2nd & 3rd fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling. ceiling work to remain. no sprinkler work needed (ab017) | $106,000 |
| Mar 27, 2026 | In progress issued Mar 2026 | 85 02nd St | Novo Construction Inc | 1st fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling work to remain. no sprinkler work needed (ab017). improvement for build back under separate permitDetails
1st fl - ti including demo of non-structural partitions (bldg is fully sprinklered). existing ceiling work to remain. no sprinkler work needed (ab017). improvement for build back under separate permit | $50,000 |
| Feb 24, 2026 | Completed final sign-off May 2026 | 85 02nd St | C C I Commercial Construction & Improv | revision to bpa#202510248065, administrative permit to remove deferred sprinkler permit requirement ref sffd ab 2.04Details
revision to bpa#202510248065, administrative permit to remove deferred sprinkler permit requirement ref sffd ab 2.04 | |
| Nov 18, 2025 | Completed final sign-off Apr 2026 | 85 02nd St | Anderson Construction Group Inc | 7th fl, ste 700 revision to pa 202509084762 (arch'l) & 202510087007 (mech) and add'l work installation of 6 privacy booths; mechanical title 24 docs; electrical - 3 (n) lights/switches, 4 (n) receptacles & title 24 docs.Details
7th fl, ste 700 revision to pa 202509084762 (arch'l) & 202510087007 (mech) and add'l work installation of 6 privacy booths; mechanical title 24 docs; electrical - 3 (n) lights/switches, 4 (n) receptacles & title 24 docs. | $25,000 |
| Oct 24, 2025 | Completed final sign-off May 2026 | 85 02nd St | C C I Commercial Construction & Improv | installation of 9 phone booths/ privacy pods in the fifth floor tenant space. any mep, fire sprinkler and life safety work permitted separateley.Details
installation of 9 phone booths/ privacy pods in the fifth floor tenant space. any mep, fire sprinkler and life safety work permitted separateley. | $10,000 |
| Oct 8, 2025 | Completed final sign-off Apr 2026 | 85 02nd St | Marina Mechanical Services | 7th floor: mechanical unit relocation and associated duct work, addition or 4 zone dampers. work in conjunction with pa #202509084762Details
7th floor: mechanical unit relocation and associated duct work, addition or 4 zone dampers. work in conjunction with pa #202509084762 | $15,000 |
| Oct 6, 2025 | Completed final sign-off Dec 2025 | 85 02nd St | Aquamatic Fire Protection | 7/fl-relocate amd replace (2) , add (1) , plug (2) pendent fire sprinklers. no underground work. ref ti 202509084762Details
7/fl-relocate amd replace (2) , add (1) , plug (2) pendent fire sprinklers. no underground work. ref ti 202509084762 | $5,900 |
| Sep 18, 2025 | Completed final sign-off Dec 2025 | 85 02nd St | Siemens Industry, Inc. | fire only work for the conference rooms remodel on floor 7 done under 202509084762; 3 speaker/strobees are added and 1 smoke detector is relocated.Details
fire only work for the conference rooms remodel on floor 7 done under 202509084762; 3 speaker/strobees are added and 1 smoke detector is relocated. | $3,605 |
| Sep 8, 2025 | Completed final sign-off Apr 2026 | 85 02nd St | Anderson Construction Group Inc | interior tenant improvement projet on 7th floor: selective demolition, buildout of three small meeting rooms in place of existing tranining room. new walls, doors, galzing and lighting. any mep, title 24 calcs, fire sprinklers & life safety to be permitted separately.Details
interior tenant improvement projet on 7th floor: selective demolition, buildout of three small meeting rooms in place of existing tranining room. new walls, doors, galzing and lighting. any mep, title 24 calcs, fire sprinklers & life safety to be permitted separately. | $30,000 |
| Jul 16, 2025 | Completed final sign-off Jan 2026 | 85 02nd St | Access Systems & Solutions Inc | phase 2 of permit 202409130683. installation of an outrigger beam system, guard rails on the penthouse roof for exterior building maintenance operations.Details
phase 2 of permit 202409130683. installation of an outrigger beam system, guard rails on the penthouse roof for exterior building maintenance operations. | $40,000 |
| May 9, 2025 | In progress filed May 2025, not yet issued | 85 02nd St | 7/f suite 710 - installation of (3) single-occupant phone privacy booths. to partially remedy sffd nov 2405-0056.Details
7/f suite 710 - installation of (3) single-occupant phone privacy booths. to partially remedy sffd nov 2405-0056. | $3,000 | |
| Mar 5, 2025 | Completed final sign-off Jul 2025 | 85 02nd St | Anderson Construction Group Inc | 4/f: reposition of (4) phone booth to comply with code required placement. fire and life safety system to remain intact and operational.Details
4/f: reposition of (4) phone booth to comply with code required placement. fire and life safety system to remain intact and operational. | $9,344 |
| Feb 13, 2025 | Completed final sign-off Oct 2025 | 85 02nd St | Source Planning And Construction Inc | revision to pa# 202410163039 it was found in field that some of the phone booth attachments needed a different way to attach. structural alternative method on 3rd fl onlyDetails
revision to pa# 202410163039 it was found in field that some of the phone booth attachments needed a different way to attach. structural alternative method on 3rd fl only | |
| Oct 16, 2024 | Completed final sign-off Oct 2025 | 85 02nd St | Source Planning And Construction Inc | installation of phone privacy for tenant on first and third floors to partially remedy sffd nov (id 2405-0056)Details
installation of phone privacy for tenant on first and third floors to partially remedy sffd nov (id 2405-0056) | $5,000 |
| Sep 13, 2024 | Completed final sign-off Dec 2024 | 85 02nd St | Access Systems & Solutions Inc | new exterior building maintenance system at the roofDetails
new exterior building maintenance system at the roof | $50,000 |
| Sep 4, 2024 | In progress issued Sep 2024 | 85 02nd St | 7/fl- interior ti project on 7th floor selective demo plus remodel of (e) pantry area to include (n) island counter, electrical and finishes. all mep, fire work to be on separte permitDetails
7/fl- interior ti project on 7th floor selective demo plus remodel of (e) pantry area to include (n) island counter, electrical and finishes. all mep, fire work to be on separte permit | $30,000 | |
| Jul 2, 2024 | In progress issued Aug 2024 | 85 02nd St | Siemens Industry, Inc. | fire only work for the elevator controller modifications; additions are 2 modules. no ref pa as no remodel work being done. roof levelDetails
fire only work for the elevator controller modifications; additions are 2 modules. no ref pa as no remodel work being done. roof level | $1,200 |
| Jun 28, 2022 | Completed final sign-off Jul 2022 | 85 02nd St | Siemens Industry, Inc. | revision to pa# 202204262959. fire only work for "andrew world". remodel on 1st floor. 4 duct detectors and 1 speaker added. 2 speaker/strobe relocated. ref t.i. pa# 202111102161. revision is to correct matrix and wiring diagram.Details
revision to pa# 202204262959. fire only work for "andrew world". remodel on 1st floor. 4 duct detectors and 1 speaker added. 2 speaker/strobe relocated. ref t.i. pa# 202111102161. revision is to correct matrix and wiring diagram. | |
| Apr 26, 2022 | Never finaled issued Apr 2022, no final | 85 02nd St | Siemens Industry, Inc. | 1/f: fire only work for the "andrew world" remodel; (4) duct detectors and (1) speaker/strobe are added, and (2) speaker/strobes are relocated. ref pa 2021-1110-2161Details
1/f: fire only work for the "andrew world" remodel; (4) duct detectors and (1) speaker/strobe are added, and (2) speaker/strobes are relocated. ref pa 2021-1110-2161 | $7,600 |
| Jan 19, 2022 | Completed final sign-off Jun 2022 | 85 02nd St | Shield Fire Protection, Inc. | revise overhead fire sprinklers for new ceilings.Details
revise overhead fire sprinklers for new ceilings. | $11,000 |
| Nov 16, 2021 | Completed final sign-off Jan 2022 | 85 02nd St | Field Construction Inc. | electrical portion of ti pa 2021-1013-0399Details
electrical portion of ti pa 2021-1013-0399 | $45,000 |
| Nov 10, 2021 | Completed final sign-off Jul 2022 | 85 02nd St | Evolv Commercial Construction Inc | 1st fl, tenant improvement - expansion of existing furniture showroom into adjacent tenant space. work include new partitions, door millwork, lighting, electrical and finishes; no exterior work; mep, fire sprinklers & life safety under separate permits.Details
1st fl, tenant improvement - expansion of existing furniture showroom into adjacent tenant space. work include new partitions, door millwork, lighting, electrical and finishes; no exterior work; mep, fire sprinklers & life safety under separate permits. | $223,000 |
| Oct 13, 2021 | Completed final sign-off Dec 2021 | 85 02nd St | Field Construction Inc. | ground floor t.i: demolition of one non-structural partial height partition, doors and sitelite. new construction of one non structural partition, reinstall salvaged doors and frames, minor lighting and electrical work. all interior ti.Details
ground floor t.i: demolition of one non-structural partial height partition, doors and sitelite. new construction of one non structural partition, reinstall salvaged doors and frames, minor lighting and electrical work. all interior ti. | $168,000 |
| Oct 1, 2019 | Completed final sign-off Sep 2020 | 85 02nd St | Constructive Solutions Inc. | 4th fl: new gypsum board soffit and herculite doors.Details
4th fl: new gypsum board soffit and herculite doors. | $14,639 |
| May 30, 2019 | Completed final sign-off Jun 2019 | 85 02nd St | Ayoob & Peery Plumbing Co Inc | relocate and remove sprinklers per ti 1st fl - 2 relocate and 1 remove. ref pa 2019-0424-8827Details
relocate and remove sprinklers per ti 1st fl - 2 relocate and 1 remove. ref pa 2019-0424-8827 | $450 |
| Apr 24, 2019 | Completed final sign-off Jun 2019 | 85 02nd St | Gci, Inc | demo of non load bearing interior partition & millworkDetails
demo of non load bearing interior partition & millwork | $21,000 |
| Apr 3, 2018 | Completed final sign-off May 2021 | 85 02nd St | Phoenix Electric Co. | new traffic signal pole foundation in subsidewalk basement. n/a for maherDetails
new traffic signal pole foundation in subsidewalk basement. n/a for maher | $60,000 |
| Mar 30, 2018 | Completed final sign-off Apr 2018 | 85 02nd St | R L H Fire Protection Inc | fire sprinlkers - relocate 2 pendent sprinklers in the 7th flr ti - 201802211825 maher naDetails
fire sprinlkers - relocate 2 pendent sprinklers in the 7th flr ti - 201802211825 maher na | $1,000 |
| Feb 26, 2018 | Completed final sign-off Mar 2018 | 85 02nd St | Marina Mechanical Services | install 2 supply register and 2 return grills for 2 new offices being constructed in extg conditioned space. ref app#201802211825. n/a for maher. ref pa# 201802211825Details
install 2 supply register and 2 return grills for 2 new offices being constructed in extg conditioned space. ref app#201802211825. n/a for maher. ref pa# 201802211825 | $3,000 |
| Feb 21, 2018 | Completed final sign-off Jul 2018 | 85 02nd St | suite 710: project consists of a ti on the 7th flr of an 8-story building. build-out includes construction of new non-load bearing interior partitions, glazing, ceiling, & power/data work & minor new finishes. mep, life safety & sprinkler system modification are to be under separate permit. maher naDetails
suite 710: project consists of a ti on the 7th flr of an 8-story building. build-out includes construction of new non-load bearing interior partitions, glazing, ceiling, & power/data work & minor new finishes. mep, life safety & sprinkler system modification are to be under separate permit. maher na | $56,000 | |
| Jan 11, 2018 | Completed final sign-off May 2021 | 85 02nd St | Phoenix Electric Co. | new pedestrian light pole support at sub-sidewalk basement. maher naDetails
new pedestrian light pole support at sub-sidewalk basement. maher na | $10,000 |
| Sep 11, 2017 | Completed final sign-off Oct 2017 | 85 02nd St | Siemens Industry, Inc. | as built permit to correct the fire alarm system matrix per the sffd testing inspector. the change indicates the shutdown of heat pumps from any alarm condition on each floor. ref pa 2017-0503-5532 4th fl and 2017-0503-5530, 5th flDetails
as built permit to correct the fire alarm system matrix per the sffd testing inspector. the change indicates the shutdown of heat pumps from any alarm condition on each floor. ref pa 2017-0503-5532 4th fl and 2017-0503-5530, 5th fl | |
| Jun 29, 2017 | Never finaled issued Jun 2017, no final | 85 02nd St | Siemens Industry, Inc. | fire alarm work for the "plaid" remodels on floors 4 and 5; additions are 12 smoke detectors, 29 duct detectors, 2 strobe power supplies, 55 speaker/strobes and 22 strobes. ref pa 2017-0503-5532 (4th fl) 2017-0503-5530 (5th fl) n/a for maherDetails
fire alarm work for the "plaid" remodels on floors 4 and 5; additions are 12 smoke detectors, 29 duct detectors, 2 strobe power supplies, 55 speaker/strobes and 22 strobes. ref pa 2017-0503-5532 (4th fl) 2017-0503-5530 (5th fl) n/a for maher | $68,360 |
| Jun 15, 2017 | Never finaled issued Jun 2017, no final | 85 02nd St | Anderson, Rowe & Buckley, Inc. | 4th & 5th flr: 4th - relocate 68, added 6 5th - relocated 33, add 1 maher naDetails
4th & 5th flr: 4th - relocate 68, added 6 5th - relocated 33, add 1 maher na | $56,160 |
| May 3, 2017 | Completed final sign-off Oct 2017 | 85 02nd St | 4th fl - (n) interior partitions, glazing, ceiling, power/data work, new finishes, and restroom upgrades. life safety & sprinkler system modifications, structural for garage door and wood panel wd1 are under separate permit. no exterior building, site, landscape, use or parking changes are proposed.Details
4th fl - (n) interior partitions, glazing, ceiling, power/data work, new finishes, and restroom upgrades. life safety & sprinkler system modifications, structural for garage door and wood panel wd1 are under separate permit. no exterior building, site, landscape, use or parking changes are proposed. | $1,933,320 | |
| May 3, 2017 | Completed final sign-off Oct 2017 | 85 02nd St | 5th fl - construction of (n) non-load bearing interior partitions, glazing, ceiling and power/data work and new finishes. life safety and sprinkler system modification are to be under a separate permit. no exterior building site, landscape use or parking changes are proposed. the suite is currentlyDetails
5th fl - construction of (n) non-load bearing interior partitions, glazing, ceiling and power/data work and new finishes. life safety and sprinkler system modification are to be under a separate permit. no exterior building site, landscape use or parking changes are proposed. the suite is currently | $1,168,320 | |
| Mar 20, 2017 | Never finaled issued Apr 2017, no final | 85 02nd St | A & B Construction | basement: repair ceiling of (e) basement that consists of rebar for the above slab, concrete mix and water proofing on top. concrete mix: base master emaco s466c1 or equivalent. work done at northern easterly corner as noted on plans.Details
basement: repair ceiling of (e) basement that consists of rebar for the above slab, concrete mix and water proofing on top. concrete mix: base master emaco s466c1 or equivalent. work done at northern easterly corner as noted on plans. | $10,000 |
| Feb 23, 2017 | Completed final sign-off Jun 2017 | 85 02nd St | 5/f- project scope consists of selective demolition and safe-off in vacant 5/f. no new construction is considered in this scope of work. area of work is currently unoccupied per ab-017. n/a ordinance #155-13 ceilings to remain intactDetails
5/f- project scope consists of selective demolition and safe-off in vacant 5/f. no new construction is considered in this scope of work. area of work is currently unoccupied per ab-017. n/a ordinance #155-13 ceilings to remain intact | $55,000 | |
| Feb 23, 2017 | Completed final sign-off Jun 2017 | 85 02nd St | 4/f- project scope consists of selective demolition and safe-off in vacant 4/f. no new construction is considered in this scope of work. area of work is currently unoccupied per ab-017. n/a ordinance #155-13 ceilings to remain intactDetails
4/f- project scope consists of selective demolition and safe-off in vacant 4/f. no new construction is considered in this scope of work. area of work is currently unoccupied per ab-017. n/a ordinance #155-13 ceilings to remain intact | $55,000 | |
| Feb 21, 2017 | Expired or cancelled cancelled Jan 2026 | 85 02nd St | Engler Construction | remodel at first floor display window, any mep, t-24 7 fire sprinkler work under separate permits. n/a maher ordinanceDetails
remodel at first floor display window, any mep, t-24 7 fire sprinkler work under separate permits. n/a maher ordinance | $3,500 |
| Nov 16, 2016 | Completed final sign-off May 2017 | 85 02nd St | 1st flr: revision to ref 201607263413 & 201608165114: changing millwork measurements and changing walls foe conference room. structural included interior work only maher naDetails
1st flr: revision to ref 201607263413 & 201608165114: changing millwork measurements and changing walls foe conference room. structural included interior work only maher na | ||
| Nov 7, 2016 | Expired or cancelled withdrawn Nov 2016 | 85 02nd St | 1st flr: revision to 201607263413, scope includes structural drawings for freestanding conference on ground floor; maher n/aDetails
1st flr: revision to 201607263413, scope includes structural drawings for freestanding conference on ground floor; maher n/a | $76,881 | |
| Oct 24, 2016 | Completed final sign-off May 2017 | 85 02nd St | Sun Graphics | fabricate and install 4 emergency evacuation maps at 85 2nd street. 2 on 2nd floor, 2 on 3rd floor. digital print. sub surface mounted to 1/8" non glare acrylic mounted to wall with vhb tape and silicone. n/a for maher.Details
fabricate and install 4 emergency evacuation maps at 85 2nd street. 2 on 2nd floor, 2 on 3rd floor. digital print. sub surface mounted to 1/8" non glare acrylic mounted to wall with vhb tape and silicone. n/a for maher. | $620 |
| Sep 15, 2016 | Completed final sign-off May 2017 | 85 02nd St | Skyline Construction | electrical work for ti per pa 201607263413Details
electrical work for ti per pa 201607263413 | $10,000 |
| Sep 15, 2016 | Completed final sign-off May 2017 | 85 02nd St | Skyline Construction | electrical work for ti 201607263410Details
electrical work for ti 201607263410 | $10,000 |
| Sep 15, 2016 | Completed final sign-off May 2017 | 85 02nd St | Skyline Construction | electrical work for tenant improvement, reference ti 2016.0816.5116 maher not reqDetails
electrical work for tenant improvement, reference ti 2016.0816.5116 maher not req | $10,000 |
| Sep 6, 2016 | Completed final sign-off Oct 2016 | 85 02nd St | Golden Gate Fire Protection Inc | 1st, 2nd, 3rd floor: fire sprinklers - relocate 2 upright sprinklers on 1st. relocate 3 pendent sprinklers. relocate 10 upright sprinklers on 2nd. relocates 11 uprights on the 3 floors and 17 pendents. ref ti 1st- 201607263413, 2nd - 201607263412, 3rd - 201607263410 maher naDetails
1st, 2nd, 3rd floor: fire sprinklers - relocate 2 upright sprinklers on 1st. relocate 3 pendent sprinklers. relocate 10 upright sprinklers on 2nd. relocates 11 uprights on the 3 floors and 17 pendents. ref ti 1st- 201607263413, 2nd - 201607263412, 3rd - 201607263410 maher na | $29,960 |
| Sep 2, 2016 | Completed final sign-off Apr 2017 | 85 02nd St | Marina Mechanical Services | 2nd flr: install new ac unit to (e) server room exhaust fans 1st & 3rd flr maher naDetails
2nd flr: install new ac unit to (e) server room exhaust fans 1st & 3rd flr maher na | $40,000 |
| Aug 30, 2016 | Completed final sign-off Nov 2016 | 85 02nd St | Siemens Industry, Inc. | 1-3 flr: fire alarm for "chartboost". add 15 smoke detectors, 31 duct detectors, 2 strobe power supplies, 80 speakers/strobes, 11 strobes. ref. 201607263410, 201607263412, 201607263413. maher naDetails
1-3 flr: fire alarm for "chartboost". add 15 smoke detectors, 31 duct detectors, 2 strobe power supplies, 80 speakers/strobes, 11 strobes. ref. 201607263410, 201607263412, 201607263413. maher na | $78,550 |
| Aug 16, 2016 | Completed final sign-off May 2017 | 85 02nd St | Skyline Construction | 2/f- revision to cover sheet for arch. t.i. pa#201607263412, non infringement statement corrected. n/a ordinance #155-13Details
2/f- revision to cover sheet for arch. t.i. pa#201607263412, non infringement statement corrected. n/a ordinance #155-13 | |
| Aug 16, 2016 | Completed final sign-off May 2017 | 85 02nd St | Skyline Construction | revision to app#2016-0726-3410. 3rd floor t.i. non-infringment statement corrected. n/a for maherDetails
revision to app#2016-0726-3410. 3rd floor t.i. non-infringment statement corrected. n/a for maher | |
| Aug 16, 2016 | Completed final sign-off May 2017 | 85 02nd St | Skyline Construction | revision to app#2016-0726-3413. 1st floor t.i. non-infringment statement corrected. n/a for maherDetails
revision to app#2016-0726-3413. 1st floor t.i. non-infringment statement corrected. n/a for maher | |
| Aug 2, 2016 | Completed final sign-off Apr 2017 | 85 02nd St | Marina Mechanical Services | remove existing hot water fan coils & assoc. duct. install new water source heat pumps & assoc. duct new condenser water piping. floor 1-3.Details
remove existing hot water fan coils & assoc. duct. install new water source heat pumps & assoc. duct new condenser water piping. floor 1-3. | $650,000 |
| Jul 26, 2016 | Completed final sign-off May 2017 | 85 02nd St | 1st floor ti - include new non-load bearing interior partitions (some demo), glazing, ceiling & power/datra work and new finishes; mep, life safety & sprinkler under separate permit. n/a ordinance #155-13Details
1st floor ti - include new non-load bearing interior partitions (some demo), glazing, ceiling & power/datra work and new finishes; mep, life safety & sprinkler under separate permit. n/a ordinance #155-13 | $450,000 | |
| Jul 26, 2016 | Completed final sign-off May 2017 | 85 02nd St | 2nd floor ti - some demo, new non-load bearing interior partitions, glazing, ceiling & power/datra work and new finishes; mep, life safety & sprinkler under separate permit. n/a ordinance #155-13Details
2nd floor ti - some demo, new non-load bearing interior partitions, glazing, ceiling & power/datra work and new finishes; mep, life safety & sprinkler under separate permit. n/a ordinance #155-13 | $600,000 | |
| Jul 26, 2016 | Completed final sign-off May 2017 | 85 02nd St | 3rd floor ti - some demo, new non-load bearing interior partitions, glazing, ceiling & power/datra work and new finishes; mep, life safety & sprinkler under separate permit. constr cost shown excludes mep. n/a ordinance #155-13Details
3rd floor ti - some demo, new non-load bearing interior partitions, glazing, ceiling & power/datra work and new finishes; mep, life safety & sprinkler under separate permit. constr cost shown excludes mep. n/a ordinance #155-13 | $600,000 | |
| May 18, 2016 | Completed final sign-off Mar 2017 | 85 02nd St | Marina Mechanical Services | 7th floor: replace like for like 3 water source heat pumps. maher naDetails
7th floor: replace like for like 3 water source heat pumps. maher na | $50,000 |
| May 16, 2016 | Completed final sign-off Jul 2016 | 85 02nd St | project scope consists of selective demolition and safe-off in vacant 3/f, no new construction is considered in this scope of work. t.i. under seperate permit. n/a ordinance #155-13 ab-017 applies.Details
project scope consists of selective demolition and safe-off in vacant 3/f, no new construction is considered in this scope of work. t.i. under seperate permit. n/a ordinance #155-13 ab-017 applies. | $35,000 | |
| Feb 23, 2016 | Completed final sign-off Jul 2016 | 85 02nd St | 2nd floor - scope consists of selective demolition & safe-off in vacant space. no new construction is considered in this scope of work. tenant improvement under separate permit. (ab-017) n/a maher ordinance all life safety systems to be maintainedDetails
2nd floor - scope consists of selective demolition & safe-off in vacant space. no new construction is considered in this scope of work. tenant improvement under separate permit. (ab-017) n/a maher ordinance all life safety systems to be maintained | $1,000 | |
| Oct 6, 2015 | Expired or cancelled cancelled Mar 2017 | 85 02nd St | Gci, Inc | ground floor, suite #100: enlarging server room. duct distribution being modified. 1 new 2.0 tons split ac system for telcom room 114. maher naDetails
ground floor, suite #100: enlarging server room. duct distribution being modified. 1 new 2.0 tons split ac system for telcom room 114. maher na | $50,000 |
| Mar 2, 2015 | Completed final sign-off Mar 2015 | 85 02nd St | T N T Fire Protection Inc. | demo (e) fire sprinkler heads due to the removal of ceiling. (e) sprinklers head removed & plugged and four relocate maher - not req'dDetails
demo (e) fire sprinkler heads due to the removal of ceiling. (e) sprinklers head removed & plugged and four relocate maher - not req'd | $1,800 |
| Feb 19, 2015 | Completed final sign-off May 2015 | 85 02nd St | Engler Construction | tenant improvements in first floor space for furniture showroom, work includes, new partitions, door, millwork, lighting, electrical & finishes, mep, life safety & fire sprinklers under separate permit; maher n/a. comply with nov # 201521931Details
tenant improvements in first floor space for furniture showroom, work includes, new partitions, door, millwork, lighting, electrical & finishes, mep, life safety & fire sprinklers under separate permit; maher n/a. comply with nov # 201521931 | $65,000 |
| Jan 30, 2015 | Completed final sign-off Feb 2015 | 85 02nd St | Engler Construction | 1st flr: soft (non structural) demolition including partitions, doors, millwork, sink, light fixtures, floor finishes in preparation for tenant improvements under separate permit. note all life safety devices to remain. maher n/aDetails
1st flr: soft (non structural) demolition including partitions, doors, millwork, sink, light fixtures, floor finishes in preparation for tenant improvements under separate permit. note all life safety devices to remain. maher n/a | $5,000 |
| May 9, 2013 | Completed final sign-off Jun 2013 | 85 02nd St | Siemens Industry, Inc. | addition of duct detectors, 3 speakers, 9 strobes, and a strobe power supply for the "thoughtbot" tenant remodel on floor 7. all new devices connect onto the fire alarm system; ref. 2013-0306-1586Details
addition of duct detectors, 3 speakers, 9 strobes, and a strobe power supply for the "thoughtbot" tenant remodel on floor 7. all new devices connect onto the fire alarm system; ref. 2013-0306-1586 | $10,000 |
| Apr 8, 2013 | Completed final sign-off May 2013 | 85 02nd St | Aquamatic Fire Protection | 3 relocated uprights sprinklers. 9 new upright sprinklers, 8 new pendent sprinklers. t.i ref pa# 201303061586Details
3 relocated uprights sprinklers. 9 new upright sprinklers, 8 new pendent sprinklers. t.i ref pa# 201303061586 | $4,500 |
| Apr 4, 2013 | Completed final sign-off Apr 2013 | 85 02nd St | Golden Gate Fire Protection Inc | 8th floor-relocate 4 pendent sprinklers & relocate 3 pendents in a conference roomDetails
8th floor-relocate 4 pendent sprinklers & relocate 3 pendents in a conference room | $2,575 |
| Mar 8, 2013 | Completed final sign-off Jun 2013 | 85 02nd St | Skyline Construction | demo of limited non structural partitions. modify cabinetry in existing kitchenette. mep and life safety under separate permitDetails
demo of limited non structural partitions. modify cabinetry in existing kitchenette. mep and life safety under separate permit | $100,000 |
| Mar 6, 2013 | Completed final sign-off Jun 2013 | 85 02nd St | suite 700: new t.i. to include doors, partitions, ceiling and millwork. m.e.p. is included in this permit.Details
suite 700: new t.i. to include doors, partitions, ceiling and millwork. m.e.p. is included in this permit. | $275,000 | |
| Sep 25, 2012 | Never finaled issued Sep 2012, no final | 85 02nd St | Golden Gate Fire Protection Inc | 1st floor:fire sprinkler system upgrade; relocate 3 pendent sprinkler heads on the 1st floor. delete 6 heads. t.i pa# 201207306057Details
1st floor:fire sprinkler system upgrade; relocate 3 pendent sprinkler heads on the 1st floor. delete 6 heads. t.i pa# 201207306057 | $1,545 |
| Sep 18, 2012 | Expired or cancelled cancelled Jan 2026 | 85 02nd St | ground & basement levels-revision to pa# 2012-0730-6057-add valet parkingDetails
ground & basement levels-revision to pa# 2012-0730-6057-add valet parking | ||
| Sep 7, 2012 | Completed final sign-off Oct 2012 | 85 02nd St | Siemens Industry, Inc. | addition of 10 speakers, 4 speaker/strobes, strobe synchronization module for constant contact remodel of floor 1. all devices connect onto the life safety systemDetails
addition of 10 speakers, 4 speaker/strobes, strobe synchronization module for constant contact remodel of floor 1. all devices connect onto the life safety system | $11,000 |
| Aug 28, 2012 | Completed final sign-off Feb 2017 | 85 02nd St | Gci, Inc | ground floor - mechanical & electrical work for tenant improvement. ref arch #201207306057Details
ground floor - mechanical & electrical work for tenant improvement. ref arch #201207306057 | $165,000 |
| Jul 30, 2012 | Completed final sign-off Oct 2012 | 85 02nd St | t.i. on a multi-tenant ground floor, new partitions, demo millwork and interior partitions. minor relocation of lighting, new doors and glazing. mep under seperate permit.Details
t.i. on a multi-tenant ground floor, new partitions, demo millwork and interior partitions. minor relocation of lighting, new doors and glazing. mep under seperate permit. | $320,000 | |
| Oct 26, 2011 | Completed final sign-off Dec 2011 | 85 02nd St | R L H Fire Protection Inc | fire sprinkler only. 2nd fl: relocate 8 pendents, 2 uprights, add 1, remove 1. relocate 6 pendentsDetails
fire sprinkler only. 2nd fl: relocate 8 pendents, 2 uprights, add 1, remove 1. relocate 6 pendents | $8,000 |
| Oct 14, 2011 | Completed final sign-off Jan 2012 | 85 02nd St | Field Construction Inc. | tenant improvement - 2nd, 3rd and 4th floor. non-structural. electrical, mechannical and life safety under separate permit.Details
tenant improvement - 2nd, 3rd and 4th floor. non-structural. electrical, mechannical and life safety under separate permit. | $387,000 |
| Sep 13, 2011 | Completed final sign-off Oct 2011 | 85 02nd St | R L H Fire Protection Inc | fire sprinkler permit, add 2 pendent sprinklersDetails
fire sprinkler permit, add 2 pendent sprinklers | $1,000 |
| Jul 7, 2011 | Completed final sign-off Oct 2011 | 85 02nd St | Field Construction Inc. | tenant improvement approx 200 sq ft on 2nd floor. convert 2 workstations to private offices & add 2 workstations at extg storage/file area.Details
tenant improvement approx 200 sq ft on 2nd floor. convert 2 workstations to private offices & add 2 workstations at extg storage/file area. | $59,365 |
| May 27, 2011 | Completed final sign-off Aug 2011 | 85 02nd St | Field Construction Inc. | 3rd floor tenant improvement of existing office - converting workstations to 2 private offices. mep & lfs under separate permit;includes lightingDetails
3rd floor tenant improvement of existing office - converting workstations to 2 private offices. mep & lfs under separate permit;includes lighting | $37,767 |
| May 25, 2011 | Completed final sign-off Aug 2011 | 85 02nd St | R L H Fire Protection Inc | fire sprinkler permit. add 2 pendent sprinkler heads on 3rd flDetails
fire sprinkler permit. add 2 pendent sprinkler heads on 3rd fl | $1,000 |
| Feb 23, 2010 | Never finaled issued Feb 2010, no final | 85 02nd St | to complete work and obtain final inspection for work approved under pa 200810154268Details
to complete work and obtain final inspection for work approved under pa 200810154268 | ||
| Dec 17, 2008 | Completed final sign-off Jan 2009 | 85 02nd St | Johnstone - Mc Auliffe Const. Inc. | to complete work and obtain find inspection for work approved under pa 200703297607.Details
to complete work and obtain find inspection for work approved under pa 200703297607. | |
| Oct 15, 2008 | Never finaled issued Oct 2008, no final | 85 02nd St | interior tenant improvement of an existing office space, including addition of non-load bearing partitions. electrical, mechanical, plumbing. life safety to be completed under separate permit.Details
interior tenant improvement of an existing office space, including addition of non-load bearing partitions. electrical, mechanical, plumbing. life safety to be completed under separate permit. | $100,000 | |
| Jul 21, 2008 | Never finaled issued Jul 2008, no final | 85 02nd St | 7th floor: demolition of non-load bearing interior partitions.(per ab-017)Details
7th floor: demolition of non-load bearing interior partitions.(per ab-017) | $5,000 | |
| Jan 15, 2008 | Never finaled issued Jan 2008, no final | 85 02nd St | Johnstone - Mc Auliffe Const. Inc. | 1st floor: minor demolition, floor patching, paint, carpetDetails
1st floor: minor demolition, floor patching, paint, carpet | $20,000 |
| Aug 17, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | Team Commercial Construction Inc. | 5/f- mechanical improvement to office space. install new return air grilleDetails
5/f- mechanical improvement to office space. install new return air grille | $10,000 |
| Aug 17, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | Team Commercial Construction Inc. | 2/f- mechanical improvement to office space, install 2 new return air grills, install 2 new csd with flex duct.Details
2/f- mechanical improvement to office space, install 2 new return air grills, install 2 new csd with flex duct. | $10,000 |
| Aug 1, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | Ayoob & Peery Plumbing Co Inc | demo preaction system valve and reconnect to wet system 6th floorDetails
demo preaction system valve and reconnect to wet system 6th floor | $1,550 |
| Jul 3, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | Pioneer Fire Protection | relocate fire sprinkler heads on 2nd floor. 2 relocates totalDetails
relocate fire sprinkler heads on 2nd floor. 2 relocates total | $500 |
| Jul 3, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | Pioneer Fire Protection | relocate sprinklers into new t-bae. 5 total relocatesDetails
relocate sprinklers into new t-bae. 5 total relocates | $1,200 |
| Jun 26, 2007 | Never finaled issued Jun 2007, no final | 85 02nd St | oti-1, 1st floor, tenant improvement. demo millwork. new walls. electrical on separate permit.Details
oti-1, 1st floor, tenant improvement. demo millwork. new walls. electrical on separate permit. | $45,000 | |
| Jun 12, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | oti-1, 5th floor, el, me, ls, sp.Details
oti-1, 5th floor, el, me, ls, sp. | $45,000 | |
| Jun 12, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | oti-1, 2nd floor, el, me, ls, sp.Details
oti-1, 2nd floor, el, me, ls, sp. | $25,000 | |
| Jun 11, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | Metropolitan Electrical Construction | rev. to matrix chart listed on sheet fa.02 to previous application #2007/05/22/1904. work has been paid for under previous applic. number.Details
rev. to matrix chart listed on sheet fa.02 to previous application #2007/05/22/1904. work has been paid for under previous applic. number. | |
| May 31, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | Ayoob & Peery Plumbing Co Inc | relocate f.s. heads per t.i. 3 heads relocates.Details
relocate f.s. heads per t.i. 3 heads relocates. | $850 |
| May 29, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | Richlen Construction | 6th floor-addition of 26 speakers/strobes and a strobe power supply for the 6th floor conference room remodel. the (e) speaker/strobe units on the floor outside of the 2 new conference rooms are being replace with new synchronized units.Details
6th floor-addition of 26 speakers/strobes and a strobe power supply for the 6th floor conference room remodel. the (e) speaker/strobe units on the floor outside of the 2 new conference rooms are being replace with new synchronized units. | $10,800 |
| May 23, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | Marina Mechanical Services | add 2 fir smoke dampers in new corridor walls.Details
add 2 fir smoke dampers in new corridor walls. | $7,800 |
| May 22, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | oti-1 revision 5th flDetails
oti-1 revision 5th fl | ||
| May 22, 2007 | Never finaled issued May 2007, no final | 85 02nd St | Metropolitan Electrical Construction | install of 2 fire smoke dampers and 2 smoke detectorsDetails
install of 2 fire smoke dampers and 2 smoke detectors | $5,000 |
| May 8, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | interior non structural demolition. disability accessibility compliance is exempt per sfbc ab-017Details
interior non structural demolition. disability accessibility compliance is exempt per sfbc ab-017 | $2,000 | |
| May 1, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | oti-1 5th floor el, me, l/s, spDetails
oti-1 5th floor el, me, l/s, sp | $45,000 | |
| Apr 26, 2007 | Completed final sign-off Nov 2007 | 85 02nd St | Richlen Construction | 6th floor-interior tenant improvement including but not limit to: remodel on non bearing partitions and construction of new non bearing partition. work on 6th floor only.Details
6th floor-interior tenant improvement including but not limit to: remodel on non bearing partitions and construction of new non bearing partition. work on 6th floor only. | $45,000 |
| Jul 29, 2004 | Completed final sign-off Aug 2004 | 85 02nd St | Field Construction Inc. | oti-2 2nd and 3rd floor el, me, spDetails
oti-2 2nd and 3rd floor el, me, sp | $12,000 |
| Jun 11, 2004 | Completed final sign-off Aug 2004 | 85 02nd St | oti-1 ,3rd fl-el, m,sp, lsDetails
oti-1 ,3rd fl-el, m,sp, ls | $22,000 | |
| Jan 17, 2003 | Expired or cancelled expired Sep 2005 | 85 02nd St | Taslimi Construction Co Inc | oti-4 1st l/sDetails
oti-4 1st l/s | $9,700 |
| Nov 22, 2002 | Expired or cancelled expired Sep 2005 | 85 02nd St | Taslimi Construction Co Inc | oti-3 1st flr. spDetails
oti-3 1st flr. sp | $5,900 |
| Oct 1, 2002 | Expired or cancelled expired Sep 2005 | 85 02nd St | Taslimi Construction Co Inc | oti-2, 1st floor, el.Details
oti-2, 1st floor, el. | $20,000 |
| Oct 1, 2002 | Expired or cancelled expired Aug 2005 | 85 02nd St | Taslimi Construction Co Inc | oti-1, 1st floor, el, me, ls, sp.Details
oti-1, 1st floor, el, me, ls, sp. | $50,000 |
| Aug 23, 2002 | Completed final sign-off Nov 2002 | 85 02nd St | Capitol Electric Const | installation of (1) duct detector to existing fire alarm, mech separate permitDetails
installation of (1) duct detector to existing fire alarm, mech separate permit | $7,000 |
| Jul 10, 2002 | Completed final sign-off Nov 2002 | 85 02nd St | Marina Mechanical Services | hvac - add (1) water source heat pump to (e)spaceDetails
hvac - add (1) water source heat pump to (e)space | $3,000 |
| Jul 9, 2002 | Completed final sign-off Nov 2002 | 85 02nd St | Ayoob & Peery Plumbing Co Inc | relocate & add fire sprk heads per tenant improvementsDetails
relocate & add fire sprk heads per tenant improvements | $2,100 |
| May 31, 2002 | Completed final sign-off Nov 2002 | 85 02nd St | oti-1,grd flr, ls, sprDetails
oti-1,grd flr, ls, spr | $15,000 | |
| Sep 12, 2001 | Expired or cancelled expired Oct 2003 | 85 02nd St | structural repair of bsmnt walls/replacement of partial slabDetails
structural repair of bsmnt walls/replacement of partial slab | $90,000 | |
| Mar 27, 2001 | Completed final sign-off May 2001 | 85 02nd St | Dpw Inc. | add and relocate sprinkler head per approved plan on 2nd and 3rd fl onlyDetails
add and relocate sprinkler head per approved plan on 2nd and 3rd fl only | $2,500 |
| Jan 8, 2001 | Completed final sign-off May 2001 | 85 02nd St | 2nd flr add glass lite,remve e low walls convert 2 0ffices 3rd fl alter prvt office add 2 off/carrelDetails
2nd flr add glass lite,remve e low walls convert 2 0ffices 3rd fl alter prvt office add 2 off/carrel | $56,000 | |
| Dec 15, 2000 | Expired or cancelled expired Oct 2003 | 85 02nd St | D. M. Jepsen, Inc. | life safety work addition of smoke detector and horn strobe gr floorDetails
life safety work addition of smoke detector and horn strobe gr floor | $2,000 |
| Nov 22, 2000 | Expired or cancelled expired Oct 2003 | 85 02nd St | Richlen Construction | oti-3 1st floor spDetails
oti-3 1st floor sp | $2,500 |
| Oct 31, 2000 | Expired or cancelled expired Oct 2003 | 85 02nd St | Ayoob & Peery Plumbing Co Inc | add and relocate fire sprinklers (1st fl only)Details
add and relocate fire sprinklers (1st fl only) | $1,800 |
| Oct 27, 2000 | Expired or cancelled expired Oct 2003 | 85 02nd St | Richlen Construction | oti-2 grnd floor el and meDetails
oti-2 grnd floor el and me | $30,000 |
| Sep 21, 2000 | Expired or cancelled expired Oct 2003 | 85 02nd St | Richlen Construction | demolition of partition wall. new partition wall. new suspended ceiling.Details
demolition of partition wall. new partition wall. new suspended ceiling. | $50,000 |
| Aug 8, 2000 | Expired or cancelled expired Oct 2003 | 85 02nd St | remove (e) metal awnings enclose (e) covered portico w/new storefront windows to match (e) windowsDetails
remove (e) metal awnings enclose (e) covered portico w/new storefront windows to match (e) windows | $55,000 | |
| Jul 27, 2000 | Expired or cancelled expired Oct 2003 | 85 02nd St | removal of (e) non structural partition to open up space provide (n) non structural low ht wallsDetails
removal of (e) non structural partition to open up space provide (n) non structural low ht walls | $86,000 | |
| Jun 8, 2000 | Completed final sign-off May 2002 | 85 02nd St | provide tie back no increase in office spaceDetails
provide tie back no increase in office space | $50,000 | |
| Mar 14, 2000 | Completed final sign-off Jul 2000 | 85 02nd St | new partitions, new mechanical & electrical distributionDetails
new partitions, new mechanical & electrical distribution | $110,000 | |
| Feb 9, 2000 | Expired or cancelled expired Oct 2003 | 85 02nd St | Richlen Construction | f/s only ti under 9926784Details
f/s only ti under 9926784 | $5,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.