Douglas Mehl
- Listed as
- architect, engineer
- Firm
- Fennie + Mehl Architects
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Mar 2026
86 permits since 2000 (architect on 83 permits, engineer on 3 permits): 70 completed, 2 in progress, 10 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 20, 2026 | Completed final sign-off Apr 2026 | 501 02nd St | R.M.R. Construction Company | 1st/f ste# 150: revision to 202512030848, install 2 phone podsDetails
1st/f ste# 150: revision to 202512030848, install 2 phone pods | $12,000 |
| Mar 12, 2026 | Completed final sign-off May 2026 | 501 02nd St | R.M.R. Construction Company | ste 501. (2) new privacy pods. provide seismic anchorage to concrete slab.Details
ste 501. (2) new privacy pods. provide seismic anchorage to concrete slab. | $18,000 |
| Dec 3, 2025 | Completed final sign-off Apr 2026 | 501 02nd St | R.M.R. Construction Company | #150: installing 3 new privacy pods. provide seismic anchorage to concrete slab.Details
#150: installing 3 new privacy pods. provide seismic anchorage to concrete slab. | $9,000 |
| Aug 19, 2025 | Completed final sign-off Sep 2025 | 501 02nd St | R.M.R. Construction Company | 1st/f ste# 150: provide seismic anchorage to privacy pods per fire department nov 2506-0190 dated 6/11/25Details
1st/f ste# 150: provide seismic anchorage to privacy pods per fire department nov 2506-0190 dated 6/11/25 | $12,000 |
| Dec 26, 2024 | Completed final sign-off Jul 2025 | 1 California St | Novo Construction Inc | 8th floor; interior demolition of ceiling height partitions construction of new partiations, doors, glazing, millowrk, finishes, associated mechanical, electrical, and plumbing.Details
8th floor; interior demolition of ceiling height partitions construction of new partiations, doors, glazing, millowrk, finishes, associated mechanical, electrical, and plumbing. | $2,500,000 |
| May 20, 2024 | Completed final sign-off Nov 2024 | 501 02nd St | Principal Builders Inc. | 6th fl/ ste 615. t.i. n) partitions, millwork, glazing, finishes, power/lighting/mech distribution. all non-structural.Details
6th fl/ ste 615. t.i. n) partitions, millwork, glazing, finishes, power/lighting/mech distribution. all non-structural. | $345,000 |
| May 7, 2024 | Completed final sign-off Aug 2026 | 350 Brannan St | Lombardi Property Development | 2/f -demolition existing ceiling height partition, construction of new full height partitions, doors, millwork and finishes. associated power/lighting distribution, associated mechanical system distribution, associated life safety system changes and plumbing. structural scope of work encompassesDetails
2/f -demolition existing ceiling height partition, construction of new full height partitions, doors, millwork and finishes. associated power/lighting distribution, associated mechanical system distribution, associated life safety system changes and plumbing. structural scope of work encompasses | $375,000 |
| May 6, 2024 | In progress filed May 2024, not yet issued | 350 Brannan St | barrier removal only -demo ofpartitions, entry landing, g/f entry lobby & stair improvement & finishes, structural scope encompasses concrete infill & concrete stair at vestibule, stair stringer & glass guardrail attachment. associated ele/power/lighting distribution.Details
barrier removal only -demo ofpartitions, entry landing, g/f entry lobby & stair improvement & finishes, structural scope encompasses concrete infill & concrete stair at vestibule, stair stringer & glass guardrail attachment. associated ele/power/lighting distribution. | $150,000 | |
| Dec 13, 2023 | In progress issued May 2024 | 350 Brannan St | decommission and demolition of (e) freight elevator. infill pit with new grade floor slab. establish and document wholesale sales use on the ground floor pursuant to the sf planning code.Details
decommission and demolition of (e) freight elevator. infill pit with new grade floor slab. establish and document wholesale sales use on the ground floor pursuant to the sf planning code. | $10,000 | |
| Nov 16, 2023 | Completed final sign-off Feb 2024 | 501 02nd St | Principal Builders Inc. | ste 600: t.i. demo full height partitions, construct new partitions, doors, millwork, mep. demising new ste 600, ste 615 and base buidling corridor.Details
ste 600: t.i. demo full height partitions, construct new partitions, doors, millwork, mep. demising new ste 600, ste 615 and base buidling corridor. | $539,280 |
| Nov 16, 2023 | Completed final sign-off Feb 2024 | 501 02nd St | Principal Builders Inc. | 6th floor (ste# 615): ti demo millwork; lighting (n) full-weight partitions, millwork, mep.Details
6th floor (ste# 615): ti demo millwork; lighting (n) full-weight partitions, millwork, mep. | $239,440 |
| Aug 16, 2023 | Never finaled issued Aug 2023, no final | 350 Brannan St | Modern Construction Inc | demo: remove all non-structure interior walls and ceiling on the 2nd floorDetails
demo: remove all non-structure interior walls and ceiling on the 2nd floor | $35,000 |
| May 25, 2023 | Expired or cancelled withdrawn Dec 2023 | 350 Brannan St | establish office use per 2021-011143zad zoning administrator determination letter. renovate ground and 2nd floors. no work on 3rd floor. demolition of existing ceiling height partitions, new full height non bearing partition walls, cold form steel infill and glass guardrail attachments, mep deferredDetails
establish office use per 2021-011143zad zoning administrator determination letter. renovate ground and 2nd floors. no work on 3rd floor. demolition of existing ceiling height partitions, new full height non bearing partition walls, cold form steel infill and glass guardrail attachments, mep deferred | $1,480,488 | |
| Jan 6, 2023 | Completed final sign-off May 2023 | 501 02nd St | R.M.R. Construction Company | demising (e) suite 120 into 2 separate suites. (e) suite 120 no new construction. (n) suite 150: const new full height partitions, doors, glazing, millwork, finishing and asscos power ltg distribution. deferred life safety, elec & mechDetails
demising (e) suite 120 into 2 separate suites. (e) suite 120 no new construction. (n) suite 150: const new full height partitions, doors, glazing, millwork, finishing and asscos power ltg distribution. deferred life safety, elec & mech | $60,000 |
| Dec 27, 2022 | Completed final sign-off Aug 2023 | 501 02nd St | R.M.R. Construction Company | 7/f suite 710: demolition of some existing non bearing ceiling height walls, construction of new full height partitions, glazing, pantry, millwork, plumbing, finishes and assoc. electrical power/light dist. deferred: life safety, elect, mech and plumbing.Details
7/f suite 710: demolition of some existing non bearing ceiling height walls, construction of new full height partitions, glazing, pantry, millwork, plumbing, finishes and assoc. electrical power/light dist. deferred: life safety, elect, mech and plumbing. | $312,650 |
| Dec 6, 2022 | Completed final sign-off May 2023 | 501 02nd St | R.M.R. Construction Company | suite 650: new millwork base/upper cabinets, new sink, associated electrical power/lighting distribution & associated plumbingDetails
suite 650: new millwork base/upper cabinets, new sink, associated electrical power/lighting distribution & associated plumbing | $12,200 |
| Nov 10, 2022 | Completed final sign-off Jun 2023 | 201 Mission St | Truebeck Construction | fl 2,3,16: minor casework and accessibility upgrade: interior work only. existing hvac system to remain.Details
fl 2,3,16: minor casework and accessibility upgrade: interior work only. existing hvac system to remain. | $27,000 |
| Jun 21, 2022 | Completed final sign-off Feb 2023 | 4 Embarcadero Center | Skyline Construction | 26th flr ste 2600: interior demolition, new full/partial height partitions, ceiling and millwork. mep & life safety under separate permits. restroom upgrades.Details
26th flr ste 2600: interior demolition, new full/partial height partitions, ceiling and millwork. mep & life safety under separate permits. restroom upgrades. | $350,000 |
| May 24, 2022 | Completed final sign-off Jan 2023 | 1 Bush St | Bcci Construction Company | 13th floor- revision to approved arch permit. m.e.p revision submittal included in set. ref: 202202047388.Details
13th floor- revision to approved arch permit. m.e.p revision submittal included in set. ref: 202202047388. | $175,000 |
| May 12, 2022 | Completed final sign-off Aug 2022 | 501 02nd St | R.M.R. Construction Company | ste 500: creating of huddle room. mep & sprinklers deferred.Details
ste 500: creating of huddle room. mep & sprinklers deferred. | $65,450 |
| Feb 4, 2022 | Completed final sign-off Jan 2023 | 1 Bush St | Bcci Construction Company | 13/f suite 1300: new construction of partitions, power and lighting, mep and finishes. sprinkler, emergency lighting, fire alarm all deferred.Details
13/f suite 1300: new construction of partitions, power and lighting, mep and finishes. sprinkler, emergency lighting, fire alarm all deferred. | $1,400,000 |
| Dec 30, 2021 | Completed final sign-off Mar 2022 | 501 02nd St | R.M.R. Construction Company | suite 403: t.i. new full-height partitions, doors, glazing millwork, finishes & associated electrical power/lighting distribution. fire sprinklers & alarm deferred.Details
suite 403: t.i. new full-height partitions, doors, glazing millwork, finishes & associated electrical power/lighting distribution. fire sprinklers & alarm deferred. | $32,000 |
| Dec 6, 2021 | Completed final sign-off Apr 2022 | 1 Bush St | Bcci Construction Company | 13th/ fl partial demo only of (e) non-structural partitions per ab-017. no exterior work.Details
13th/ fl partial demo only of (e) non-structural partitions per ab-017. no exterior work. | $45,000 |
| Sep 28, 2021 | Completed final sign-off Jan 2022 | 501 02nd St | Principal Builders Inc. | adding a door to existing storage room 49 sf, add a pair of barn doors to e break room 381 sf. add sink in #114. defer mep workDetails
adding a door to existing storage room 49 sf, add a pair of barn doors to e break room 381 sf. add sink in #114. defer mep work | $15,752 |
| Mar 22, 2021 | Completed final sign-off Dec 2021 | 2300 Harrison St | Novo Construction Inc | 1st,2nd,3rd fl: restrooms upgrades to include new millwork, finishes, and restroom accessories. electrical, plumbing & life safety under separate permit.Details
1st,2nd,3rd fl: restrooms upgrades to include new millwork, finishes, and restroom accessories. electrical, plumbing & life safety under separate permit. | $250,000 |
| Mar 18, 2021 | Expired or cancelled cancelled Jan 2026 | 501 02nd St | ste 550: revision to pa# 202002215043. addition of sheet a2.55.Details
ste 550: revision to pa# 202002215043. addition of sheet a2.55. | $150,000 | |
| Oct 30, 2020 | Never finaled issued Aug 2021, no final | 2101 Mission St | A M Rocca Inc. | revision to bpa# 202002245209. base building improvements by property owner, including finishes, lighting & deferred electrical & plumbing. no longer ab-017; t.i. for spaces to be occupied.Details
revision to bpa# 202002245209. base building improvements by property owner, including finishes, lighting & deferred electrical & plumbing. no longer ab-017; t.i. for spaces to be occupied. | $125,000 |
| Sep 21, 2020 | Completed final sign-off Mar 2021 | 501 02nd St | Novo Construction Inc | suite 211. demolition of millwork, ceiling, elements, electrical & finishes. construction of new wall opening extend existing walls to deck above. mep under separate permit.Details
suite 211. demolition of millwork, ceiling, elements, electrical & finishes. construction of new wall opening extend existing walls to deck above. mep under separate permit. | $211,200 |
| Feb 24, 2020 | Completed final sign-off Feb 2022 | 2101 Mission St | A M Rocca Inc. | infill of existing opening on opening on ground floor; construction of new opening at floor 2; construct full height partitions, partial height partitions and door frames.Details
infill of existing opening on opening on ground floor; construction of new opening at floor 2; construct full height partitions, partial height partitions and door frames. | $200,000 |
| Jan 30, 2020 | Completed final sign-off Apr 2021 | 2101 Mission St | A M Rocca Inc. | no construction work is proposed. administrative permit to document extg improvements in suite #108c. ref pa 201707283290 and 201906214136.Details
no construction work is proposed. administrative permit to document extg improvements in suite #108c. ref pa 201707283290 and 201906214136. | |
| Dec 17, 2019 | Completed final sign-off Mar 2020 | 274 Brannan St | Sc Builders, Inc | 6th fl: demolition of selective existing full-height partitions, ceiling elements & lighting. construction of new non-structural partitions, doors, glazing. mep & fire life safety under separate permit. maher naDetails
6th fl: demolition of selective existing full-height partitions, ceiling elements & lighting. construction of new non-structural partitions, doors, glazing. mep & fire life safety under separate permit. maher na | $400,000 |
| Dec 3, 2019 | Completed final sign-off Jan 2020 | 2101 Mission St | A M Rocca Inc. | construction of full height partitions, partial height partitions, door frames, & interior glazing partitions. restroom upgrades, finishes, millwork,ceiling grids soffits & associatedDetails
construction of full height partitions, partial height partitions, door frames, & interior glazing partitions. restroom upgrades, finishes, millwork,ceiling grids soffits & associated | $100,000 |
| Nov 26, 2019 | Completed final sign-off May 2020 | 50 Hawthorne St | Principal Builders Inc. | 1st floor: demo construction of partitions, glazing, millwork, doors, & finishes on extg t.i. mep on seperate permit. maher n/a.Details
1st floor: demo construction of partitions, glazing, millwork, doors, & finishes on extg t.i. mep on seperate permit. maher n/a. | $172,773 |
| Oct 31, 2019 | Completed final sign-off Feb 2022 | 2101 Mission St | A M Rocca Inc. | ste 105: restroom barrier removal in restrooms.Details
ste 105: restroom barrier removal in restrooms. | $40,000 |
| Oct 31, 2019 | Never finaled issued Oct 2019, no final | 2101 Mission St | A M Rocca Inc. | 2/f: restroom barrier removal in restrooms.Details
2/f: restroom barrier removal in restrooms. | $40,000 |
| Sep 11, 2019 | Completed final sign-off Feb 2020 | 2101 Mission St | A M Rocca Inc. | revision to pa 2018-1023-3861 ti to existing industrictive service spance on 3rd floor resulting in two suites, consisteat with planning commission moton 19446, construction of full height partitions, door frames & restrooms, and associates mechanical, electrical and lighting. maher n/a.Details
revision to pa 2018-1023-3861 ti to existing industrictive service spance on 3rd floor resulting in two suites, consisteat with planning commission moton 19446, construction of full height partitions, door frames & restrooms, and associates mechanical, electrical and lighting. maher n/a. | $115,000 |
| Jun 21, 2019 | Never finaled issued Jul 2019, no final | 2101 Mission St | A M Rocca Inc. | add new ada compliant bathroom, add new lighting.Details
add new ada compliant bathroom, add new lighting. | $35,000 |
| May 24, 2019 | Completed final sign-off Feb 2020 | 2101 Mission St | A M Rocca Inc. | 1/f lobby: revision to pa 201606039129. restoration of finishes at entryway. maher n/a.Details
1/f lobby: revision to pa 201606039129. restoration of finishes at entryway. maher n/a. | |
| Nov 5, 2018 | Completed final sign-off Jan 2019 | 575 Market St | Novo Construction Inc | 36/f: new lighting and branch circuitry to (e) panel. title-24 compliance. ref t.i. 201809261451. maher n/a.Details
36/f: new lighting and branch circuitry to (e) panel. title-24 compliance. ref t.i. 201809261451. maher n/a. | $10,000 |
| Sep 17, 2018 | Completed final sign-off Oct 2021 | 2101 Mission St | A M Rocca Inc. | 3rd fl; new ada compliant gender neutal restroom. n/a maherDetails
3rd fl; new ada compliant gender neutal restroom. n/a maher | $25,000 |
| May 15, 2018 | Completed final sign-off Jun 2019 | 501 02nd St | R.M.R. Construction Company | 1st & 5th floors: restrooms upgrades-barrier removal , mep/fire under separate permits maher naDetails
1st & 5th floors: restrooms upgrades-barrier removal , mep/fire under separate permits maher na | $10,000 |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 8 Presidio Tr | Principal Builders Inc. | administrative revision to pa 2017-0522-7247 to remove dph note requesting an outswing door @ jacuzzi room 032 and modifying for inswing. outswing door is in conflict with cbc 1005.7.1 which states the egress width may not be reduced by more than 50% of the reqd. width; n/a maherDetails
administrative revision to pa 2017-0522-7247 to remove dph note requesting an outswing door @ jacuzzi room 032 and modifying for inswing. outswing door is in conflict with cbc 1005.7.1 which states the egress width may not be reduced by more than 50% of the reqd. width; n/a maher | |
| Jan 17, 2018 | Completed final sign-off Mar 2019 | 201 Mission St | Novo Construction Inc | tenant improvement to consist of new non load bearing partitions door frames, interior glazing, finishes and millwork. mep & life safety under separate permitDetails
tenant improvement to consist of new non load bearing partitions door frames, interior glazing, finishes and millwork. mep & life safety under separate permit | $300,000 |
| Oct 16, 2017 | Never finaled issued Oct 2017, no final | 501 02nd St | Novo Construction Inc | barrier removal for 3rd fl restrooms upbradeDetails
barrier removal for 3rd fl restrooms upbrade | $5,000 |
| Sep 28, 2017 | Completed final sign-off Nov 2017 | 501 02nd St | Sc Builders, Inc | 1st fl, ste 120 500 sq ft of ti in existing office space. construct (n) ceiling height partitions, remove some (e) glass partitions associated with mep changes. mep, life safety and sprinklers permits under separate permit if need (fully sprinklered bldg)Details
1st fl, ste 120 500 sq ft of ti in existing office space. construct (n) ceiling height partitions, remove some (e) glass partitions associated with mep changes. mep, life safety and sprinklers permits under separate permit if need (fully sprinklered bldg) | $33,000 |
| Aug 17, 2017 | Completed final sign-off May 2018 | 274 Brannan St | Source Planning And Construction Inc | 5/f: rev to pa#201706169558. correcting a wall error. maher n/aDetails
5/f: rev to pa#201706169558. correcting a wall error. maher n/a | |
| Aug 9, 2017 | Completed final sign-off May 2019 | 750 02nd St | Buck O'neill Builders Inc. | construction of new partitions, associated electrical power/lighting distribution, associated mechanical system distribution, associated life safety system changes, finishes, construction of accessible single occ restroomsDetails
construction of new partitions, associated electrical power/lighting distribution, associated mechanical system distribution, associated life safety system changes, finishes, construction of accessible single occ restrooms | $400,000 |
| Mar 20, 2017 | Expired or cancelled expired Jan 2023 | 901 Battery St | Novo Construction Inc | 2/f- infill of a single stair opening in existing concrete building, raised floor over structural framing.Details
2/f- infill of a single stair opening in existing concrete building, raised floor over structural framing. | $30,000 |
| Mar 3, 2016 | Completed final sign-off Nov 2016 | 350 Treat Av | Plant Construction Co, Lp | new roof mounted boiler and hvac units and assoc. equip. with associated structural, ducting plumbing and electrical; new wall insulation and interior cladding; new electrical service pg&e transformer room, new electrical room, and associate changes. n/a for maher.Details
new roof mounted boiler and hvac units and assoc. equip. with associated structural, ducting plumbing and electrical; new wall insulation and interior cladding; new electrical service pg&e transformer room, new electrical room, and associate changes. n/a for maher. | $480,000 |
| Nov 17, 2015 | Completed final sign-off Feb 2018 | 501 02nd St | Novo Construction Inc | on 4th floor - suite # 403 :construction of new full height partitions, doors, glazing, millwork, & finishes. mep under sep. permit.Details
on 4th floor - suite # 403 :construction of new full height partitions, doors, glazing, millwork, & finishes. mep under sep. permit. | $205,000 |
| Oct 5, 2015 | Completed final sign-off Dec 2015 | 1000 Sansome St | Rossi Builders Inc. | 3rd floor: t.i.- demo of existing partitions, construction of full height partitions, framed glazing, door, suspend ceiling, carpet finish. minor electrical & mechanical under separate permit.Details
3rd floor: t.i.- demo of existing partitions, construction of full height partitions, framed glazing, door, suspend ceiling, carpet finish. minor electrical & mechanical under separate permit. | $110,000 |
| Jul 29, 2015 | Completed final sign-off Feb 2018 | 501 02nd St | Novo Construction Inc | construction of new full height partitions, doors, glazing, millwork & finishes. l/s,mep under separate permit. n/a ordinance #155-13Details
construction of new full height partitions, doors, glazing, millwork & finishes. l/s,mep under separate permit. n/a ordinance #155-13 | $472,000 |
| Jul 17, 2015 | Completed final sign-off Oct 2015 | 350 Rhode Island St | Richlen Construction | relocate pantry and miscellaneous work at second floor suite 230. maher naDetails
relocate pantry and miscellaneous work at second floor suite 230. maher na | $100,000 |
| Jul 17, 2015 | Completed final sign-off Feb 2018 | 501 02nd St | Novo Construction Inc | 2nd floor suite 200 - safe off electrical, demo walls, floor covering, ceiling, grid, lights & electrical & plumbing fixtures (ab-017). arch., mep, f/a, sprinkler under separate permit. n/a ordinance #155-13Details
2nd floor suite 200 - safe off electrical, demo walls, floor covering, ceiling, grid, lights & electrical & plumbing fixtures (ab-017). arch., mep, f/a, sprinkler under separate permit. n/a ordinance #155-13 | $15,750 |
| Jul 13, 2015 | Never finaled issued Jul 2015, no final | 274 Brannan St | Sc Builders, Inc | suite 601 - new full height partitions, (n) partial height partitions, doors, frames, glazing, millwork, finishes etc. meps, life safety changes, if need , will be design build & sumbitted separated. n/a maher ordinanceDetails
suite 601 - new full height partitions, (n) partial height partitions, doors, frames, glazing, millwork, finishes etc. meps, life safety changes, if need , will be design build & sumbitted separated. n/a maher ordinance | $450,000 |
| Jun 1, 2015 | Completed final sign-off Feb 2016 | 274 Brannan St | R.M.R. Construction Company | 6th floor - ada bathroom upgrade. n/a maher ordinanceDetails
6th floor - ada bathroom upgrade. n/a maher ordinance | $146,000 |
| Mar 4, 2015 | Never finaled issued Mar 2015, no final | 600 California St | Bcci Construction Company | revision to 201502037379 to reconfigure 2 officesDetails
revision to 201502037379 to reconfigure 2 offices | |
| Mar 3, 2015 | Completed final sign-off Aug 2015 | 201 03rd St | Truebeck Construction | demolition of some existing partitions and doors. construction of new full height partitions, associated electrical power/lighting distribution, associated mechanical & plumbing, associated life safety changes, new shower and associated finishes.Details
demolition of some existing partitions and doors. construction of new full height partitions, associated electrical power/lighting distribution, associated mechanical & plumbing, associated life safety changes, new shower and associated finishes. | $2,220,000 |
| Feb 3, 2015 | Never finaled issued Feb 2015, no final | 600 California St | Bcci Construction Company | 19th & 20th flrs: t.i. including demo of some existing ceiling height partitions,construction of new ceiling height partitions, mech,elec & l/s under separate permit; maher n/aDetails
19th & 20th flrs: t.i. including demo of some existing ceiling height partitions,construction of new ceiling height partitions, mech,elec & l/s under separate permit; maher n/a | $125,000 |
| Jan 14, 2015 | Completed final sign-off Feb 2018 | 501 02nd St | R.M.R. Construction Company | #300- t.i. demo of (e) non-load bearing interior partitions & ceiling. construction of new full height partitions, associate electrical, power, lighting distribution, associated mechanical system distribution & new finishes. n/a ordinance #155-13Details
#300- t.i. demo of (e) non-load bearing interior partitions & ceiling. construction of new full height partitions, associate electrical, power, lighting distribution, associated mechanical system distribution & new finishes. n/a ordinance #155-13 | $25,000 |
| Dec 16, 2014 | Completed final sign-off Aug 2015 | 201 03rd St | Truebeck Construction | 9th floor - demo of existing partitions, millwork, light fixtures, ceiling elements & associated electrical, mechanical & plumbing fixtures. building security, fire alarm & fire protection systems are to be maintained in place (per ab-017)Details
9th floor - demo of existing partitions, millwork, light fixtures, ceiling elements & associated electrical, mechanical & plumbing fixtures. building security, fire alarm & fire protection systems are to be maintained in place (per ab-017) | $65,000 |
| Oct 9, 2014 | Completed final sign-off Nov 2014 | 350 Rhode Island St | Richlen Construction | 2/f- relocation of doors and windows, addition of door, reconfiguration of walls. n/a ordinance #155-13Details
2/f- relocation of doors and windows, addition of door, reconfiguration of walls. n/a ordinance #155-13 | $70,000 |
| Sep 17, 2014 | Completed final sign-off Jan 2015 | 340 Brannan St | Gidel & Kocal Construction Co Inc | suite 400 - t.i. : demo partitions & construction of new full height partitions & da path of travel upgrades, new finishes. mep & life safety under separate permit.Details
suite 400 - t.i. : demo partitions & construction of new full height partitions & da path of travel upgrades, new finishes. mep & life safety under separate permit. | $350,000 |
| Aug 11, 2014 | Completed final sign-off Feb 2015 | 139 Townsend St | Ideal Dimensions Inc | ti 3rd fl to construct new walls, doors, finishes, mill work on 3rd fl. mep fire alarms, sprinklers on sep permit maher not req-155-13Details
ti 3rd fl to construct new walls, doors, finishes, mill work on 3rd fl. mep fire alarms, sprinklers on sep permit maher not req-155-13 | $310,000 |
| Jul 18, 2014 | Completed final sign-off Nov 2014 | 139 Townsend St | Ideal Dimensions Inc | demo of (e) ceiling height partitions and doors per ab017;maher n/aDetails
demo of (e) ceiling height partitions and doors per ab017;maher n/a | $10,000 |
| May 23, 2014 | Completed final sign-off Sep 2014 | 1 Bush St | Gci, Inc | 14th floor: t.i. to construct new partition doors, millwork and finishes. mep sprinklers and life safety on seperate permit.Details
14th floor: t.i. to construct new partition doors, millwork and finishes. mep sprinklers and life safety on seperate permit. | $1,115,000 |
| May 15, 2014 | Completed final sign-off Oct 2014 | 534 04th St | Truebeck Construction | interior soft demo only - on ground floor per ab017 no construciton work. n /a maherDetails
interior soft demo only - on ground floor per ab017 no construciton work. n /a maher | $15,000 |
| Jan 6, 2014 | Completed final sign-off May 2014 | 2300 Harrison St | Novo Construction Inc | ground floor:demolition of existing ceiling height partitions, construction of new full height partitions, mep & life safety under seperate permit.Details
ground floor:demolition of existing ceiling height partitions, construction of new full height partitions, mep & life safety under seperate permit. | $20,000 |
| Dec 23, 2013 | Completed final sign-off Jun 2014 | 909 Montgomery St | Principal Builders Inc. | 5th floor. demolition of non-load bearing partitions, ceilings & lighting fixts. space to remain vacant under ab-017. all ada will be addressed under future ti permit.Details
5th floor. demolition of non-load bearing partitions, ceilings & lighting fixts. space to remain vacant under ab-017. all ada will be addressed under future ti permit. | $150,000 |
| Aug 5, 2013 | Completed final sign-off Jun 2014 | 901 Battery St | Plant Construction Co, Lp | voluntary structural strengthening. construction of foundation for one interior steel braced frame and one interior shear wallDetails
voluntary structural strengthening. construction of foundation for one interior steel braced frame and one interior shear wall | $175,000 |
| Apr 11, 2013 | Expired or cancelled cancelled Jan 2020 | 130 08th St | Source Planning And Construction Inc | basement & floors 1, 2, & 3 - demolition of int walls, partial floor structure, plumbing fixtures, millwork & finishes, construction of new toilet rooms, stairs, new elevator, hvac & elec systems & lighting. all upgrades are base bldg only including front door & mech equipment on roof.Details
basement & floors 1, 2, & 3 - demolition of int walls, partial floor structure, plumbing fixtures, millwork & finishes, construction of new toilet rooms, stairs, new elevator, hvac & elec systems & lighting. all upgrades are base bldg only including front door & mech equipment on roof. | $1,000,000 |
| Feb 13, 2013 | Completed final sign-off Sep 2013 | 275 Brannan St | Truebeck Construction | tenant improvement for 1st, 2nd & 3rd floors. core & shell & ada approves under pa# 201207164925. fire alarm & sprinkler under separate permit. new partitions and full height partitions. full service kitchen for tenants only.Details
tenant improvement for 1st, 2nd & 3rd floors. core & shell & ada approves under pa# 201207164925. fire alarm & sprinkler under separate permit. new partitions and full height partitions. full service kitchen for tenants only. | $1,995,000 |
| May 21, 2012 | Completed final sign-off Aug 2012 | 501 02nd St | Novo Construction Inc | barrier removal only to add power door operator at mens and womens restroom, add high low drinking fountainDetails
barrier removal only to add power door operator at mens and womens restroom, add high low drinking fountain | $14,000 |
| Nov 30, 2011 | Completed final sign-off May 2012 | 501 02nd St | Novo Construction Inc | tenant improvement of 7th floor 2 include demo of partitions, new ceiling height and slab to slab to slab for addition of rated exit corridor. 2 private office break room and electrical roomDetails
tenant improvement of 7th floor 2 include demo of partitions, new ceiling height and slab to slab to slab for addition of rated exit corridor. 2 private office break room and electrical room | $40,000 |
| Oct 14, 2011 | Completed final sign-off Nov 2011 | 655 Montgomery St | Principal Builders Inc. | suite 1490 demo of 3 interior offices, new carpet, paint, elec and data, new glass partition/doorDetails
suite 1490 demo of 3 interior offices, new carpet, paint, elec and data, new glass partition/door | $30,000 |
| Jul 19, 2011 | Completed final sign-off Dec 2011 | 1 Montgomery St | Bcci Construction Company | construction of full-ht. + clg. ht. partitions for offices, conf. rooms & break area. demolition of millwork, partial clg. partial walls, new finishes.Details
construction of full-ht. + clg. ht. partitions for offices, conf. rooms & break area. demolition of millwork, partial clg. partial walls, new finishes. | $200,000 |
| Jul 7, 2011 | Completed final sign-off Sep 2013 | 814 Mission St | barrier removal work only on 2nd fl. new disabled restrooms. life safety upgrades to corridor. all mep under sep permitDetails
barrier removal work only on 2nd fl. new disabled restrooms. life safety upgrades to corridor. all mep under sep permit | $220,000 | |
| Jul 6, 2011 | Completed final sign-off Apr 2013 | 814 Mission St | relocate (e) deli entrance and new storefront (tenant improvement under separate permit).Details
relocate (e) deli entrance and new storefront (tenant improvement under separate permit). | $100,000 | |
| Dec 19, 2008 | Completed final sign-off Feb 2009 | 350 Rhode Island St | Richlen Construction | 2nd fl connecting power to new or relocated light fixtures,power outlets & tenant equipment,installation of (7) new vav boxes (6 reheat,1 no reheat) & all associated ducting, distributio & controls to match (e) bldg system. reference appl #200811035691. life safety, fire sprink under separate permitDetails
2nd fl connecting power to new or relocated light fixtures,power outlets & tenant equipment,installation of (7) new vav boxes (6 reheat,1 no reheat) & all associated ducting, distributio & controls to match (e) bldg system. reference appl #200811035691. life safety, fire sprink under separate permit | $150,000 |
| Nov 3, 2008 | Completed final sign-off Mar 2009 | 350 Rhode Island St | Richlen Construction | 2nd floor - demolition of existing non-structural partitions, construction of new non-structural petitions, associated elec power & lighting distribution, associed life safety system changes, & associated disabled access upgrades. elec, mech, fire sprinkler & life safety under separate permit.Details
2nd floor - demolition of existing non-structural partitions, construction of new non-structural petitions, associated elec power & lighting distribution, associed life safety system changes, & associated disabled access upgrades. elec, mech, fire sprinkler & life safety under separate permit. | $300,000 |
| Aug 7, 2008 | Never finaled issued Aug 2008, no final | 300 Brannan St | 5th floor - demolish (2) existing unaccessible toilet rooms (2) and construct (2) accessible toilet rooms. barrier removal.Details
5th floor - demolish (2) existing unaccessible toilet rooms (2) and construct (2) accessible toilet rooms. barrier removal. | $30,000 | |
| Aug 9, 2006 | Completed final sign-off Mar 2007 | 1 Embarcadero Center | Dpr Construction Inc | oti-1, 40th floor, el, me, ls, sp.Details
oti-1, 40th floor, el, me, ls, sp. | $500,000 |
| Jun 28, 2005 | Completed final sign-off Aug 2005 | 101 California St | Skyline Construction | oti-1,20th/fl. el, me, ls,sp.Details
oti-1,20th/fl. el, me, ls,sp. | $109,000 |
| Jun 10, 2005 | Completed final sign-off Apr 2006 | 595 Market St | Principal Builders Inc. | add interior partitions for new private office (n) ceiliings (n) finishes for law firm tenantDetails
add interior partitions for new private office (n) ceiliings (n) finishes for law firm tenant | $150,000 |
| Jun 10, 2005 | Completed final sign-off Aug 2005 | 101 California St | Skyline Construction | demolation only. no increase in office space 20th/fl. all non structural.Details
demolation only. no increase in office space 20th/fl. all non structural. | $7,500 |
| Jun 3, 2005 | Completed final sign-off Aug 2005 | 101 California St | tenant improvement on 8th floor including partition, millwork, doors & reflected ceiling perDetails
tenant improvement on 8th floor including partition, millwork, doors & reflected ceiling per | $450,000 |