Block 3572, lot 002
350 Treat Ave
- City’s use
- Industrial
- Built
- 1944
- Stories
- 1
- Units
- 3
- Rooms
- 2 bathrooms
- Building
- 23,111 sq ft
- Lot
- 19,436 sq ft
- Zoning
- PDR1G
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 27, 2026 | Completed final sign-off Aug 2026 | 350 Treat Av | P S R West Coast Builders Inc | alteration to existing interior non load bearing wall. relocation of existing door and creation of new convenience door connecting areas fo the facility.Details
alteration to existing interior non load bearing wall. relocation of existing door and creation of new convenience door connecting areas fo the facility. | $9,800 |
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 350 Treat Av | P S R West Coast Builders Inc | this project is the construction of an accessory structure housing shaking test equipment.Details
this project is the construction of an accessory structure housing shaking test equipment. | $18,000 |
| Jan 31, 2020 | Never finaled issued Mar 2020, no final | 350 Treat Av | American Mechanical Inc | furnish and install fluid cooler and circulating pumps to serve 5 environmental test chambers / condenser water system at exterior.Details
furnish and install fluid cooler and circulating pumps to serve 5 environmental test chambers / condenser water system at exterior. | $150,000 |
| Jan 23, 2019 | Completed final sign-off Apr 2019 | 350 Treat Av | Centric Construction Inc | (n) lighting, (n) electrical outlets, (n) electrical panels, (n) 112.5kva transformer. ref ti #201809049004Details
(n) lighting, (n) electrical outlets, (n) electrical panels, (n) 112.5kva transformer. ref ti #201809049004 | $120,000 |
| Nov 6, 2018 | Completed final sign-off Nov 2018 | 350 Treat Av | Tri-Signal Integration Inc. | fire alarm ti: add 5 horn strobes 3 strobes, 1 duct detector with smoke and relay module. ref pa #201809049004.Details
fire alarm ti: add 5 horn strobes 3 strobes, 1 duct detector with smoke and relay module. ref pa #201809049004. | $6,500 |
| Oct 17, 2018 | Never finaled issued Oct 2018, no final | 350 Treat Av | Incom Mechanical Inc | install 45 new pendants off of 29 new mechanical tees for new room configuration ref 201809049004-ordianary hazard spacing and new siesmic bracing calcsDetails
install 45 new pendants off of 29 new mechanical tees for new room configuration ref 201809049004-ordianary hazard spacing and new siesmic bracing calcs | $10,000 |
| Oct 1, 2018 | Never finaled issued Oct 2018, no final | 350 Treat Av | American Mechanical Inc | ref 201809049004 provide and install heating, ventialation, air conditioning and ductwork for fabrication clean room spaceDetails
ref 201809049004 provide and install heating, ventialation, air conditioning and ductwork for fabrication clean room space | $5,000 |
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 350 Treat Av | Garnett Signs Llc | install 6 evac signsDetails
install 6 evac signs | $3,600 |
| Sep 4, 2018 | Completed final sign-off Apr 2019 | 350 Treat Av | Centric Construction Inc | demo of (e) non-load bearing demising wall. patch& repair any damaged wall. (n) non-load bearing partition walls and doors. (n) t-bar ceiling and lighting fin fab clean room. (n) wall mounted lights in exist corridor.Details
demo of (e) non-load bearing demising wall. patch& repair any damaged wall. (n) non-load bearing partition walls and doors. (n) t-bar ceiling and lighting fin fab clean room. (n) wall mounted lights in exist corridor. | $5,000 |
| May 8, 2018 | Completed final sign-off Sep 2018 | 350 Treat Av | Tri-Signal Integration Inc. | as-builts: ref pa#201804055583 - added two relays for roll-up door close, access control shunt. eol changes. new door ref #201804126153Details
as-builts: ref pa#201804055583 - added two relays for roll-up door close, access control shunt. eol changes. new door ref #201804126153 | |
| Apr 12, 2018 | Completed final sign-off Oct 2018 | 350 Treat Av | Centric Construction Inc | revision to pa# 201711214631. exterior door replacementDetails
revision to pa# 201711214631. exterior door replacement | $2,000 |
| Apr 11, 2018 | Completed final sign-off Jun 2018 | 350 Treat Av | Centric Construction Inc | administrative permit to document that work performed under pa #201109084137 was superceded by work under pa #201711214631. maher naDetails
administrative permit to document that work performed under pa #201109084137 was superceded by work under pa #201711214631. maher na | |
| Apr 5, 2018 | Completed final sign-off May 2018 | 350 Treat Av | Tri-Signal Integration Inc. | as builts for ref 2018021401210. added one duct detectorDetails
as builts for ref 2018021401210. added one duct detector | |
| Feb 14, 2018 | Completed final sign-off May 2018 | 350 Treat Av | Tri-Signal Integration Inc. | new fire alarm system includes 1 fire alarm control unit; 1 icgm-4 communicator, 1 annunciator; 2 photoelectric smoke detectors; 3 dual monitor modules, 1 manual pull stattion; 10 wall mounted horn/strobes, 7 ceiling mounted horn/strobes; 6 wall mounted strobes; 2 ceiling mounted weather proofDetails
new fire alarm system includes 1 fire alarm control unit; 1 icgm-4 communicator, 1 annunciator; 2 photoelectric smoke detectors; 3 dual monitor modules, 1 manual pull stattion; 10 wall mounted horn/strobes, 7 ceiling mounted horn/strobes; 6 wall mounted strobes; 2 ceiling mounted weather proof | $22,000 |
| Jan 30, 2018 | Completed final sign-off Mar 2018 | 350 Treat Av | Incom Mechanical Inc | install 11 pendants & 11 new uprights of 13 new mechanical tees for new configurations. ref pa 2017-1121-4631Details
install 11 pendants & 11 new uprights of 13 new mechanical tees for new configurations. ref pa 2017-1121-4631 | $6,500 |
| Jan 30, 2018 | Never finaled issued Mar 2018, no final | 350 Treat Av | Centric Construction Inc | revision to pa# 201711214631, install new exhaust for (e) pantry room and electric cooktop. maher naDetails
revision to pa# 201711214631, install new exhaust for (e) pantry room and electric cooktop. maher na | $1,000 |
| Dec 12, 2017 | Never finaled issued Dec 2017, no final | 350 Treat Av | Centric Construction Inc | demo of mezzanines and reinforcement of extg columns at roof structure. n/a for maherDetails
demo of mezzanines and reinforcement of extg columns at roof structure. n/a for maher | $120,000 |
| Nov 21, 2017 | Completed final sign-off Oct 2018 | 350 Treat Av | Centric Construction Inc | interior tenant improvement of existing space to accomodate light manufacturing of laser sensors. scope includes structural alteration to mezzanine and mep. build out of clean room under sep permit maher not req. sprinklers deferred.Details
interior tenant improvement of existing space to accomodate light manufacturing of laser sensors. scope includes structural alteration to mezzanine and mep. build out of clean room under sep permit maher not req. sprinklers deferred. | $1,200,000 |
| May 27, 2016 | Completed final sign-off May 2025 | 350 Treat Av | Ayoob & Peery Plumbing Co Inc | grd. flr. relocate two fire sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref pa #201603031142. n/a maher ordinanceDetails
grd. flr. relocate two fire sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref pa #201603031142. n/a maher ordinance | $1,020 |
| Mar 3, 2016 | Completed final sign-off Nov 2016 | 350 Treat Av | Plant Construction Co, Lp | new roof mounted boiler and hvac units and assoc. equip. with associated structural, ducting plumbing and electrical; new wall insulation and interior cladding; new electrical service pg&e transformer room, new electrical room, and associate changes. n/a for maher.Details
new roof mounted boiler and hvac units and assoc. equip. with associated structural, ducting plumbing and electrical; new wall insulation and interior cladding; new electrical service pg&e transformer room, new electrical room, and associate changes. n/a for maher. | $480,000 |
| Nov 12, 2015 | Completed final sign-off Mar 2016 | 350 Treat Av | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $295,000 |
| Jun 4, 2014 | Completed final sign-off Jun 2014 | 350 Treat Av | Rivera Construction | alter floor plan to permit 201402047810; provide new door, repair (e) walls and install window; compliance with ord 155-13 not required.Details
alter floor plan to permit 201402047810; provide new door, repair (e) walls and install window; compliance with ord 155-13 not required. | |
| Feb 4, 2014 | Completed final sign-off Jul 2014 | 350 Treat Av | Rivera Construction | voluntary access upgrades to the main entrance restrooms and main stair. work also includes demo to small portion of roof and kitchenette and breakroom. 2nd exit added. mep and fire under separate permit. maher ordinance not requiredDetails
voluntary access upgrades to the main entrance restrooms and main stair. work also includes demo to small portion of roof and kitchenette and breakroom. 2nd exit added. mep and fire under separate permit. maher ordinance not required | $20,000 |
| Jan 22, 2014 | Completed final sign-off Jul 2014 | 350 Treat Av | Rivera Construction | demo extg partition wall, plumbing fixtures and a portion of the slab for future plumbing. work also includes minor electrical demo. no exterior work included in this permit. per ab-017Details
demo extg partition wall, plumbing fixtures and a portion of the slab for future plumbing. work also includes minor electrical demo. no exterior work included in this permit. per ab-017 | $3,500 |
| Sep 8, 2011 | Never finaled issued Sep 2011, no final | 350 Treat Av | separation of welding operation from automotive repair by 2 hour wall/ceiling. modify entrance to building by installing at framp at entry and lower slab at interior. install automatic push botton at entry. change doors,hardware in path of travel. modify sprinkler system as necessary. sep permitDetails
separation of welding operation from automotive repair by 2 hour wall/ceiling. modify entrance to building by installing at framp at entry and lower slab at interior. install automatic push botton at entry. change doors,hardware in path of travel. modify sprinkler system as necessary. sep permit | $36,700 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.