Rivera Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2025
- Last 24 months
- 1 permit filed
250 permits since 2000: 141 completed, 2 in progress, 63 never finaled, 44 expired or cancelled.
Of the 63 never-finaled permits, 1 is 3 to 5 years old, 10 are 5 to 10 years old, 52 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 250.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2025 | In progress issued Oct 2025 | 1166 Capitol Av | recommencement and completion of work approved under pa# 201910154431Details
recommencement and completion of work approved under pa# 201910154431 | $51,021 |
| Oct 8, 2021 | Never finaled issued Oct 2021, no final | 211 Cornwall St | unit 7: replace kitchen cabinets (small kitchen) as existingDetails
unit 7: replace kitchen cabinets (small kitchen) as existing | $4,500 |
| Oct 8, 2021 | Completed final sign-off Apr 2023 | 101 Quintara St | replace kitchen cabinets as existing: replace tiles and vanity in three bathroomsDetails
replace kitchen cabinets as existing: replace tiles and vanity in three bathrooms | $12,000 |
| Oct 1, 2020 | Completed final sign-off Dec 2020 | 36 Cervantes Bl | unit 2, 3 & 6 - remodel kitchen in-kind in each unitDetails
unit 2, 3 & 6 - remodel kitchen in-kind in each unit | $12,000 |
| Sep 30, 2020 | Completed final sign-off Dec 2020 | 1 Fair Oaks St | apt 5: remodel kitchen & bathroom in-kind.Details
apt 5: remodel kitchen & bathroom in-kind. | $12,000 |
| Sep 30, 2020 | Completed final sign-off Dec 2020 | 755 Burnett Av | apt 8: remodel kitchen & bathroom, in-kind.Details
apt 8: remodel kitchen & bathroom, in-kind. | $12,000 |
| Mar 2, 2020 | Never finaled issued Mar 2020, no final | 3248 18th St | to obtain final inspection for work approved under pa# 2014-1010-8650, all work is complete.Details
to obtain final inspection for work approved under pa# 2014-1010-8650, all work is complete. | |
| Oct 15, 2019 | In progress issued Feb 2024 | 1166 Capitol Av | unit b on 1st flr will be legalized pursuant to ord 43-14. included 2 bedrooms, 1 kitchen, 1 living room & 2 bathrooms. legalizing unpermit/as-built rear addition on 1st & 2nd floor, expand as-buildt roof deck @ 2nd floor, remove unpermit shed @ rear yard under separate permit bpa# 202009154186.Details
unit b on 1st flr will be legalized pursuant to ord 43-14. included 2 bedrooms, 1 kitchen, 1 living room & 2 bathrooms. legalizing unpermit/as-built rear addition on 1st & 2nd floor, expand as-buildt roof deck @ 2nd floor, remove unpermit shed @ rear yard under separate permit bpa# 202009154186. | $40,000 |
| Aug 30, 2019 | Never finaled issued Aug 2019, no final | 755 Burnett Av | to comply with nov #201970521. all work on violation notice. tie heaters to wall, extended pipe on heater, install door, remove debris.Details
to comply with nov #201970521. all work on violation notice. tie heaters to wall, extended pipe on heater, install door, remove debris. | $1,500 |
| May 20, 2019 | Expired or cancelled expired Dec 2022 | 2965 24th St | residential: soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4. see nov 201813521Details
residential: soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4. see nov 201813521 | $66,733 |
| May 20, 2019 | Expired or cancelled expired Dec 2022 | 2965 24th St | commercial: soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4. see nov 201813521Details
commercial: soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4. see nov 201813521 | $36,890 |
| May 14, 2019 | Never finaled issued May 2019, no final | 151 Galewood Cr | replace tile bath tub in kind.Details
replace tile bath tub in kind. | $3,500 |
| Dec 18, 2018 | Completed final sign-off Jun 2020 | 855 37th Av | residential renovation. second floor renovation to kitchenDetails
residential renovation. second floor renovation to kitchen | $10,000 |
| Dec 14, 2018 | Never finaled issued Jul 2019, no final | 1935 19th Av | rev to pa# 201706260314 s-1 r/2; foundation system for pre-manufactured classroom.Details
rev to pa# 201706260314 s-1 r/2; foundation system for pre-manufactured classroom. | |
| Dec 14, 2018 | Never finaled issued Dec 2018, no final | 450 Eddy St | to comply with nov 201896152 sf housing code section 604 repair wood rear stairs in kind less than 50%Details
to comply with nov 201896152 sf housing code section 604 repair wood rear stairs in kind less than 50% | $4,500 |
| Dec 14, 2018 | Completed final sign-off Feb 2019 | 211 Cornwall St | replace kitchen remodeling in kind 64 sf. no change in wall & opening layoutDetails
replace kitchen remodeling in kind 64 sf. no change in wall & opening layout | $10,000 |
| Sep 24, 2018 | Completed final sign-off Nov 2018 | 700 12th Av | unit 4: to obtain final inspection for work approved under pa #201608165164. all work is completed.Details
unit 4: to obtain final inspection for work approved under pa #201608165164. all work is completed. | |
| Aug 27, 2018 | Completed final sign-off Feb 2022 | 795 Burnett Av | #1: remodel kitchen & bathroom as existing. 70sq ft kitchen. 35sq ft bathroom.Details
#1: remodel kitchen & bathroom as existing. 70sq ft kitchen. 35sq ft bathroom. | $12,000 |
| Aug 9, 2018 | Completed final sign-off Oct 2018 | 1790 Jackson St | apt 701: replace kitchen cabinets & counters.Details
apt 701: replace kitchen cabinets & counters. | $6,000 |
| Aug 9, 2018 | Completed final sign-off Oct 2018 | 1790 Jackson St | apt 605: replace kitchen cabinets & counters.Details
apt 605: replace kitchen cabinets & counters. | $6,000 |
| May 7, 2018 | Completed final sign-off Nov 2018 | 3939 18th St | unit 3943: remodel kitchen and bathroom, replace (e) sliding patio door in-kind, (4) windows as (e), new flooring in kitchen & bathDetails
unit 3943: remodel kitchen and bathroom, replace (e) sliding patio door in-kind, (4) windows as (e), new flooring in kitchen & bath | $15,000 |
| Mar 22, 2018 | Completed final sign-off May 2018 | 1 Fair Oaks St | comply with nov 201846021, 201845422 install ventalation for existing garbage rm, replace missing rated doors. repair lightwell roof, repair fire proofing heater roomDetails
comply with nov 201846021, 201845422 install ventalation for existing garbage rm, replace missing rated doors. repair lightwell roof, repair fire proofing heater room | $2,500 |
| Feb 26, 2018 | Completed final sign-off Dec 2019 | 1388 California St | relocation of new ada bathroom at bottom flr - southwest corner (empty space). detail change per approved plan ref 201501307116Details
relocation of new ada bathroom at bottom flr - southwest corner (empty space). detail change per approved plan ref 201501307116 | $5,000 |
| Jan 5, 2018 | Completed final sign-off Aug 2024 | 1784 Sanchez St | revision to pa 2014-0314-0813 s1 replace (e) brick foundations at front of building. revise family/dining room to be on framing instead of slab on grade. voluntary seismic strengthening of garage walls and provide plywood to garage ceilingDetails
revision to pa 2014-0314-0813 s1 replace (e) brick foundations at front of building. revise family/dining room to be on framing instead of slab on grade. voluntary seismic strengthening of garage walls and provide plywood to garage ceiling | $15,000 |
| Sep 13, 2017 | Completed final sign-off Mar 2018 | 625 Haight St | renew for final 201309177070. all work is completeDetails
renew for final 201309177070. all work is complete | |
| Sep 6, 2017 | Completed final sign-off Mar 2021 | 842 Guerrero St | seismic upgrade. soft story retrofit per 2016 cebc appendix a-4.Details
seismic upgrade. soft story retrofit per 2016 cebc appendix a-4. | $32,000 |
| Jul 19, 2017 | Expired or cancelled cancelled Jan 2026 | 842 Guerrero St | mandatory soft story retrofit per ch 40Details
mandatory soft story retrofit per ch 40 | $9,500 |
| Jun 27, 2017 | Never finaled issued Jun 2017, no final | 1650 California St | replace tile in shower to comply with violation #2 work to occur in unit #7. n/a maherDetails
replace tile in shower to comply with violation #2 work to occur in unit #7. n/a maher | $1,200 |
| Jun 26, 2017 | Never finaled issued Feb 2018, no final | 1935 19th Av | to erect a one story, type v, pre manufactured classroom in parking of an (e) school.Details
to erect a one story, type v, pre manufactured classroom in parking of an (e) school. | $50,000 |
| Jun 21, 2017 | Never finaled issued Jun 2017, no final | 101 Quintara St | fix minor dryrot on garage parapet wall. nolf replace top plates and in-kind.Details
fix minor dryrot on garage parapet wall. nolf replace top plates and in-kind. | $1,200 |
| Jun 21, 2017 | Never finaled issued Jun 2017, no final | 642 Alvarado St | to comply with nov#201562201: hand rail, 8lf (plate) 42in height, 34in hand rail.Details
to comply with nov#201562201: hand rail, 8lf (plate) 42in height, 34in hand rail. | $250 |
| Feb 9, 2017 | Never finaled issued Mar 2017, no final | 240 Lombard St | #336 -r&r kitchen cabinets, sink, r&r bathroom vanity/sink in same location.Details
#336 -r&r kitchen cabinets, sink, r&r bathroom vanity/sink in same location. | $6,500 |
| Jan 26, 2017 | Expired or cancelled expired Jul 2022 | 3248 18th St | to complete work and obtain final inspection for work under pa # 201410108650. n/a maher ord. 155-13Details
to complete work and obtain final inspection for work under pa # 201410108650. n/a maher ord. 155-13 | $1,600 |
| Dec 6, 2016 | Completed final sign-off Aug 2017 | 177 Capp St | voluntary hold downs and shear plywood installation. (not comply with bldg code seismic upgarde requirement)Details
voluntary hold downs and shear plywood installation. (not comply with bldg code seismic upgarde requirement) | $15,000 |
| Sep 7, 2016 | Never finaled issued Sep 2016, no final | 2757 Harrison St | street spaceDetails
street space | |
| Aug 29, 2016 | Never finaled issued Aug 2016, no final | 183 Ellsworth St | replace existing rotted siding as existing rear of bldgDetails
replace existing rotted siding as existing rear of bldg | $800 |
| Aug 23, 2016 | Completed final sign-off Mar 2018 | 625 Haight St | revision to app#201409045432. revise layout ground floor unit. relocate bathroom and rehabilitate kitchen. n/a for maherDetails
revision to app#201409045432. revise layout ground floor unit. relocate bathroom and rehabilitate kitchen. n/a for maher | $60,000 |
| Aug 16, 2016 | Completed final sign-off Jun 2020 | 700 12th Av | unit 4 - interior renovations - new bathroom and new bedroom, no structural, no exterior.Details
unit 4 - interior renovations - new bathroom and new bedroom, no structural, no exterior. | $20,000 |
| Aug 4, 2016 | Completed final sign-off Aug 2017 | 1717 Mcallister St | revision to 2016-0601-8852, kitchen and bath renovation units 108, 307, 308. 10 skylightsDetails
revision to 2016-0601-8852, kitchen and bath renovation units 108, 307, 308. 10 skylights | $120,000 |
| Aug 2, 2016 | Completed final sign-off Nov 2016 | 20 Burnside Av | replace kitchen cabinets as existingDetails
replace kitchen cabinets as existing | $8,000 |
| Jun 13, 2016 | Completed final sign-off Jun 2020 | 700 12th Av | remodel 1 kitchen & 1 bathroom as existing. no alteration of wall, window & door.Details
remodel 1 kitchen & 1 bathroom as existing. no alteration of wall, window & door. | $33,950 |
| Jun 2, 2016 | Completed final sign-off Mar 2017 | 700 12th Av | interior renovation at unit 6: add bathroom, reconfigure for 3 bedrooms per plansDetails
interior renovation at unit 6: add bathroom, reconfigure for 3 bedrooms per plans | $15,000 |
| Jun 1, 2016 | Completed final sign-off Aug 2017 | 1717 Mcallister St | unit #309: kitchen and bathroom renovation, add 5 skylights. maher naDetails
unit #309: kitchen and bathroom renovation, add 5 skylights. maher na | $30,000 |
| May 10, 2016 | Never finaled issued May 2016, no final | 765 Burnett Av | #4 - one kitchen remodel, replace cabs. in small kitchen.Details
#4 - one kitchen remodel, replace cabs. in small kitchen. | $10,000 |
| May 10, 2016 | Never finaled issued May 2016, no final | 765 Burnett Av | #1 - one kitchen remodel, replace cabs. in small kitchen.Details
#1 - one kitchen remodel, replace cabs. in small kitchen. | $10,000 |
| Nov 24, 2015 | Completed final sign-off Jul 2016 | 150 Steiner St | to comply with nov# 201576452, replace single metal post (like for like) at front building corner.Details
to comply with nov# 201576452, replace single metal post (like for like) at front building corner. | $2,500 |
| Oct 5, 2015 | Completed final sign-off Feb 2017 | 2335 Pacific Av | unit 203: remodel bathroom, like-for-like, no changes to wall or fixture locations. to comply with nove #201565941 dated 8/28/2015.Details
unit 203: remodel bathroom, like-for-like, no changes to wall or fixture locations. to comply with nove #201565941 dated 8/28/2015. | $1,500 |
| Sep 23, 2015 | Completed final sign-off Sep 2015 | 2400 Van Ness Av | repair rear stairs in kind, less than 50%. to satisfy complaint #201570111Details
repair rear stairs in kind, less than 50%. to satisfy complaint #201570111 | $1,500 |
| Sep 15, 2015 | Completed final sign-off Aug 2017 | 2757 Harrison St | vertical addition above (e) 3rd floor. creation new 4th floor for top unit, new roof deck @ front of 4th floor addition & above. reconfigure 3rd floor bedroom & kitchen, add pocket doors to (e) space. ** maher: compliance with ordinance no# 155-13 not requied **Details
vertical addition above (e) 3rd floor. creation new 4th floor for top unit, new roof deck @ front of 4th floor addition & above. reconfigure 3rd floor bedroom & kitchen, add pocket doors to (e) space. ** maher: compliance with ordinance no# 155-13 not requied ** | $100,000 |
| Jul 29, 2015 | Completed final sign-off Jul 2015 | 629 Capp St | to comply with nov his#201557312, repair minor dryrot to back exterior stair (in kind), not to exceed 50%.Details
to comply with nov his#201557312, repair minor dryrot to back exterior stair (in kind), not to exceed 50%. | $1,500 |
| May 11, 2015 | Never finaled issued May 2015, no final | 1868 Mcallister St | remodel kitchen and bathroom as exist all (n) lite shall be led. replace exh fan @ bathroomDetails
remodel kitchen and bathroom as exist all (n) lite shall be led. replace exh fan @ bathroom | $12,000 |
| Feb 10, 2015 | Completed final sign-off Sep 2015 | 2295 California St | soft story retrofit per sfbc chapter 34b engineering criterioa fema p707Details
soft story retrofit per sfbc chapter 34b engineering criterioa fema p707 | $110,000 |
| Feb 10, 2015 | Completed final sign-off Sep 2016 | 204 Dore St | soft story retrofit per s ch 34 b engineering criteria 2012iebc appendix a4Details
soft story retrofit per s ch 34 b engineering criteria 2012iebc appendix a4 | $85,000 |
| Jan 8, 2015 | Completed final sign-off Oct 2016 | 700 12th Av | interior renovation at unit 3. new bathroom, new bedroom, kitchen finishesDetails
interior renovation at unit 3. new bathroom, new bedroom, kitchen finishes | $25,000 |
| Nov 18, 2014 | Completed final sign-off Apr 2015 | 274 05th Av | revision to appl. 2014.1105.0741. install 3 beams for additional support per plan.Details
revision to appl. 2014.1105.0741. install 3 beams for additional support per plan. | $3,000 |
| Oct 10, 2014 | Never finaled issued Nov 2014, no final | 3248 18th St | to comply with nov# 201468433. revision to pa# 201301258819. remove storage room and add (n) door per plans.Details
to comply with nov# 201468433. revision to pa# 201301258819. remove storage room and add (n) door per plans. | $1,600 |
| Oct 9, 2014 | Completed final sign-off Apr 2015 | 274 05th Av | remodel kitchen and bathroom, sheetrock unitDetails
remodel kitchen and bathroom, sheetrock unit | $18,000 |
| Sep 4, 2014 | Completed final sign-off Mar 2018 | 625 Haight St | horizontal rear addition to 2nd & 3rd floors w/ minor interior modificaitons (same footprint). code upgrades to commercial space, mech/electrical, structural upgradesDetails
horizontal rear addition to 2nd & 3rd floors w/ minor interior modificaitons (same footprint). code upgrades to commercial space, mech/electrical, structural upgrades | $130,000 |
| Jul 22, 2014 | Completed final sign-off Oct 2014 | 1281 06th Av | replace cabinets in kitchen as existing and countertop; to comply with cec150(k) 8Details
replace cabinets in kitchen as existing and countertop; to comply with cec150(k) 8 | $12,500 |
| Jun 5, 2014 | Expired or cancelled withdrawn Oct 2020 | 115 Valencia St | new light storage loft on ground floor.Details
new light storage loft on ground floor. | $10,000 |
| Jun 4, 2014 | Completed final sign-off Jun 2014 | 350 Treat Av | alter floor plan to permit 201402047810; provide new door, repair (e) walls and install window; compliance with ord 155-13 not required.Details
alter floor plan to permit 201402047810; provide new door, repair (e) walls and install window; compliance with ord 155-13 not required. | |
| May 22, 2014 | Completed final sign-off Aug 2014 | 105 Prospect Av | replace cabinets in 2 kitchens, replace tile in bathroom all as exist no wall modificationDetails
replace cabinets in 2 kitchens, replace tile in bathroom all as exist no wall modification | $18,000 |
| Mar 4, 2014 | Never finaled issued May 2014, no final | 550 Larkin St | all work done in #202- remove/add interior walls, relocate kitchen, lighting to modified spaces.Details
all work done in #202- remove/add interior walls, relocate kitchen, lighting to modified spaces. | $18,000 |
| Feb 7, 2014 | Completed final sign-off Jul 2014 | 550 Larkin St | remodel kitchen & bathroom as existing in unit # 202Details
remodel kitchen & bathroom as existing in unit # 202 | $12,000 |
| Feb 4, 2014 | Completed final sign-off Jul 2014 | 350 Treat Av | voluntary access upgrades to the main entrance restrooms and main stair. work also includes demo to small portion of roof and kitchenette and breakroom. 2nd exit added. mep and fire under separate permit. maher ordinance not requiredDetails
voluntary access upgrades to the main entrance restrooms and main stair. work also includes demo to small portion of roof and kitchenette and breakroom. 2nd exit added. mep and fire under separate permit. maher ordinance not required | $20,000 |
| Jan 22, 2014 | Completed final sign-off Jul 2014 | 350 Treat Av | demo extg partition wall, plumbing fixtures and a portion of the slab for future plumbing. work also includes minor electrical demo. no exterior work included in this permit. per ab-017Details
demo extg partition wall, plumbing fixtures and a portion of the slab for future plumbing. work also includes minor electrical demo. no exterior work included in this permit. per ab-017 | $3,500 |
| Nov 20, 2013 | Completed final sign-off Dec 2013 | 940 Jackson St | repair rear exterior stairs, less than 50%Details
repair rear exterior stairs, less than 50% | $1,200 |
| Nov 19, 2013 | Completed final sign-off Jul 2014 | 287 Page St | replace existing property line fence bordering page & laguna mini park, replace existing concrete site retaining wall at front property line and cap with decorative iron fencing.Details
replace existing property line fence bordering page & laguna mini park, replace existing concrete site retaining wall at front property line and cap with decorative iron fencing. | $30,000 |
| Sep 17, 2013 | Expired or cancelled expired Aug 2017 | 625 Haight St | fire damage repairs. comply with notice of violation 201305851. fire alarm installation under separate permitDetails
fire damage repairs. comply with notice of violation 201305851. fire alarm installation under separate permit | $600,000 |
| Jun 24, 2013 | Never finaled issued Jun 2013, no final | 1409 15th St | to obtain final inspection for work approved under pa #2008.05.02.1152. all work is complete.Details
to obtain final inspection for work approved under pa #2008.05.02.1152. all work is complete. | |
| Apr 12, 2013 | Never finaled issued Apr 2014, no final | 1240 California St | replacing in-kind side, manditory second egress, not visible from street. (stairs and landing)Details
replacing in-kind side, manditory second egress, not visible from street. (stairs and landing) | $15,000 |
| Apr 12, 2013 | Never finaled issued Apr 2013, no final | 665 Pine St | remodel kitchen-cabinets as (e) remodel kitchen, no change of walls. no change in lightingDetails
remodel kitchen-cabinets as (e) remodel kitchen, no change of walls. no change in lighting | $12,000 |
| Feb 11, 2013 | Expired or cancelled suspend Apr 2013 | 2205 Mission St | replace stucco at front facade of building in kind.Details
replace stucco at front facade of building in kind. | $1,200 |
| Jan 25, 2013 | Completed final sign-off Sep 2013 | 3248 18th St | equipment addition to existing restaurant facility. install walk-in cooler & dishwasher. install power door operator at front entrance.Details
equipment addition to existing restaurant facility. install walk-in cooler & dishwasher. install power door operator at front entrance. | $35,000 |
| Jan 23, 2013 | Completed final sign-off Jan 2013 | 115 Haight St | repair rear stairs less than 50% work not visible from streetDetails
repair rear stairs less than 50% work not visible from street | $1,500 |
| Jan 8, 2013 | Completed final sign-off Feb 2013 | 1790 Jackson St | one bathroom and wet bar, sink remodel.Details
one bathroom and wet bar, sink remodel. | $8,000 |
| Jan 8, 2013 | Never finaled issued Jan 2013, no final | 550 South Van Ness Av | repair 20 lf of fence at rear yard. (6' feet high fence). common area.Details
repair 20 lf of fence at rear yard. (6' feet high fence). common area. | $1,850 |
| Dec 20, 2012 | Completed final sign-off Oct 2013 | 849 Divisadero St | replace in kind rear mandatory 2nd means of egressDetails
replace in kind rear mandatory 2nd means of egress | $12,000 |
| Dec 20, 2012 | Completed final sign-off Oct 2013 | 833 Divisadero St | replace in kind rear mandatory 2nd means of egressDetails
replace in kind rear mandatory 2nd means of egress | $12,000 |
| Dec 20, 2012 | Expired or cancelled cancelled Mar 2016 | 1208 Cole St | foundation upgrade at rear. 5 new interior footingsDetails
foundation upgrade at rear. 5 new interior footings | $13,000 |
| Nov 30, 2012 | Completed final sign-off Feb 2013 | 3475 16th St | to comply w/ complaint #201279101. add five storage spaces to basement.Details
to comply w/ complaint #201279101. add five storage spaces to basement. | $800 |
| Nov 27, 2012 | Never finaled issued Nov 2012, no final | 503 Waller St | remodel kitchen & bathroom in kind.Details
remodel kitchen & bathroom in kind. | $18,000 |
| Nov 19, 2012 | Completed final sign-off Nov 2012 | 2112 Hyde St | re-epoxy existing deck, patch hole, in sheetrock @ garage areaDetails
re-epoxy existing deck, patch hole, in sheetrock @ garage area | $1,200 |
| Nov 19, 2012 | Never finaled issued Nov 2012, no final | 401 Irving St | replace mop sink, replace 1 light fixture and 1 non fire rated interior doorDetails
replace mop sink, replace 1 light fixture and 1 non fire rated interior door | $1,225 |
| Oct 4, 2012 | Completed final sign-off Feb 2014 | 2791 16th St | minor repair to comply with nov 201234101, 201234001, pid 201297793. concrete patch replacement at furnace room roof. fire wrap on ceiling of furnace room. repair lightwell roof leaks, attach e flue straps to building. cut down rear fence to less than 6ft.Details
minor repair to comply with nov 201234101, 201234001, pid 201297793. concrete patch replacement at furnace room roof. fire wrap on ceiling of furnace room. repair lightwell roof leaks, attach e flue straps to building. cut down rear fence to less than 6ft. | $5,000 |
| Sep 24, 2012 | Completed final sign-off Oct 2013 | 773 Cole St | voluntary seismic upgrade of soft-story.replace garage door in kind.Details
voluntary seismic upgrade of soft-story.replace garage door in kind. | $20,000 |
| Sep 18, 2012 | Expired or cancelled expired Oct 2014 | 320 Judah St | repair dryrot in east wall at 1st floor (40% of the front wall)Details
repair dryrot in east wall at 1st floor (40% of the front wall) | $3,000 |
| Aug 14, 2012 | Completed final sign-off Oct 2013 | 1367 Kansas St | lower level of room downstairs 80 ceiling height will be legal, room for storageDetails
lower level of room downstairs 80 ceiling height will be legal, room for storage | $3,600 |
| Aug 14, 2012 | Completed final sign-off Sep 2012 | 438 Lily St | repair rear stairs less than 50% in kindDetails
repair rear stairs less than 50% in kind | $1,200 |
| Jul 11, 2012 | Completed final sign-off Aug 2012 | 59 La Grande Av | rebuild rear stairs and landing as existingDetails
rebuild rear stairs and landing as existing | $2,200 |
| May 3, 2012 | Never finaled issued May 2012, no final | 1101 Holloway Av | replace shower and sink in downstairs bathroom.Details
replace shower and sink in downstairs bathroom. | $1,800 |
| May 3, 2012 | Never finaled issued May 2012, no final | 20 Romolo Pl | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $10,000 |
| Apr 26, 2012 | Never finaled issued Apr 2012, no final | 574 03rd Av | replace door from basement to yardDetails
replace door from basement to yard | $250 |
| Mar 26, 2012 | Completed final sign-off Jul 2013 | 340 Spruce St | repair 9 porches as existing flooring, less than 50% in kind repair.Details
repair 9 porches as existing flooring, less than 50% in kind repair. | $9,500 |
| Mar 2, 2012 | Never finaled issued Mar 2012, no final | 3 Commonwealth Av | unit #8: remodel kitchen and bathroom, (n) lights, cabinets and counters, comply with cec 150(k) lighting requirements, no change to exhaust systemDetails
unit #8: remodel kitchen and bathroom, (n) lights, cabinets and counters, comply with cec 150(k) lighting requirements, no change to exhaust system | $2,500 |
| Jan 19, 2012 | Never finaled issued Jan 2012, no final | 1023 Natoma St | correct violation #201069167; to comply with comp #201069167; repair wall and ceiling water damage 201175933, 201010052272 for finalDetails
correct violation #201069167; to comply with comp #201069167; repair wall and ceiling water damage 201175933, 201010052272 for final | $250 |
| Jan 17, 2012 | Completed final sign-off Oct 2014 | 1040 Folsom St | rehabilitation of building damaged by fire (no changes to layout) repairs of roof, walls, floor finishes and windows. mechanical & electrical upgrades. fire sprinklers and fire alarm on separate permits.Details
rehabilitation of building damaged by fire (no changes to layout) repairs of roof, walls, floor finishes and windows. mechanical & electrical upgrades. fire sprinklers and fire alarm on separate permits. | $150,000 |
| Jan 9, 2012 | Completed final sign-off Mar 2012 | 1407 15th St | comply with nov# 20118610-install handrails & repair sidingDetails
comply with nov# 20118610-install handrails & repair siding | $1,200 |
| Dec 19, 2011 | Never finaled issued Dec 2011, no final | 925 Cole St | build 1 foot high wire fence at top of existing block wall.Details
build 1 foot high wire fence at top of existing block wall. | $1,500 |
| Dec 12, 2011 | Never finaled issued Dec 2011, no final | 1864 Mcallister St | remodel kitchen as existing, kitchen lighting wattage,min 50% from high efficiency lightsDetails
remodel kitchen as existing, kitchen lighting wattage,min 50% from high efficiency lights | $3,000 |