Block 1038, lot 001
3 Commonwealth Ave
- City’s use
- Multi-Family Residential
- Built
- 1921
- Stories
- 3
- Units
- 9
- Rooms
- 9 bedrooms, 9 bathrooms
- Building
- 9,540 sq ft
- Lot
- 4,485 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 1, 2022 | Completed final sign-off Feb 2023 | 3 Commonwealth Av | Crime Watch Security Sys Llc | like for like fa system replacement with new control panel, smoke detectors and pull stations at the same locations. replace (e) bells with new horn/strobes, install lf horns inside all units. install new radio near control panel.Details
like for like fa system replacement with new control panel, smoke detectors and pull stations at the same locations. replace (e) bells with new horn/strobes, install lf horns inside all units. install new radio near control panel. | $16,000 |
| May 29, 2020 | Expired or cancelled cancelled Jan 2026 | 3 Commonwealth Av | Architectural Fenestration & Restoration | remove and replace stucco and substrate wall where leaking on south side front section where leaking. add insulation to stud cavity. re stucco, repaint. not street facing.Details
remove and replace stucco and substrate wall where leaking on south side front section where leaking. add insulation to stud cavity. re stucco, repaint. not street facing. | $38,500 |
| Aug 5, 2019 | Completed final sign-off Feb 2020 | 3 Commonwealth Av | Custom Construction Enterprises | per 604 report, replace in kind partially dryrot stairs at back of house.Details
per 604 report, replace in kind partially dryrot stairs at back of house. | $20,000 |
| Dec 28, 2016 | Completed final sign-off Apr 2018 | 3 Commonwealth Av | Sgv Group Construction | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4; n/a maherDetails
soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4; n/a maher | $75,000 |
| Feb 6, 2015 | Completed final sign-off Apr 2015 | 3 Commonwealth Av | Make Ready Maintenance Inc | kitchen & bathroom remodel, no windows or structural.Details
kitchen & bathroom remodel, no windows or structural. | $27,000 |
| Aug 8, 2013 | Never finaled issued Aug 2013, no final | 3 Commonwealth Av | M Rivera Construction Inc. | replace cabinets in kitchen, replace toilet & tub in the bathroom, no lighting work under this permitDetails
replace cabinets in kitchen, replace toilet & tub in the bathroom, no lighting work under this permit | $6,500 |
| Mar 2, 2012 | Never finaled issued Mar 2012, no final | 3 Commonwealth Av | Rivera Construction | unit #8: remodel kitchen and bathroom, (n) lights, cabinets and counters, comply with cec 150(k) lighting requirements, no change to exhaust systemDetails
unit #8: remodel kitchen and bathroom, (n) lights, cabinets and counters, comply with cec 150(k) lighting requirements, no change to exhaust system | $2,500 |
| May 22, 2008 | Never finaled issued May 2008, no final | 3 Commonwealth Av | Young's Roofing, Inc. | reroofing. | $23,500 |
| Mar 5, 2007 | Expired or cancelled cancelled May 2007 | 3 Commonwealth Av | On-Site Maintenance | apt.#7 - bathroom remodel in kind. no structural changes. building, plumbing & electrical code upgrade. no window or door work.Details
apt.#7 - bathroom remodel in kind. no structural changes. building, plumbing & electrical code upgrade. no window or door work. | $9,000 |
| Apr 28, 2005 | Never finaled issued Apr 2005, no final | 3 Commonwealth Av | street space permit | ||
| Mar 17, 2005 | Never finaled issued Mar 2005, no final | 3 Commonwealth Av | On-Site Maintenance | replace olk kitchen abinets w/(n) tub, banity, tile around bath tub. (apt.4)Details
replace olk kitchen abinets w/(n) tub, banity, tile around bath tub. (apt.4) | $10,000 |
| Mar 17, 2005 | Completed final sign-off Jun 2005 | 3 Commonwealth Av | On-Site Maintenance | replace olk kitchen abinets w/(n) tub, cabinets, tile around bath tub. (apt.5)Details
replace olk kitchen abinets w/(n) tub, cabinets, tile around bath tub. (apt.5) | $10,000 |
| Mar 14, 2005 | Never finaled issued Mar 2005, no final | 3 Commonwealth Av | streetspace |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- On-Site Maintenance (3), Architectural Fenestration & Restoration, Crime Watch Security Sys Llc, Custom Construction Enterprises, M Rivera Construction Inc., Make Ready Maintenance Inc, Rivera Construction, Sgv Group Construction, Young's Roofing, Inc.
- Designers
- Crime Watch Security Systems
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.