Back to bathroom remodel contractors
Rivera Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2025
- Last 24 months
- 1 permit filed
250 permits since 2000: 141 completed, 2 in progress, 63 never finaled, 44 expired or cancelled.
Of the 63 never-finaled permits, 1 is 3 to 5 years old, 10 are 5 to 10 years old, 52 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
42 bathroom remodel permits: 26 completed, 1 in progress, 11 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2021 | Completed final sign-off Apr 2023 | 101 Quintara St | replace kitchen cabinets as existing: replace tiles and vanity in three bathroomsDetails
replace kitchen cabinets as existing: replace tiles and vanity in three bathrooms | $12,000 |
| Sep 30, 2020 | Completed final sign-off Dec 2020 | 755 Burnett Av | apt 8: remodel kitchen & bathroom, in-kind.Details
apt 8: remodel kitchen & bathroom, in-kind. | $12,000 |
| Sep 30, 2020 | Completed final sign-off Dec 2020 | 1 Fair Oaks St | apt 5: remodel kitchen & bathroom in-kind.Details
apt 5: remodel kitchen & bathroom in-kind. | $12,000 |
| Oct 15, 2019 | In progress issued Feb 2024 | 1166 Capitol Av | unit b on 1st flr will be legalized pursuant to ord 43-14. included 2 bedrooms, 1 kitchen, 1 living room & 2 bathrooms. legalizing unpermit/as-built rear addition on 1st & 2nd floor, expand as-buildt roof deck @ 2nd floor, remove unpermit shed @ rear yard under separate permit bpa# 202009154186.Details
unit b on 1st flr will be legalized pursuant to ord 43-14. included 2 bedrooms, 1 kitchen, 1 living room & 2 bathrooms. legalizing unpermit/as-built rear addition on 1st & 2nd floor, expand as-buildt roof deck @ 2nd floor, remove unpermit shed @ rear yard under separate permit bpa# 202009154186. | $40,000 |
| May 14, 2019 | Never finaled issued May 2019, no final | 151 Galewood Cr | replace tile bath tub in kind.Details
replace tile bath tub in kind. | $3,500 |
| Aug 27, 2018 | Completed final sign-off Feb 2022 | 795 Burnett Av | #1: remodel kitchen & bathroom as existing. 70sq ft kitchen. 35sq ft bathroom.Details
#1: remodel kitchen & bathroom as existing. 70sq ft kitchen. 35sq ft bathroom. | $12,000 |
| May 7, 2018 | Completed final sign-off Nov 2018 | 3939 18th St | unit 3943: remodel kitchen and bathroom, replace (e) sliding patio door in-kind, (4) windows as (e), new flooring in kitchen & bathDetails
unit 3943: remodel kitchen and bathroom, replace (e) sliding patio door in-kind, (4) windows as (e), new flooring in kitchen & bath | $15,000 |
| Feb 26, 2018 | Completed final sign-off Dec 2019 | 1388 California St | relocation of new ada bathroom at bottom flr - southwest corner (empty space). detail change per approved plan ref 201501307116Details
relocation of new ada bathroom at bottom flr - southwest corner (empty space). detail change per approved plan ref 201501307116 | $5,000 |
| Feb 9, 2017 | Never finaled issued Mar 2017, no final | 240 Lombard St | #336 -r&r kitchen cabinets, sink, r&r bathroom vanity/sink in same location.Details
#336 -r&r kitchen cabinets, sink, r&r bathroom vanity/sink in same location. | $6,500 |
| Aug 23, 2016 | Completed final sign-off Mar 2018 | 625 Haight St | revision to app#201409045432. revise layout ground floor unit. relocate bathroom and rehabilitate kitchen. n/a for maherDetails
revision to app#201409045432. revise layout ground floor unit. relocate bathroom and rehabilitate kitchen. n/a for maher | $60,000 |
| Aug 16, 2016 | Completed final sign-off Jun 2020 | 700 12th Av | unit 4 - interior renovations - new bathroom and new bedroom, no structural, no exterior.Details
unit 4 - interior renovations - new bathroom and new bedroom, no structural, no exterior. | $20,000 |
| Aug 4, 2016 | Completed final sign-off Aug 2017 | 1717 Mcallister St | revision to 2016-0601-8852, kitchen and bath renovation units 108, 307, 308. 10 skylightsDetails
revision to 2016-0601-8852, kitchen and bath renovation units 108, 307, 308. 10 skylights | $120,000 |
| Jun 13, 2016 | Completed final sign-off Jun 2020 | 700 12th Av | remodel 1 kitchen & 1 bathroom as existing. no alteration of wall, window & door.Details
remodel 1 kitchen & 1 bathroom as existing. no alteration of wall, window & door. | $33,950 |
| Jun 2, 2016 | Completed final sign-off Mar 2017 | 700 12th Av | interior renovation at unit 6: add bathroom, reconfigure for 3 bedrooms per plansDetails
interior renovation at unit 6: add bathroom, reconfigure for 3 bedrooms per plans | $15,000 |
| Jun 1, 2016 | Completed final sign-off Aug 2017 | 1717 Mcallister St | unit #309: kitchen and bathroom renovation, add 5 skylights. maher naDetails
unit #309: kitchen and bathroom renovation, add 5 skylights. maher na | $30,000 |
| Oct 5, 2015 | Completed final sign-off Feb 2017 | 2335 Pacific Av | unit 203: remodel bathroom, like-for-like, no changes to wall or fixture locations. to comply with nove #201565941 dated 8/28/2015.Details
unit 203: remodel bathroom, like-for-like, no changes to wall or fixture locations. to comply with nove #201565941 dated 8/28/2015. | $1,500 |
| May 11, 2015 | Never finaled issued May 2015, no final | 1868 Mcallister St | remodel kitchen and bathroom as exist all (n) lite shall be led. replace exh fan @ bathroomDetails
remodel kitchen and bathroom as exist all (n) lite shall be led. replace exh fan @ bathroom | $12,000 |
| Jan 8, 2015 | Completed final sign-off Oct 2016 | 700 12th Av | interior renovation at unit 3. new bathroom, new bedroom, kitchen finishesDetails
interior renovation at unit 3. new bathroom, new bedroom, kitchen finishes | $25,000 |
| Oct 9, 2014 | Completed final sign-off Apr 2015 | 274 05th Av | remodel kitchen and bathroom, sheetrock unitDetails
remodel kitchen and bathroom, sheetrock unit | $18,000 |
| May 22, 2014 | Completed final sign-off Aug 2014 | 105 Prospect Av | replace cabinets in 2 kitchens, replace tile in bathroom all as exist no wall modificationDetails
replace cabinets in 2 kitchens, replace tile in bathroom all as exist no wall modification | $18,000 |
| Feb 7, 2014 | Completed final sign-off Jul 2014 | 550 Larkin St | remodel kitchen & bathroom as existing in unit # 202Details
remodel kitchen & bathroom as existing in unit # 202 | $12,000 |
| Jan 8, 2013 | Completed final sign-off Feb 2013 | 1790 Jackson St | one bathroom and wet bar, sink remodel.Details
one bathroom and wet bar, sink remodel. | $8,000 |
| Nov 27, 2012 | Never finaled issued Nov 2012, no final | 503 Waller St | remodel kitchen & bathroom in kind.Details
remodel kitchen & bathroom in kind. | $18,000 |
| May 3, 2012 | Never finaled issued May 2012, no final | 20 Romolo Pl | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $10,000 |
| May 3, 2012 | Never finaled issued May 2012, no final | 1101 Holloway Av | replace shower and sink in downstairs bathroom.Details
replace shower and sink in downstairs bathroom. | $1,800 |
| Mar 2, 2012 | Never finaled issued Mar 2012, no final | 3 Commonwealth Av | unit #8: remodel kitchen and bathroom, (n) lights, cabinets and counters, comply with cec 150(k) lighting requirements, no change to exhaust systemDetails
unit #8: remodel kitchen and bathroom, (n) lights, cabinets and counters, comply with cec 150(k) lighting requirements, no change to exhaust system | $2,500 |
| Sep 22, 2010 | Never finaled issued Sep 2010, no final | 665 Pine St | change tile in bathroom, replace cabinets in kitchen in unit # 903, 9th floor.Details
change tile in bathroom, replace cabinets in kitchen in unit # 903, 9th floor. | $2,010 |
| Jun 28, 2010 | Completed final sign-off Nov 2010 | 333 Douglass St | remodel existing lower unit and add new full bath room. expand existin kitchen, convert (e) study room to new bedroom. existing deck to remain.Details
remodel existing lower unit and add new full bath room. expand existin kitchen, convert (e) study room to new bedroom. existing deck to remain. | $9,000 |
| Oct 30, 2008 | Completed final sign-off Oct 2009 | 183 Broad St | revision to 200404060498. as-built storage room at the 1st floor. instead of bathroom & walk-in closet.Details
revision to 200404060498. as-built storage room at the 1st floor. instead of bathroom & walk-in closet. | |
| Oct 15, 2008 | Expired or cancelled expired May 2011 | 839 Leavenworth St | install new door the existing bathroom in storage room as existing basement area. patch holes in sheetrock walls. install receptacles lights. replace toilet & sink.Details
install new door the existing bathroom in storage room as existing basement area. patch holes in sheetrock walls. install receptacles lights. replace toilet & sink. | $500 |
| Aug 27, 2008 | Completed final sign-off Nov 2008 | 27 Alta Mar Wy | replace bathtub & sink in main bathroom main floor. laundry service to adjacent room garage relocate. no new lighting.Details
replace bathtub & sink in main bathroom main floor. laundry service to adjacent room garage relocate. no new lighting. | $2,500 |
| May 2, 2008 | Never finaled issued May 2008, no final | 1409 15th St | install tile in 1 bathroom floor, shower. replace sink, faucet & toilet. no change to window, doors or exit.Details
install tile in 1 bathroom floor, shower. replace sink, faucet & toilet. no change to window, doors or exit. | $3,000 |
| Apr 29, 2008 | Never finaled issued May 2008, no final | 1726 36th Av | revision for 200705020218, steel column and beam at garage level. revised steel frame and related foundation design to avoid demolition of existing kitchen and bathroom finishesDetails
revision for 200705020218, steel column and beam at garage level. revised steel frame and related foundation design to avoid demolition of existing kitchen and bathroom finishes | |
| May 25, 2007 | Expired or cancelled expired May 2011 | 3353 Folsom St | demo & rebuild 1st floor storage and add bathroom , bedroom, laundry with higher ceiling. reconfigure 2nd floor with new finisher, kitchen, bath. remodel kitchen & bath on 3rd floor, add storage, reguild rear staris, new roof.Details
demo & rebuild 1st floor storage and add bathroom , bedroom, laundry with higher ceiling. reconfigure 2nd floor with new finisher, kitchen, bath. remodel kitchen & bath on 3rd floor, add storage, reguild rear staris, new roof. | $275,000 |
| Apr 10, 2007 | Expired or cancelled expired Aug 2017 | 701 43rd Av | relocate ground floor bath, create bedroom. add rear deck 3' or less at extend bedroom.Details
relocate ground floor bath, create bedroom. add rear deck 3' or less at extend bedroom. | $22,000 |
| Jun 9, 2006 | Completed final sign-off Dec 2007 | 1051 Geneva Av | comply nov 200563627. ground floor development, to allow for a half-bath, laundry sink, bedroom, office all associated with the dwelling unit above, per variance denial case 2006-0370v.Details
comply nov 200563627. ground floor development, to allow for a half-bath, laundry sink, bedroom, office all associated with the dwelling unit above, per variance denial case 2006-0370v. | $7,000 |
| Oct 28, 2005 | Completed final sign-off Jun 2006 | 3734 Broderick St | remodel bathroom in kind,replace fixtures & tile.Details
remodel bathroom in kind,replace fixtures & tile. | $5,000 |
| Dec 13, 2004 | Completed final sign-off Feb 2005 | 1284 Mission St | revision to pa# 2004/11/19/9762 move bathroom to different location.Details
revision to pa# 2004/11/19/9762 move bathroom to different location. | $3,000 |
| Jun 24, 2004 | Never finaled issued Aug 2004, no final | 3526 Washington St | remodel kichen 3526. add bathroom, 2 rooms lower lever. remodel upper 2 bathroom & 2 mezz too big. (Details
remodel kichen 3526. add bathroom, 2 rooms lower lever. remodel upper 2 bathroom & 2 mezz too big. ( | $6,500 |
| Jan 14, 2004 | Expired or cancelled expired May 2004 | 1578 Fell St | repair shower in unit# 3, repair bathroom in unit #1 (repair tile)Details
repair shower in unit# 3, repair bathroom in unit #1 (repair tile) | $1,200 |
| Dec 3, 2003 | Completed final sign-off Jan 2004 | 50 Arnold Av | revise to app #2003/05/27/5560 to include remodel kitchen and bathroom on main floor and build aDetails
revise to app #2003/05/27/5560 to include remodel kitchen and bathroom on main floor and build a | $14,000 |
| May 27, 2003 | Completed final sign-off Jan 2004 | 50 Arnold Av | addition of bedroom + bathroom, wetbar wall heater (gas) fireplace (gas only).Details
addition of bedroom + bathroom, wetbar wall heater (gas) fireplace (gas only). | $6,000 |